175QJ Pump Ceelka Hoosaysa

Samee farsamaynta OEM! Marka loo eego shuruudaha isticmaalaha, naqshadeynta iyo soo saarista noocyada kala duwan ee shuruudaha gaarka ah ee matoorka iyo bamka aan caadiga ahayn. Heerarka hirgelinta alaabta: GB/T2816-2014 "bamka si fiican hoos ugu dhejinaya", GB/T2818-2014 "matoorka asynchronous si fiican hoos u dhigi kara". WhatsApp: 17855846335
PDF DOWNLOAD
Faahfaahin
Tags
 
Dulmarka alaabta

QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.

 

 
Shuruudaha Isticmaalka

This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.

 

 
Macnaha Model

Read More About deep well pumps for sale

 
Tixraaca Model Qaybeed
Qaabka Socodka (m3/saacaddii) Madaxa
(m)
Rotatingspeed(change/point) Biyo-mareenka (%)  Bixinta
dhexroorka
(mm)
Si fiican loo dabaqi karo
dhexroor (mm) 
 Lagu qiimeeyay
power(KW)
Lagu qiimeeyay
danab (V)
Lagu qiimeeyay
hadda (A)
Karti (%) power factorcosφ   Unug
Cabbirka Radial Maximu (mm)
175QJ10-42 10 42 2850 53 50  175sare 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175sare 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175sare 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175sare 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175sare 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175sare 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80 175sare 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175sare 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175sare 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175sare 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175sare 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175sare 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175sare 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Taxadirka Badbaadada

1, bamka si fiican hoos ugu dhigi kara bamka biyaha nadiifka ah, mamnuucaya in la dhaqo ceel cusub, bamgareynta wasakhda iyo biyaha dhoobada ah,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.

4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.

5, si adag sida ku xusan qodobbada wiishka bamka, kala duwanaanshaha socodka isticmaalka, si looga hortago socodka hooseeya ama xoogga sare ee wiishka, xajinta iyo qaybaha kale ee xirashada, culeyska matoorka ayaa gubtay

6, ka dib markii bamka hoos ceelka, cabbiraadda motor in ay iska caabin dahaarka dhulka waa in aanay noqon wax ka yar 100M, ka dib markii bilowga si ay u dhawraan danab iyo hadda, hubi dahaarka dabaylaha motor, haddii si waafaqsan shuruudaha; heerkulka meesha lagu kaydiyo bamka haddii uu ka yar yahay barta qaboojinta, waa in lagu qallajiyaa biyaha godka matoorka, ka ilaali godka matoorka biyaha barafka ee uu keeno heerkulka hooseeya.

 

 
Hordhaca Qaab-dhismeedka

The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.


Tilmaamaha ugu muhiimsan ee alaabta waxaa ka mid ah:

  1. 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
  2. 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
  3. 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
  4. 4. The motor and pump bearing are lubricated by water.
  5. 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
  6. 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.
Read More About deep well submersible pump
 
Ku rakib

(1) Diyaarinta ka hor inta aan la rakibin:
1. Hubi in bamka hoos mara uu buuxiyo shuruudaha isticmaalka iyo baaxadda lagu sheegay buug-gacmeedka.
2. Adigoo isticmaalaya dhexroor culus oo leh dhexroor la mid ah dhexroorka dibadda ee ugu sarreeya ee bamka hoos mara, cabbir haddii dhexroorka ceelka ceelka uu ku habboon yahay bamka hoos mara, cabbirna haddii qoto-dheeraanta ceelku buuxinayo shuruudaha rakibidda.
3. Hubi in ceelka ceelku uu nadiif yahay iyo in biyuhu ceelku yihiin kuwo gurracan. Weligaa ha isticmaalin bam koronto oo hoos iman kara si aad u dhaqdo bamka weriyaha dhoobada iyo biyaha ciidda si aad uga fogaato dhaawac degdeg ah oo soo gaadha bamka korontadu hoos u dhigto.
4. Hubi in booska xajinaha welhead ku habboon yahay iyo haddii ay u adkeysan karto tayada unugga oo dhan
5. Hubi in qaybaha matoorka hoos u dhigi karaan ay dhammaystiran yihiin oo si sax ah loo rakibay si waafaqsan jaantuska kulanka ee buug-gacmeedka, ka saar shaashadda oo beddel isku-xidhka si aad u aragto inay si dabacsan u wareegayso.
6. Ka fur furka biyaha oo ka buuxi godka matoorka biyo nadiif ah oo aan daxalaysan (xusuusnow in aad buuxiso), ka bacdina adkee xadhigga biyaha. Ka dib 12 saacadood oo duritaanka biyaha ah, caabbinta dahaarka ee matoorku waa in aanu ka yarayn 150M Q marka lagu cabbiro miis gariir 500V ah.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Jaantuska habka fiilooyinka fiilooyinka ee ku lifaaqan waa sida soo socota:
Read More About deep well pump

 

8. Isticmaal multimeter-ka si aad u hubiso in xadhkaha saddexda weji ay isku xidhan yihiin iyo in iska caabbinta DC-ku ay qiyaas ahaan dheelli tiran yihiin.
9. Hubi in awoodda wareegga iyo beddelka ay si xad dhaaf ah u raran yihiin, ka dibna ku xidh furaha ilaalinta culayska ama qalabka bilowga. Ka eeg Shaxda 2 noocyo gaar ah, ka dibna ku shub baaldi biyo ah bamka biyaha ee ka soo baxa bamka biyaha si aad u saliidayn xadhkaha caagga ah ee bamka, ka dibna bamka korontadu hoos u dhigto dhig mid toosan oo joogto ah. Bilow (wax aan ka badnayn hal ilbiriqsi) oo hubi in jihada isteerinka ay waafaqsan tahay calaamadda isteerinka. Haddaysan ahayn, ku beddel laba xidhiidhiye oo ka mid ah fiilada saddexda weji leh. Kaddib rakib shaandhada una diyaari inaad ceelka dhaadhacdo. Haddii loo isticmaalo waqtiyo gaar ah (sida godadka, godadka, webiyada, balliyada, balliyada, iwm.), bamka korontadu waa in si la isku halleyn karo loo dejiyo.

 

(2) Qalabka iyo qalabka lagu rakibo:
1. Hal ka mid ah silsiladaha wax-qaadista ee ka badan laba tan.
2. Sadex geesood ah oo leh joog toosan oo aan ka yarayn afar mitir.
3. Laba xadhig oo ka laadlaad ah oo qaadi kara miisaan ka badan hal tan (waxay qaadi karaan culayska bambooyin biyo ah oo dhammaystiran).
4. Ku rakib laba-labo oo xajin ah (kabyo).
5. Biraha, dubbaha, kaashawiito, qalabka korontada iyo qalabka, iwm.

 

(3) Ku rakibida bamka korontada
1. Jaantuska rakibaadda ee bamka korontada hoostiisa ayaa lagu muujiyay Jaantuska 2. Cabbirrada rakibidda gaarka ah ayaa lagu muujiyay shaxda 3 "Liiska Cabbirrada Rakibaadda ee Bamka Korontada ee Submersible".

 

2. Bambooyin koronto oo hoos yimaada oo madax ka yar 30 mitir ayaa si toos ah loogu shubi karaa ceelka iyadoo la isticmaalayo tubooyinka iyo xargaha ama xargaha kale ee hemp kuwaas oo qaadi kara miisaanka buuxa ee dhammaan mishiinka, tuubooyinka biyaha, iyo biyaha tuubooyinka.

 

3. Bambooyin leh madax ka badan 30 mitir ayaa isticmaala tubooyinka birta, nidaamka rakibiddana waa sida soo socota.
①Isticmaal xajin si aad ugu xidho cidhifka sare ee qaybta matoorka biyaha (matoorka iyo bamka biyaha ayaa ku xidhan wakhtigan), ku qaad silsilad ka laadlaadsan, oo si tartiib ah ugu xidh ceelka ilaa aad xajinayso madaxa ceelka oo ka saar silsilad laadlaadsan.
② Isticmaal labo xajin oo kale si aad tuubada ugu xajiso, ku qaad silsilad laadlaad ah oo 15 cm ka fog garabka, oo si tartiib ah hoos ugu dhig. Inta u dhaxaysa flange tuubada iyo bamka bamka, dhig suufka caagga ah meesha oo adkee tuubada oo si siman ugu bamgareyso boolal, lawska iyo weelasha guga.
③ Xoogaa kor u qaad bamka hoos mara, ka saar xajinta cidhifka sare ee bamka biyaha, si adag ugu xidh fiilada tuubada biyaha cajalad balaastik ah, oo si tartiib ah hoos ugu xidh ilaa xajinta la dhigo madaxa ceelka.
④ Isticmaal isku qaab si aad ugu xidhid dhammaan tuubooyinka biyaha ceelka.
⑤Kadib markii fiilada macdanta "lead-out" lagu xiro furaha kantaroolka, waxay ku xiran tahay sahayda korontada ee saddexda weji.


(4) Waxyaabaha la xuso marka la rakibayo:
1. Haddi dhacdo isku buuqid ah la helo inta lagu jiro habka bamgareynta, leexi ama jiid tuubada biyaha si aad uga gudubto meesha saxmada leh. Haddii tillaabooyin kala duwani aanay weli shaqayn, fadlan ha ku qasbin bamka si aad uga fogaato burbur ku yimaadda bamka korontada ee hoos u dhigi kara iyo ceelka.
2. Inta lagu jiro rakibidda, suufka caagga ah waa in lagu dhejiyaa gees ka gees kasta oo tuubo ah oo la adkeeyo si siman.
3. Marka bamka biyaha lagu shubo ceelka waa in la dhex dhigaa dhuunta ceelka badhtankeeda si aanay bamku ugu socon darbiga ceelka muddo dheer, taasina ay keento in bamku gariiro oo matoorku xaaqo oo gubato. .
4. Go'aami qoto dheeraanta bamka biyaha ilaa gunta ceelka iyadoo loo eegayo ciidda qulqulaya iyo xaaladaha ciidda ee ceelka. Ha ku aasin bamka dhoobada. Masaafada u jirta bamka biyaha ilaa gunta ceelka guud ahaan waa mid aan ka yarayn 3 mitir (eeg sawirka 2).
5. Moolka gelitaanka biyaha ee bamka biyuhu waa in aanu ka yarayn 1-1.5 mitir heerka biyaha firfircoon ilaa marinka biyaha gelitaanka (eeg sawirka 2). Haddii kale, xadhkaha matoorka biyaha ayaa si fudud u dhaawacmi kara.
6. Wiishka bamka biyuhu ma noqon karo mid aad u hooseeya. Haddii kale, waxaa loo baahan yahay in lagu rakibo tuubada biyaha ee albaabka ceelka si loo xakameeyo socodka bamka ee barta socodka lagu qiimeeyay si looga hortago in matoorku uu si xad dhaaf ah u raro oo uu u gubto heerka socodka badan ee socodka awgeed.
7. Marka bamka biyuhu socdo, wax-soo-saarka biyuhu waa inuu ahaado mid joogto ah oo xitaa, hadda waa inuu ahaado mid deggan (marka la qiimeeyo xaaladaha shaqada, guud ahaan wax aan ka badnayn 10% ee hadda la qiimeeyay), waana inaysan jirin gariir ama buuq. Haddii ay jiraan wax aan caadi ahayn, mashiinka waa in la joojiyaa si loo ogaado sababta oo loo tirtiro.
8. Markaad rakibayso, fiiro gaar ah u yeelo goobta siliga goynta matoorka (eeg sawirka 2). Marka dhuumaha biyuhu ay yihiin tuubo bir ah, ka soo hoggaami xajinta madaxa ceelka; marka tuubada biyuhu ay tahay tuubo caag ah, ka soo jiid calaamadda dhulka ee bamka korontada.

 

 
Dayactirka iyo Dayactirka

(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.

(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.

(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.

(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.

 

 1 ee xaaladda la qiimeeyay, hadda waa in ka badan 20%.

 2 heerka biyaha firfircoon ilaa qaybta soo galitaanka biyaha, taasoo keenaysa biyo kala go'a.

 3 bamka hoos mara gariir ama buuq daran.

 4 danab sahayda ayaa ka hooseeya 340 volts.

 5 fiyuus ayaa gubtay weji.

 6 tuubooyinka biyaha oo burburay.

 7 matoorka caabbinta kuleylka kuleylka ayaa ka yar 0.5 megaohm.

 

(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.

 

 
Kaydinta iyo haynta

 1, dami biyaha godka matoorka (gaar ahaan xilliga jiilaalka si aad uga hortagto matoorku baraf), oo si fiican u xidh fiilada.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, isticmaalka muddada dheer waa in fiiro gaar ah u leh ka hortagga miridhku ee matoorada submersible.

 

 
Xidhashada Qaybaha
  • Impeller
  • Shaft sleeve
  • Gacan-gacmeedka caagga ah
  • giraanta xiridda

 
Xaaladaha Codsiga

01 Qaadashada biyaha ceelka qoto dheer

02 Biyo-helid-sare

03 biyaha buuraha 

04 munaaradaha biyaha

05 waraabka beeraha

06 waraabka beerta

07 qaadashada biyaha webiga

08 biyaha guriga

 

Haddii aad xiisaynayso alaabtayada, waxaad dooran kartaa inaad macluumaadkaaga kaga tagto halkan, wax yarna waanu kula soo xidhiidhi doonaa.


Halkan ku qor fariintaada oo noo soo dir

Haddii aad xiisaynayso alaabtayada, waxaad dooran kartaa inaad macluumaadkaaga kaga tagto halkan, wax yarna waanu kula soo xidhiidhi doonaa.


soSomali