QJP series fountain pump is a special pump for fountain developed by our factory.The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, good magnetic conductivity, and frequent start will not fever.Both ends of the motor rotor use water as lubricant alloy copper sleeve.Stainless steel sleeve instead of ball bearings, to avoid the problem of easy rust ball bearings and lack of oil wear and tear the motor.The most suitable for music fountain use, all models can be used.
This product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply system. Applicable water quality conditions include water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, it must be filled with clean water to prevent false filling, and then tighten the water injection and exhaust bolts, otherwise it is not allowed to use. The submersible pump must be completely immersed in water, and the penetration depth shall not exceed 70m. The distance between the submersible pump base and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the water output and continuous operation of the submersible pump. The water output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump can not be used horizontally or upside down, but only vertically. The submersible pump shall be equipped with cables and external overload protection devices as required. The pump is strictly prohibited from no-load test without water.
Modell | Flow (m3/h) | Kapp (m) |
Rotatiounsgeschwindegkeet (Ännerung / Punkt) |
Waasserpompel (%) | Outlet Duerchmiesser (mm) |
Gutt applicabel Duerchmiesser (mm) |
Bewäert power(KW) |
Bewäert Spannung (V) |
Bewäert aktuell (A) |
Motoreffizienz (%) | Power factorcosφ | Eenheet Radial Maximum Gréisst (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175uewen | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175uewen | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175uewen | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175uewen | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175uewen | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175uewen | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175uewen | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175uewen | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175uewen | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175uewen | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175uewen | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175uewen | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175uewen | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, strikt no de Bestëmmunge vun der Pompel Lift, Flux Gamme vun benotzen, niddereg Flux oder héich Lift Pompel Kraaft ze verhënneren, de Schub Lager an aner Deeler vun der zouzedrécken, de Motor iwwerlaascht verbrannt
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main features of the product include: the motor is a water immersed wet three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing; the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of temperature; in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring; in order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed under the motor; the lubrication of the motor and the pump bearing is water lubrication; the stator winding of the motor is made of high quality submersible motor winding, with high insulation performance; the pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Virbereedung virun der Installatioun:
1. Iwwerpréift ob d'Tauchtpompel d'Benotzungsbedéngungen an den Ëmfang entsprécht, déi am Handbuch spezifizéiert sinn.
2. Benotzt e schwéieren Objet mat engem Duerchmiesser gläich wéi de maximalen äusseren Duerchmiesser vun der Tauchpompel, moosst ob den Inneldiameter vun der Wellbore d'Tauchpompel passt, a moosst ob d'Wueldéift d'Installatiounsufuerderunge entsprécht.
3. Iwwerpréift ob de Wellbore propper ass an ob d'Wuelwasser türbid ass. Benotzt ni eng submersibel elektresch Pompel fir de Welor Pompel Schlamm a Sand Waasser ze wäschen fir virzäitegen Schued un der Tauchtpompel ze vermeiden.
4. Iwwerpréift ob d'Positioun vun der Wellhead Installatiounsklem gëeegent ass an ob et d'Qualitéit vun der ganzer Eenheet widderstoen kann
5. Iwwerpréift ob d'Tauchpompelkomponenten komplett sinn a richteg installéiert sinn no dem Montagediagramm am Handbuch De Filterbildschierm ewechhuelen an d'Kupplung rotéieren fir ze kucken ob se flexibel rotéiert
6. Schrauwen d'Waasserschrauwen un a fëllt d'Motorhuelraum mat propperem, net ätzendem Waasser (Notiz. Gitt sécher datt Dir se fillt), da dréit d'Waasserschraube fest. No 12 Stonnen Waasserinjektioun, däerf d'Isolatiounsresistenz vum Motor net manner wéi 150M Q sinn wann se mat engem 500V Schüttdësch gemooss ginn.
7. Kabelverbindung, schneiden eng 120mm Gummi-Hülse vun engem Enn vum erausgaange Kabel an de passende Kabel mat engem Elektriker Messer ofschneid dann d'Längt vun den dräi Kärdrähten an enger gesträifter Form, schielen en 20mm Kupferkär, schrauwen vum Oxid Layer op der ausserhalb vun der Koffer Drot mat engem Messer oder Sand Stoff, an setzen déi zwee verbonne Drot Enn an Palirs.No der Layer dicht mat feine Koffer Drot, solder et grëndlech a fest, a Sand vun all. Burrs op der Uewerfläch. Dann, fir déi dräi Gelenker, benotzt Polyvester Isolatiounsband fir se op eng hallef gestapelt Manéier fir dräi Lavers ze wéckelen. Wickelt déi zwee Enden vun der Wrappingschicht fest mat Nyion Fuedem, a benotzt dann eng semi-gestapelt Method fir de Band fir dräi Schichten ze wéckelen. Wrap den Outellayer mat Héichdrockisolatiounsband fir dräi Schichten. Endlech, klappt d'Drei Strécke zesummen a wéckelt se ëmmer erëm fir fënnef Schichten mat Héichdrockband. All Schicht muss enk gebonnen sinn, an d'Interlayer Gelenker mussen enk a fënnef sinn fir ze verhënneren datt Waasser d'Isolatioun penetréiert an beschiedegt. , déi net manner wéi 100M Ω soll sinn
Dat befestegt Kabelverdrahtungsdiagramm ass wéi follegt:
8. Benotzt e Multimeter fir z'iwwerpréiwen ob d'Drei-Phas-Drähte verbonne sinn an ob d'DC-Resistenz ongeféier ausgeglach ass.
9. Kontrolléiert ob de Circuit an den Transformatorkapazitéit iwwerlaascht sinn, a verbënnt dann den Iwwerlaaschtschutzschalter oder Startausrüstung. Gesinn Table 2 fir spezifesch Modeller, an dann Pour engem Eemer Waasser an d'Waasser Pompel aus dem Waasser Pompel Outlet der Gummistécker Lager an der Pompel ze schmieren, an dann Plaz der submersible elektresch Pompel oprecht a steady.Start (net méi wéi eng Sekonn) a kontrolléiert ob d'Steierungsrichtung mat dem Lenkzeechen konsequent ass. Wann net, swap all zwee Stecker vun der dräi-Phase Kabel. Dann installéiert de Filter a preparéieren der gutt erof goen. Wann se a speziellen Occasiounen benotzt ginn (wéi Grape, Gruef, Flëss, Weiere, Weiere, etc.), muss d'elektresch Pompel zouverlässeg Buedem sinn.
(2) Installatioun Ausrüstung an Tools:
1. Ee Paar Liftketten fir méi wéi zwee Tonnen.
2. E Stativ mat enger vertikaler Héicht vun net manner wéi véier Meter.
3. Zwee hängend Seeler (Draadseeler), déi e Gewiicht vu méi wéi engem Ton droen kënnen (kann d'Gewiicht vun engem komplette Set vu Waasserpompelen droen).
4. Installéiert zwee Puer Klameren (Splint).
5. Wrenches, Hammers, screwdrivers, elektresch Handwierksgeschir an Instrumenter, etc.
(3) Elektresch Pompel Installatioun:
1. D'Installatiounsdiagramm vun der Tauchpompel gëtt an der Figur 2. Déi spezifesch Installatiounsdimensioune ginn an der Tabell 3 "Lëscht vun Installatiounsdimensioune vun der Tauchtpompel" gewisen.
2. Submersibel elektresch Pompelen mat engem Kapp manner wéi 30 Meter kënnen direkt an d'Brunn geheien ginn mat Schlauchen a Drahtseeler oder aner Hanf Seeler, déi de ganze Gewiicht vun der ganzer Maschinn, Waasserleitungen a Waasser an de Päifen droen kënnen.
3. Pompelen mat engem Kapp vu méi wéi 30 Meter benotzen Stahlleitungen, an d'Installatiounssequenz ass wéi follegt:
①Benotzt eng Klemm fir den ieweschten Enn vum Waasserpompeldeel ze klemmen (de Motor a Waasserpompel sinn zu dësem Zäitpunkt ugeschloss), hieft se mat enger hängender Kette op, a bindt se lues an d'Brunn bis d'Klemm op de Brunnkopf setzt an d'Klemm erofhuelen. hängend Kette.
② Benotzt en anert Pair vu Klameren fir e Päif ze klemmen, hieft et mat enger hängender Kette 15 cm ewech vum Flange, a setzt se lues erof. Zwëschen Päifflens a Pompelflens Setzt d'Gummi-Pad op der Plaz a spannen d'Päif a pompelen gläichméisseg mat Bolzen, Nëss a Fréijoerswäschen.
③ Lift d'Tauchtpompel liicht op, huelt d'Klemm op der ieweschter Enn vun der Waasserpompel erof, bannen de Kabel fest an d'Waasserleitung mat engem Plastiksband, a bannen se lues erof bis D'Klemm op der Wellhead plazéiert ass.
④Benotz déiselwecht Method fir all Waasserleitungen an d'Bunn ze verbannen.
⑤Nodeems de Lead-Out-Kabel un de Kontrollschalter ugeschloss ass, ass et mat der Dräi-Phase-Energieversuergung ugeschloss.
(4) Saachen ze notéieren während der Installatioun:
1. Wann e Stau-Phänomen während dem Pompelprozess fonnt gëtt, dréit oder zitt d'Waasserleitung fir de Staupunkt ze iwwerwannen. Wann verschidde Moossnamen nach ëmmer net funktionnéieren, w.e.g. Kraaft d'Pompel net erof fir Schued un der Tauchtpompel an der Brunn ze vermeiden.
2. Bei der Installatioun sollt e Gummi-Pad am Flange vun all Päif plazéiert ginn a gläichméisseg festgehalen ginn.
3. Wann d'Waasserpompel an d'Wuel erofgesat gëtt, sollt et an der Mëtt vun der Brunnpipe plazéiert ginn, fir datt d'Pompel net laang géint d'Wuelmauer leeft, sou datt d'Pompel vibréiert an de Motor schëdden a brennt. .
4. Bestëmmt d'Tiefe vun der Waasserpompel bis zum Buedem vun der Brunn no de fléissende Sand a Siltbedingunge vun der Brunn. Begruewen d'Pompel net am Bulli. D'Distanz vun der Waasserpompel bis zum Enn vun der Brunn ass normalerweis net manner wéi 3 Meter (kuckt Figur 2).
5. D'Waasserentrée Tiefe vun der Waasserpompel sollt net manner wéi 1-1,5 Meter vum dynamesche Waasserniveau op d'Waasserinletknuet sinn (kuckt Figur 2). Soss kënnen d'Waasserpompellager liicht beschiedegt ginn.
6. De Lift vun der Waasserpompel kann net ze niddreg sinn. Soss muss e Paartventil op der Wellhead Waasserleitung installéiert ginn fir de Pompelstroum um bewäertte Flosspunkt ze kontrolléieren fir ze verhënneren datt de Motor iwwerlaascht a verbrannt gëtt wéinst grousse Flowraten.
7. Wann d'Waasserpompel leeft, soll d'Waasserausgang kontinuéierlech sinn a souguer, de Stroum soll stabil sinn (ënner bewäertte Aarbechtsbedingunge, allgemeng net méi wéi 10% vum bewäerten Stroum), an et sollt keng Schwéngung oder Kaméidi sinn. Wann et eng Anomalie ass, sollt d'Maschinn gestoppt ginn fir d'Ursaach erauszefannen an ze eliminéieren.
8. Beim Installatioun, oppassen op d'Astellung vum Motor Buedemdraad (kuckt Bild 2). Wann d'Waasser Päif e Stol Päif ass, féiert et aus der wellhead clamp; wann d'Waasserleitung e Plastiksleit ass, féiert se vun der Äerdmarke vun der elektrescher Pompel.
- 1.After installing the submersible pump, recheck the insulation resistance and the three-phase continuity at the switch, and check whether there are errors in the connection of the instrument and the starting equipment.If there are no problems, you can start to test the machine. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump emits any noise or vibration. If everything is normal, it can be put into operation.
- 2. After the pump runs for the first four hours, the thermal insulation resistance of the motor should be closed and tested quickly.Its value should not be less than 0.5 megaohm.After the pump stops, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and burning the motor due to excessive current.
- 3. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1 Am bewäertten Aarbechtskonditioun ass de Stroum méi wéi 20%.
- 2 Den dynamesche Waasserniveau fällt op d'Waasserintaksektioun, wat intermittéiert Waasser verursaacht.
- 3 D'Tauchtpompel huet schwéier Schwéngungen oder Kaméidi.
- 4 D'Versuergungsspannung ass manner wéi 340 Volt.
- 5 Eng Sicherung ass ausgebrannt.
- 6 D'Waasserversuergungsleitung ass beschiedegt.
- 7 D'Isolatiounsresistenz vum Motor géint de geothermesche Staat ass manner wéi 0,5 Megaohm.
- Unit disassembly:
- 1.untie cable rope, remove the pipeline part, remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the inlet junction with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) inlet junction, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising of the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the reverse order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product adopts advanced design and provides advanced storage suggestions to ensure long-term use effect.First of all, in winter, it is necessary to exhaust all the water to prevent freezing. In addition, the wire rolls should be placed well and tied up.Secondly, when storing, the environment without corrosive action and gas should be selected and the temperature should be kept below 40 °C. Finally, when not used for a long time, attention should be paid to prevent rust of submersible pump.These storage requirements will ensure that the product can maintain its performance status and prolong its service life for a long time.
- Impeller
- Schaft Hülse
- Gummistécker Schacht Hülse
-
Dichtungsring
01 Déift gutt Waasser ofgeroden
02 Héichwaasserversuergung
03 Bierg Waasser Fourniture
04 Tuerm Waasser
05 Landwirtschaftlech Bewässerung
06 Gaart Bewässerung
07 Floss Waasser ofgeroden
08 Hauswaasser