300QJB chuqur quduqli suv osti nasosi

OEM ishlov berishni amalga oshiring! Foydalanuvchi talablariga muvofiq, nostandart suv osti dvigatel va nasosning har xil turdagi maxsus talablarini loyihalash va ishlab chiqarish. Mahsulotni amalga oshirish standartlari: GB / T2816-2014 "quduqli suv osti nasosi", GB / T2818-2014 "quduqli suv ostida asenkron motor". WhatsApp: 17855846335
PDF DOWNLOAD
Tafsilotlar
Teglar
 
Mahsulotga umumiy nuqtai

This product adopts a variable frequency winding design, ensuring the motor's smooth conversion operation between 1HZ and 50HZ for a long time. This innovative design not only saves energy and prolongs service life, but also provides lasting and reliable performance in the work process. Whether in a home or industrial environment, this product will provide users with excellent efficiency and reliability, making it an indispensable tool in the manufacturing and production process.

 

Foydalanish shartlari

1, quvvat manbai: uch fazali AC 380V (tolerantlik + / - 5%), 50HZ (tolerantlik + / - 1%).

2, suv sifati:

(1) water temperature is not higher than 20 °C;

(2) qattiq aralashmalar miqdori (massa nisbati) 0,01% dan ko'p emas;

(3) PH qiymati (pH) 6,5-8,5;

(4) vodorod sulfidi miqdori 1,5 mg / L dan oshmaydi;

(5) xlorid ionining miqdori 400 mg / L dan oshmaydi.

3, vosita yopiq yoki suv bilan to'ldirilgan ho'l tuzilishga ega, ishlatishdan oldin suv ostidagi vosita bo'shlig'i toza suv bilan to'la bo'lishi kerak, noto'g'ri to'ldirilishining oldini olish uchun, keyin suv quyish, havo chiqarish murvatlarini torting, aks holda foydalanishga ruxsat etilmaydi.

4, submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m. 5, the well water flow should be able to meet the submersible pump water output and continuous operation, the submersible pump water output should be controlled at 0.7 - 1.2 times the rated flow.

6, quduq to'g'ri bo'lishi kerak, suv osti nasosini ishlatish yoki tushirish mumkin emas, faqat vertikal foydalanish.

7, suv osti nasosi talablarga muvofiq simi va tashqi ortiqcha yukdan himoya qilish moslamasi bilan mos kelishi kerak.

8, nasos suvsiz yuk sinov mashinasisiz qat'iyan man etiladi

 

 
Model ma'nosi

300QJB Deep Well Submersible Pump

 
Qisman namunaviy havola
Model Oqim (m3/soat) Bosh
(m)

Aylanish tezligi

(o'zgartirish / nuqta)

Suv nasosi(%)  Chiqish
diametri
(mm)
Yaxshi qo'llanilishi mumkin
diametri (mm) 
 Baholangan
power(KW)
Baholangan
kuchlanish (V)
Baholangan
joriy (A)
Motor samaradorligi (%) power factorcosφ   Birlik
Radial maksimal o'lcham (mm)
Izoh
300QJ200-40 200 40 2900 76 150  300yuqorida 37 380 77.8 85.0 0.85 281  
300QJ200-60 60 55 115 85.5 0.85  
300QJ200-80 80 75 154.1 86.0 0.86  
300QJ200-100 100 90 183.8 86.5 0.86  
300QJ200-120 120 100 204.3 86.5 0.86  
300QJ200-140 140 125 249.5 87.5 0.87  
300QJ200-160 160 140 277.8 88.0 0.87  
300QJ200-180 180 160 317.5 88.0 0.87  
300QJ200-200 200 185 367.2 88.0 0.87  
300QJ200-240 240 220 436.6 88.0 0.87  
300QJ320-30 320 30 2900 77 200  300yuqorida 45 380 94.6 85.0 0.85 281  
300QJ320-60 60 90 183.8 86.5 0.86  
300QJ320-90 90 125 249.5 87.5 0.87  
300QJ320-120 120 160 317.5 88.0 0.87  

 

 
Xavfsizlik choralari

 This well submersible pump is a pump suitable for clean water. It is strictly prohibited to dig new wells and pump dirty water containing sediment. The voltage grade of the pump is 380/50HZ, and other submersible motors with different voltage grades need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as short circuit overload protection, dephase protection, undervoltage protection, grounding protection and idling protection, etc., in order to prevent timely tripping when abnormal conditions occur. During the installation and use process, the pump must have reliable grounding. It is strictly prohibited to push and pull the switch when your hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. An obvious sign "anti-electric shock" must be set up where the pump is used. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water, and the water inlet and outlet bolts must be tightened. When testing the pump on the ground, water must be filled into the pump chamber to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the steering is correct. Pay attention to safety when the pump is upright to prevent toppling and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump with a large flow at low lift or produce a large pull at high lift, resulting in extreme wear of thrust bearings and other parts, the motor overload and burn. After the pump into the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ. After starting, regularly observe the voltage and current, and check whether the motor winding insulation meets the requirements; if the pump storage temperature below freezing point, should be drained to prevent the water in the motor cavity from freezing and cause the motor damage due to low temperature.

 

 
Strukturaga kirish

The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components.


Mahsulotning asosiy xususiyatlari quyidagilardan iborat:

  1. 1.The motor is a water-filled wet submersible three-phase asynchronous motor. The motor cavity is filled with clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water in the body caused by the temperature rise of the motor.
  2. 2. In order to prevent the sand particles from entering the motor, two sand seals are installed at the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring.
  3. 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed at the bottom of the motor.
  4. 4. The lubrication method of the motor and the pump bearing is water lubrication.
  5. 5. The stator winding of the motor adopts high quality submersible motor winding wire with high insulation performance.
  6. 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.
300QJB Deep Well Submersible Pump
 
O'rnatish

(1) O'rnatishdan oldin tayyorgarlik:
1. Suv osti nasosining qo'llanmada ko'rsatilgan foydalanish shartlari va ko'lamiga mos kelishini tekshiring.
2. Diametri suv osti nasosining maksimal tashqi diametriga teng bo'lgan og'ir obiektdan foydalanib, quduqning ichki diametri suv osti nasosiga mos kelishini o'lchang va quduq chuqurligi o'rnatish talablariga javob beradimi yoki yo'qligini o'lchang.
3. Quduq qudug'ining tozaligini va quduq suvining loyqaligini tekshiring. Suv osti elektr nasosiga muddatidan oldin shikast etkazmaslik uchun hech qachon suv osti nasosidan loy va qumli suvni yuvish uchun foydalanmang.
4. Quduq boshini o'rnatish qisqichining joylashuvi mos yoki yo'qligini va u butun qurilma sifatiga bardosh bera oladimi yoki yo'qligini tekshiring.
5. Qo'llanmadagi yig'ish sxemasiga muvofiq suv osti nasosi komponentlari to'liq va to'g'ri o'rnatilganligini tekshiring. Filtr ekranini olib tashlang va muftani egiluvchan aylanayotganligini ko'rish uchun aylantiring.
6. Suv vintini bo'shating va vosita bo'shlig'ini toza, korroziy bo'lmagan suv bilan to'ldiring (eslatma. uni to'ldirishni unutmang), so'ngra suv vintini torting. 12 soatlik suv quyishdan so'ng, 500V chayqash stoli bilan o'lchanganda, dvigatelning izolyatsiyaga chidamliligi 150M Q dan kam bo'lmasligi kerak.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Qo'shilgan kabelni ulash jarayoni diagrammasi quyidagicha:
300QJB Deep Well Submersible Pump

 

8. Multimetrdan foydalanib, uch fazali simlarning ulanganligini va shahar qarshiligining taxminan muvozanatlanganligini tekshiring.
9. O'chirish va transformator quvvati haddan tashqari yuklangan yoki yo'qligini tekshirib ko'ring va keyin ortiqcha yuk himoyasi kalitini yoki ishga tushirish uskunasini ulang. Muayyan modellar uchun 2-jadvalga qarang, so'ngra nasosdagi rezina podshipniklarni moylash uchun suv nasosining chiqishidan suv nasosiga bir chelak suv quying, so'ngra suv ostidagi elektr nasosni tik va barqaror joylashtiring. Ishga tushirish (bir soniyadan oshmasligi kerak) va rul yo'nalishi rul belgisiga mos kelishini tekshiring. Agar yo'q bo'lsa, uch fazali kabelning har qanday ikkita ulagichini almashtiring.Keyin filtrni o'rnating va quduqqa tushishga tayyorlang. Maxsus holatlarda (masalan, ariqlar, ariqlar, daryolar, suv havzalari, suv havzalari va boshqalar) ishlatilsa, elektr nasos ishonchli tarzda erga ulangan bo'lishi kerak.

 

(2) O'rnatish uskunalari va asboblari:
1. Ikki tonnadan ortiq yuk ko'tarish uchun bir juft zanjir.
2. Vertikal balandligi to'rt metrdan kam bo'lmagan tripod.
3. Bir tonnadan ortiq og'irlikni ko'tara oladigan ikkita osilgan arqon (sim arqonlari) (suv nasoslarining to'liq to'plamining og'irligini ko'tara oladi).
4. Ikki juft qisqichni (shponlarni) o'rnating.
5. Kalitlar, bolg'alar, tornavidalar, elektr asboblari va asboblari va boshqalar.

 

(3) Elektr nasosni o'rnatish:
1. Suv osti elektr nasosining o'rnatish sxemasi 2-rasmda ko'rsatilgan. Maxsus o'rnatish o'lchamlari 3-jadvalda "Suv ​​ostidagi elektr nasosni o'rnatish o'lchamlari ro'yxati" da ko'rsatilgan.

 

2. Boshi 30 metrdan kam bo'lgan suv osti elektr nasoslari to'g'ridan-to'g'ri quduqqa shlanglar va sim arqonlar yoki butun mashinaning, suv quvurlarining va quvurlardagi suvning to'liq og'irligini ko'tara oladigan boshqa kanop arqonlari yordamida ko'tarilishi mumkin.

 

3. Boshi 30 metrdan ortiq bo‘lgan nasoslar po‘lat quvurlardan foydalanadi va o‘rnatish ketma-ketligi quyidagicha:
①Suv nasos qismining yuqori uchini qisqich bilan mahkamlang (motor va suv nasosi bu vaqtda ulangan), uni osilgan zanjir bilan ko'taring va quduq boshiga qisqichni o'rnatguncha sekin quduqqa bog'lab qo'ying va osilgan zanjir.
② Quvurni mahkamlash uchun yana bir juft qisqichdan foydalaning, uni osilgan zanjir bilan gardishdan 15 sm uzoqlikda ko'taring va sekin pastga tushiring. Quvur gardish va nasos gardishi o'rtasida Kauchuk yostiqni joyiga qo'ying va quvurni torting va murvat, yong'oq va prujinali rondelalar bilan bir tekisda pompalang.
③ Suv osti nasosini biroz ko'taring, suv nasosining yuqori uchidagi qisqichni echib oling, kabelni suv trubasiga plastik lenta bilan mahkam bog'lang va qisqich quduq boshiga o'rnatilguncha sekin bog'lang.
④Hamma suv quvurlarini quduqqa ulash uchun xuddi shu usuldan foydalaning.
⑤Chiqish kabeli boshqaruv kalitiga ulangandan so'ng, u uch fazali quvvat manbaiga ulanadi.


(4) O'rnatish vaqtida e'tiborga olish kerak bo'lgan narsalar:
1. Nasos jarayonida tiqilib qolish hodisasi aniqlansa, tiqilib qolish nuqtasini yengish uchun suv trubkasini burang yoki torting. Agar turli xil choralar hali ham ishlamasa, iltimos, suv osti elektr nasosi va quduqqa shikast etkazmaslik uchun nasosni majburlamang.
2. O'rnatish vaqtida har bir quvurning gardish qismida kauchuk yostiq qo'yilishi va bir tekis tortilishi kerak.
3. Suv nasosi quduqqa tushirilganda, nasosning quduq devoriga uzoq vaqt davomida ishlamasligi, nasosning tebranishi va dvigatelning supurib yonishiga olib kelishi uchun uni quduq trubasining o'rtasiga qo'yish kerak. .
4. Quduqning oqayotgan qum va loy sharoitiga qarab suv nasosining quduq tubiga chuqurligini aniqlang. Nasosni loyga ko'mmang. Suv nasosidan quduq tubigacha bo'lgan masofa odatda 3 metrdan kam emas (2-rasmga qarang).
5. Suv nasosining suvga kirish chuqurligi dinamik suv sathidan suv kirish tuguniga qadar 1-1,5 metrdan kam bo'lmasligi kerak (2-rasmga qarang). Aks holda, suv nasosining podshipniklari osongina shikastlanishi mumkin.
6. Suv nasosining ko'tarilishi juda past bo'lishi mumkin emas. Aks holda, katta oqim tezligi tufayli dvigatelning haddan tashqari yuklanishi va yonib ketishining oldini olish uchun nominal oqim nuqtasida nasos oqimini nazorat qilish uchun quduq bo'yidagi suv quvur liniyasiga eshik klapanini o'rnatish kerak.
7. Suv pompasi ishlayotganida, suv chiqishi uzluksiz va bir tekis bo'lishi kerak, oqim barqaror bo'lishi kerak (nominal ish sharoitida, odatda nominal oqimning 10% dan ko'p bo'lmagan) va tebranish yoki shovqin bo'lmasligi kerak. Agar biron bir anormallik bo'lsa, sababni aniqlash va uni bartaraf etish uchun mashinani to'xtatish kerak.
8. O'rnatishda vosita topraklama simini sozlashga e'tibor bering (2-rasmga qarang). Suv trubkasi po'lat quvur bo'lsa, uni quduqning qisqichidan olib boring; suv trubkasi plastik quvur bo'lsa, uni elektr nasosning topraklama belgisidan olib boring.

 

 
Xizmat va texnik xizmat ko'rsatish
  • 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  • 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  • 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  •  
  • 4.After the pump is running normally, in order to prolong its service life, it is necessary to check the power supply voltage, running current and insulation resistance regularly to see if they are normal.If the following conditions are found, the equipment should be shut down immediately to troubleshoot.
  • (1)Under the rated working conditions, the current exceeds 20% of the rated value.
  • (2)The dynamic water level drops to the inlet part, resulting in intermittent water discharge.
  • (3)The submersible pump vibrates violently or emits noisy noise.
  • (4)The power supply voltage is lower than 340 volts.
  • (5)A fuse is burned out.
  • (6)The water pipe is damaged.
  • (7)The thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
  • These inspections will help to ensure the normal operation of the pump, improve its reliability and stability, so as to ensure its durability and service life.
  •  
  • 5.unit disassembly:
  • - untie cable rope, remove the pipeline part, remove the wire plate.
  • - suv murvatini burab, suvni motor kamerasiga qo'ying.
  • - remove the filter, loose the fixed screw on the coupling fixed motor shaft.
  • - screw down the bolt connected with the motor at the inlet junction, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)
  • - pump disassembly sequence is: (see figure 1) inlet junction, impeller, guide housing, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.
  • - motor disassembly process is: (see figure 1) place the motor on the platform, remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn, then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • - unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • 6.The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Saqlash va saqlash

 1, vosita bo'shlig'idagi suvni to'kib tashlang (ayniqsa qishda dvigatel muzlashiga yo'l qo'ymaslik uchun) va kabelni yaxshilab bog'lang.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, uzoq muddatli foydalanish suv osti nasoslarining zang oldini olishga e'tibor berish kerak.

 

 
Ehtiyot qismlar
  • Pervanel
  • Mil yengi
  • Kauchuk mil yengi
  • Muhrlash halqasi

 
Ilova stsenariylari

01 Chuqur quduqdan suv olish

02 Ko'p qavatli suv ta'minoti

03 tog 'suv ta'minoti 

04 minora suvi

05 Qishloq xo'jaligini sug'orish

06 bog'ni sug'orish

07 daryo suv olish

08 maishiy suv

 

Agar siz bizning mahsulotlarimizga qiziqsangiz, ma'lumotingizni shu yerda qoldirishingiz mumkin va biz tez orada siz bilan bog'lanamiz.


Xabaringizni shu yerga yozing va bizga yuboring

Agar siz bizning mahsulotlarimizga qiziqsangiz, ma'lumotingizni shu yerda qoldirishingiz mumkin va biz tez orada siz bilan bog'lanamiz.


uz_UZUzbek