The product adopts special water-resistant wire for motor winding, with excellent characteristics such as high frequency shock resistance, pulse peak voltage shock resistance and high temperature aging resistance. The frequency conversion winding design ensures the motor to operate smoothly between 1Hz and 50Hz for a long time, making the frequency conversion deep well pump more energy saving and longer service life.
We are honored to introduce our products, this product provides three-phase AC 380V power supply (tolerance of ± 5%), 50HZ voltage (tolerance of ± 1%). At the same time, our products require strict water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor adopts closed or water-filled wet structure, which must be filled with clean water before use to prevent empty. Tighten the water charging and deflating bolts before use, otherwise, it is not allowed to use. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The well water flow shall meet the output and continuous operation requirements of the submersible pump, and the output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or inverted, but only vertically. The submersible pump must be equipped with cables according to requirements, and is equipped with external overload protection devices. It is strictly prohibited to conduct no-load tests on the pump without water. Our products guarantee to provide you with high quality and stable performance, while meeting your needs to ensure safe and reliable.
Model | Axın (m3/saat) | Baş (m) |
Fırlanma sürəti (dəyişiklik/nöqtə) |
Su nasosu(%) | Çıxış Diametr (mm) |
Yaxşı tətbiq olunur diametri (mm) |
Qiymətləndirildi power(KW) |
Qiymətləndirildi gərginlik(V) |
Qiymətləndirildi cari (A) |
Motor səmərəliliyi (%) | güc faktorucosφ | Vahid Radial Maksimum ölçü (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175yuxarıda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175yuxarıda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175yuxarıda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175yuxarıda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175yuxarıda | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175yuxarıda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175yuxarıda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175yuxarıda | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175yuxarıda | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175yuxarıda | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175yuxarıda | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175yuxarıda | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175yuxarıda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
This well submersible pump is a pump suitable for clean water. Digging new wells and pumping sediment and turbid water are strictly prohibited. The voltage grade of the well pump is 380V/50HZ. Submersible motors with other voltage grades need to be customized. Underground cables must use waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as overload short circuit protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be tripped in time. During installation and use, the pump must be reliably grounded. It is prohibited to push and pull the switch when hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be injected with distilled water or non-corrosive clear cold water in the inner cavity, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. The same as the steering instructions. Pay attention to safety when the pump is upright to prevent tilting and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump flow at low lift or in high lift pull too large, resulting in extreme wear of thrust bearings and other components, the motor due to overload and burn. After put into the well, the measurement of the motor and the ground insulation resistance value, not less than 100M. After the start, regular observation of voltage and current, and check the motor winding insulation is in line with the requirements of the provisions. If the temperature of the storage site is below the freezing point, the water in the pump chamber should be drained to prevent the water in the motor chamber from freezing and damaging the motor due to low temperature.
Quruluşun qısa təqdimatı: nasos hissəsi əsasən nasos şaftından, çarxdan, təxribat qabığından, rezin rulmandan, çek klapan gövdəsindən (isteğe bağlı hissələr) və digər komponentlərdən ibarətdir. Mühərrik hissəsi əsasən baza, təzyiq tənzimləyici plyonka, dayaq yatağı, dayaq lövhəsi, aşağı bələdçi dayaq oturacağı, stator, rotor, yuxarı bələdçi dayaq oturacağı, qum halqası, su giriş hissəsi, kabel və digər komponentlərdən ibarətdir.
Məhsulun əsas xüsusiyyətlərinə aşağıdakılar daxildir:
1.The motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing, the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the change of the temperature rise of the motor.
2.In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft is equipped with two oil seals, and a sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed at the lower part of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6.The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Quraşdırmadan əvvəl hazırlıq:
1. Sualtı nasosun təlimatda göstərilən istifadə şərtlərinə və əhatə dairəsinə uyğun olub olmadığını yoxlayın.
2. Diametri sualtı nasosun maksimum xarici diametrinə bərabər olan ağır obyektdən istifadə edərək, quyunun daxili diametrinin sualtı nasosa uyğun olub-olmadığını ölçün və quyu dərinliyinin quraşdırma tələblərinə cavab verib-vermədiyini ölçün.
3. Quyu lüləsinin təmiz olub-olmadığını və quyu suyunun bulanıq olub olmadığını yoxlayın. Dalgıç elektrik nasosunun vaxtından əvvəl zədələnməsinin qarşısını almaq üçün heç vaxt sualtı nasosdan palçıq və qum suyunu yumaq üçün sualtı elektrik nasosundan istifadə etməyin.
4. Quyu başı quraşdırma qısqacının mövqeyinin uyğun olub olmadığını və onun bütün qurğunun keyfiyyətinə tab gətirə biləcəyini yoxlayın.
5. Sualtı nasos komponentlərinin tam olub olmadığını və təlimatdakı montaj diaqramına uyğun olaraq düzgün quraşdırılıb-quraşdırılmadığını yoxlayın. Filtr ekranını çıxarın və muftanın çevik şəkildə fırlandığını görmək üçün fırladın.
6. Su vintini açın və mühərrik boşluğunu təmiz, aşındırıcı olmayan su ilə doldurun (qeyd edin. doldurmağınızdan əmin olun), sonra su vintini sıxın. 12 saatlıq su vurulduqdan sonra, 500V silkələnmə masası ilə ölçüldükdə mühərrikin izolyasiya müqaviməti 150M Q-dan az olmamalıdır.
7. Kabel birləşdiricisi, çıxan kabelin bir ucundan 120 mm-lik rezin qolunu kəsin və uyğun kabeli elektrikçi bıçağı ilə kəsin, sonra üç əsas naqilin uzunluğunu pilləli formada səndələyin, 20 mm mis nüvəni soyun, oksidi sıyırın. bıçaq və ya qum parça ilə mis məftil theoutside qat, və palirs iki bağlı məftil uclarını daxil edin. Qatı incə mis məftil ilə sıx bağladıqdan sonra, hərtərəfli və möhkəm lehim və hər hansı bir qum. səthində buruqlar. Sonra, üç birləşmə üçün, üç laver üçün yarı yığılmış şəkildə bükmək üçün polyvester izolyasiya lentindən istifadə edin. Sarma qatının iki ucunu nyion iplə möhkəm sarın və sonra üç qat üçün lenti sarmaq üçün yarı yığılmış üsuldan istifadə edin. Xarici təbəqəni üç qat üçün yüksək təzyiqli izolyasiya lenti ilə sarın. Nəhayət, üç ipi bir-birinə qatlayın və onları yüksək təzyiqli lentlə dəfələrlə beş qat üçün sarın. Hər bir təbəqə möhkəm bağlanmalı və təbəqələrarası birləşmələr suyun içəriyə nüfuz etməməsi və izolyasiyaya zərər verməməsi üçün sıx və sıx olmalıdır. Qapadıqdan sonra 12 saat otaq temperaturunda 20 'C suda isladın və sarsıntı masası ilə izolyasiya müqavimətini ölçün. , 100M Ω-dən az olmamalıdır
Əlavə edilmiş kabel naqillərinin diaqramı aşağıdakı kimidir:
8. Üç fazalı naqillərin qoşulub-qoşulmadığını və DC müqavimətinin təxminən balanslaşdırılmış olub olmadığını yoxlamaq üçün multimetrdən istifadə edin.
9. Dövrə və transformator tutumunun həddən artıq yüklənməsini yoxlayın və sonra həddindən artıq yükdən qorunma açarını və ya işə salma avadanlığını birləşdirin. Xüsusi modellər üçün Cədvəl 2-ə baxın, sonra nasosun çıxışından su nasosuna bir vedrə su tökün və nasosdakı rezin podşipnikləri yağlayın və sonra sualtı elektrik nasosunu dik və sabit şəkildə yerləşdirin. Başlayın (bir saniyədən çox olmayaraq) və sükan istiqamətinin sükan işarəsi ilə uyğun olub olmadığını yoxlayın. Əgər belə deyilsə, üç fazalı kabelin hər hansı iki birləşdiricisini dəyişdirin. Sonra filtri quraşdırın və quyuya enməyə hazır olun. Xüsusi hallarda (məsələn, arxlar, arxlar, çaylar, gölməçələr, gölməçələr və s.) istifadə edilərsə, elektrik nasosu etibarlı şəkildə torpaqlanmalıdır.
(2) Quraşdırma avadanlığı və alətləri:
1. İki tondan artıq yük üçün bir cüt qaldırıcı zəncir.
2. Şaquli hündürlüyü dörd metrdən az olmayan ştativ.
3. Bir tondan artıq çəkiyə tab gətirə bilən (su nasoslarının tam dəstinin ağırlığını daşıya bilən) iki asma kəndir (məftil).
4. İki cüt sıxac (spints) quraşdırın.
5. Açarlar, çəkiclər, tornavidalar, elektrik alətləri və alətləri və s.
(3) Elektrik nasosunun quraşdırılması:
1. Sualtı elektrik nasosunun quraşdırma diaqramı Şəkil 2-də göstərilmişdir. Xüsusi quraşdırma ölçüləri Cədvəl 3-də "Sualtı elektrik nasosunun quraşdırma ölçülərinin siyahısı" göstərilmişdir.
2. Başlığı 30 metrdən az olan sualtı elektrik nasosları bütün maşının, su borularının və borulardakı suyun tam çəkisini daşıya bilən şlanqlar və məftil kanatlardan və ya digər çətənə kəndirlərindən istifadə etməklə birbaşa quyuya qaldırıla bilər.
3. Başlığı 30 metrdən çox olan nasoslarda polad borulardan istifadə olunur və quraşdırma ardıcıllığı aşağıdakı kimidir:
①Su nasosu hissəsinin yuxarı ucunu sıxmaq üçün sıxacdan istifadə edin (motor və su nasosu bu zaman birləşdirilib), onu asma zəncirlə qaldırın və sıxacı quyunun ağzına taxana qədər yavaş-yavaş quyuya bağlayın. asma zəncir.
② Boru sıxmaq üçün başqa bir cüt sıxacdan istifadə edin, onu asma zəncirlə flanşdan 15 sm uzaqda qaldırın və yavaş-yavaş endirin. Boru flanşı ilə nasos flanşı arasında Rezin yastığı yerinə qoyun və boruyu sıxın və boltlar, qoz-fındıq və yay yuyucuları ilə bərabər şəkildə pompalayın.
③ Sualtı nasosu yüngülcə qaldırın, su nasosunun yuxarı ucundakı qısqacını çıxarın, kabeli plastik lentlə su borusuna möhkəm bağlayın və sıxac quyu ağzına yerləşdirilənə qədər yavaş-yavaş bağlayın.
④Bütün su borularını quyuya bağlamaq üçün eyni üsuldan istifadə edin.
⑤Çıxış kabeli idarəetmə açarına qoşulduqdan sonra o, üç fazalı enerji təchizatına qoşulur.
(4) Quraşdırma zamanı nəzərə alınmalı olanlar:
1. Nasos prosesi zamanı tıxanma hadisəsi aşkar edilərsə, tıxanma nöqtəsini aradan qaldırmaq üçün su borusunu döndərin və ya çəkin. Əgər müxtəlif tədbirlər hələ də nəticə vermirsə, sualtı elektrik nasosuna və quyuya zərər verməmək üçün nasosu məcbur etməyin.
2. Quraşdırma zamanı hər bir borunun flanşına rezin yastıq qoyulmalı və bərabər şəkildə sıxılmalıdır.
3. Su nasosu quyuya endirildikdə, nasosun uzun müddət quyu divarına qarşı işləməsinin, nasosun titrəməsinə və mühərrikin süpürülməsinə və yanmasına səbəb olmasının qarşısını almaq üçün onu quyu borusunun ortasına qoymaq lazımdır. .
4. Quyunun axan qum və lil şəraitinə uyğun olaraq su nasosunun quyunun dibinə qədər dərinliyini təyin edin. Pompanı palçığa basdırmayın. Su nasosundan quyunun dibinə qədər olan məsafə ümumiyyətlə 3 metrdən az deyil (Şəkil 2-ə baxın).
5. Su nasosunun suyun daxil olma dərinliyi dinamik su səviyyəsindən su giriş qovşağına qədər 1-1,5 metrdən az olmamalıdır (bax Şəkil 2). Əks halda, su nasosunun rulmanları asanlıqla zədələnə bilər.
6. Su nasosunun qaldırıcısı çox aşağı ola bilməz. Əks halda, böyük axın sürətlərinə görə mühərrikin həddindən artıq yüklənməsinin və yanmasının qarşısını almaq üçün nominal axın nöqtəsində nasos axınına nəzarət etmək üçün quyu ağzı su boru kəmərində qapı klapanının quraşdırılması lazımdır.
7. Su nasosu işləyərkən su çıxışı davamlı və bərabər olmalı, cərəyan sabit olmalıdır (nominal iş şəraitində, ümumiyyətlə nominal cərəyanın 10%-dən çox olmamalıdır), vibrasiya və səs-küy olmamalıdır. Hər hansı bir anormallıq varsa, səbəbi tapmaq və aradan qaldırmaq üçün maşın dayandırılmalıdır.
8. Quraşdırarkən, mühərrikin torpaqlama naqilinin quraşdırılmasına diqqət yetirin (Şəkil 2-ə baxın). Su borusu polad boru olduqda, onu quyu ağzı sıxacından aparın; su borusu plastik boru olduqda, onu elektrik nasosunun torpaqlama işarəsindən aparın.
- 1.After installing the submersible pump, recheck the insulation resistance and three-phase continuity switch, check whether there is any error in the connection between the instrument and the starting equipment.If there is no problem, you can start to test the machine. After starting, observe whether the indication reading of each instrument is correct.If the rated voltage and current specified on the nameplate are exceeded, please observe whether the pump has noise or vibration.If everything is normal, it can be put into operation. After the pump runs for the first time for four hours, the motor thermal insulation resistance should be closed and tested quickly. Its value should not be less than 0.5 megaohm. After the pump stops, it should be restarted after five minutes to prevent the water column in the pipeline from completely reversing, which will cause the motor to burn out due to excessive current.
- 2.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1.Under the rated working condition, the current exceeds 20%.
- 2.The dynamic water level drops to the water inlet section, resulting in intermittent water.
- 3.The submersible pump has severe vibration or noise.
- 4.The supply voltage is lower than 340 volts.
- 5.A fuse is burned out.
- 6.The water pipeline is damaged.
- 7.The motor's insulation resistance to the geothermal state is lower than 0.5 megaohm.
- 3.Unit disassembly:
- - Kabel bağını açın, boru kəmərinin hissəsini çıxarın və məftil lövhəsini çıxarın.
- - screw down the water bolt, put out the water in the motor chamber.
- - filtri çıxarın, motor milini düzəltmək üçün muftadakı sabit vintini gevşetin.
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
1, motor boşluğundakı suyu söndürün (xüsusilə qışda motorun donmasının qarşısını almaq üçün) və kabeli yaxşı bağlayın.
2, aşındırıcı maddələr və qazlar olmayan, 40 °C-dən aşağı temperaturda qapalı otaqda saxlayın.
3, uzunmüddətli istifadə dalgıç nasosların pas qarşısının alınmasına diqqət yetirməlidir.
- Pervane
- Mil qolu
- Rezin şaft qolu
-
Sızdırmazlıq halqası
01 Dərin quyu suyunun qəbulu
02 Hündür mərtəbəli su təchizatı
03 dağ su təchizatı
04 qüllə suyu
05 Kənd təsərrüfatının suvarılması
06 bağçanın suvarılması
07 çay suqəbuledici
08 məişət suyu