QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.
This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Модели | Ҷараён (м3/с) | Сардор (м) |
Rotatingspeed(change/point) | Насоси обӣ (%) | Васлаки диаметр (мм) |
Хуб татбиқшаванда диаметри (мм) |
Баҳо дода шудааст power(KW) |
Баҳо дода шудааст шиддат (V) |
Баҳо дода шудааст ҷорӣ (A) |
Самаранокии мотор (%) | power factorcosφ | Воҳиди Андозаи максималии радиалӣ (мм) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175боло | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175боло | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175боло | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175боло | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175боло | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175боло | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175боло | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175боло | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175боло | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175боло | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175боло | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175боло | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175боло | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, насоси зериобӣ барои насоси оби тоза, шустани чоҳи нав, кашидани таҳшин ва оби лойро манъ мекунад,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.
4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.
5, ба таври қатъӣ тибқи муқаррароти лифт насос, диапазони ҷараёни истифода, барои пешгирии ҷараёни паст ё қувваи обкашии баланд, подшипник ва дигар қисмҳои фарсудашавӣ, аз ҳад зиёди муҳаррик сӯхтааст.
6, пас аз насоси поён чоҳ, андозагирии муҳаррик ба муқовимати изолятсияи замин набояд аз 100M камтар бошад, пас аз оғоз ба мушоҳида кардани шиддат ва ҷараён, изолятсияи печи муҳаррикро тафтиш кунед, оё мувофиқи талабот; ҳарорати ҷойгиршавии насоси нигоҳдории насос, агар аз нуқтаи яхкунӣ камтар бошад, обро дар холигоҳи мотор хушк кунед, вайроншавии яхбандии обро, ки аз ҳарорати паст ба вуҷуд омадааст, пешгирӣ кунед.
The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.
Хусусиятҳои асосии маҳсулот инҳоянд:
- 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
- 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
- 4. The motor and pump bearing are lubricated by water.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Тайёрӣ пеш аз насб:
1. Санҷед, ки насоси зериобӣ ба шартҳои истифода ва миқёси дар дастур зикршуда мувофиқат мекунад ё на.
2. Бо истифода аз объекти вазнин, ки диаметраш ба диаметри максималии берунии насоси зериобӣ баробар аст, чен кунед, ки оё диаметри дохилии чоҳ ба насоси зериобӣ мувофиқат мекунад ва чен кунед, ки оё чуқурии чоҳ ба талаботи насб мувофиқат мекунад.
3. Тафтиш кунед, ки чоҳ тоза аст ё оби чоҳ хира аст. Ҳеҷ гоҳ насоси электрикии зериобшавандаро барои шустани лой ва оби қум истифода набаред, то ба насоси барқии зериобӣ осеб нарасонед.
4. Санҷед, ки оё мавқеъи тазиқи васлкунии чоҳ мувофиқ аст ва оё он ба сифати тамоми агрегат тоб оварда метавонад ё не
5. Санҷед, ки ҷузъҳои насоси зериобӣ мувофиқи диаграммаи васлкунӣ дар дастур пурра ва дуруст насб карда шудаанд Экрани филтрро хориҷ кунед ва муфтаро гардиш кунед, то бубинед, ки оё он чандир давр мезанад ё не
6. Буридани обро кушоед ва холигии моторро бо оби тозаи зангнашаванда пур кунед (дар хотир доред. ҳатман онро пур кунед), сипас винти обдорро мустаҳкам кунед. Пас аз 12 соати тазриқи об, муқовимати изолятсияи мотор набояд аз 150M Q камтар бошад, вақте ки бо мизи ларзиши 500V чен карда мешавад.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Диаграммаи раванди кабели замимашуда чунин аст:
8. Аз мултиметр истифода бурда, санҷед, ки оё симҳои сефаза пайвастанд ва муқовимати доимии доимӣ тақрибан баробар аст.
9. Санҷед, ки иқтидори занҷир ва трансформатор аз ҳад зиёд сарборӣ аст, ва сипас калиди муҳофизаткунандаи изофабор ё таҷҳизоти оғозёбиро пайваст кунед. Барои моделҳои мушаххас ба Ҷадвали 2 нигаред, ва сипас як сатил обро ба насоси обкашӣ аз васлаки насоси об резед, то подшипникҳои резиниро дар насос молед ва насоси барқии зериобшавандаро рост ва устувор ҷойгир кунед. Оғоз кунед (на бештар аз як сония) ва тафтиш кунед, ки оё самти руль ба аломати руль мувофиқ аст ё не. Дар акси ҳол, ду пайвасткунаки сими сефазаро иваз кунед. Сипас филтрро насб кунед ва барои поён рафтан ба чоҳ омода шавед. Агар дар мавридхои махсус (масалан, захбурхо, захбурхо, дарьёхо, хавзхо, хавзхо ва гайра) истифода бурда шавад, насоси электрики бояд боэътимод ба замин пайваст карда шавад.
(2) Таҷҳизот ва асбобҳои насбкунӣ:
1. Як ҷуфт занҷири борбардорӣ барои зиёда аз ду тонна.
2. штатив бо баландии амудї на камтар аз чор метр.
3. Ду ресмони овезон (арғамчини сим), ки вазни зиёда аз як тоннаро бардошта метавонад (вазни маҷмӯи пурраи насосҳои обро бардошта метавонад).
4. Ду ҷуфт тазиқи (шплинт) насб кунед.
5. Калид, болга, отвертка, асбобу асбобхои электрики ва гайра.
(3) Насби насоси барқӣ:
1. Диаграммаи насби насоси зериобии электрикӣ дар расми 2 нишон дода шудааст.
2. Насосхои электрикии зериобиро, ки сарашон аз 30 метр камтар аст, бо ёрии шлангхо ва ресмонхои сим ё дигар ресмонхои бангдона, ки тамоми вазни тамоми машина, кубурхои обгузар ва оби кубурхоро бардошта метавонанд, бевосита ба чох андохтан мумкин аст.
3. Насосхое, ки сарашон аз 30 метр зиёд аст, кубурхои пулодиро истифода мебаранд, ки тартиби васлкунй чунин аст.
①Истифодаи тазиқи нӯги болоии қисми насоси об (мотор ва насоси об дар айни замон пайваст карда шудааст), онро бо занҷири овезон бардошта, оҳиста ба чоҳ пайваст кунед, то он даме, ки тазиқи ба сари чоҳ гузоред ва онро хориҷ кунед. занҷири овезон.
② Барои часпак кардани қубур як ҷуфт тазиқи дигарро истифода баред, онро бо занҷири овезон 15 см дуртар аз фланец бардошта, оҳиста фуроваред. Байни ҳалқаи қубур ва ҳалқаи насос Ҷойҳои резиниро ба ҷои худ гузоред ва қубурро маҳкам кунед ва бо болтҳо, гайкаҳо ва шустушӯйҳои пружина баробар насос кунед.
③ Насоси зериобшавандаро каме боло бардоред, тазиқи канори болоии насоси обро хориҷ кунед, кабелро бо лентаи пластикӣ ба қубури об сахт пайваст кунед ва то он даме, ки тазиқи дар сари чоҳ ҷойгир карда шавад, оҳиста ба поён гузоред.
④Барои бастани ҳамаи қубурҳои обкашӣ ба чоҳ ҳамин усулро истифода баред.
⑤Пас аз он ки сими берунӣ ба гузаргоҳи идоракунӣ пайваст карда мешавад, он ба таъминоти барқи сефазавӣ пайваст карда мешавад.
(4) Чизҳоеро, ки ҳангоми насб бояд қайд кард:
1. Агар дар ҷараёни обкашӣ ҳодисаи роҳбандӣ пайдо шавад, қубури обгузарро гардонед ё кашед, то нуқтаи роҳбандиро бартараф кунед. Агар чораҳои гуногун то ҳол кор накунанд, лутфан насосро маҷбур накунед, то ба насоси электрикии зериобӣ ва чоҳ осеб нарасонед.
2. Дар ваќти васлкунї бояд дар канори њар як ќубур љойи резинї љойгир карда, баробар мањкам карда шавад.
3. Ҳангоми ба чоҳ фуровардани насоси обӣ, онро дар мобайни қубур гузоштан лозим аст, то ки насос муддати тӯлонӣ ба девори чоҳ кор накунад, ки насос ба ларзиш ва муҳаррики он рӯбучин ва сӯзонда шавад. .
4. Мутобиқи шароити реги равон ва лойии чоҳ чуқурии насоси обро то қаъри чоҳ муайян кунед. Насосро ба лой нагузоред. Масофа аз насоси обкаш то қаъри чоҳ умуман на камтар аз 3 метр аст (нигаред ба расми 2).
5. Чуќурии обкашии насоси обкашї бояд на камтар аз 1-1,5 метр аз сатњи динамикии об то гирењи воридоти об бошад (ниг. расми 2). Дар акси хол подшипникхои насоси обй ба осонй вайрон шуда метавонанд.
6. Баландбардории насоси обкашӣ хеле паст буда наметавонад. Дар акси ҳол, бояд дар лӯлаи обгузари чоҳ клапани дарвозӣ насб карда шавад, то ҷараёни насосро дар нуқтаи номиналӣ назорат кунад, то аз изофабор ва сӯхтани муҳаррик аз сабаби суръати зиёди ҷараёни об пешгирӣ карда шавад.
7. Вақте ки насоси об кор мекунад, баромади об бояд пайваста ва ҳатто бошад, ҷараён бояд устувор бошад (дар шароити кории номиналӣ, умуман на бештар аз 10% аз ҷараёни номиналӣ), ва набояд ларзиш ё садо бошад. Агар ягон норасоӣ мавҷуд бошад, барои муайян кардани сабаб ва бартараф кардани он мошинро қатъ кардан лозим аст.
8. Ҳангоми насб кардан, ба танзими сими заминкании мотор диққат диҳед (ниг. Расми 2). Вакте ки кубури обгузар кубури пулодй аст, онро аз тазики чох кашед; вакте ки кубури обгузар кубури пластмассй бошад, онро аз аломати заминкании насоси электрики кашед.
(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.
(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.
1 дар ҳолати номиналӣ, ҷорӣ зиёда аз 20% аст.
2 сатҳи динамикии об ба қисмати вуруди об, ки боиси фосилаи об мегардад.
3 насоси зериобӣ ларзиш ё садои шадид.
4 шиддати таъминот аз 340 вольт пасттар аст.
5 приставка як фазаро сӯзонд.
6 зарари кубури обгузар.
7 мотор ба муқовимати гармидиҳӣ камтар аз 0,5 мегаом аст.
(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.
1, обро дар холигии мотор гузоред (махсусан дар фасли зимистон барои пешгирӣ кардани ях кардани мотор) ва кабелро хуб баста кунед.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, истифодаи дарозмуддат бояд ба пешгирии занги насосҳои зериобӣ диққат диҳед.
- Импеллер
- Отини чоҳ
- Отини чоҳи резинӣ
-
Ҳалқаи мӯҳр
01 Гирифтани оби чукур
02 Водопроводи баландошьёна
03 таъминоти оби кухй
04 манора об
05 Обьёрии хочагии кишлок
06 обьёрии богхо
07 оби дарё
08 Оби маишӣ