QJP series fountain pump is a special pump for fountain developed by our factory.The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, good magnetic conductivity, and frequent start will not fever.Both ends of the motor rotor use water as lubricant alloy copper sleeve.Stainless steel sleeve instead of ball bearings, to avoid the problem of easy rust ball bearings and lack of oil wear and tear the motor.The most suitable for music fountain use, all models can be used.
This product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply system. Applicable water quality conditions include water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, it must be filled with clean water to prevent false filling, and then tighten the water injection and exhaust bolts, otherwise it is not allowed to use. The submersible pump must be completely immersed in water, and the penetration depth shall not exceed 70m. The distance between the submersible pump base and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the water output and continuous operation of the submersible pump. The water output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump can not be used horizontally or upside down, but only vertically. The submersible pump shall be equipped with cables and external overload protection devices as required. The pump is strictly prohibited from no-load test without water.
Modell | Átfolyás (m3/h) | Fej (m) |
Forgási sebesség (változtatás/pont) |
Vízszivattyú(%) | Kimenet átmérő (mm) |
Jól alkalmazható átmérő (mm) |
Névleges power(KW) |
Névleges feszültség (V) |
Névleges áram (A) |
Motorhatás (%) | power factorcosφ | Mértékegység Radiális Maximális méret (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175felett | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175felett | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175felett | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175felett | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175felett | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175felett | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175felett | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175felett | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175felett | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175felett | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175felett | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175felett | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175felett | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, szigorúan a szivattyú emelésére, az áramlási tartományra vonatkozó rendelkezéseknek megfelelően, hogy megakadályozzák az alacsony áramlást vagy a nagy emelőerőt, a nyomócsapágyat és a kopás egyéb részeit, a motor túlterhelése égett
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main features of the product include: the motor is a water immersed wet three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing; the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of temperature; in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring; in order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed under the motor; the lubrication of the motor and the pump bearing is water lubrication; the stator winding of the motor is made of high quality submersible motor winding, with high insulation performance; the pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Előkészítés a telepítés előtt:
1. Ellenőrizze, hogy a búvárszivattyú megfelel-e a kézikönyvben megadott használati feltételeknek és hatókörnek.
2. A búvárszivattyú maximális külső átmérőjével megegyező átmérőjű nehéz obiect segítségével mérje meg, hogy a kút belső átmérője illeszkedik-e a búvárszivattyúhoz, és mérje meg, hogy a kút mélysége megfelel-e a telepítési követelményeknek.
3. Ellenőrizze, hogy a kútfúrás tiszta-e, és hogy a kút vize zavaros-e. Soha ne használjon elektromos búvárszivattyút a sár és homokvíz mosásához, hogy elkerülje a merülő elektromos szivattyú idő előtti károsodását.
4. Ellenőrizze, hogy a hegesztőfej szerelőbilincs helyzete megfelelő-e, és hogy kibírja-e az egész egység minőségét
5. Ellenőrizze, hogy a búvárszivattyú alkatrészei teljesek-e és megfelelően vannak-e beszerelve a kézikönyv összeszerelési rajza szerint. Távolítsa el a szűrőernyőt, és forgassa el a tengelykapcsolót, hogy lássa, rugalmasan forog-e
6. Csavarja ki a vízcsavart, és töltse fel a motor üregét tiszta, nem korrozív vízzel (megjegyzés: feltétlenül töltse fel), majd húzza meg a vízcsavart. 12 óra vízbefecskendezés után a motor szigetelési ellenállása nem lehet kisebb 150M Q-nál 500V-os rázóasztallal mérve.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
A mellékelt kábelezési folyamatábra a következő:
8. Multiméter segítségével ellenőrizze, hogy a háromfázisú vezetékek csatlakoztatva vannak-e, és hogy az egyenáramú ellenállás megközelítőleg kiegyensúlyozott-e.
9. Ellenőrizze, hogy nincs-e túlterhelve az áramkör és a transzformátor kapacitása, majd csatlakoztassa a túlterhelésvédő kapcsolót vagy az indítóberendezést. Lásd a 2. táblázatot az egyes modellekért, majd öntsön egy vödör vizet a vízszivattyúba a vízszivattyú kimeneténél, hogy megkenje a szivattyú gumicsapágyait, majd helyezze függőlegesen és stabilan a merülő elektromos szivattyút. Indítás (legfeljebb egy másodperc) és ellenőrizze, hogy a kormányzás iránya összhangban van-e a kormánytáblával. Ha nem, cserélje ki a háromfázisú kábel bármelyik két csatlakozóját. Ezután helyezze be a szűrőt, és készüljön fel a kútba való lejutásra. Ha különleges alkalmakkor (például árkok, árkok, folyók, tavak, tavak stb.) használják, az elektromos szivattyút megbízhatóan földelni kell.
(2) Szerelési berendezések és szerszámok:
1. Egy pár emelőlánc több mint két tonnához.
2. Legalább négy méter függőleges magasságú állvány.
3. Két akasztókötél (drótkötél), amelyek egy tonnánál nagyobb súlyt is elbírnak (elbírják egy teljes vízszivattyú-készlet súlyát).
4. Szereljen fel két pár bilincset (sínt).
5. Villáskulcsok, kalapácsok, csavarhúzók, elektromos szerszámok és műszerek stb.
(3) Elektromos szivattyú beszerelése:
1. A merülő elektromos szivattyú beépítési rajza a 2. ábrán látható. A konkrét beépítési méretek a 3. táblázatban láthatók "A merülő elektromos szivattyú beépítési méreteinek listája".
2. A 30 méternél kisebb emelőmagasságú búvárszivattyúk közvetlenül a kútba emelhetők tömlők és drótkötelek vagy más kenderkötelek segítségével, amelyek elbírják a teljes gép, a vízvezetékek és a csövekben lévő víz teljes súlyát.
3. A 30 méternél nagyobb fejű szivattyúk acélcsöveket használnak, és a telepítési sorrend a következő:
①Kilincs segítségével rögzítse a vízszivattyú alkatrészének felső végét (a motor és a vízszivattyú ekkor össze van kötve), emelje fel egy függőlánccal, és lassan kösse be a kútba, amíg Tegye fel a bilincset a kútfejre és távolítsa el a függő lánc.
② Használjon egy másik bilincspárt egy cső rögzítéséhez, emelje fel egy függőlánccal 15 cm-re a karimától, és lassan engedje le. A csőkarima és a szivattyú karima közé Helyezze a gumibetétet a helyére, és csavarokkal, anyákkal és rugós alátétekkel egyenletesen húzza meg a csövet és a szivattyút.
③ Enyhén emelje meg a búvárszivattyút, távolítsa el a bilincset a vízszivattyú felső végén, rögzítse a kábelt erősen a vízcsőhöz egy műanyag szalaggal, és lassan kösse le, amíg a bilincs a kútfejre nem kerül.
④ Ugyanezzel a módszerrel kösse be az összes vízvezetéket a kútba.
⑤ Miután a kivezető kábelt csatlakoztatta a vezérlőkapcsolóhoz, csatlakozik a háromfázisú tápegységhez.
(4) A telepítés során figyelni kell:
1. Ha a szivattyúzási folyamat során elakadást észlel, fordítsa el vagy húzza meg a vízcsövet, hogy kiküszöbölje az elakadási pontot. Ha a különféle intézkedések továbbra sem működnek, kérjük, ne erőltesse le a szivattyút, hogy elkerülje a merülő elektromos szivattyú és a kút sérülését.
2. A szerelés során minden cső karimájára gumibetétet kell helyezni, és egyenletesen meg kell húzni.
3. Amikor a vízszivattyút leengedik a kútba, a kútcső közepére kell helyezni, hogy a szivattyú ne futhasson hosszú ideig a kút falának, ami a szivattyú rezgését, a motor söpörését és égését okozza. .
4. Határozza meg a vízszivattyú mélységét a kút aljáig a kút folyó homok- és iszapviszonyoknak megfelelően. Ne temessük a szivattyút a sárba. A vízszivattyú és a kút alja közötti távolság általában nem kevesebb, mint 3 méter (lásd a 2. ábrát).
5. A vízszivattyú vízbevezetési mélysége nem lehet kevesebb, mint 1-1,5 méter a dinamikus vízszinttől a vízbevezető csomópontig (lásd 2. ábra). Ellenkező esetben a vízszivattyú csapágyai könnyen megsérülhetnek.
6. A vízszivattyú emelése nem lehet túl alacsony. Ellenkező esetben a kútfej vízvezetékére tolózárat kell felszerelni, amely szabályozza a szivattyú áramlását a névleges áramlási ponton, hogy megakadályozza a motor túlterhelését és kiégését a nagy áramlási sebességek miatt.
7. Amikor a vízszivattyú működik, a vízkimenetnek folyamatosnak és egyenletesnek kell lennie, az áramerősségnek stabilnak kell lennie (névleges üzemi körülmények között, általában nem haladhatja meg a névleges áram 10%-át), és nem lehet rezgés vagy zaj. Ha bármilyen rendellenességet észlel, le kell állítani a gépet, hogy megtudja az okot és megszüntesse azt.
8. Telepítéskor ügyeljen a motor földelő vezetékének beállítására (lásd 2. ábra). Ha a vízcső acélcső, vezesse ki a kútfej bilincséből; ha a vízcső műanyag cső, vezesse el az elektromos szivattyú földelési jelétől.
- 1.After installing the submersible pump, recheck the insulation resistance and the three-phase continuity at the switch, and check whether there are errors in the connection of the instrument and the starting equipment.If there are no problems, you can start to test the machine. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump emits any noise or vibration. If everything is normal, it can be put into operation.
- 2. After the pump runs for the first four hours, the thermal insulation resistance of the motor should be closed and tested quickly.Its value should not be less than 0.5 megaohm.After the pump stops, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and burning the motor due to excessive current.
- 3. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1 Névleges üzemállapotban az áram meghaladja a 20%-ot.
- 2 A dinamikus vízszint leesik a vízbevezető szakaszra, ami időszakos vízfolyást okoz.
- 3 A búvárszivattyú erős vibrációt vagy zajt mutat.
- 4 A tápfeszültség kisebb, mint 340 volt.
- 5 Egy biztosíték kiégett.
- 6 A vízellátó cső sérült.
- 7 A motor geotermikus állapottal szembeni szigetelési ellenállása kisebb, mint 0,5 megaohm.
- Unit disassembly:
- 1.untie cable rope, remove the pipeline part, remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the inlet junction with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) inlet junction, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising of the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the reverse order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product adopts advanced design and provides advanced storage suggestions to ensure long-term use effect.First of all, in winter, it is necessary to exhaust all the water to prevent freezing. In addition, the wire rolls should be placed well and tied up.Secondly, when storing, the environment without corrosive action and gas should be selected and the temperature should be kept below 40 °C. Finally, when not used for a long time, attention should be paid to prevent rust of submersible pump.These storage requirements will ensure that the product can maintain its performance status and prolong its service life for a long time.
- Járókerék
- Tengelyhüvely
- Gumi tengelyhüvely
-
Tömítőgyűrű
01 Mélykút vízvétele
02 Sokemeletes vízellátás
03 hegyi vízellátás
04 toronyvíz
05 Mezőgazdasági öntözés
06 kerti öntözés
07 folyami vízvétel
08 használati víz