QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.
The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).
The water quality shall meet the following requirements:
(1) the water temperature shall not be higher than 20 °C;
(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;
(3) the PH value (acidity and alkalinity) is 6.5-8.5;
(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;
(5) the content of chloride ions shall not be higher than 400mg/L.
The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.
Modelo | Agos (m3/h) | Ulo (m) |
Katulin sa pagtuyok (bag-o/punto) |
bomba sa tubig(%) | Outlet diametro (mm) |
Applicable nga maayo diametro (mm) |
Gi-rate gahum (KW) |
Gi-rate boltahe(V) |
Gi-rate kasamtangan (A) |
Episyente sa motor (%) | power factorcosφ | Yunit Radial Maximu nga gidak-on (mm) |
Sulti | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135sa ibabaw | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135sa ibabaw | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135sa ibabaw | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135sa ibabaw | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135sa ibabaw | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135sa ibabaw | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135sa ibabaw | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, maayo nga submersible pump alang sa limpyo nga tubig pump, nagdili sa bag-ong atabay, pumping linugdang ug lapok nga tubig,
2, maayo nga water pump boltahe nga grado 380/50HZ, ang paggamit sa ubang mga boltahe nga grado sa submersible motors kinahanglan nga customized. Ang underground cable kinahanglan nga mogamit sa waterproof cable, kinahanglan nga adunay gamit sa pagsugod, sama sa distribution box, magsugod nga dili andam kinahanglan nga adunay kasagarang gigamit nga motor comprehensive protection function, sama sa short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection , sa kaso sa abnormal nga mga kahimtang, ang proteksyon device kinahanglan nga tukma sa panahon nga aksyon biyahe.
3, ang pag-instalar ug paggamit sa bomba kinahanglan nga masaligan nga gisaligan, gidid-an ang pagduso ug pagbitad sa switch kung basa ang mga kamot ug tiil, kinahanglan nga putlon ang suplay sa kuryente sa dili pa i-install ug mamentinar ang bomba, ang lugar nga gigamit sa bomba aron ma-set up " aron malikayan ang electric shock" klaro nga mga timailhan:
4, sa ubos sa atabay o sa wala pa instalar, ang motor lungag kinahanglan nga mapuno sa distilled nga tubig o non-corrosive limpyo nga bugnaw nga Nagabukal tubig, higpitan ang / tubig bolt, ang bomba sa yuta pagsulay run, kinahanglan nga ngadto sa pump lawak sa tubig lubrication rubber. bearings, diha-diha dayon magsugod dili labaw pa kay sa usa ka segundo, tan-awa kon ang manibela mao ang sama sa sa steering instruksyon. Kung ang bomba matul-id, hatagi'g pagtagad ang kaluwasan, likayi ang pagbali sa kadaot.
5, hugot nga sumala sa mga probisyon sa pump lift, dagan range sa paggamit, sa pagpugong sa ubos nga dagan o taas nga pagbayaw pumping puwersa, ang thrust bearing ug uban pang mga bahin sa pagsul-ob, ang motor overload gisunog
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components
2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.
3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6. The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Pagpangandam sa dili pa i-install:
1. Susiha kung ang submersible pump nakatagbo sa mga kondisyon sa paggamit ug sakup nga gitakda sa manwal.
2. Gamit ang usa ka bug-at nga obiect nga adunay diyametro nga katumbas sa labing taas nga gawas nga diametro sa submersible pump, sukda kung ang inneldiameter sa wellbore mahimong mohaum sa submersible pump, ug sukda kung ang giladmon sa atabay nagtagbo sa mga kinahanglanon sa pag-instalar.
3. Susiha kung limpyo ba ang atabay ug kung ang tubig sa atabay lapok. Ayaw paggamit ug submersible electric pump sa paghugas sa welor pump nga lapok ug balas nga tubig aron malikayan ang ahat nga kadaot sa submersible electric pump.
4. Susiha kon ang posisyon sa welhead installation clamp haom ug kon kini makasugakod sa kalidad sa tibuok unit
5. Susiha kon ang mga sangkap sa submersible pump kompleto ug na-install sa husto sumala sa assembly diagram sa manwalKuhaa ang filter screen ug i-rotate ang coupling aron makita kung kini nagtuyok nga flexible
6. Ablihi ang tornilyo sa tubig ug pun-a ang lungag sa motor sa limpyo, dili makadaot nga tubig (timan-i. siguroha nga sal-an kini), unya hugti ang waterscrew. Pagkahuman sa 12 ka oras nga pag-injection sa tubig, ang resistensya sa pagkakabukod sa motor kinahanglan dili moubos sa 150M Q kung gisukod sa usa ka 500V nga pag-uyog nga lamesa.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Ang gilakip nga cable wiring process diagram mao ang mosunod:
8. Gamit ug multimeter aron masusi kung konektado ba ang tulo ka hugna nga mga wire ug kung ang resistensya sa DC gibana-bana nga balanse.
9. Susiha kung ang kapasidad sa sirkito ug transpormer sobra na ang gibug-aton, ug dayon ikonektar ang overload protection switch o kagamitan sa pagsugod. Tan-awa ang Talaan 2 para sa piho nga mga modelo, ug dayon Ibubo ang usa ka balde nga tubig ngadto sa water pump gikan sa water pump outlet aron lubricate ang rubber bearings sa pump, ug dayon ibutang ang submersible electric pump nga tul-id ug makanunayon. Pagsugod (dili molapas sa usa ka segundo) ug susiha kung ang direksyon sa pagmaneho nahiuyon sa timaan sa pagmaneho. Kung dili, ibaylo ang bisan unsang duha ka konektor sa tulo ka hugna nga kable. Unya i-install ang filter ug pangandam sa pagkanaog sa atabay. Kung gigamit sa mga espesyal nga okasyon (sama sa mga kanal, kanal, suba, lim-aw, lim-aw, ug uban pa), ang electric pump kinahanglan nga kasaligan nga gisaligan.
(2) Mga kagamitan sa pag-instalar ug mga himan:
1. Usa ka parisan sa pag-alsa sa mga kadena nga sobra sa duha ka tonelada.
2. Usa ka tripod nga adunay bertikal nga gitas-on nga dili moubos sa upat ka metros.
3. Duha ka nagbitay nga mga pisi (wire ropes) nga makadala sa gibug-aton nga sobra sa usa ka tonelada (makadala sa gibug-aton sa usa ka kompleto nga hugpong sa mga bomba sa tubig).
4. Pagbutang ug duha ka parisan sa mga clamp (splints).
5. Mga wrenches, martilyo, screwdriver, electrical nga mga himan ug instrumento, ug uban pa.
(3) Pag-instalar sa electric pump:
1. Ang diagram sa pag-instalar sa submersible electric pump gipakita sa Figure 2. Ang espesipikong mga sukod sa pag-instalar gipakita sa Table 3 "Listahan sa Mga Dimensyon sa Pag-instalar sa Submersible Electric Pump".
2. Ang mga submersible electric pump nga adunay ulo nga ubos sa 30 metros mahimong ipataas direkta ngadto sa atabay gamit ang mga hose ug wire rope o uban pang mga pisi nga abaka nga makadala sa tibuok nga gibug-aton sa tibuok makina, mga tubo sa tubig, ug tubig sa mga tubo.
3. Ang mga bomba nga adunay ulo nga labaw sa 30 metros naggamit sa mga tubo nga puthaw, ug ang pagkasunod-sunod sa pag-instalar mao ang mosunod:
①Paggamit ug clamp aron i-clamp ang ibabaw nga tumoy sa bahin sa water pump (ang motor ug water pump konektado na karong panahona), iisa kini gamit ang nagbitay nga kadena, ug hinayhinay nga ihigot kini sa atabay hangtod Ibutang ang clamp sa wellhead ug kuhaa ang nagbitay nga kadena.
② Gamit ug laing pares nga clamp para i-clamp ang tubo, iisa kini gamit ang nagbitay nga kadena nga 15 cm ang gilay-on gikan sa flange, ug hinayhinay nga ipaubos. Sa tunga-tunga sa pipe flange ug pump flangeIbutang ang rubber pad sa lugar ug hugti ang tubo ug i-bomba nga parehas gamit ang bolts, nuts ug spring washers.
③ Ipataas gamay ang submersible pump, kuhaa ang clamp sa ibabaw nga tumoy sa water pump, ihigot pag-ayo ang kable sa tubo sa tubig gamit ang plastic tape, ug hinayhinay nga ihigot hangtod ang clamp ibutang sa wellhead.
④ Gamita ang samang paagi sa paghigot sa tanang tubo sa tubig ngadto sa atabay.
⑤Human makonektar ang lead-out cable sa control switch, konektado kini sa three-phase power supply.
(4) Mga butang nga matikdan sa panahon sa pag-instalar:
1. Kung adunay makit-an nga panghitabo sa jamming sa panahon sa proseso sa pumping, liko o ibira ang tubo sa tubig aron mabuntog ang jamming point. Kung ang lainlaing mga lakang dili gihapon molihok, palihug Ayaw pugsa ang bomba aron malikayan ang kadaot sa submersible electric pump ug sa atabay.
2. Atol sa pag-instalar, ang usa ka rubber pad kinahanglan ibutang sa flange sa matag tubo ug higpitan nga parehas.
3. Sa diha nga ang bomba sa tubig ipaubos ngadto sa atabay, kini kinahanglan nga ibutang sa tunga-tunga sa tubo sa atabay aron mapugngan ang bomba nga modagan batok sa bungbong sa atabay sa dugay nga panahon, hinungdan nga ang bomba mag-vibrate ug ang motor masilhig ug masunog. .
4. Tinoa ang giladmon sa bomba sa tubig hangtod sa ilawom sa atabay sumala sa nag-agos nga balas ug silt nga kahimtang sa atabay. Ayaw ilubong ang bomba sa lapok. Ang gilay-on gikan sa water pump hangtod sa ilawom sa atabay kasagaran dili moubos sa 3 metros (tan-awa ang Figure 2).
5. Ang giladmon sa pagsulod sa tubig sa water pump kinahanglang dili moubos sa 1-1.5 metros gikan sa dinamikong lebel sa tubig ngadto sa water inlet node (tan-awa ang Figure 2). Kay kon dili, ang water pump bearings mahimong daling madaot.
6. Ang pagbayaw sa water pump dili mahimong ubos kaayo. Kung dili, kinahanglan nga i-install ang usa ka balbula sa ganghaan sa pipeline sa tubig sa wellhead aron makontrol ang pag-agos sa bomba sa rate nga punto sa pag-agos aron mapugngan ang motor nga ma-overload ug masunog tungod sa daghang mga rate sa pag-agos.
7. Sa diha nga ang water pump nagdagan, ang tubig nga output kinahanglan nga padayon ug bisan pa, ang kasamtangan kinahanglan nga lig-on (ubos sa rated nga kahimtang sa pagtrabaho, sa kasagaran dili labaw pa kay sa 10% sa rated kasamtangan), ug kinahanglan nga walay vibration o kasaba. Kung adunay bisan unsang abnormalidad, kinahanglan nga hunongon ang makina aron mahibal-an ang hinungdan ug mawagtang kini.
8. Sa diha nga ang pag-instalar, pagtagad sa setting sa motor grounding wire (tan-awa ang Figure 2). Sa diha nga ang tubo sa tubig kay puthaw nga tubo, dad-a kini gikan sa wellhead clamp; kung ang tubo sa tubig kay plastik nga tubo, dad-a kini gikan sa grounding mark sa electric pump.
- (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 Ang dinamikong lebel sa tubig mius-os ngadto sa bahin sa pagsulod sa tubig, nga maoy hinungdan sa nag-agay nga tubig.
3 Ang submersible pump adunay grabe nga vibration o kasaba.
4 Ang suplay nga boltahe mas ubos kaysa 340 volts.
5 Ang fuse nasunog.
6 Nadaot ang tubo sa suplay sa tubig.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
- 1 tangtangon ang pisi sa kable, kuhaa ang bahin sa pipeline, kuhaa ang wire plate.
2 isira ang bolt sa tubig, ibutang ang tubig sa chamber sa motor.
3 kuhaa ang filter, loose ang fixed screw sa coupling aron ayuhon ang motor shaft.
4 i-screw down ang bolt nga nagkonektar sa inlet junction sa motor, ug ibulag ang pump gikan sa motor (hatagi ug pagtagad ang unit cushion kung magbulag, aron mapugngan ang pagliko sa pump shaft)
5 ang pagkasunod-sunod sa disassembly sa bomba mao ang: (tan-awa ang numero 1) inlet junction, impeller, diversion shell, impeller...... check valve body, sa dihang tangtangon ang impeller, gamita ang espesyal nga mga himan aron maluagan ang conical sleeve sa fixed impeller una, ug likayi ang pagduko ug pagsamad sa pump shaft sa proseso sa pag-disassembly.
6 ang proseso sa disassembly sa motor mao ang: (tan-awa ang numero 1) ibutang ang motor sa plataporma, ug kuhaa ang mga nuts, base, shaft head locking nut, thrust plate, yawe, ubos nga guide bearing seat ug double head bolt gikan sa ubos sa ang motor sa baylo, ug dayon kuhaa ang rotor (pagtagad nga dili makadaot sa wire package) ug sa katapusan kuhaa ang nagkonektar nga seksyon ug sa ibabaw nga giya nga nagdala sa lingkuranan.
7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.
1, ibutang ang tubig sa lungag sa motor (ilabi na sa tingtugnaw aron mapugngan ang motor gikan sa pagyelo), ug ihigot og maayo ang kable.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, ang dugay nga paggamit kinahanglan nga hatagan pagtagad ang pagpugong sa taya sa mga submersible pump.
- Impeller
- Shaft sleeve
- Goma shaft manggas
-
Singsing sa pagsilyo
01 Pag-inom og tubig sa lawom nga atabay
02 Taas nga suplay sa tubig
03 suplay sa tubig sa kabukiran
04 nga tubig sa torre
05 Agrikultura nga irigasyon
06 irigasyon sa tanaman
07 pag-inom sa tubig sa suba
08 tubig sa panimalay