QJP series fountain pump is a special pump for fountain developed by our factory.The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, good magnetic conductivity, and frequent start will not fever.Both ends of the motor rotor use water as lubricant alloy copper sleeve.Stainless steel sleeve instead of ball bearings, to avoid the problem of easy rust ball bearings and lack of oil wear and tear the motor.The most suitable for music fountain use, all models can be used.
This product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply system. Applicable water quality conditions include water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, it must be filled with clean water to prevent false filling, and then tighten the water injection and exhaust bolts, otherwise it is not allowed to use. The submersible pump must be completely immersed in water, and the penetration depth shall not exceed 70m. The distance between the submersible pump base and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the water output and continuous operation of the submersible pump. The water output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump can not be used horizontally or upside down, but only vertically. The submersible pump shall be equipped with cables and external overload protection devices as required. The pump is strictly prohibited from no-load test without water.
Model | Akym (m3 / sag) | Baş (m) |
Aýlanma (üýtgetmek / nokat) |
Suw nasosy (%) | Çykyş diametri (mm) |
Gowy ulanylýar diametri (mm) |
Bahalandyryldy power(KW) |
Bahalandyryldy naprýa .eniýe (V) |
Bahalandyryldy häzirki (A) |
Motorefficiency (%) | güýç faktorlary | Bölüm Radial Maksimu ululygy (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175ýokarda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175ýokarda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175ýokarda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175ýokarda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175ýokarda | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175ýokarda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175ýokarda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175ýokarda | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175ýokarda | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175ýokarda | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175ýokarda | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175ýokarda | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175ýokarda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, pes akymyň ýa-da ýokary göteriji nasos güýjüniň, zyňylýan rulmanyň we köýnegiň beýleki bölekleriniň öňüni almak üçin nasos göterijisiniň düzgünlerine, ulanyş aralygyna, motoryň artykmaç ýüklenmegi
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main features of the product include: the motor is a water immersed wet three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing; the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of temperature; in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring; in order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed under the motor; the lubrication of the motor and the pump bearing is water lubrication; the stator winding of the motor is made of high quality submersible motor winding, with high insulation performance; the pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Gurmakdan öň taýýarlyk:
1. Suwa çümýän nasosyň gollanmada görkezilen ulanyş şertlerine we gerimine laýyk gelýändigini barlaň.
2. Suwa çümýän nasosyň daşky diametrine deň bolan agyr obýekte ulanmak, guýynyň inneldiametriniň suwa çümýän nasosyna laýyk bolup biljekdigini ýa-da guýynyň çuňlugynyň gurnama talaplaryna laýyk gelýändigini ölçäň.
3. Guýynyň arassa bolandygyny ýa-da guýynyň suwunyň bulaşykdygyny barlaň. Suwa çümýän elektrik nasosyna wagtyndan öň zeper ýetmezligi üçin, garşylaýjy nasos palçyklaryny we gum suwlaryny ýuwmak üçin hiç wagt suwa çümýän elektrik nasosyny ulanmaň.
4. Kelleli gurnama gysgyjynyň ýagdaýynyň laýykdygyny ýa-da tutuş bölümiň hiline çydap biljekdigini barlaň
5. Gollanma gurnama diagrammasyna laýyklykda suwa çümýän nasos bölekleriniň doly we dogry gurlandygyny barlaň Süzgüç ekranyny aýyryň we çeýe aýlanýandygyny ýa-da ýokdugyny aýlaň.
6. Suw nurbatyny aýryň we motor boşlugyny arassa, poslamaýan suw bilen dolduryň (bellik ediň. 12 sagat suw sanjymyndan soň, 500V titreýän stol bilen ölçelende motoryň izolýasiýa garşylygy 150M Q-dan pes bolmaly däldir.
7. Kabel birleşmesi, çykýan kabeliň bir ujundan 120 mm rezin ýeňi kesiň we elektrikçiniň pyçakly gabat gelýän kabeli basgançakly üç ýadro siminiň uzynlygyny 20 mm mis ýadrosyny gabyň, oksidiň galyndylaryny kesiň. mis simiň daşyndaky pyçak ýa-da gum mata bilen gatlak we iki sany birikdirilen simiň ujuny palirlere salyň. Gatlagy inçe mis sim bilen daňanyňyzdan soň, ony gowy we pugta lehimläň we islendik biriniň gumy. üstünde gabyklar. Soňra üç boguny berkitiň, üç sany söýgüli üçin ýarym gaplanan görnüşde poliwester izolýasiýa lentasyny ulanyň. Ionapylýan gatlagyň iki ujuny nyion ýüplügi bilen örtüň we lentany üç gatlak bilen örtmek üçin ýarym gaplanan usuly ulanyň. Daşky gatlagy üç gatlak üçin ýokary basyşly izolýasiýa lentasy bilen örtüň. Ahyrynda, üçburçluklary bir ýere jemläň we ýokary basyşly lenta bilen bäş oýunçy üçin birnäçe gezek örtüň. Her gat gaty berk daňylmalydyr we suwuň izolýasiýa girmeginiň we zaýalanmagynyň öňüni almak üçin birleşdiriji bogunlar berk we ýuka bolmaly, Gaplanylandan soň, 20 ° C temperaturada suwa 12 sagat çümdüriň we izolýasiýa garşylygyny titreýän stol bilen ölçäň. , 100M than-dan az bolmaly däldir
Berkidilen kabel simleriniň diagrammasy aşakdaky ýaly:
8. Üç fazaly simleriň birikdirilendigini ýa-da DC garşylygynyň takmynan deňagramlydygyny ýa-da ýokdugyny barlamak üçin multimetr ulanyň.
9. Zynjyryň we transformatoryň kuwwatynyň aşa ýüklenendigini ýa-da ýokdugyny barlaň, soňra bolsa artykmaç gorag wyklýuçatelini ýa-da başlangyç enjamlary birikdiriň. Specificörite modeller üçin 2-nji tablisa serediň, soňra nasosdaky rezin podşipnikleri ýaglamak üçin suw nasosynyň rozetkasyndan bir bedre suw guýuň, soňra suwa çümýän elektrik nasosyny dik we durnukly ýerleşdiriň. Başlaň (bir sekuntdan köp bolmaly däl) we ruluň rul belgisine laýyk gelýändigini barlaň. Notok bolsa, üç fazaly kabeliň islendik iki birikdirijisini çalyşyň. Soňra süzgüçi guruň we guýynyň aşagyna gitmäge taýynlaň. Specialörite ýagdaýlarda (garymlar, garymlar, derýalar, howuzlar, howuzlar we ş.m.) ulanylsa, elektrik nasosy ygtybarly bolmaly.
(2) Gurnama enjamlary we gurallary:
1. Iki tonnadan gowrak göteriji zynjyr.
2. Dikligi dört metrden az bolmadyk üçburçluk.
3. Bir tonnadan gowrak agramy göterip bilýän iki sany asma ýüp (simli ýüpler) (suw nasoslarynyň doly toplumynyň agramyny göterip biler).
4. Iki jübüt gysgyç guruň.
5. Kirpikler, çekiçler, otwýortkalar, elektrik gurallary we gurallar we ş.m.
(3) Elektrik nasosyny oturtmak:
1. Suwa çümýän elektrik nasosynyň gurnama diagrammasy 2-nji suratda görkezilýär. Gurluşyň anyk ölçegleri 3-nji tablisada "Suwasty elektrik nasosynyň gurnama ölçegleriniň sanawy" görkezilýär.
2. Kellesi 30 metrden az bolan suwa çümdürilen elektrik nasoslary, ähli maşynyň, suw turbalarynyň we turbalardaky suwuň doly agramyny göterip bilýän şlanglar we sim arkanlary ýa-da beýleki kenep ýüpleri bilen göni guýa çykarylyp bilner.
3. 30 metrden gowrak kellesi bolan nasoslar polat turbalary ulanýarlar we gurnama yzygiderliligi aşakdaky ýaly:
Water Suw nasos böleginiň ýokarky ujuny gysmak üçin gysgyç ulanyň (motor we suw nasosy şu wagt birikdirildi), asylan zynjyr bilen galdyryň we guýynyň başyna gysgyç goýýançaňyz we haýallyk bilen guýa daňyň. asma zynjyr.
A Turbany gysmak, flanesden 15 sm uzaklykda asylan zynjyr bilen götermek we haýallyk bilen aşak düşürmek üçin başga bir gysgyç ulanyň. Turbanyň flanesleri bilen nasos flanesleriniň arasynda rezin paneli ýerleşdiriň we turbany berkidiň we boltlar, hozlar we pru springina ýuwujylar bilen deň derejede nasoslaň.
Sub Çökýän nasosy birneme ýokaryk galdyryň, suw nasosynyň ýokarky ujundaky gysgyçlary aýyryň, kabeli suw turbasyna plastmassa lenta bilen berkidiň we gysgyç guýynyň başyna goýulýança ýuwaş-ýuwaşdan daňyň.
Water waterhli suw turbalaryny guýa baglamak üçin şol bir usuly ulanyň.
Lead Gurluş kabeli dolandyryş wyklýuçateline birikdirilenden soň, üç fazaly elektrik üpjünçiligine birikdirilýär.
(4) Gurmak wagtynda bellemeli zatlar:
1. Sordurmak prosesinde dykyzlyk hadysasy tapylsa, dykylýan nokady ýeňip geçmek üçin suw turbasyny öwüriň ýa-da çekiň. Dürli çäreler henizem işlemeýän bolsa, suwa çümýän elektrik nasosyna we guýa zeper ýetmezligi üçin nasosy aşak mejbur etmäň.
2. Gurmak wagtynda her turbanyň flanesine rezin pad goýulmaly we deň derejede berkidilmeli.
3. Suw nasosy guýa düşürilende, nasosyň titremegine we motoryň süpürilmegine we ýanmagyna sebäp bolup, nasosyň guýynyň diwaryna uzak wagtlap işlemezligi üçin guýynyň turbasynyň ortasyna goýulmalydyr. .
4. Guýynyň akýan çäge we palçyk şertlerine görä guýynyň düýbüne suw nasosynyň çuňlugyny kesgitläň. Nasosy palçykda jaýlamaň. Suw nasosyndan guýynyň düýbüne çenli aralyk, adatça, 3 metrden az däl (2-nji surata serediň).
5. Suw nasosynyň suw giriş çuňlugy dinamiki suw derejesinden suw girelgesine çenli 1-1,5 metrden az bolmaly däldir (2-nji surata serediň). Otherwiseogsam, suw nasosynyň podşipnikleri aňsat zaýalanmagy mümkin.
6. Suw nasosynyň göterilmegi gaty pes bolup bilmez. Otherwiseogsam, uly akym tizligi sebäpli motoryň aşa köp ýüklenmeginiň we ýanmagynyň öňüni almak üçin, kesgitlenen akym nokadyndaky nasos akymyna gözegçilik etmek üçin guýy suw geçirijisine derwezeli klapan oturdylmalydyr.
7. Suw nasosy işleýän mahaly, suw çykarylyşy üznüksiz bolmaly we hatda tok durnukly bolmaly (bahalandyrylan iş şertlerinde, adatça bahalandyrylan tokyň 10% -inden köp bolmaly däldir) we yrgyldy ýa-da ses bolmaly däldir. Anormallik bar bolsa, sebäbini bilmek we ýok etmek üçin enjamy saklamaly.
8. Gurnanyňyzda, hereketlendirijiniň toprak siminiň sazlanmagyna üns beriň (2-nji surata serediň). Suw turbasy polat turba bolanda, ony guýy gysgyjyndan alyp gidiň; suw turbasy plastik turba bolanda, ony elektrik nasosynyň toprak belgisinden alyp çykyň.
- 1.After installing the submersible pump, recheck the insulation resistance and the three-phase continuity at the switch, and check whether there are errors in the connection of the instrument and the starting equipment.If there are no problems, you can start to test the machine. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump emits any noise or vibration. If everything is normal, it can be put into operation.
- 2. After the pump runs for the first four hours, the thermal insulation resistance of the motor should be closed and tested quickly.Its value should not be less than 0.5 megaohm.After the pump stops, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and burning the motor due to excessive current.
- 3. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1 Bahalandyrylan iş ýagdaýynda tok 20% -den geçýär.
- 2 Dinamiki suw derejesi, aralyk suwuň döremegine sebäp bolup, suw giriş bölümine düşýär.
- 3 Suwa çümýän nasosda yrgyldy ýa-da ses bar.
- 4 Üpjünçilik naprýa .eniýesi 340 woltdan pesdir.
- Ereýän predohranitel ýakylýar.
- 6 Suw üpjünçiligi turbasyna zeper ýetdi.
- 7 Motoryň geotermiki ýagdaýyna izolýasiýa garşylygy 0,5 megaohmdan pesdir.
- Unit disassembly:
- 1.untie cable rope, remove the pipeline part, remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the inlet junction with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) inlet junction, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising of the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the reverse order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product adopts advanced design and provides advanced storage suggestions to ensure long-term use effect.First of all, in winter, it is necessary to exhaust all the water to prevent freezing. In addition, the wire rolls should be placed well and tied up.Secondly, when storing, the environment without corrosive action and gas should be selected and the temperature should be kept below 40 °C. Finally, when not used for a long time, attention should be paid to prevent rust of submersible pump.These storage requirements will ensure that the product can maintain its performance status and prolong its service life for a long time.
- Impeller
- Mil ýeňi
- Kauçuk ýeň
-
Möhür halkasy
01 Çuň guýynyň suwy
02 -okary gatly suw üpjünçiligi
03 dag suw üpjünçiligi
04 diň suwy
05 Oba hojalygyny suwarmak
06 bag suwaryş
07 derýa suwuny kabul etmek
08 içerki suw