QJP series fountain pump is a special pump for fountain developed by our factory.The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, good magnetic conductivity, and frequent start will not fever.Both ends of the motor rotor use water as lubricant alloy copper sleeve.Stainless steel sleeve instead of ball bearings, to avoid the problem of easy rust ball bearings and lack of oil wear and tear the motor.The most suitable for music fountain use, all models can be used.
This product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply system. Applicable water quality conditions include water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, it must be filled with clean water to prevent false filling, and then tighten the water injection and exhaust bolts, otherwise it is not allowed to use. The submersible pump must be completely immersed in water, and the penetration depth shall not exceed 70m. The distance between the submersible pump base and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the water output and continuous operation of the submersible pump. The water output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump can not be used horizontally or upside down, but only vertically. The submersible pump shall be equipped with cables and external overload protection devices as required. The pump is strictly prohibited from no-load test without water.
Eredua | Emaria (m3/h) | Burua (m) |
Biraketa-abiadura (aldaketa/puntua) |
Ur-ponpa (%) | Saltokia diametroa (mm) |
Ondo aplikatzekoa diametroa (mm) |
Baloratua power(KW) |
Baloratua tentsioa (V) |
Baloratua korrontea (A) |
Motor-eraginkortasuna (%) | potentzia-faktoreacosφ | Unitatea Gehienezko tamaina erradiala (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175goian | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175goian | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175goian | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175goian | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175goian | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175goian | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175goian | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175goian | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175goian | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175goian | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175goian | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175goian | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175goian | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, ponpa-igogailuaren xedapenen arabera, erabilera-emariaren erabilera-eremuaren arabera, fluxu baxua edo igoera handiko ponpaketa-indarra, bultzada-errodamenduak eta higaduraren beste atal batzuk, motorren gainkarga erretzea saihesteko.
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main features of the product include: the motor is a water immersed wet three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing; the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of temperature; in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring; in order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed under the motor; the lubrication of the motor and the pump bearing is water lubrication; the stator winding of the motor is made of high quality submersible motor winding, with high insulation performance; the pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Instalazio aurretik prestatzea:
1. Egiaztatu urpeko ponpak eskuliburuan zehaztutako erabilera-baldintzak eta esparruak betetzen dituen ala ez.
2. Urpeko ponparen kanpoko diametroaren gehienezko diametroa duen objektu astun bat erabiliz, neurtu putzuaren barneko diametroa ponpa urperagarrira egoki daitekeen, eta neurtu putzuaren sakonerak instalazio-baldintzak betetzen dituen.
3. Egiaztatu putzua garbi dagoen eta putzuko ura uhera den. Inoiz ez erabili urpeko ponpa elektrikorik welor pump lokatza eta harea ura garbitzeko, ponpa elektriko urperagarriari kalte goiztiarra ekiditeko.
4. Egiaztatu welhead instalazioaren posizioa egokia den eta unitate osoaren kalitatea jasan dezakeen ala ez.
5. Egiaztatu urpeko ponpa osagaiak osatuta dauden eta behar bezala instalatuta dauden eskuliburuko muntaketa-diagramaren arabera. Kendu iragazkia pantaila eta biratu akoplamendua malgutasunez biratzen duen ikusteko.
6. Askatu ur-torlojua eta bete motorraren barrunbea ur garbi eta ez korrosiboarekin (kontuan izan. ziurtatu bete egin duzula), eta estutu ur-torlojua. Ura injektatu 12 ordu igaro ondoren, motorraren isolamendu-erresistentzia ez da 150 M Q baino txikiagoa izan behar 500 V-ko astindu-mahai batekin neurtuta.
7. Kable-juntura, moztu 120 mm-ko gomazko mahuka bat irteerako kablearen mutur batetik eta bat datorren kablea elektrizistaren aizto batekin, gero hiru nukleoko harien luzera mailakatu forman mailakatu, kendu 20 mm-ko kobre-nukleoa, oxidoa urratu. geruza kobrezko alanbrearen kanpoaldean labana edo hareazko zapi batekin, eta sartu konektatutako alanbre bi muturrak paliretan. Geruza kobrezko alanbre finarekin ondo lotu ondoren, ondo eta irmo soldatu eta edozein harea. gainazalean errebak. Ondoren, hiru junturetarako, erabili polibester zinta isolatzaile horiek erdi pilatuta biltzeko hiru labeletarako. Itzulbiratu biltzeko geruzaren bi muturrak nyion hariarekin, eta erabili erdi pilatutako metodo bat zinta hiru geruzetarako biltzeko. Itzulbi ezazu kanpoko geruza hiru geruzetarako presio handiko isolamendu-zintarekin. Azkenik, tolestu hiru kateak elkarrekin eta behin eta berriz bildu bost geruza presio handiko zintarekin. Geruza bakoitza ondo lotu behar da, eta geruzen arteko junturak estu eta finkoak izan behar dira ura ez dadin sartzea eta isolamendua kaltetzea saihesteko. Bilatu ondoren, busti uretan 20 ºC-ko giro-tenperaturan 12 orduz, eta neurtu isolamendu-erresistentzia dardarka mahai batekin. , 100M Ω baino txikiagoa izan behar ez duena
Erantsitako kablearen kableatu-prozesuaren diagrama hau da:
8. Erabili multimetroa hari trifasikoak konektatuta dauden eta DC erresistentzia gutxi gorabehera orekatuta dagoen egiaztatzeko.
9. Egiaztatu zirkuitua eta transformadorearen ahalmena gainkargatuta dauden ala ez, eta gero konektatu gainkarga babesteko etengailua edo abiarazte-ekipoa. Ikusi 2. taula eredu zehatzetarako, eta, ondoren, isuri ur-ontzi bat ur-ponparen irteeratik ponparen gomazko errodamenduak lubrifikatzeko, eta jarri urpeko ponpa elektrikoa zutik eta egonkor. Hasi (segundo bat baino gehiago). eta egiaztatu direkzio-norabidea koherentea den direkzio-seinalearekin. Hala ez bada, aldatu kable trifasikoko bi konektoreak. Ondoren, instalatu iragazkia eta prestatu putzutik jaisteko. Kasu berezietan erabiltzen bada (adibidez, lubakiak, lubakiak, ibaiak, urmaelak, urmaelak, etab.), ponpa elektrikoa fidagarritasunez lurreratu behar da.
(2) Instalazio ekipoak eta tresnak:
1. Bi tona baino gehiagoko altxatze-kate pare bat.
2. Lau metrotik beherako altuera bertikala duen tripode bat.
3. Tona bat baino gehiagoko pisua jasan dezaketen bi soka zintzilik (alanbrezko sokak) (ur-ponpa multzo oso baten pisua jasan dezakete).
4. Jarri bi besarkada pare (ferulak).
5. Giltzak, mailuak, bihurkinak, erreminta eta tresna elektrikoak, etab.
(3) Ponpa elektrikoaren instalazioa:
1. Urpeko ponpa elektrikoaren instalazio-diagrama 2. Irudian ageri da. Instalazio-neurri espezifikoak 3. Taulan agertzen dira "Sumergigarriko ponpa elektrikoaren instalazio-neurrien zerrenda".
2. 30 metrotik beherako burua duten ponpa elektriko urperagarriak zuzenean putzura igo daitezke, makina osoaren, ur-hodien eta hodietako uraren pisu osoa jasan dezaketen mahukak eta alanbre-sokak edo beste kalamu-soka batzuk erabiliz.
3. 30 metro baino gehiagoko burua duten ponpek altzairuzko hodiak erabiltzen dituzte, eta instalazioaren sekuentzia hau da:
①Erabili besarkada bat ur-ponparen zatiaren goiko muturra estutzeko (motorea eta ur-ponpa konektatuta daude momentu honetan), altxa ezazu zintzilik dagoen kate batekin eta lotu poliki-poliki putzuan. Jarri besarkada putzu-buruan eta kendu zintzilik katea.
② Erabili beste besarkada pare bat hodi bat estutzeko, altxa ezazu zintzilik dagoen kate batekin bridatik 15 cm-ra, eta jaitsi poliki-poliki. Hodiaren bridenaren eta ponparen bridenaren artean. Jarri gomazko kupoia eta estutu hodia eta ponpatu uniformeki torlojuekin, azkoinekin eta malguki-zirrindarekin.
③ Altxatu urpeko ponpa apur bat, kendu ur-ponparen goiko muturrean dagoen besarkada, lotu kablea tinko ur-hodiari plastikozko zinta batekin eta lotu poliki-poliki besarkada putzu-buruan jarri arte.
④Erabili metodo bera ur-hodi guztiak putzuan lotzeko.
⑤ Irteerako kablea kontrol-etengailura konektatu ondoren, elikadura trifasikora konektatzen da.
(4) Instalazioan kontuan izan beharrekoak:
1. Ponpatze-prozesuan blokeo-fenomeno bat aurkitzen bada, bira eman edo tira ur-hodiari traba-puntua gainditzeko. Hainbat neurrik oraindik ez badute funtzionatzen, mesedez, ez behartu ponpa behera urpean dagoen ponpa elektrikoa eta putzua ez kaltetzeko.
2. Instalazioan, gomazko kuskulina bat jarri behar da hodi bakoitzaren bridan eta uniformeki estutu.
3. Ur-ponpa putzuan jaisten denean, putzuaren erdian jarri behar da ponpa putzuaren hormaren kontra denbora luzez ibil ez dadin, ponpa dardara eta motorra miaketa eta erretzea eraginez. .
4. Zehaztu ur-ponparen sakonera putzuaren hondoraino, putzuaren harea eta limo-baldintzen arabera. Ez lurperatu ponpa lokatzetan. Ur-ponpatik putzuaren hondorainoko distantzia, oro har, ez da 3 metro baino gutxiagokoa (ikus 2. irudia).
5. Ur ponparen ura sartzeko sakonera ez da 1-1,5 metro baino txikiagoa izan behar uraren maila dinamikotik uraren sarrerako nodoraino (ikus 2. irudia). Bestela, ur ponparen errodamenduak erraz honda daitezke.
6. Ur-ponparen igoera ezin da baxuegia izan. Bestela, ate-balbula bat instalatu behar da putzu-buruko ur-hodietan ponparen emaria kontrolatzeko emari-puntuan emari handien ondorioz motorra gainkargatu eta erre ez dadin.
7. Ur-ponpa martxan dagoenean, ur-irteera etengabea eta berdina izan behar da, korrontea egonkorra izan behar da (lan-baldintzetan, oro har, korronte nominalaren % 10 baino gehiago), eta ez da bibraziorik edo zaratarik egon behar. Anormaltasunik badago, makina gelditu egin behar da kausa ezagutzeko eta ezabatzeko.
8. Instalatzerakoan, arreta jarri motorra lurreratzeko kablearen ezarpenari (ikus 2. irudia). Ur-hodia altzairuzko hodia denean, eraman ezazu putzu-buruko besarkadatik; ur-hodia plastikozko hodia denean, eraman ezazu ponpa elektrikoaren lurreratze-markatik.
- 1.After installing the submersible pump, recheck the insulation resistance and the three-phase continuity at the switch, and check whether there are errors in the connection of the instrument and the starting equipment.If there are no problems, you can start to test the machine. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump emits any noise or vibration. If everything is normal, it can be put into operation.
- 2. After the pump runs for the first four hours, the thermal insulation resistance of the motor should be closed and tested quickly.Its value should not be less than 0.5 megaohm.After the pump stops, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and burning the motor due to excessive current.
- 3. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1 Lan baldintza nominalean, korronteak % 20 gainditzen du.
- 2 Ur-maila dinamikoa uraren sarrerako sekziora jaisten da, eta tarteka ura eragiten du.
- 3 Urpeko ponpak bibrazio edo zarata handiak ditu.
- 4 Hornidura-tentsioa 340 voltio baino txikiagoa da.
- 5 Fusible bat erreta dago.
- 6 Ura hornitzeko hodia hondatuta dago.
- 7 Motorraren isolamendu-erresistentzia egoera geotermikoarekiko 0,5 megaohm baino txikiagoa da.
- Unit disassembly:
- 1.untie cable rope, remove the pipeline part, remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the inlet junction with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) inlet junction, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising of the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the reverse order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product adopts advanced design and provides advanced storage suggestions to ensure long-term use effect.First of all, in winter, it is necessary to exhaust all the water to prevent freezing. In addition, the wire rolls should be placed well and tied up.Secondly, when storing, the environment without corrosive action and gas should be selected and the temperature should be kept below 40 °C. Finally, when not used for a long time, attention should be paid to prevent rust of submersible pump.These storage requirements will ensure that the product can maintain its performance status and prolong its service life for a long time.
- Buldagailua
- Ardatz mahuka
- Gomazko ardatzaren mahuka
-
Zigilatzeko eraztuna
01 Putzu sakoneko ura hartzea
02 Goiko ur-hornidura
03 mendiko ur hornidura
04 dorre ura
05 Nekazaritzako ureztatzea
06 lorategiko ureztatzea
07 ibaiko ur-hartunea
08 etxeko ura