Pompa głębinowa 200QJP Peep Well

Podejmij się przetwarzania OEM! Zgodnie z wymaganiami użytkownika, projektowanie i produkcja różnego rodzaju specjalnych wymagań niestandardowych silników głębinowych i pomp. Normy wdrożeniowe produktu: GB/T2816-2014 „studnia pompa głębinowa”, GB/T2818-2014 „studniowy silnik asynchroniczny”. WhatsApp: 17855846335
PDF DOWNLOAD
Detale
Tagi
 
Przegląd produktów

QJP series special fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are covered with alloy copper sleeve as lubricant, using water. Stainless steel sleeves replace ball bearings, avoiding the problem of easy rust of ball bearings and the problem of motor burning due to lack of oil wear. It is very suitable for music fountain, all models can be used horizontally.

 

 
Warunki użytkowania

This product uses three-phase AC 380V power supply (tolerance + 5%), 50HZ frequency (tolerance + 1%); the applicable water quality conditions for water temperature is not higher than 20 °C, solid impurities content (mass ratio) is not more than 0.01%, pH value (pH) is 6.5-8.5, hydrogen sulfide content is not more than 1.5mg/L, chloride ion content is not more than 400mg/L. The motor adopts closed or water sealed wet structure, before use must be filled with clean water to prevent virtual filled, and then tighten the water injection and air exhaust bolts, otherwise not to use. Submersible pump must be completely immersed in water to work, immersion depth shall not exceed 70 meters, the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The water in the well should be able to meet the water output and continuous operation of the submersible pump, the water output of the pump should be controlled at 0.7-1.2 times the rated flow. The well should be kept vertical, the submersible pump can not be used horizontally or overturned, only vertical installation. The submersible pump must be equipped with cables as required, and equipped with external overload protection device. The pump is strictly prohibited from no water load test.

 

 
Znaczenie modelu

200QJP Peep Well Submersible Pump

 

 
Częściowe odniesienie do modelu
Model Przepływ (m3/h) Głowa
(M)

Prędkość obrotowa

(zmiana/punkt)

Pompa wodna(%)  Wylot
średnica
(mm)
Dobrze się sprawdza
średnica (mm) 
 Oceniono
power(KW)
Oceniono
napięcie (V)
Oceniono
prąd (A)
Sprawność motoryczna (%) power factorcosφ   Jednostka
Maksymalny rozmiar promieniowy (mm)
Uwaga
200QJ20-40 20 40 2850 66 50  200powyżej 4 380 10.1 76.0 0.79 184  
200QJ20-54 54 5.5 13.6 77.0 0.8  
200QJ20-81 81 7.5 18.0 78.0 0.81  
200QJ20-93 93 9.2 21.7 78.5 0.82  
200QJ20-108 108 11 25.8 79.0 0.82  
200QJ20-121 121 13 29.8 80.0 0.83  
200QJ20-148 148 15 33.9 81.0 0.83  
200QJ20-175 175 18.5 41.6 81.5 0.83  
200QJ20-202 202 22 48.2 82.5 0.84  
200QJ20-243 243 25 54.5 83.0 0.84  
200QJ20-270 270 30 65.4 83.0 0.84  
200QJ20-360 360 37 79.7 84.0 0.84  
200QJ20-442 442 45 96.9 84.0 0.84  
200QJ25-28 25 28 2850 68 65  200powyżej 4 380 10.1 76.0 0.79 184  
200QJ25-42 42 5.5 13.6 77.0 0.8  
200QJ25-56 56 7.5 18.0 78.0 0.81  
200QJ25-70 70 9.2 21.7 78.5 0.82  
200QJ25-98 98 11 25.8 79.0 0.82  
200QJ25-112 25 112 2850 68 65  200powyżej 13 380 29.8 80.0 0.83 184  
200QJ25-126 126 15 33.9 81.0 0.83  
200QJ25-154 154 18.5 41.6 81.5 0.83  
200QJ25-182 182 22 48.2 82.5 0.84  
200QJ25-210 210 25 54.5 83.0 0.84  
200QJ25-252 252 30 65.4 83.0 0.84  
200QJ25-308 308 37 79.7 84.0 0.84  
200QJ25-378 378 45 96.9 84.0 0.84  
200QJ32-26 32 26 2850 70 80  200powyżej 4 380 10.1 76.0 0.79 184  
200QJ32-39 39 5.5 13.6 77.0 0.8  
200QJ32-52 52 7.5 18.0 78.0 0.81  
200QJ32-65 65 9.2 21.7 78.5 0.82  
200QJ32-78 78 11 25.8 79.0 0.82  
200QJ32-91 91 13 29.8 80.0 0.83  
200QJ32-104 104 15 33.9 81.0 0.83  
200QJ32-130 130 18.5 41.6 81.5 0.83  
200QJ32-143 143 22 48.2 82.5 0.84  
200QJ32-169 169 25 54.5 83.0 0.84  
200QJ32-195 195 30 65.4 83.0 0.84  
200QJ32-247 247 37 79.7 84.0 0.84  
200QJ32-299 299 45 96.9 84.0 0.84  
200QJ40-26 40 26 2850 72 80  200powyżej 5.5 380 13.6 77.0 0.8 184  
200QJ40-39 39 7.5 18.0 78.0 0.81  
200QJ40-52 52 9.2 21.7 78.5 0.82  
200QJ40-65 65 11 25.8 79.0 0.82  
200QJ40-78 78 15 33.9 81.0 0.83  
200QJ40-104 104 18.5 41.6 81.5 0.83  
200QJ40-117 117 22 48.2 82.5 0.84  
200QJ40-143 143 25 54.5 83.0 0.84  
200QJ40-169 169 30 65.4 83.0 0.84  
200QJ40-208 208 37 79.7 84.0 0.84  
200QJ40-247 247 45 96.9 84.0 0.84  
200QJ50-26 50 26 2850 74 80  200powyżej 5.5 380 13.6 77.0 0.8 184  
200QJ50-39 39 9.2 21.7 78.5 0.82  
200QJ50-52 52 11 25.8 79.0 0.82  
200QJ50-65 65 15 33.9 81.0 0.83  
200QJ50-78 78 18.5 41.6 81.5 0.83  
200QJ50-91 91 22 48.2 82.5 0.84  
200QJ50-104 104 25 54.5 83.0 0.84  
200QJ50-130 130 30 65.4 83.0 0.84  
200QJ50-156 156 37 79.7 84.0 0.84  
200QJ50-208 208 45 96.9 84.0 0.84  
200QJ63-24 63 24 2850 74 80  200powyżej 7.5 380 18.0 78.0 0.81 184  
200QJ63-36 36 11 25.8 79.0 0.82  
200QJ63-60 60 18.5 41.6 81.5 0.83  
200QJ63-72 72 22 48.2 82.5 0.84  
200QJ63-84 84 25 54.5 83.0 0.84  
200QJ63-96 96 30 65.4 83.0 0.84  
200QJ63-120 120 37 79.7 84.0 0.84  
200QJ63-144 144 45 96.9 84.0 0.84  
200QJ80-22 80 22 2850 75 100  200powyżej 7.5 380 18.0 78.0 0.81 184  
200QJ80-33 33 11 25.8 79.0 0.82  
200QJ80-44 44 15 33.9 81.0 0.83  
200QJ80-55 55 18.5 41.6 81.5 0.83  
200QJ80-66 66 22 48.2 82.5 0.84  
200QJ80-88 88 30 65.4 83.0 0.84  
200QJ80-99 99 37 79.7 84.0 0.84  
200QJ80-121 121 45 96.9 84.0 0.84  
200QJ100-18 100 18 2850 75 100  200powyżej 9.2 380 21.7 78.5 0.82 184  
200QJ100-27 27 13 29.8 80.0 0.83  
200QJ100-36 36 18.5 41.6 81.5 0.83  
200QJ100-45 45 22 48.2 82.5 0.84  
200QJ100-54 54 25 54.5 83.0 0.84  
200QJ100-63 63 30 65.4 83.0 0.84  
200QJ100-72 100 72 2850 75 100  200powyżej 37 380 79.7 84.0 0.84 184  
200QJ100-90 90 45 96.9 84.0 0.84  

 

 
Środki ostrożności

 Well submersible pump is a kind of fresh water pump, it is strictly prohibited to dig new wells and pump mud and sand. The product adopts 380/50HZ voltage grade, other voltage grades shall not be used, and the submersible motor needs to be customized. Underground cables must use waterproof cables, and must be equipped with starting equipment, such as distribution box, etc. The starting equipment shall have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and no-load protection, etc. In abnormal cases, the protection device shall be tripped in time. When installed and used, the pump must be reliably grounded, it is prohibited to push and pull the switch when hands and feet are wet, and the power supply must be cut off before installation and maintenance of the pump. In the place where the pump is used, an obvious "anti-electric shock" sign must be set up. Before going down the well or installing, the motor must be filled with distilled water or non-corrosive clean cold water, and the water adding/discharge bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instantaneous start time shall not exceed one second to check whether the steering is correct, pay attention to safety, and prevent the pump from toppling and injuring people when it is upright. In strict accordance with the specified lift and flow range of the pump, to prevent the pump in low lift with large flow or in high lift with large traction, resulting in extreme wear of thrust bearings and other components, the motor overload and burn. After the pump into the well, the motor to the ground insulation resistance should be measured not less than 100MΩ. After the start, regular observation of voltage and current, and check whether the motor winding insulation meets the requirements; if the location of the pump storage temperature below freezing, should discharge the water in the motor cavity, to prevent water in the motor cavity ice and damage the motor due to low temperature.

 

 
Wprowadzenie do struktury

Krótkie przedstawienie konstrukcji: część pompy składa się głównie z wału pompy, wirnika, osłony dywersyjnej, łożyska gumowego, korpusu zaworu zwrotnego (części opcjonalne) i innych elementów. Część silnika składa się głównie z podstawy, folii regulującej ciśnienie, łożyska oporowego, płyty oporowej , dolne gniazdo łożyska prowadzącego, stojan, wirnik, górne gniazdo łożyska prowadzącego, pierścień piaskowy, sekcja wlotu wody, kabel i inne elementy.



Główne cechy produktu to:

 1, silnik jest wypełnionym wodą, zanurzalnym, trójfazowym silnikiem asynchronicznym, komora silnika jest wypełniona czystą wodą, używaną do chłodzenia silnika i smarowania łożyska, do regulacji służy folia regulująca ciśnienie na spodzie silnika różnica ciśnień rozszerzania i kurczenia się wody wewnątrz korpusu, spowodowana zmianą wzrostu temperatury silnika.

 2. Aby zapobiec przedostawaniu się piasku ze studni do silnika, górny koniec wału silnika jest wyposażony w dwie uszczelki olejowe i zainstalowany jest pierścień piaskowy, aby utworzyć konstrukcję zapobiegającą zapiaszczeniu.

 3. Aby zapobiec przesuwaniu się wału pompy podczas uruchamiania, wał pompy i wał silnika są połączone sprzęgłem, a w dolnej części silnika zamontowane jest górne łożysko oporowe.

 4, Smarowanie silnika i łożyska pompy to smarowanie wodne.

 5, Uzwojenie stojana silnika wykonane jest z wysokiej jakości drutu uzwojenia silnika podwodnego o wysokiej wydajności izolacji.

 6, Pompa została zaprojektowana przez komputer CAD, o prostej konstrukcji i dobrych parametrach technicznych.

200QJP Peep Well Submersible Pump
 
zainstalować

(1) Przygotowanie przed instalacją:
1. Sprawdź, czy pompa głębinowa spełnia warunki użytkowania i zakres określony w instrukcji.
2. Za pomocą ciężkiego przedmiotu o średnicy równej maksymalnej średnicy zewnętrznej pompy głębinowej zmierzyć, czy średnica wewnętrzna odwiertu zmieści się w pompie głębinowej oraz zmierzyć, czy głębokość studni spełnia wymagania montażowe.
3. Sprawdź, czy odwiert jest czysty i czy woda w studni jest mętna. Nigdy nie używaj elektrycznej pompy głębinowej do mycia błota i piasku z pompy Welor, aby uniknąć przedwczesnego uszkodzenia pompy elektrycznej.
4. Sprawdź, czy pozycja zacisku montażowego głowicy spawalniczej jest odpowiednia i czy wytrzyma jakość całego urządzenia
5. Sprawdź czy elementy pompy głębinowej są kompletne i prawidłowo zamontowane zgodnie ze schematem montażu zawartym w instrukcji. Zdejmij sito filtra i obróć sprzęgło, aby sprawdzić, czy obraca się elastycznie
6. Odkręć śrubę wodną i napełnij komorę silnika czystą, niekorozyjną wodą (pamiętaj o jej napełnieniu), a następnie dokręć śrubę wodną. Po 12 godzinach wtrysku wody rezystancja izolacji silnika nie powinna być mniejsza niż 150M Q, mierzona za pomocą stołu wibracyjnego 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Załączony schemat procesu okablowania kabla jest następujący:

200QJP Peep Well Submersible Pump

 

8. Za pomocą multimetru sprawdź, czy przewody trójfazowe są podłączone i czy rezystancja prądu stałego jest w przybliżeniu zrównoważona.
9. Sprawdź, czy obwód i moc transformatora nie są przeciążone, a następnie podłącz wyłącznik zabezpieczający przed przeciążeniem lub sprzęt rozruchowy. Aby zapoznać się z konkretnymi modelami, patrz Tabela 2, a następnie wlej wiadro wody do pompy wodnej z wylotu pompy wodnej, aby nasmarować gumowe łożyska pompy, a następnie umieść elektryczną pompę głębinową pionowo i stabilnie. Uruchomienie (nie dłużej niż jedna sekunda) i sprawdź, czy kierunek skrętu jest zgodny ze znakiem skrętu. Jeśli nie, zamień dowolne dwie wtyczki kabla trójfazowego. Następnie zainstaluj filtr i przygotuj się do zejścia do studni. W przypadku używania pompy elektrycznej do specjalnych celów (takich jak rowy, rowy, rzeki, stawy, stawy itp.) pompa elektryczna musi być niezawodnie uziemiona.

 

(2) Sprzęt i narzędzia instalacyjne:
1. Jedna para łańcuchów do podnoszenia na ponad dwie tony.
2. Statyw o wysokości pionowej nie mniejszej niż cztery metry.
3. Dwie wiszące liny (liny stalowe) o wytrzymałości większej niż jedna tona (mogą udźwignąć ciężar kompletnego zestawu pomp wodnych).
4. Zamontuj dwie pary zacisków (szyn).
5. Klucze, młotki, śrubokręty, narzędzia i przyrządy elektryczne itp.

 

(3) Instalacja pompy elektrycznej:
1. Schemat instalacji elektrycznej pompy głębinowej pokazano na rysunku 2. Konkretne wymiary montażowe pokazano w Tabeli 3 „Wykaz wymiarów montażowych pompy elektrycznej głębinowej”.

 

2. Zatapialne pompy elektryczne o wysokości podnoszenia mniejszej niż 30 metrów można wciągać bezpośrednio do studni za pomocą węży i ​​lin stalowych lub innych lin konopnych, które są w stanie unieść cały ciężar całej maszyny, rur wodociągowych i wody w rurach.

 

3. W pompach o wysokości podnoszenia większej niż 30 metrów stosuje się rury stalowe, a kolejność montażu jest następująca:
①Użyj zacisku, aby zacisnąć górny koniec części pompy wodnej (silnik i pompa wodna zostały w tym czasie połączone), podnieś ją za pomocą wiszącego łańcucha i powoli przymocuj do studni, aż założysz zacisk na głowicę odwiertu i zdemontujesz wiszący łańcuch.
② Użyj kolejnej pary zacisków, aby zacisnąć rurę, podnieś ją za pomocą wiszącego łańcucha w odległości 15 cm od kołnierza i powoli opuść. Pomiędzy kołnierzem rury a kołnierzem pompy Załóż gumową podkładkę i równomiernie dokręć rurę i pompę za pomocą śrub, nakrętek i podkładek sprężystych.
③ Lekko podnieś pompę głębinową, zdejmij zacisk na górnym końcu pompy wodnej, mocno przymocuj kabel do rury wodnej za pomocą plastikowej taśmy i powoli zamocuj, aż zacisk zostanie umieszczony na głowicy odwiertu.
④Użyj tej samej metody, aby podłączyć wszystkie rury wodociągowe do studni.
⑤Po podłączeniu kabla wyjściowego do przełącznika sterującego, należy go podłączyć do trójfazowego źródła zasilania.


(4) Rzeczy, na które należy zwrócić uwagę podczas instalacji:
1. Jeśli podczas pompowania zostanie stwierdzone zjawisko zakleszczenia, obróć lub pociągnij rurę wodną, ​​aby pokonać punkt zakleszczenia. Jeśli różne środki nadal nie pomagają, nie należy opuszczać pompy na siłę, aby uniknąć uszkodzenia elektrycznej pompy głębinowej i studni.
2. Podczas montażu należy na kołnierz każdej rury założyć podkładkę gumową i równomiernie ją dokręcić.
3. Po opuszczeniu pompy wodnej do studni należy ją umieścić na środku rury studni, aby zapobiec długotrwałemu uderzaniu pompy o ścianę studni, powodując wibrację pompy oraz zamiatanie i spalanie silnika .
4. Określ głębokość pompy wodnej do dna studni, zgodnie z warunkami przepływu piasku i mułu w studni. Nie zakopuj pompy w błocie. Odległość pompy wodnej od dna studni na ogół nie jest mniejsza niż 3 metry (patrz rysunek 2).
5. Głębokość wejścia wody do pompy wodnej nie powinna być mniejsza niż 1-1,5 metra od dynamicznego poziomu wody do węzła wlotu wody (patrz rysunek 2). W przeciwnym razie łożyska pompy wodnej mogą łatwo ulec uszkodzeniu.
6. Podnoszenie pompy wodnej nie może być zbyt niskie. W przeciwnym razie na rurociągu wody głowicy odwiertu należy zainstalować zasuwę, aby kontrolować przepływ pompy w znamionowym punkcie przepływu, aby zapobiec przeciążeniu i spaleniu silnika z powodu dużych prędkości przepływu.
7. Gdy pompa wodna pracuje, wydatek wody powinien być ciągły i równy, prąd powinien być stabilny (w znamionowych warunkach pracy, na ogół nie więcej niż 10% prądu znamionowego), nie powinno być żadnych wibracji ani hałasu. Jeśli wystąpią jakiekolwiek nieprawidłowości, należy zatrzymać maszynę, aby znaleźć przyczynę i ją wyeliminować.
8. Podczas montażu należy zwrócić uwagę na ustawienie przewodu uziemiającego silnik (patrz rysunek 2). Jeżeli rura wodna jest rurą stalową, należy ją poprowadzić od obejmy głowicy odwiertu; jeśli rura wodna jest rurą z tworzywa sztucznego, poprowadź ją od znaku uziemienia pompy elektrycznej.

 

 
Konserwacja i konserwacja
  • 1. Po zamontowaniu pompy głębinowej należy ponownie sprawdzić rezystancję izolacji i przewodnictwo trójfazowe od wyłącznika, sprawdzić, czy przyrząd i podłączenie urządzeń rozruchowych są prawidłowe, jeśli nie ma problemu, można uruchomić maszynę próbną, i zaobserwuj, czy po uruchomieniu wskazania wskaźników przyrządu przekraczają napięcie i prąd znamionowy podane na tabliczce znamionowej, oraz zaobserwuj, czy w pompie występują zjawiska hałasu i wibracji, i jeśli wszystko jest w porządku, uruchom ją.
  • 2. Po pierwszym uruchomieniu pompy przez cztery godziny należy wyłączyć silnik w celu szybkiego sprawdzenia rezystancji izolacji termicznej, a jej wartość nie powinna być mniejsza niż 0,5 megaoma.
  • 3. Po wyłączeniu pompy należy ją uruchomić po pięciu minutach, aby zapobiec całkowitemu ponownemu wypłynięciu słupa wody w rurze, co mogłoby spowodować nadmierny prąd silnika i przepalenie.
  • 4. Po uruchomieniu pompy, w celu przedłużenia jej żywotności, należy regularnie sprawdzać, czy napięcie zasilania, prąd roboczy i rezystancja izolacji są w normie. W przypadku stwierdzenia poniższych warunków należy natychmiast wyłączyć pompę w celu rozwiązania problemu.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Dynamiczny poziom wody spada do sekcji wlotu wody, powodując okresowe pojawianie się wody.
  • 3 W pompie głębinowej występują silne wibracje lub hałas.
  • 4 Napięcie zasilania jest niższe niż 340 woltów.
  • 5 Przepalony bezpiecznik.
  • 6 Rura doprowadzająca wodę jest uszkodzona.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Przechowywanie i opieka

 This product is a submersible pump, which is suitable for various water areas, such as home, agriculture and industry.In order to prevent the motor from freezing in winter, be sure to discharge all the water in the pump chamber, and roll and tie the cable well.In addition, a room without corrosive substances and gases and with a temperature below 40 °C should be selected for storage.When not in use for a long time, special attention should be paid to the rust prevention of the submersible pump.This product is exquisitely designed and convenient to use, which can help users efficiently deal with various water needs, and is an ideal choice for your home and industrial water.

 

 
Części zużywające się
  • Wirnik
  • Tuleja wału
  • Gumowa tuleja wału
  • Uszczelka

 
Scenariusze zastosowań

01 Ujęcie wody ze studni głębinowej

02 Wysokie źródło wody

03 zaopatrzenie w wodę w górach

04 wieża wodna

05 Nawadnianie rolnictwa

06 nawadnianie ogrodu

07 ujęcie wody rzecznej

08 woda użytkowa

 

Jeśli jesteś zainteresowany naszymi produktami, możesz zostawić tutaj swoje dane, a my wkrótce się z Tobą skontaktujemy.


Napisz tutaj swoją wiadomość i wyślij ją do nas

Jeśli jesteś zainteresowany naszymi produktami, możesz zostawić tutaj swoje dane, a my wkrótce się z Tobą skontaktujemy.


pl_PLPolish