Pompa Submersible Sumur 300QJR

Nindakake pangolahan OEM! Miturut syarat pangguna, desain lan pabrik macem-macem jinis syarat khusus motor lan pompa submersible non-standar. Standar implementasi produk: GB / T2816-2014 "pompa submersible sumur", GB / T2818-2014 "motor asinkron sumur submersible". WhatsApp: 17855846335
PDF DOWNLOAD
Rincian
Tag
 
Ringkesan produk

This hot water pump adopts the motor made of 50W400 grade high quality cold rolled silicon steel, which is stamped by high speed punch press. It has the advantages of low stator iron loss and low self-heating. The motor winding is designed for hot water pump, high temperature resistance and anti-aging. The winding has water resistance, and adopts 3CR13 stainless steel blade shaft, high temperature resistant bushing and other high quality accessories to enable it to operate for a long time at high temperature, and can be used with frequency converter, so as to automatically adjust according to the amount of water used. This hot water pump is the ideal choice for your hot water equipment, which can operate stably and efficiently, providing you with a lasting hot water supply.

 

 
Katentuan Pangginaan supados langkung

The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply submersible pump. With water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not more than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not more than 1.5mg/L; chloride ion content is not more than 400mg/L. The electric pump adopts closed or water sealed wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, and then tighten the water and air bolts, otherwise not to use. Its work should be completely immersed in water, immersion depth is not more than 70 meters, the distance between the bottom of the pump and the bottom of the well is not less than 3 meters. Well water inflow quantity should be able to meet the electric pump water output and continuous operation, the output water quantity should be controlled at 0.7-1.2 times of the rated flow. The well should be vertical, the electric pump can not be used horizontally or inclined, only vertically placed. The electric pump must be equipped with cables and external overload protection device as required. It is strictly prohibited to conduct no-load test under no water condition.

 

 
Arti Model

Read More About submersible well pumps

 

 
Referensi Model parsial
Model Aliran (m3/jam) sirah
(m)

Kacepetan puteran

(ganti/titik)

Pompa banyu (%)  Outlet
diameteripun
(mm)
Ditrapake kanthi apik
diameteripun (mm) 
 Dirating
power(KW)
Dirating
tegangan (V)
Dirating
saiki (A)
Efisiensi motor (%) faktor daya φ   Unit
Ukuran maksimal Radial (mm)
Tetembungane
300QJ200-40 200 40 2900 76 150  300ndhuwur 37 380 77.8 85.0 0.85 281  
300QJ200-60 60 55 115 85.5 0.85  
300QJ200-80 80 75 154.1 86.0 0.86  
300QJ200-100 100 90 183.8 86.5 0.86  
300QJ200-120 120 100 204.3 86.5 0.86  
300QJ200-140 140 125 249.5 87.5 0.87  
300QJ200-160 160 140 277.8 88.0 0.87  
300QJ200-180 180 160 317.5 88.0 0.87  
300QJ200-200 200 185 367.2 88.0 0.87  
300QJ200-240 240 220 436.6 88.0 0.87  
300QJ320-30 320 30 2900 77 200  300ndhuwur 45 380 94.6 85.0 0.85 281  
300QJ320-60 60 90 183.8 86.5 0.86  
300QJ320-90 90 125 249.5 87.5 0.87  
300QJ320-120 120 160 317.5 88.0 0.87  

 

 
Pancegahan Safety

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, strictly miturut pranata angkat pump, sawetara aliran nggunakake, kanggo nyegah aliran kurang utawa angkat dhuwur pumping pasukan, bantalan tikaman lan bagean liyane saka nyandhang, kakehan motor burned

6, sawise pump mudhun sumur, pangukuran motor kanggo resistance insulasi lemah ngirim ora kurang saka 100M, sawise miwiti kanggo mirsani voltase lan saiki, mriksa motor nduwurke tumpukan jampel, apa ing baris karo syarat; suhu lokasi panyimpenan pump yen kurang saka titik beku, kudu garing banyu ing growong motor, nyegah karusakan es banyu growong motor disebabake kurang suhu.

 

 
Pambuka kanggo Struktur

The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other components. The main characteristic of this product is that the motor is a water-cooled submersible three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom is used to adjust the expansion-contraction pressure difference in the body caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed at the bottom of the motor. The lubrication of the motor and the pump bearing is realized through water lubrication. The stator winding of the motor is made of high-quality well motor winding wire, with high insulation performance. The pump is designed by computer CAD, with simple structure and good technical performance.

Read More About 4 inch deep well submersible pump
 
Instal

(1) Preparation sadurunge instalasi:
1. Priksa manawa pompa submersible cocog karo kahanan panggunaan lan ruang lingkup sing ditemtokake ing manual.
2. Nggunakake obiect abot karo diameteripun witjaksono menyang diameteripun njaba maksimum pump submersible, ngukur apa inneldiameter saka wellbore bisa pas pump submersible, lan ngukur apa ambane sumur meets syarat instalasi.
3. Priksa manawa sumur sumur resik lan banyu sumur keruh. Aja nggunakake pompa listrik submersible kanggo ngumbah lendhut pompa welor lan banyu pasir supaya ora rusak sadurunge pompa listrik submersible.
4. Priksa manawa posisi clamp instalasi welhead cocok lan apa bisa tahan kualitas kabeh unit
5. Priksa manawa komponen pompa submersible wis lengkap lan dipasang kanthi bener miturut diagram perakitan ing manual Copot layar panyaring lan puterake kopling kanggo ndeleng apa rotasi kanthi fleksibel
6. Copot sekrup banyu lan isi rongga motor kanthi banyu sing resik lan ora korosif (cathetan, manawa kanggo ngisi), banjur kencengake sekrup banyu. Sawise 12 jam injeksi banyu, ing resistance jampel saka motor ngirim ora kurang saka 150M Q nalika diukur karo 500V goyang meja.
7. Sambungan kabel, ngethok lengen karet 120mm saka siji ujung kabel sing metu lan kabel sing cocog karo piso tukang listrik banjur stagger dawa telung kabel inti ing wangun stepped, copot inti tembaga 20mm, scrape saka oksida lapisan ing njaba kabel tembaga karo piso utawa kain wedhi, lan masang loro kabel disambungake ends ing palirs.Sawise naleni lapisan tightly karo kabel tembaga nggoleki, solder iku sak tenane lan kuwat, lan wedhi sembarang. burrs ing lumahing. Banjur, kanggo telung joints, gunakake tape insulasi polyvester kanggo mbungkus kanthi cara setengah ditumpuk kanggo telung laver. Bungkus rong ujung lapisan bungkus kanthi kenceng karo benang nyion, banjur gunakake cara setengah ditumpuk kanggo mbungkus tape kanggo telung lapisan. Bungkus outellayer kanthi tape insulasi tekanan dhuwur kanggo telung lapisan. Pungkasan, lempitan telung untaian lan bola-bali bungkus limang lapisan kanthi tape tekanan dhuwur. Saben lapisan kudu tightly disambungake, lan joints interlayer kudu nyenyet lan fimm kanggo nyegah banyu saka penetrating lan ngrusak jampel, Sawise mbungkus, rendhem ing banyu ing suhu kamar saka 20 'c kanggo 12 jam, lan ngukur resistance jampel karo goyang meja. , sing ngirim ora kurang saka 100M Ω

 

Diagram proses pengkabelan kabel minangka nderek:
Read More About submersible well water pump

 

8. Gunakake multimeter kanggo mriksa apa kabel telung phase disambungake lan apa resistance DC kira-kira imbang.
9. Priksa manawa sirkuit lan trafo kapasitas overloaded, lan banjur nyambungake ngalih pangayoman kakehan utawa miwiti peralatan. Waca Tabel 2 kanggo model tartamtu, banjurPour ember banyu menyang kumpa banyu saka stopkontak pump banyu kanggo lubricate bantalan karet ing kumpa, lan banjur sijine pump listrik submersible mujur lan ajeg.Mulai (ora luwih saka siji detik) lan priksa manawa arah setir cocog karo tandha setir. Yen ora, ganti loro konektor kabel telung fase. Banjur pasang filter lan siyap mudhun sumur. Yen digunakake ing acara khusus (kayata selokan, selokan, kali, blumbang, blumbang, lan sapiturute), pompa listrik kudu dilebokake kanthi andal.

 

(2) Peralatan lan piranti instalasi:
1. Siji pasang rentengan ngangkat luwih saka rong ton.
2. Tripod kanthi dhuwur vertikal ora kurang saka patang meter.
3. Rong tali gantung (tali kawat) sing bisa nanggung bobot luwih saka siji ton (bisa nanggung bobot saka set lengkap pompa banyu).
4. Pasang rong pasang clamps (splints).
5. Kunci pas, palu, obeng, piranti lan piranti listrik, lsp.

 

(3) Instalasi pompa listrik:
1. Diagram instalasi pompa listrik submersible ditampilake ing Gambar 2. Dimensi instalasi spesifik ditampilake ing Tabel 3 "Dhaptar Dimensi Instalasi Pompa Listrik Submersible".

2. Pompa listrik submersible kanthi sirah kurang saka 30 meter bisa diangkat langsung menyang sumur nggunakake selang lan tali kawat utawa tali rami liyane sing bisa nanggung bobot kabeh mesin, pipa banyu, lan banyu ing pipa.

3. Pumps kanthi sirah luwih saka 30 meter nggunakake pipa baja, lan urutan instalasi kaya ing ngisor iki:
①Gunakake penjepit kanggo ngapit ujung ndhuwur bagean pompa banyu (motor lan pompa banyu wis disambungake ing wektu iki), angkat nganggo rantai gantung, lan alon-alon dasi menyang sumur nganti pasang clamp ing sirah sumur lan copot ranté gantung.
② Gunakake sepasang klem liyane kanggo njepit pipa, angkat nganggo rante gantung 15 cm adoh saka flange, banjur mudhunake alon-alon. Antarane flange pipe lan flange pumpLebokake pad karet ing panggonan lan kenceng pipa lan pompa roto-roto nganggo bolts, perkakas lan spring washers.
③ Angkat pompa submersible rada, copot clamp ing mburi ndhuwur pump banyu, dasi kabel kuwat menyang pipa banyu karo plastik tape, lan alon dasi mudhun nganti Clamp diselehake ing wellhead.
④Gunakake cara sing padha kanggo naleni kabeh pipa banyu menyang sumur.
⑤Sawise kabel timbal-metu disambungake menyang saklar kontrol, disambungake menyang sumber daya telung fase.


(4) Bab sing kudu digatekake sajrone instalasi:
1. Yen ana fenomena jamming nalika proses pumping, nguripake utawa narik pipa banyu kanggo ngatasi titik jamming. Yen macem-macem langkah isih ora bisa, please Aja meksa kumpa mudhun kanggo ngindhari karusakan ing pompa listrik submersible lan sumur.
2. Sajrone instalasi, pad karet kudu diselehake ing flange saben pipa lan tightened roto-roto.
3. Nalika pompa banyu diturunake menyang sumur, kudu diselehake ing tengah pipa sumur supaya pompa ora mlaku ing tembok sumur nganti suwe, nyebabake pompa kedher lan motor nyapu lan diobong. .
4. Nemtokake ambane pompa banyu ing ngisor sumur miturut kondisi pasir lan lempung sing mili. Aja ngubur pompa ing lendhut. Jarak saka pompa banyu menyang dhasar sumur umume ora kurang saka 3 meter (pirsani Gambar 2).
5. Ambane entri banyu saka pompa banyu kudu ora kurang saka 1-1,5 meter saka tingkat banyu dinamis menyang simpul inlet banyu (pirsani Gambar 2). Yen ora, bantalan pompa banyu bisa gampang rusak.
6. Angkat pompa banyu ora bisa sithik banget. Yen ora, katup gapura kudu dipasang ing pipa banyu sumur kanggo ngontrol aliran pompa ing titik aliran sing dirating kanggo nyegah motor kakehan lan kobong amarga tingkat aliran gedhe.
7. Nalika pompa banyu mlaku, output banyu kudu terus-terusan lan malah, arus kudu stabil (ing kondisi kerja sing dirating, umume ora luwih saka 10% saka arus sing dirating), lan ora ana getaran utawa gangguan. Yen ana kelainan, mesin kudu mandheg kanggo ngerteni sababe lan ngilangi.
8. Nalika nginstal, mbayar manungsa waé menyang setelan saka kabel grounding motor (ndeleng Figure 2). Nalika pipa banyu minangka pipa baja, mimpin saka clamp wellhead; nalika pipa banyu minangka pipa plastik, mimpin saka tandha grounding pompa listrik.

 

 
Maintenance lan Maintenance

 After installation of the underwater pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether the connection between the instrument and the starting equipment is wrong. If there is no problem, you can start the test machine. After starting, observe whether the indication reading of each instrument is correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has any noise or vibration. If everything is normal, it can be put into operation. Four hours after the first operation of the pump, it should be turned off and the thermal insulation resistance of the motor should be quickly tested, and its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing, resulting in the motor burning due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to eliminate the fault:

1 the current exceeds 20% under the rated working condition.

2 the dynamic water level drops to the inlet section, resulting in intermittent drainage.

3 the underwater pump vibrates violently or emits huge noise.

4 the supply voltage is lower than 340 volts.

5 a fuse is burned.

6 the water pipe is damaged.

7 the thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.

When disassembling the device, it is necessary to untie the cable bundle and remove the pipeline part and the line protection plate. Remove the drain bolt and exclude all water in the motor chamber. Remove the filter element and loosen the screw on the coupling fixed to the motor shaft. Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (pay attention to placing the device horizontally when separating to prevent the bending of the pump shaft). The sequence of disassembling the pump is as follows: (see Figure 1) water inlet section, impeller, water inlet shell, impeller. Check the valve body, and use a special tool to loosen the cone sleeve fixed to the impeller when removing the impeller. In the process of disassembly, avoid bending the pump shaft and damaging various components. The disassembly process of the motor is as follows: (see Figure 1) put the motor on the platform, and remove the nuts on the screw (pull rod bolt), base, shaft head lock nut, thrust plate, key and lower guide rail - bearing seat, bolt, and then remove the rotor (be careful not to damage the wiring harness), and finally remove the connecting parts and upper guide bearing seat. Unit assembly: before assembly, the rust and dirt of each component should be cleaned, and the sealant should be coated on each mating surface and fastener, and then assembled in the opposite order of disassembly (the movement of the motor shaft after assembly is about one millimeter), after the assembly is completed, the coupling should be flexibly rotated, and then the filter element should be placed for testing. Each time the underwater electric pump has been used for one year, or less than one year but has been immersed for two years, it must be disassembled and inspected in accordance with Article 5 and replace the worn parts.

 

 
Panyimpenan lan Kustodian

 1, sijine metu banyu ing growong motor (utamané ing mangsa kanggo nyegah motor saka pembekuan), lan dasi kabel uga.

 2, simpen ing kamar njero ruangan tanpa zat korosif lan gas, kanthi suhu ing ngisor 40 °C.

 3, nggunakake long-term kudu mbayar manungsa waé kanggo Nyegah teyeng saka pumps submersible.

 

 
Nganggo Parts
  • Impeller
  • Lengan poros
  • Lengan poros karet
  • Ring segel

 
Skenario Aplikasi

01 Intake banyu sumur jero

02 Sumber banyu dhuwur

03 banyu gunung 

04 banyu menara

05 Irigasi Pertanian

06 irigasi kebon

07 intake banyu kali

08 banyu omah

 

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


Tulis pesen ing kene lan kirimake menyang kita

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


jvJavanese