200QJP Peep Quduqli suv osti nasosi

OEM ishlov berishni amalga oshiring! Foydalanuvchi talablariga muvofiq, nostandart suv osti dvigatel va nasosning har xil turdagi maxsus talablarini loyihalash va ishlab chiqarish. Mahsulotni amalga oshirish standartlari: GB / T2816-2014 "quduqli suv osti nasosi", GB / T2818-2014 "quduqli suv ostida asenkron motor". WhatsApp: 17855846335
PDF DOWNLOAD
Tafsilotlar
Teglar
 
Mahsulotga umumiy nuqtai

QJP series special fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are covered with alloy copper sleeve as lubricant, using water. Stainless steel sleeves replace ball bearings, avoiding the problem of easy rust of ball bearings and the problem of motor burning due to lack of oil wear. It is very suitable for music fountain, all models can be used horizontally.

 

 
Foydalanish shartlari

This product uses three-phase AC 380V power supply (tolerance + 5%), 50HZ frequency (tolerance + 1%); the applicable water quality conditions for water temperature is not higher than 20 °C, solid impurities content (mass ratio) is not more than 0.01%, pH value (pH) is 6.5-8.5, hydrogen sulfide content is not more than 1.5mg/L, chloride ion content is not more than 400mg/L. The motor adopts closed or water sealed wet structure, before use must be filled with clean water to prevent virtual filled, and then tighten the water injection and air exhaust bolts, otherwise not to use. Submersible pump must be completely immersed in water to work, immersion depth shall not exceed 70 meters, the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The water in the well should be able to meet the water output and continuous operation of the submersible pump, the water output of the pump should be controlled at 0.7-1.2 times the rated flow. The well should be kept vertical, the submersible pump can not be used horizontally or overturned, only vertical installation. The submersible pump must be equipped with cables as required, and equipped with external overload protection device. The pump is strictly prohibited from no water load test.

 

 
Model ma'nosi

 

 
Qisman namunaviy havola
Model Oqim (m3/soat) Bosh
(m)

Aylanish tezligi

(o'zgartirish / nuqta)

Suv nasosi(%)  Chiqish
diametri
(mm)
Yaxshi qo'llanilishi mumkin
diametri (mm) 
 Baholangan
power(KW)
Baholangan
kuchlanish (V)
Baholangan
joriy (A)
Motor samaradorligi (%) kuch faktoricosph   Birlik
Radial maksimal o'lcham (mm)
Izoh
200QJ20-40 20 40 2850 66 50  200yuqorida 4 380 10.1 76.0 0.79 184  
200QJ20-54 54 5.5 13.6 77.0 0.8  
200QJ20-81 81 7.5 18.0 78.0 0.81  
200QJ20-93 93 9.2 21.7 78.5 0.82  
200QJ20-108 108 11 25.8 79.0 0.82  
200QJ20-121 121 13 29.8 80.0 0.83  
200QJ20-148 148 15 33.9 81.0 0.83  
200QJ20-175 175 18.5 41.6 81.5 0.83  
200QJ20-202 202 22 48.2 82.5 0.84  
200QJ20-243 243 25 54.5 83.0 0.84  
200QJ20-270 270 30 65.4 83.0 0.84  
200QJ20-360 360 37 79.7 84.0 0.84  
200QJ20-442 442 45 96.9 84.0 0.84  
200QJ25-28 25 28 2850 68 65  200yuqorida 4 380 10.1 76.0 0.79 184  
200QJ25-42 42 5.5 13.6 77.0 0.8  
200QJ25-56 56 7.5 18.0 78.0 0.81  
200QJ25-70 70 9.2 21.7 78.5 0.82  
200QJ25-98 98 11 25.8 79.0 0.82  
200QJ25-112 25 112 2850 68 65  200yuqorida 13 380 29.8 80.0 0.83 184  
200QJ25-126 126 15 33.9 81.0 0.83  
200QJ25-154 154 18.5 41.6 81.5 0.83  
200QJ25-182 182 22 48.2 82.5 0.84  
200QJ25-210 210 25 54.5 83.0 0.84  
200QJ25-252 252 30 65.4 83.0 0.84  
200QJ25-308 308 37 79.7 84.0 0.84  
200QJ25-378 378 45 96.9 84.0 0.84  
200QJ32-26 32 26 2850 70 80  200yuqorida 4 380 10.1 76.0 0.79 184  
200QJ32-39 39 5.5 13.6 77.0 0.8  
200QJ32-52 52 7.5 18.0 78.0 0.81  
200QJ32-65 65 9.2 21.7 78.5 0.82  
200QJ32-78 78 11 25.8 79.0 0.82  
200QJ32-91 91 13 29.8 80.0 0.83  
200QJ32-104 104 15 33.9 81.0 0.83  
200QJ32-130 130 18.5 41.6 81.5 0.83  
200QJ32-143 143 22 48.2 82.5 0.84  
200QJ32-169 169 25 54.5 83.0 0.84  
200QJ32-195 195 30 65.4 83.0 0.84  
200QJ32-247 247 37 79.7 84.0 0.84  
200QJ32-299 299 45 96.9 84.0 0.84  
200QJ40-26 40 26 2850 72 80  200yuqorida 5.5 380 13.6 77.0 0.8 184  
200QJ40-39 39 7.5 18.0 78.0 0.81  
200QJ40-52 52 9.2 21.7 78.5 0.82  
200QJ40-65 65 11 25.8 79.0 0.82  
200QJ40-78 78 15 33.9 81.0 0.83  
200QJ40-104 104 18.5 41.6 81.5 0.83  
200QJ40-117 117 22 48.2 82.5 0.84  
200QJ40-143 143 25 54.5 83.0 0.84  
200QJ40-169 169 30 65.4 83.0 0.84  
200QJ40-208 208 37 79.7 84.0 0.84  
200QJ40-247 247 45 96.9 84.0 0.84  
200QJ50-26 50 26 2850 74 80  200yuqorida 5.5 380 13.6 77.0 0.8 184  
200QJ50-39 39 9.2 21.7 78.5 0.82  
200QJ50-52 52 11 25.8 79.0 0.82  
200QJ50-65 65 15 33.9 81.0 0.83  
200QJ50-78 78 18.5 41.6 81.5 0.83  
200QJ50-91 91 22 48.2 82.5 0.84  
200QJ50-104 104 25 54.5 83.0 0.84  
200QJ50-130 130 30 65.4 83.0 0.84  
200QJ50-156 156 37 79.7 84.0 0.84  
200QJ50-208 208 45 96.9 84.0 0.84  
200QJ63-24 63 24 2850 74 80  200yuqorida 7.5 380 18.0 78.0 0.81 184  
200QJ63-36 36 11 25.8 79.0 0.82  
200QJ63-60 60 18.5 41.6 81.5 0.83  
200QJ63-72 72 22 48.2 82.5 0.84  
200QJ63-84 84 25 54.5 83.0 0.84  
200QJ63-96 96 30 65.4 83.0 0.84  
200QJ63-120 120 37 79.7 84.0 0.84  
200QJ63-144 144 45 96.9 84.0 0.84  
200QJ80-22 80 22 2850 75 100  200yuqorida 7.5 380 18.0 78.0 0.81 184  
200QJ80-33 33 11 25.8 79.0 0.82  
200QJ80-44 44 15 33.9 81.0 0.83  
200QJ80-55 55 18.5 41.6 81.5 0.83  
200QJ80-66 66 22 48.2 82.5 0.84  
200QJ80-88 88 30 65.4 83.0 0.84  
200QJ80-99 99 37 79.7 84.0 0.84  
200QJ80-121 121 45 96.9 84.0 0.84  
200QJ100-18 100 18 2850 75 100  200yuqorida 9.2 380 21.7 78.5 0.82 184  
200QJ100-27 27 13 29.8 80.0 0.83  
200QJ100-36 36 18.5 41.6 81.5 0.83  
200QJ100-45 45 22 48.2 82.5 0.84  
200QJ100-54 54 25 54.5 83.0 0.84  
200QJ100-63 63 30 65.4 83.0 0.84  
200QJ100-72 100 72 2850 75 100  200yuqorida 37 380 79.7 84.0 0.84 184  
200QJ100-90 90 45 96.9 84.0 0.84  

 

 
Xavfsizlik choralari

 Well submersible pump is a kind of fresh water pump, it is strictly prohibited to dig new wells and pump mud and sand. The product adopts 380/50HZ voltage grade, other voltage grades shall not be used, and the submersible motor needs to be customized. Underground cables must use waterproof cables, and must be equipped with starting equipment, such as distribution box, etc. The starting equipment shall have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and no-load protection, etc. In abnormal cases, the protection device shall be tripped in time. When installed and used, the pump must be reliably grounded, it is prohibited to push and pull the switch when hands and feet are wet, and the power supply must be cut off before installation and maintenance of the pump. In the place where the pump is used, an obvious "anti-electric shock" sign must be set up. Before going down the well or installing, the motor must be filled with distilled water or non-corrosive clean cold water, and the water adding/discharge bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instantaneous start time shall not exceed one second to check whether the steering is correct, pay attention to safety, and prevent the pump from toppling and injuring people when it is upright. In strict accordance with the specified lift and flow range of the pump, to prevent the pump in low lift with large flow or in high lift with large traction, resulting in extreme wear of thrust bearings and other components, the motor overload and burn. After the pump into the well, the motor to the ground insulation resistance should be measured not less than 100MΩ. After the start, regular observation of voltage and current, and check whether the motor winding insulation meets the requirements; if the location of the pump storage temperature below freezing, should discharge the water in the motor cavity, to prevent water in the motor cavity ice and damage the motor due to low temperature.

 

 
Strukturaga kirish

Tuzilishi haqida qisqacha ma'lumot: nasos qismi asosan nasos mili, pervanel, burilish qobig'i, kauchuk podshipnik, nazorat valfi tanasi (ixtiyoriy qismlar) va boshqa komponentlardan iborat.Dvigatel qismi asosan taglik, bosimni tartibga soluvchi plyonka, surish rulmanı, surish plitasidan iborat. , pastki hidoyat yotoq o'rindig'i, stator, rotor, yuqori hidoyat yotoq o'rindig'i, qum halqasi, suv kirish qismi, simi va boshqa komponentlar.



Mahsulotning asosiy xususiyatlari quyidagilardan iborat:

 1, Dvigatel suv bilan to'ldirilgan nam suv osti uch fazali asenkron vosita bo'lib, vosita bo'shlig'i toza suv bilan to'la, dvigatelni sovutish va podshipnikni moylash uchun ishlatiladi, dvigatelning pastki qismidagi bosimni tartibga soluvchi plyonka sozlash uchun ishlatiladi. dvigatelning harorat ko'tarilishining o'zgarishi natijasida vujudga kelgan suvning kengayish va qisqarish bosimi farqi.

 2, quduq suvidagi qumning dvigatelga kirishiga yo'l qo'ymaslik uchun vosita milining yuqori uchi ikkita yog 'muhrlari bilan jihozlangan va qumni oldini olish strukturasini shakllantirish uchun qum halqasi o'rnatilgan.

 3, nasos milini ishga tushirishda ishlamasligi uchun nasos mili va vosita mili mufta bilan ulanadi va dvigatelning pastki qismida yuqori rulman o'rnatiladi.

 4, Dvigatel va nasos podshipnikining moylanishi suv moylash hisoblanadi.

 5, Dvigatel stator sargisi yuqori izolyatsiyalash ko'rsatkichlariga ega bo'lgan yuqori sifatli suv osti dvigatel o'rash simidan qilingan.

 6, nasos oddiy tuzilishga va yaxshi texnik ko'rsatkichlarga ega bo'lgan kompyuter SAPR tomonidan ishlab chiqilgan.

 
O'rnatish

(1) O'rnatishdan oldin tayyorgarlik:
1. Suv osti nasosining qo'llanmada ko'rsatilgan foydalanish shartlari va ko'lamiga mos kelishini tekshiring.
2. Diametri suv osti nasosining maksimal tashqi diametriga teng bo'lgan og'ir obiektdan foydalanib, quduqning ichki diametri suv osti nasosiga mos kelishini o'lchang va quduq chuqurligi o'rnatish talablariga javob beradimi yoki yo'qligini o'lchang.
3. Quduq qudug'ining tozaligini va quduq suvining loyqaligini tekshiring. Suv osti elektr nasosiga muddatidan oldin shikast etkazmaslik uchun hech qachon suv osti nasosidan loy va qumli suvni yuvish uchun foydalanmang.
4. Quduq boshini o'rnatish qisqichining joylashuvi mos yoki yo'qligini va u butun qurilma sifatiga bardosh bera oladimi yoki yo'qligini tekshiring.
5. Qo'llanmadagi yig'ish sxemasiga muvofiq suv osti nasosi komponentlari to'liq va to'g'ri o'rnatilganligini tekshiring. Filtr ekranini olib tashlang va muftani egiluvchan aylanayotganligini ko'rish uchun aylantiring.
6. Suv vintini bo'shating va vosita bo'shlig'ini toza, korroziy bo'lmagan suv bilan to'ldiring (eslatma. uni to'ldirishni unutmang), so'ngra suv vintini torting. 12 soatlik suv quyishdan so'ng, 500V chayqash stoli bilan o'lchanganda, dvigatelning izolyatsiyaga chidamliligi 150M Q dan kam bo'lmasligi kerak.
7. Kabelning birlashmasi, chiqadigan kabelning bir uchidan 120 mm rezina gilzani kesib oling va mos keladigan kabelni elektrchi pichog'i bilan kesib oling, so'ngra uchta yadroli simlarning uzunligini pog'onali shaklda siljiting, 20 mm mis yadroni tozalang, oksidni qirib tashlang. mis simning tashqi tomoniga pichoq yoki qum mato bilan qatlam qo'ying va ikkita bog'langan sim uchlarini palirlarga joylashtiring. Qatlamni nozik mis sim bilan mahkam bog'lab bo'lgandan so'ng, uni yaxshilab va mahkam lehimlang va har qandayini qumlang. yuzasida burmalar. Keyin, uchta bo'g'in uchun, ularni uchta laver uchun yarim qatlamli tarzda o'rash uchun polivester izolyatsiyalovchi lentadan foydalaning. O'rash qatlamining ikki uchini nyion ip bilan mahkam o'rang va keyin uchta qatlam uchun lentani o'rash uchun yarim qatlamli usuldan foydalaning. Tashqi qoplamani uchta qatlam uchun yuqori bosimli izolyatsiyalovchi lenta bilan o'rab oling. Nihoyat, uchta ipni bir-biriga katlayın va ularni yuqori bosimli lenta bilan beshta qatlam uchun qayta-qayta o'rang. Har bir qatlam mahkam bog'langan bo'lishi kerak va qatlamlar orasidagi bo'g'inlar suv o'tkazmasligi va izolyatsiyani shikastlamasligi uchun qattiq va qattiq bo'lishi kerak, o'ralganidan keyin xona haroratida 20 'C suvda 12 soat davomida namlang va izolyatsion qarshilikni silkituvchi stol bilan o'lchang. , bu 100M Ō dan kam bo'lmasligi kerak

 

Qo'shilgan kabelni ulash jarayoni diagrammasi quyidagicha:

 

8. Multimetrdan foydalanib, uch fazali simlarning ulanganligini va shahar qarshiligining taxminan muvozanatlanganligini tekshiring.
9. O'chirish va transformator quvvati haddan tashqari yuklangan yoki yo'qligini tekshirib ko'ring va keyin ortiqcha yuk himoyasi kalitini yoki ishga tushirish uskunasini ulang. Muayyan modellar uchun 2-jadvalga qarang, so'ngra nasosdagi rezina podshipniklarni moylash uchun suv nasosining chiqishidan suv nasosiga bir chelak suv quying, so'ngra suv ostidagi elektr nasosni tik va barqaror joylashtiring. Ishga tushirish (bir soniyadan oshmasligi kerak) va rul yo'nalishi rul belgisiga mos kelishini tekshiring. Agar yo'q bo'lsa, uch fazali kabelning har qanday ikkita ulagichini almashtiring.Keyin filtrni o'rnating va quduqqa tushishga tayyorlang. Maxsus holatlarda (masalan, ariqlar, ariqlar, daryolar, suv havzalari, suv havzalari va boshqalar) ishlatilsa, elektr nasos ishonchli tarzda erga ulangan bo'lishi kerak.

 

(2) O'rnatish uskunalari va asboblari:
1. Ikki tonnadan ortiq yuk ko'tarish uchun bir juft zanjir.
2. Vertikal balandligi to'rt metrdan kam bo'lmagan tripod.
3. Bir tonnadan ortiq og'irlikni ko'tara oladigan ikkita osilgan arqon (sim arqonlari) (suv nasoslarining to'liq to'plamining og'irligini ko'tara oladi).
4. Ikki juft qisqichni (shponlarni) o'rnating.
5. Kalitlar, bolg'alar, tornavidalar, elektr asboblari va asboblari va boshqalar.

 

(3) Elektr nasosni o'rnatish:
1. Suv osti elektr nasosining o'rnatish sxemasi 2-rasmda ko'rsatilgan. Maxsus o'rnatish o'lchamlari 3-jadvalda "Suv ​​ostidagi elektr nasosni o'rnatish o'lchamlari ro'yxati" da ko'rsatilgan.

 

2. Boshi 30 metrdan kam bo'lgan suv osti elektr nasoslari to'g'ridan-to'g'ri quduqqa shlanglar va sim arqonlar yoki butun mashinaning, suv quvurlarining va quvurlardagi suvning to'liq og'irligini ko'tara oladigan boshqa kanop arqonlari yordamida ko'tarilishi mumkin.

 

3. Boshi 30 metrdan ortiq bo‘lgan nasoslar po‘lat quvurlardan foydalanadi va o‘rnatish ketma-ketligi quyidagicha:
①Suv nasos qismining yuqori uchini qisqich bilan mahkamlang (motor va suv nasosi bu vaqtda ulangan), uni osilgan zanjir bilan ko'taring va quduq boshiga qisqichni o'rnatguncha sekin quduqqa bog'lab qo'ying va osilgan zanjir.
② Quvurni mahkamlash uchun yana bir juft qisqichdan foydalaning, uni osilgan zanjir bilan gardishdan 15 sm uzoqlikda ko'taring va sekin pastga tushiring. Quvur gardish va nasos gardishi o'rtasida Kauchuk yostiqni joyiga qo'ying va quvurni torting va murvat, yong'oq va prujinali rondelalar bilan bir tekisda pompalang.
③ Suv osti nasosini biroz ko'taring, suv nasosining yuqori uchidagi qisqichni echib oling, kabelni suv trubasiga plastik lenta bilan mahkam bog'lang va qisqich quduq boshiga o'rnatilguncha sekin bog'lang.
④Hamma suv quvurlarini quduqqa ulash uchun xuddi shu usuldan foydalaning.
⑤Chiqish kabeli boshqaruv kalitiga ulangandan so'ng, u uch fazali quvvat manbaiga ulanadi.


(4) O'rnatish vaqtida e'tiborga olish kerak bo'lgan narsalar:
1. Nasos jarayonida tiqilib qolish hodisasi aniqlansa, tiqilib qolish nuqtasini yengish uchun suv trubkasini burang yoki torting. Agar turli xil choralar hali ham ishlamasa, iltimos, suv osti elektr nasosi va quduqqa shikast etkazmaslik uchun nasosni majburlamang.
2. O'rnatish vaqtida har bir quvurning gardish qismida kauchuk yostiq qo'yilishi va bir tekis tortilishi kerak.
3. Suv nasosi quduqqa tushirilganda, nasosning quduq devoriga uzoq vaqt davomida ishlamasligi, nasosning tebranishi va dvigatelning supurib yonishiga olib kelishi uchun uni quduq trubasining o'rtasiga qo'yish kerak. .
4. Quduqning oqayotgan qum va loy sharoitiga qarab suv nasosining quduq tubiga chuqurligini aniqlang. Nasosni loyga ko'mmang. Suv nasosidan quduq tubigacha bo'lgan masofa odatda 3 metrdan kam emas (2-rasmga qarang).
5. Suv nasosining suvga kirish chuqurligi dinamik suv sathidan suv kirish tuguniga qadar 1-1,5 metrdan kam bo'lmasligi kerak (2-rasmga qarang). Aks holda, suv nasosining podshipniklari osongina shikastlanishi mumkin.
6. Suv nasosining ko'tarilishi juda past bo'lishi mumkin emas. Aks holda, katta oqim tezligi tufayli dvigatelning haddan tashqari yuklanishi va yonib ketishining oldini olish uchun nominal oqim nuqtasida nasos oqimini nazorat qilish uchun quduq bo'yidagi suv quvur liniyasiga eshik klapanini o'rnatish kerak.
7. Suv pompasi ishlayotganida, suv chiqishi uzluksiz va bir tekis bo'lishi kerak, oqim barqaror bo'lishi kerak (nominal ish sharoitida, odatda nominal oqimning 10% dan ko'p bo'lmagan) va tebranish yoki shovqin bo'lmasligi kerak. Agar biron bir anormallik bo'lsa, sababni aniqlash va uni bartaraf etish uchun mashinani to'xtatish kerak.
8. O'rnatishda vosita topraklama simini sozlashga e'tibor bering (2-rasmga qarang). Suv trubkasi po'lat quvur bo'lsa, uni quduqning qisqichidan olib boring; suv trubkasi plastik quvur bo'lsa, uni elektr nasosning topraklama belgisidan olib boring.

 

 
Xizmat va texnik xizmat ko'rsatish
  • 1. Suv osti nasosi o'rnatilgandan so'ng, kalitdan izolyatsiya qarshiligi va uch fazali o'tkazuvchanlikni yana tekshiring, asbob va ishga tushirish uskunasining ulanishi noto'g'ri yoki yo'qligini tekshiring, agar muammo bo'lmasa, sinov mashinasini ishga tushirish mumkin, va ishga tushirilgandan so'ng asbobning indikator ko'rsatkichlari nominal kuchlanish va oqimdan oshib ketishini kuzatib boring va nasosning shovqin va tebranish hodisasi bor-yo'qligini kuzatib boring va agar hamma narsa normal bo'lsa, ishga tushiring.
  • 2.To'rt soat davomida nasosning birinchi ishidan so'ng, issiqlik izolyatsiyasi qarshiligini tezda sinab ko'rish uchun vosita o'chirilishi kerak va uning qiymati 0,5 megaohmdan kam bo'lmasligi kerak.
  • 3.Nasos o'chirilgandan so'ng, quvurdagi suv ustunining to'liq qayta oqimiga yo'l qo'ymaslik va haddan tashqari vosita oqimi va yonishini oldini olish uchun uni besh daqiqadan so'ng ishga tushirish kerak.
  • 4.Nasos normal ishga tushirilgandan so'ng, uning ishlash muddatini uzaytirish uchun muntazam ravishda besleme zo'riqishida, ish oqimi va izolyatsiya qarshiligi normal yoki yo'qligini tekshirish kerak. Agar quyidagi shartlar aniqlansa, muammolarni bartaraf etish uchun nasosni darhol o'chirib qo'yish kerak.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Dinamik suv sathi suv kirish qismiga tushib, suvning vaqti-vaqti bilan paydo bo'lishiga olib keladi.
  • 3 Suv osti nasosi kuchli tebranish yoki shovqinga ega.
  • 4 Ta'minot kuchlanishi 340 voltdan past.
  • 5 Sug'urta yonib ketgan.
  • 6 Suv ta'minoti trubkasi shikastlangan.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Saqlash va saqlash

 This product is a submersible pump, which is suitable for various water areas, such as home, agriculture and industry.In order to prevent the motor from freezing in winter, be sure to discharge all the water in the pump chamber, and roll and tie the cable well.In addition, a room without corrosive substances and gases and with a temperature below 40 °C should be selected for storage.When not in use for a long time, special attention should be paid to the rust prevention of the submersible pump.This product is exquisitely designed and convenient to use, which can help users efficiently deal with various water needs, and is an ideal choice for your home and industrial water.

 

 
Ehtiyot qismlar
  • Pervanel
  • Mil yengi
  • Kauchuk mil yengi
  • Muhrlash halqasi

 
Ilova stsenariylari

01 Chuqur quduqdan suv olish

02 Ko'p qavatli suv ta'minoti

03 tog 'suv ta'minoti

04 minora suvi

05 Qishloq xo'jaligini sug'orish

06 bog'ni sug'orish

07 daryo suv olish

08 maishiy suv

 

Agar siz bizning mahsulotlarimizga qiziqsangiz, ma'lumotingizni shu yerda qoldirishingiz mumkin va biz tez orada siz bilan bog'lanamiz.


Xabaringizni shu yerga yozing va bizga yuboring

Agar siz bizning mahsulotlarimizga qiziqsangiz, ma'lumotingizni shu yerda qoldirishingiz mumkin va biz tez orada siz bilan bog'lanamiz.


uz_UZUzbek