175QJB chuqur quduqli suv osti nasosi

OEM ishlov berishni amalga oshiring! Foydalanuvchi talablariga muvofiq, nostandart suv osti dvigatel va nasosning har xil turdagi maxsus talablarini loyihalash va ishlab chiqarish. Mahsulotni amalga oshirish standartlari: GB / T2816-2014 "quduqli suv osti nasosi", GB / T2818-2014 "quduqli suv ostida asenkron motor". WhatsApp: 17855846335
PDF DOWNLOAD
Tafsilotlar
Teglar
 
Mahsulotga umumiy nuqtai

The product adopts special water-resistant wire for motor winding, with excellent characteristics such as high frequency shock resistance, pulse peak voltage shock resistance and high temperature aging resistance. The frequency conversion winding design ensures the motor to operate smoothly between 1Hz and 50Hz for a long time, making the frequency conversion deep well pump more energy saving and longer service life.

 

 
Foydalanish shartlari

We are honored to introduce our products, this product provides three-phase AC 380V power supply (tolerance of ± 5%), 50HZ voltage (tolerance of ± 1%). At the same time, our products require strict water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor adopts closed or water-filled wet structure, which must be filled with clean water before use to prevent empty. Tighten the water charging and deflating bolts before use, otherwise, it is not allowed to use. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The well water flow shall meet the output and continuous operation requirements of the submersible pump, and the output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or inverted, but only vertically. The submersible pump must be equipped with cables according to requirements, and is equipped with external overload protection devices. It is strictly prohibited to conduct no-load tests on the pump without water. Our products guarantee to provide you with high quality and stable performance, while meeting your needs to ensure safe and reliable.

 

 
Model ma'nosi

175QJB Deep Well Submersible Pump

 
Qisman namunaviy havola
Model Oqim (m3/soat) Bosh
(m)

Aylanish tezligi

(o'zgartirish / nuqta)

Suv nasosi(%)  Chiqish
diametri
(mm)
Yaxshi qo'llanilishi mumkin
diametri (mm) 
 Baholangan
power(KW)
Baholangan
kuchlanish (V)
Baholangan
joriy (A)
Motor samaradorligi (%) power factorcosφ   Birlik
Radial maksimal o'lcham (mm)
175QJ10-42 10 42 2850 53 50  175yuqorida 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175yuqorida 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175yuqorida 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175yuqorida 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175yuqorida 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175yuqorida 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80  175yuqorida 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175yuqorida 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175yuqorida 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175yuqorida 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175yuqorida 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175yuqorida 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175yuqorida 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Xavfsizlik choralari

This well submersible pump is a pump suitable for clean water. Digging new wells and pumping sediment and turbid water are strictly prohibited. The voltage grade of the well pump is 380V/50HZ. Submersible motors with other voltage grades need to be customized. Underground cables must use waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as overload short circuit protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be tripped in time. During installation and use, the pump must be reliably grounded. It is prohibited to push and pull the switch when hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be injected with distilled water or non-corrosive clear cold water in the inner cavity, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. The same as the steering instructions. Pay attention to safety when the pump is upright to prevent tilting and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump flow at low lift or in high lift pull too large, resulting in extreme wear of thrust bearings and other components, the motor due to overload and burn. After put into the well, the measurement of the motor and the ground insulation resistance value, not less than 100M. After the start, regular observation of voltage and current, and check the motor winding insulation is in line with the requirements of the provisions. If the temperature of the storage site is below the freezing point, the water in the pump chamber should be drained to prevent the water in the motor chamber from freezing and damaging the motor due to low temperature.

 

 
Strukturaga kirish

Tuzilishi haqida qisqacha ma'lumot: nasos qismi asosan nasos mili, pervanel, burilish qobig'i, kauchuk podshipnik, nazorat valfi tanasi (ixtiyoriy qismlar) va boshqa qismlardan iborat. Dvigatel qismi asosan tayanch, bosimni tartibga soluvchi plyonka, surish rulmanı, surish plitasi, pastki yo'naltiruvchi rulman o'rindig'i, stator, rotor, yuqori hidoyat rulman o'rindig'i, qum halqasi, suv kirish qismi, kabel va boshqa qismlardan iborat.


Mahsulotning asosiy xususiyatlari quyidagilardan iborat:

1.The motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing, the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the change of the temperature rise of the motor.

2.In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft is equipped with two oil seals, and a sand ring is installed to form a sand prevention structure.

3.In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed at the lower part of the motor.

4.The lubrication of the motor and the pump bearing is water lubrication.

5.The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.

6.The pump is designed by computer CAD, with simple structure and good technical performance.

175QJB Deep Well Submersible Pump
 
O'rnatish

(1) O'rnatishdan oldin tayyorgarlik:
1. Suv osti nasosining qo'llanmada ko'rsatilgan foydalanish shartlari va ko'lamiga mos kelishini tekshiring.
2. Diametri suv osti nasosining maksimal tashqi diametriga teng bo'lgan og'ir obiektdan foydalanib, quduqning ichki diametri suv osti nasosiga mos kelishini o'lchang va quduq chuqurligi o'rnatish talablariga javob beradimi yoki yo'qligini o'lchang.
3. Quduq qudug'ining tozaligini va quduq suvining loyqaligini tekshiring. Suv osti elektr nasosiga muddatidan oldin shikast etkazmaslik uchun hech qachon suv osti nasosidan loy va qumli suvni yuvish uchun foydalanmang.
4. Quduq boshini o'rnatish qisqichining joylashuvi mos yoki yo'qligini va u butun qurilma sifatiga bardosh bera oladimi yoki yo'qligini tekshiring.
5. Qo'llanmadagi yig'ish sxemasiga muvofiq suv osti nasosi komponentlari to'liq va to'g'ri o'rnatilganligini tekshiring. Filtr ekranini olib tashlang va muftani egiluvchan aylanayotganligini ko'rish uchun aylantiring.
6. Suv vintini bo'shating va vosita bo'shlig'ini toza, korroziy bo'lmagan suv bilan to'ldiring (eslatma. uni to'ldirishni unutmang), so'ngra suv vintini torting. 12 soatlik suv quyishdan so'ng, 500V chayqash stoli bilan o'lchanganda, dvigatelning izolyatsiyaga chidamliligi 150M Q dan kam bo'lmasligi kerak.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Qo'shilgan kabelni ulash jarayoni diagrammasi quyidagicha:
175QJB Deep Well Submersible Pump

8. Multimetrdan foydalanib, uch fazali simlarning ulanganligini va shahar qarshiligining taxminan muvozanatlanganligini tekshiring.
9. O'chirish va transformator quvvati haddan tashqari yuklangan yoki yo'qligini tekshirib ko'ring va keyin ortiqcha yuk himoyasi kalitini yoki ishga tushirish uskunasini ulang. Muayyan modellar uchun 2-jadvalga qarang, so'ngra nasosdagi rezina podshipniklarni moylash uchun suv nasosining chiqishidan suv nasosiga bir chelak suv quying, so'ngra suv ostidagi elektr nasosni tik va barqaror joylashtiring. Ishga tushirish (bir soniyadan oshmasligi kerak) va rul yo'nalishi rul belgisiga mos kelishini tekshiring. Agar yo'q bo'lsa, uch fazali kabelning har qanday ikkita ulagichini almashtiring.Keyin filtrni o'rnating va quduqqa tushishga tayyorlang. Maxsus holatlarda (masalan, ariqlar, ariqlar, daryolar, suv havzalari, suv havzalari va boshqalar) ishlatilsa, elektr nasos ishonchli tarzda erga ulangan bo'lishi kerak.

 

(2) O'rnatish uskunalari va asboblari:
1. Ikki tonnadan ortiq yuk ko'tarish uchun bir juft zanjir.
2. Vertikal balandligi to'rt metrdan kam bo'lmagan tripod.
3. Bir tonnadan ortiq og'irlikni ko'tara oladigan ikkita osilgan arqon (sim arqonlari) (suv nasoslarining to'liq to'plamining og'irligini ko'tara oladi).
4. Ikki juft qisqichni (shponlarni) o'rnating.
5. Kalitlar, bolg'alar, tornavidalar, elektr asboblari va asboblari va boshqalar.

 

(3) Elektr nasosni o'rnatish:
1. Suv osti elektr nasosining o'rnatish sxemasi 2-rasmda ko'rsatilgan. Maxsus o'rnatish o'lchamlari 3-jadvalda "Suv ​​ostidagi elektr nasosni o'rnatish o'lchamlari ro'yxati" da ko'rsatilgan.

 

2. Boshi 30 metrdan kam bo'lgan suv osti elektr nasoslari to'g'ridan-to'g'ri quduqqa shlanglar va sim arqonlar yoki butun mashinaning, suv quvurlarining va quvurlardagi suvning to'liq og'irligini ko'tara oladigan boshqa kanop arqonlari yordamida ko'tarilishi mumkin.

 

3. Boshi 30 metrdan ortiq bo‘lgan nasoslar po‘lat quvurlardan foydalanadi va o‘rnatish ketma-ketligi quyidagicha:
①Suv nasos qismining yuqori uchini qisqich bilan mahkamlang (motor va suv nasosi bu vaqtda ulangan), uni osilgan zanjir bilan ko'taring va quduq boshiga qisqichni o'rnatguncha sekin quduqqa bog'lab qo'ying va osilgan zanjir.
② Quvurni mahkamlash uchun yana bir juft qisqichdan foydalaning, uni osilgan zanjir bilan gardishdan 15 sm uzoqlikda ko'taring va sekin pastga tushiring. Quvur gardish va nasos gardishi o'rtasida Kauchuk yostiqni joyiga qo'ying va quvurni torting va murvat, yong'oq va prujinali rondelalar bilan bir tekisda pompalang.
③ Suv osti nasosini biroz ko'taring, suv nasosining yuqori uchidagi qisqichni echib oling, kabelni suv trubasiga plastik lenta bilan mahkam bog'lang va qisqich quduq boshiga o'rnatilguncha sekin bog'lang.
④Hamma suv quvurlarini quduqqa ulash uchun xuddi shu usuldan foydalaning.
⑤Chiqish kabeli boshqaruv kalitiga ulangandan so'ng, u uch fazali quvvat manbaiga ulanadi.


(4) O'rnatish vaqtida e'tiborga olish kerak bo'lgan narsalar:
1. Nasos jarayonida tiqilib qolish hodisasi aniqlansa, tiqilib qolish nuqtasini yengish uchun suv trubkasini burang yoki torting. Agar turli xil choralar hali ham ishlamasa, iltimos, suv osti elektr nasosi va quduqqa shikast etkazmaslik uchun nasosni majburlamang.
2. O'rnatish vaqtida har bir quvurning gardish qismida kauchuk yostiq qo'yilishi va bir tekis tortilishi kerak.
3. Suv nasosi quduqqa tushirilganda, nasosning quduq devoriga uzoq vaqt davomida ishlamasligi, nasosning tebranishi va dvigatelning supurib yonishiga olib kelishi uchun uni quduq trubasining o'rtasiga qo'yish kerak. .
4. Quduqning oqayotgan qum va loy sharoitiga qarab suv nasosining quduq tubiga chuqurligini aniqlang. Nasosni loyga ko'mmang. Suv nasosidan quduq tubigacha bo'lgan masofa odatda 3 metrdan kam emas (2-rasmga qarang).
5. Suv nasosining suvga kirish chuqurligi dinamik suv sathidan suv kirish tuguniga qadar 1-1,5 metrdan kam bo'lmasligi kerak (2-rasmga qarang). Aks holda, suv nasosining podshipniklari osongina shikastlanishi mumkin.
6. Suv nasosining ko'tarilishi juda past bo'lishi mumkin emas. Aks holda, katta oqim tezligi tufayli dvigatelning haddan tashqari yuklanishi va yonib ketishining oldini olish uchun nominal oqim nuqtasida nasos oqimini nazorat qilish uchun quduq bo'yidagi suv quvur liniyasiga eshik klapanini o'rnatish kerak.
7. Suv pompasi ishlayotganida, suv chiqishi uzluksiz va bir tekis bo'lishi kerak, oqim barqaror bo'lishi kerak (nominal ish sharoitida, odatda nominal oqimning 10% dan ko'p bo'lmagan) va tebranish yoki shovqin bo'lmasligi kerak. Agar biron bir anormallik bo'lsa, sababni aniqlash va uni bartaraf etish uchun mashinani to'xtatish kerak.
8. O'rnatishda vosita topraklama simini sozlashga e'tibor bering (2-rasmga qarang). Suv trubkasi po'lat quvur bo'lsa, uni quduqning qisqichidan olib boring; suv trubkasi plastik quvur bo'lsa, uni elektr nasosning topraklama belgisidan olib boring.

 

 
Xizmat va texnik xizmat ko'rsatish
  • 1.After installing the submersible pump, recheck the insulation resistance and three-phase continuity switch, check whether there is any error in the connection between the instrument and the starting equipment.If there is no problem, you can start to test the machine. After starting, observe whether the indication reading of each instrument is correct.If the rated voltage and current specified on the nameplate are exceeded, please observe whether the pump has noise or vibration.If everything is normal, it can be put into operation. After the pump runs for the first time for four hours, the motor thermal insulation resistance should be closed and tested quickly. Its value should not be less than 0.5 megaohm. After the pump stops, it should be restarted after five minutes to prevent the water column in the pipeline from completely reversing, which will cause the motor to burn out due to excessive current.
  •  
  • 2.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
  • 1.Under the rated working condition, the current exceeds 20%.
  • 2.The dynamic water level drops to the water inlet section, resulting in intermittent water.
  • 3.The submersible pump has severe vibration or noise.
  • 4.The supply voltage is lower than 340 volts.
  • 5.A fuse is burned out.
  • 6.The water pipeline is damaged.
  • 7.The motor's insulation resistance to the geothermal state is lower than 0.5 megaohm.
  •  
  • 3.Unit disassembly:
  • - Kabel bog'ichini echib oling, quvur liniyasi qismini echib oling va sim plitasini olib tashlang.
  • - screw down the water bolt, put out the water in the motor chamber.
  • - filtrni olib tashlang, vosita milini mahkamlash uchun muftadagi mahkamlangan vintni bo'shating.
  •  
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Saqlash va saqlash

 1, vosita bo'shlig'idagi suvni to'kib tashlang (ayniqsa qishda dvigatel muzlashiga yo'l qo'ymaslik uchun) va kabelni yaxshilab bog'lang.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, uzoq muddatli foydalanish suv osti nasoslarining zang oldini olishga e'tibor berish kerak.

 

 
Ehtiyot qismlar
  • Pervanel
  • Mil yengi
  • Kauchuk mil yengi
  • Muhrlash halqasi

 

 
Ilova stsenariylari

01 Chuqur quduqdan suv olish

02 Ko'p qavatli suv ta'minoti

03 tog 'suv ta'minoti

04 minora suvi

05 Qishloq xo'jaligini sug'orish

06 bog'ni sug'orish

07 daryo suv olish

08 maishiy suv

Agar siz bizning mahsulotlarimizga qiziqsangiz, ma'lumotingizni shu yerda qoldirishingiz mumkin va biz tez orada siz bilan bog'lanamiz.


Xabaringizni shu yerga yozing va bizga yuboring

Agar siz bizning mahsulotlarimizga qiziqsangiz, ma'lumotingizni shu yerda qoldirishingiz mumkin va biz tez orada siz bilan bog'lanamiz.


uz_UZUzbek