QJP series fountain pump is a special pump for fountain developed by our factory.The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, good magnetic conductivity, and frequent start will not fever.Both ends of the motor rotor use water as lubricant alloy copper sleeve.Stainless steel sleeve instead of ball bearings, to avoid the problem of easy rust ball bearings and lack of oil wear and tear the motor.The most suitable for music fountain use, all models can be used.
This product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply system. Applicable water quality conditions include water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, it must be filled with clean water to prevent false filling, and then tighten the water injection and exhaust bolts, otherwise it is not allowed to use. The submersible pump must be completely immersed in water, and the penetration depth shall not exceed 70m. The distance between the submersible pump base and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the water output and continuous operation of the submersible pump. The water output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump can not be used horizontally or upside down, but only vertically. The submersible pump shall be equipped with cables and external overload protection devices as required. The pump is strictly prohibited from no-load test without water.
គំរូ | លំហូរ (ម៣/ម៉ោង) | ក្បាល (ម) |
ល្បឿនបង្វិល (ការផ្លាស់ប្តូរ / ចំណុច) |
ម៉ាស៊ីនបូមទឹក(%) | ច្រកចេញ អង្កត់ផ្ចិត (មម) |
អនុវត្តបានល្អ អង្កត់ផ្ចិត (មម) |
វាយតម្លៃ power(KW) |
វាយតម្លៃ វ៉ុល (V) |
វាយតម្លៃ បច្ចុប្បន្ន (A) |
ប្រសិទ្ធភាពម៉ូតូ (%) | កត្តាថាមពល | ឯកតា ទំហំអតិបរមារ៉ាដ្យូម (មម) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175ខាងលើ | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175ខាងលើ | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175ខាងលើ | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175ខាងលើ | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175ខាងលើ | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175ខាងលើ | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175ខាងលើ | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175ខាងលើ | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175ខាងលើ | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175ខាងលើ | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175ខាងលើ | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175ខាងលើ | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175ខាងលើ | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, យ៉ាងតឹងរ៉ឹងយោងទៅតាមបទប្បញ្ញត្តិនៃការលើកបូម, ជួរលំហូរនៃការប្រើប្រាស់, ដើម្បីការពារលំហូរទាបឬកម្លាំងបូមលើកខ្ពស់, កម្លាំងរុញច្រាននិងផ្នែកផ្សេងទៀតនៃការពាក់, លើសទម្ងន់ម៉ូតូត្រូវបានដុត
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main features of the product include: the motor is a water immersed wet three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing; the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of temperature; in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring; in order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed under the motor; the lubrication of the motor and the pump bearing is water lubrication; the stator winding of the motor is made of high quality submersible motor winding, with high insulation performance; the pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) ការរៀបចំមុនពេលដំឡើង:
1. ពិនិត្យមើលថាតើស្នប់ submersible ត្រូវនឹងលក្ខខណ្ឌប្រើប្រាស់ និងវិសាលភាពដែលបានបញ្ជាក់ក្នុងសៀវភៅណែនាំឬអត់។
2. ដោយប្រើឧបករណ៍បូមទឹកធ្ងន់ដែលមានអង្កត់ផ្ចិតស្មើនឹងអង្កត់ផ្ចិតខាងក្រៅអតិបរមានៃស្នប់លិចទឹក វាស់ថាតើអង្កត់ផ្ចិតខាងក្នុងនៃអណ្តូងអាចសមនឹងស្នប់លិចទឹកបានដែរឬទេ និងវាស់ថាតើជម្រៅអណ្តូងត្រូវនឹងតម្រូវការដំឡើងដែរឬទេ។
3. ពិនិត្យមើលថាតើអណ្តូងនោះស្អាតហើយឬនៅ ថាតើអណ្តូងនោះមានទឹកឬអត់។ កុំប្រើស្នប់អគ្គិសនីដែលអាចដាក់ក្រោមទឹក ដើម្បីលាងសម្អាតភក់ និងទឹកខ្សាច់របស់ welor ដើម្បីជៀសវាងការខូចខាតមុនអាយុចំពោះស្នប់អគ្គិសនីដែលលិចទឹក។
4. ពិនិត្យមើលថាតើទីតាំងនៃការតោងដំឡើងក្បាល welhead គឺសមរម្យ និងថាតើវាអាចទប់ទល់នឹងគុណភាពនៃអង្គភាពទាំងមូលដែរឬទេ។
5. ពិនិត្យមើលថាតើធាតុផ្សំនៃស្នប់ submersible ត្រូវបានបញ្ចប់ និងដំឡើងត្រឹមត្រូវតាមដ្យាក្រាមដំឡើងនៅក្នុងសៀវភៅណែនាំឬអត់។ ដោះអេក្រង់តម្រងចេញ ហើយបង្វិលឧបករណ៍ភ្ជាប់ដើម្បីមើលថាតើវាបង្វិលបានឬអត់។
6. ដោះវីសទឹកចេញ ហើយបំពេញបែហោងធ្មែញរបស់ម៉ូទ័រដោយទឹកស្អាត ដែលមិនច្រេះ (ចំណាំ។ ត្រូវប្រាកដថាដាក់វា) បន្ទាប់មករឹតបន្តឹងវីសទឹក។ បន្ទាប់ពីការចាក់ទឹករយៈពេល 12 ម៉ោង ភាពធន់ទ្រាំអ៊ីសូឡង់របស់ម៉ូទ័រមិនគួរតិចជាង 150M Q នៅពេលវាស់ជាមួយនឹងតារាងរញ្ជួយ 500V ។
7. ការភ្ជាប់ខ្សែ កាត់ដៃអាវកៅស៊ូ 120mm ចេញពីចុងម្ខាងនៃខ្សែដែលចេញ និងខ្សែដែលត្រូវគ្នាជាមួយនឹងកាំបិតរបស់អគ្គីសនី បន្ទាប់មកធ្វើឱ្យប្រវែងនៃខ្សែស្នូលទាំងបីក្នុងទម្រង់ជាជំហាន បកចេញពីស្នូលទង់ដែង 20mm បំបែកអុកស៊ីដ។ ស្រទាប់ខាងក្រៅនៃខ្សែស្ពាន់ដោយកាំបិត ឬកណាត់ខ្សាច់ ហើយបញ្ចូលចុងខ្សែទាំងពីរដែលភ្ជាប់គ្នាជាប៉ាលី។ បន្ទាប់ពីចងស្រទាប់នេះឱ្យតឹងជាមួយនឹងខ្សែស្ពាន់ល្អហើយ ច្របាច់វាឱ្យបានហ្មត់ចត់ និងរឹងមាំ និងខ្សាច់ណាមួយ។ burrs នៅលើផ្ទៃ។ បនា្ទាប់មកសម្រាប់សន្លាក់ទាំងបីសូមប្រើកាសែតអ៊ីសូឡង់ប៉ូលីវ៉ែរដើម្បីរុំពួកវាក្នុងលក្ខណៈពាក់កណ្តាលជង់សម្រាប់បីស្រទាប់។ រុំចុងទាំងពីរនៃស្រទាប់រុំឱ្យតឹងជាមួយខ្សែស្រឡាយ nyion ហើយបន្ទាប់មកប្រើវិធីសាស្រ្តពាក់កណ្តាលជង់ដើម្បីរុំកាសែតបីស្រទាប់។ រុំ outellayer ជាមួយកាសែតអ៊ីសូឡង់សម្ពាធខ្ពស់សម្រាប់បីស្រទាប់។ ជាចុងក្រោយ បត់ខ្សែទាំងបីចូលគ្នា ហើយរុំវាម្តងហើយម្តងទៀតសម្រាប់ស្រទាប់ប្រាំជាមួយនឹងកាសែតសម្ពាធខ្ពស់។ ស្រទាប់នីមួយៗត្រូវតែចងយ៉ាងតឹង ហើយសន្លាក់ interlayer ត្រូវតែតឹង និង fimm ដើម្បីការពារទឹកពីការជ្រៀតចូល និងបំផ្លាញអ៊ីសូឡង់ បន្ទាប់ពីរុំរួច ត្រាំក្នុងទឹកនៅសីតុណ្ហភាពបន្ទប់ 20 'c រយៈពេល 12 ម៉ោង និងវាស់ភាពធន់នឹងអ៊ីសូឡង់ជាមួយនឹងតារាងរញ្ជួយ។ ដែលមិនគួរតិចជាង 100M Ω
ដ្យាក្រាមដំណើរការខ្សែខ្សែភ្ជាប់មានដូចខាងក្រោម៖
8. ប្រើ multimeter ដើម្បីពិនិត្យមើលថាតើខ្សភ្លើងបីដំណាក់កាលត្រូវបានតភ្ជាប់ហើយថាតើភាពធន់របស់ DC មានតុល្យភាពប្រហាក់ប្រហែល។
9. ពិនិត្យមើលថាតើសៀគ្វីនិងសមត្ថភាពប្លែងត្រូវបានផ្ទុកលើសទម្ងន់ហើយបន្ទាប់មកភ្ជាប់កុងតាក់ការពារលើសទម្ងន់ឬឧបករណ៍ចាប់ផ្តើម។ សូមមើលតារាងទី 2 សម្រាប់ម៉ូដែលជាក់លាក់ ហើយបន្ទាប់មកចាក់ធុងទឹកមួយចូលទៅក្នុងស្នប់ទឹកពីព្រីបូមទឹក ដើម្បីរំអិលជ័រកៅស៊ូនៅក្នុងស្នប់ ហើយបន្ទាប់មកដាក់ស្នប់អគ្គិសនីដែលអាចដាក់បញ្ចូលក្នុងទឹកឱ្យត្រង់ និងថេរ។ ចាប់ផ្តើម (មិនលើសពីមួយវិនាទី) ហើយពិនិត្យមើលថាតើទិសដៅចង្កូតស្របនឹងសញ្ញាចង្កូតឬអត់។ បើមិនដូច្នោះទេ សូមប្តូរឧបករណ៍ភ្ជាប់ពីរនៃខ្សែបីដំណាក់កាល។ បន្ទាប់មកដំឡើងតម្រង ហើយរៀបចំចុះក្រោមអណ្តូង។ ប្រសិនបើប្រើក្នុងឱកាសពិសេស (ដូចជា ប្រឡាយ ប្រឡាយ ទន្លេ ស្រះ ស្រះ ជាដើម) ស្នប់អគ្គិសនីត្រូវតែមានដីដែលអាចទុកចិត្តបាន។
(2) ការដំឡើងឧបករណ៍ និងឧបករណ៍៖
1. ខ្សែសង្វាក់លើកមួយគូ ទម្ងន់ជាងពីរតោន។
2. ជើងកាមេរ៉ាដែលមានកម្ពស់បញ្ឈរមិនតិចជាងបួនម៉ែត្រ។
3. ខ្សែពួរព្យួរចំនួនពីរ (ខ្សែខ្សែ) ដែលអាចផ្ទុកទម្ងន់លើសពីមួយតោន (អាចទ្រាំទ្រទម្ងន់នៃសំណុំនៃស្នប់ទឹកពេញលេញ)។
4. ដំឡើងប្រដាប់គៀបពីរគូ (ពុះ)។
5. មេដៃ ញញួរ ទួណឺវីស ឧបករណ៍អគ្គិសនី និងឧបករណ៍។ល។
(3) ការដំឡើងស្នប់អគ្គិសនី៖
1. ដ្យាក្រាមនៃការដំឡើងនៃស្នប់អគ្គិសនី submersible ត្រូវបានបង្ហាញនៅក្នុងរូបភាពទី 2. វិមាត្រនៃការដំឡើងជាក់លាក់ត្រូវបានបង្ហាញនៅក្នុងតារាងទី 3 "បញ្ជីនៃវិមាត្រនៃការដំឡើងនៃបូមអគ្គិសនី submersible" ។
2. ម៉ាស៊ីនបូមទឹកដែលមានក្បាលតិចជាង 30 ម៉ែត្រ អាចដាក់ចូលទៅក្នុងអណ្តូងដោយផ្ទាល់ ដោយប្រើទុយោ និងខ្សែ ឬខ្សែពួរផ្សេងទៀត ដែលអាចទ្រទម្ងន់ពេញម៉ាស៊ីនទាំងមូល បំពង់ទឹក និងទឹកនៅក្នុងបំពង់។
3. ស្នប់ដែលមានក្បាលលើសពី 30 ម៉ែត្រប្រើបំពង់ដែក ហើយលំដាប់នៃការដំឡើងមានដូចខាងក្រោម៖
① ប្រើប្រដាប់គៀបដើម្បីតោងចុងផ្នែកខាងលើនៃផ្នែកបូមទឹក (ម៉ូទ័រ និងស្នប់ទឹកត្រូវបានភ្ជាប់នៅពេលនេះ) លើកវាជាមួយនឹងខ្សែសង្វាក់ព្យួរ រួចចងវាចូលទៅក្នុងអណ្តូងយឺតៗ រហូតទាល់តែដាក់គៀបនៅលើក្បាលអណ្តូង ហើយដកវាចេញ។ ខ្សែសង្វាក់ព្យួរ។
② ប្រើឧបករណ៍គៀបមួយគូទៀតដើម្បីតោងបំពង់ លើកវាជាមួយនឹងខ្សែសង្វាក់ព្យួរចម្ងាយ 15 សង់ទីម៉ែត្រពីគែម ហើយបន្ថយវាយឺតៗ។ រវាងគែមបំពង់ និងព្រុយស្នប់ ដាក់បន្ទះកៅស៊ូនៅនឹងកន្លែង ហើយរឹតបន្តឹងបំពង់ ហើយបូមរាបស្មើជាមួយប៊ូឡុង គ្រាប់ និងឧបករណ៍លាងនិទាឃរដូវ។
③ លើកស្នប់លិចទឹកបន្តិច ដោះគៀបនៅចុងខាងលើនៃស្នប់ទឹក ចងខ្សែយ៉ាងរឹងមាំទៅនឹងបំពង់ទឹកដោយកាសែតផ្លាស្ទិច ហើយចងវាយឺតៗរហូតទាល់តែមានការគៀបដាក់នៅក្បាលអណ្តូង។
④ ប្រើវិធីដូចគ្នាដើម្បីចងបំពង់ទឹកទាំងអស់ចូលទៅក្នុងអណ្តូង។
⑤ បនា្ទាប់ពីតភា្ជាប់ខ្ស្រងដ្រលនាំចេញត្រូវបានតភា្ជាប់ទៅនឹងកុងតាក់បញ្ជា វាត្រូវបានភ្ជាប់ទៅនឹងការផ្គត់ផ្គង់ថាមពលបីដំណាក់កាល។
(4) អ្វីដែលត្រូវកត់សម្គាល់អំឡុងពេលដំឡើង:
1. ប្រសិនបើបាតុភូតកកស្ទះត្រូវបានរកឃើញក្នុងអំឡុងពេលដំណើរការបូម សូមបង្វែរ ឬទាញបំពង់ទឹក ដើម្បីយកឈ្នះចំណុចកកស្ទះ។ ប្រសិនបើវិធានការផ្សេងៗនៅតែមិនដំណើរការ សូមកុំបង្ខំបូមចុះក្រោម ដើម្បីជៀសវាងការខូចខាតដល់ម៉ាស៊ីនបូមទឹក និងអណ្តូងទឹក។
2. កំឡុងពេលដំឡើង បន្ទះកៅស៊ូគួរតែត្រូវបានដាក់នៅគែមនៃបំពង់នីមួយៗ ហើយរឹតបន្តឹងស្មើៗគ្នា។
3. ពេលបូមទឹកធ្លាក់ចូលក្នុងអណ្តូង គួរដាក់នៅកណ្តាលបំពង់អណ្តូង ដើម្បីការពារកុំឱ្យស្នប់រត់ប៉ះនឹងជញ្ជាំងអណ្តូងក្នុងរយៈពេលយូរ ធ្វើឱ្យស្នប់ញ័រ ហើយម៉ូទ័រអូស និងឆេះ។ .
4. កំណត់ជម្រៅនៃស្នប់ទឹកទៅបាតអណ្តូង ស្របតាមលក្ខខណ្ឌខ្សាច់ដែលហូរ និងដីល្បាប់នៃអណ្តូង។ កុំកប់ស្នប់ក្នុងភក់។ ចម្ងាយពីស្នប់ទឹកទៅបាតអណ្តូងជាទូទៅមិនតិចជាង 3 ម៉ែត្រទេ (សូមមើលរូបភាពទី 2) ។
5. ជម្រៅចូលទឹកនៃស្នប់ទឹកគួរតែមានមិនតិចជាង 1-1.5 ម៉ែត្រពីកម្រិតទឹកថាមវន្តទៅថ្នាំងទឹកចូល (មើលរូបភាពទី 2) ។ បើមិនដូច្នេះទេ ប្រដាប់បូមទឹកអាចនឹងត្រូវខូចខាតយ៉ាងងាយ។
6. ការលើកម៉ាស៊ីនបូមទឹកមិនអាចទាបពេកទេ។ បើមិនដូច្នោះទេ សន្ទះច្រកទ្វារត្រូវដំឡើងនៅលើបំពង់ទឹកអណ្តូង ដើម្បីគ្រប់គ្រងលំហូរបូមនៅចំណុចលំហូរដែលបានវាយតម្លៃ ដើម្បីការពារម៉ូទ័រមិនឱ្យលើសទម្ងន់ និងឆេះដោយសារអត្រាលំហូរធំ។
7. នៅពេលដែលម៉ាស៊ីនបូមទឹកកំពុងដំណើរការ ទិន្នផលទឹកគួរតែបន្ត និងសូម្បីតែ ចរន្តគួរតែមានស្ថេរភាព (ក្រោមលក្ខខណ្ឌការងារដែលបានវាយតម្លៃ ជាទូទៅមិនលើសពី 10% នៃចរន្តដែលបានវាយតម្លៃ) ហើយមិនគួរមានរំញ័រ ឬសំឡេងរំខានឡើយ។ បើមានបញ្ហាមិនប្រក្រតីម៉ាស៊ីនគួរត្រូវបានបញ្ឈប់ដើម្បីរកមូលហេតុ និងលុបបំបាត់វាចោល។
8. នៅពេលដំឡើង សូមយកចិត្តទុកដាក់លើការកំណត់នៃខ្សែដីរបស់ម៉ូទ័រ (សូមមើលរូបភាពទី 2)។ នៅពេលដែលបំពង់ទឹកគឺជាបំពង់ដែក, នាំវាពីការគៀបក្បាលអណ្តូង; នៅពេលដែលបំពង់ទឹកជាបំពង់ផ្លាស្ទិច នាំវាចេញពីសញ្ញាសម្គាល់ដីនៃស្នប់អគ្គិសនី។
- 1.After installing the submersible pump, recheck the insulation resistance and the three-phase continuity at the switch, and check whether there are errors in the connection of the instrument and the starting equipment.If there are no problems, you can start to test the machine. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump emits any noise or vibration. If everything is normal, it can be put into operation.
- 2. After the pump runs for the first four hours, the thermal insulation resistance of the motor should be closed and tested quickly.Its value should not be less than 0.5 megaohm.After the pump stops, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and burning the motor due to excessive current.
- 3. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1 នៅក្នុងលក្ខខណ្ឌការងារដែលបានវាយតម្លៃចរន្តលើសពី 20% ។
- 2 កម្រិតទឹកថាមវន្តធ្លាក់ចុះដល់ផ្នែកច្រកចូលទឹក ដែលបណ្តាលឱ្យមានទឹកមិនទៀងទាត់។
- 3 ម៉ាស៊ីនបូមទឹកមានរំញ័រ ឬសំលេងរំខានខ្លាំង។
- 4 វ៉ុលផ្គត់ផ្គង់គឺទាបជាង 340 វ៉ុល។
- 5 ហ្វុយហ្ស៊ីបមួយត្រូវបានឆេះ។
- 6 បំពង់ផ្គត់ផ្គង់ទឹកខូច។
- 7 ភាពធន់ទ្រាំអ៊ីសូឡង់របស់ម៉ូទ័រទៅនឹងស្ថានភាពកំដៅក្នុងផែនដីគឺទាបជាង 0.5 megaohm ។
- Unit disassembly:
- 1.untie cable rope, remove the pipeline part, remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the inlet junction with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) inlet junction, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising of the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the reverse order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product adopts advanced design and provides advanced storage suggestions to ensure long-term use effect.First of all, in winter, it is necessary to exhaust all the water to prevent freezing. In addition, the wire rolls should be placed well and tied up.Secondly, when storing, the environment without corrosive action and gas should be selected and the temperature should be kept below 40 °C. Finally, when not used for a long time, attention should be paid to prevent rust of submersible pump.These storage requirements will ensure that the product can maintain its performance status and prolong its service life for a long time.
- ប្រដាប់រុញ
- ដៃអាវ
- ដៃអាវកៅស៊ូ
-
ចិញ្ចៀនបិទជិត
01 អណ្តូងទឹកជ្រៅ
០២ ការផ្គត់ផ្គង់ទឹកស្អាត
03 ការផ្គត់ផ្គង់ទឹកភ្នំ
០៤ ប៉មទឹក។
០៥ ប្រព័ន្ធធារាសាស្រ្តកសិកម្ម
០៦ ប្រព័ន្ធធារាសាស្រ្ត
07 ទឹកទន្លេ
០៨ ទឹកក្នុងស្រុក