QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.
This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Үлгі | Ағым (м3/сағ) | Бас (м) |
Rotatingspeed(change/point) | Су сорғысы(%) | Розетка диаметрі (мм) |
Жақсы қолданылады диаметрі (мм) |
Бағаланған power(KW) |
Бағаланған кернеу(V) |
Бағаланған ток (A) |
Мотор тиімділігі (%) | қуат коэффициентіcosφ | Бірлік Радиалды максималды өлшем (мм) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175жоғарыда | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175жоғарыда | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175жоғарыда | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175жоғарыда | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175жоғарыда | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175жоғарыда | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175жоғарыда | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175жоғарыда | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175жоғарыда | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175жоғарыда | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175жоғарыда | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175жоғарыда | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175жоғарыда | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, таза су сорғысына арналған ұңғыманың суасты сорғысы, жаңа ұңғымаларды жууға, шөгінділер мен лай суды соруға тыйым салынады,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.
4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.
5, қатаң түрде сорғы көтеру ережелеріне сәйкес, пайдалану ағыны диапазоны, төмен ағынды немесе жоғары көтеру сорғы күшін, мойынтіректің және тозудың басқа бөліктерін болдырмау үшін, қозғалтқыштың шамадан тыс жүктелуі күйіп кетті.
6, ұңғымаға сорғыны түсіргеннен кейін, қозғалтқыштың жерге оқшаулау кедергісін өлшеу 100М-ден кем болмауы керек, кернеу мен токты бақылай бастағаннан кейін қозғалтқыштың орамының оқшаулауын, талаптарға сәйкестігін тексеріңіз; сорғыны сақтау орнының температурасы қату нүктесінен төмен болса, мотор қуысындағы суды кептіру керек, төмен температура әсерінен мотор қуысындағы су мұзының зақымдалуын болдыртпау керек.
The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.
Өнімнің негізгі ерекшеліктеріне мыналар жатады:
- 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
- 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
- 4. The motor and pump bearing are lubricated by water.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Орнату алдында дайындық:
1. Суасты сорғының нұсқаулықта көрсетілген пайдалану шарттары мен көлеміне сәйкес келетінін тексеріңіз.
2. Диаметрі суасты сорғының сыртқы диаметріне тең ауыр объектіні пайдаланып, ұңғыма оқпанының ішкі диаметрі суасты сорғысына сәйкес келетінін өлшеңіз және ұңғыма тереңдігінің орнату талаптарына сәйкес келетінін өлшеңіз.
3. Ұңғыма оқпанының тазалығын және ұңғыма суының лайлы екенін тексеріңіз. Сүңгуір электр сорғыны мерзімінен бұрын зақымдап алмас үшін, суасты сорғысын лай мен құм суын жуу үшін ешқашан суасты электр сорғысын пайдаланбаңыз.
4. Ұңғыма сағасын орнату қапсырмасының орны сәйкес келетінін және оның бүкіл қондырғының сапасына төтеп бере алатынын тексеріңіз.
5. Нұсқаулықтағы құрастыру схемасына сәйкес суасты сорғы бөліктерінің толық және дұрыс орнатылғанын тексеріңіз Сүзгі экранын алып тастаңыз және муфтаның икемді айналатынын көру үшін бұраңыз.
6. Су бұрандасын бұрап алыңыз да, мотор қуысын таза, коррозияға ұшырамайтын сумен толтырыңыз (ескертпе. толтыруды ұмытпаңыз), содан кейін су бұрандасын қатайтыңыз. 12 сағат су бүркуден кейін қозғалтқыштың оқшаулау кедергісі 500В шайқау үстелімен өлшенгенде 150M Q кем болмауы керек.
7. Кабель қосындысы, шығатын кабельдің бір шетінен 120 мм резеңке гильзаны кесіп тастаңыз және сәйкес кабельді электрик пышағымен кесіп тастаңыз, содан кейін үш өзекті сымның ұзындығын сатылы пішінде айналдырыңыз, 20 мм мыс өзегін аршып алыңыз, оксидті қырыңыз мыс сымның сыртына пышақпен немесе құм шүберекпен төсеп, екі жалғанған сымның ұшын палирлерге салыңыз. Қабатты жұқа мыс сыммен мықтап байлап болғаннан кейін, оны мұқият және мықтап дәнекерлеп, кез келгенін құмдаңыз. бетіндегі бөртпелер. Содан кейін, үш буын үшін поливестрлі оқшаулағыш таспаны пайдаланып, оларды үш жууға арналған жартылай қабаттастырылған етіп орау керек. Орау қабатының екі ұшын nyion жіппен мықтап ораңыз, содан кейін таспаны үш қабатқа орау үшін жартылай жинақталған әдісті қолданыңыз. Сыртқы қабатты үш қабатқа жоғары қысымды оқшаулағыш таспамен ораңыз. Соңында, үш жіпті біріктіріп, оларды жоғары қысымды таспамен бес қабатқа қайта-қайта ораңыз. Әрбір қабат мықтап байланған болуы керек, ал қабат аралық қосылыстар судың оқшаулауына кіріп, зақымданбауы үшін тығыз және тығыз болуы керек. Орап болғаннан кейін бөлме температурасында 20 'c суға 12 сағат салып, сілкілеу үстелімен оқшаулау кедергісін өлшеңіз. , ол 100М Ом кем болмауы керек
Қосылған кабельді қосу процесінің схемасы келесідей:
8. Үш фазалы сымдардың жалғанғанын және тұрақты тұрақты ток кедергісінің шамамен теңестірілгенін тексеру үшін мультиметрді пайдаланыңыз.
9. Тізбек пен трансформатор сыйымдылығының шамадан тыс жүктелгенін тексеріңіз, содан кейін артық жүктемеден қорғау қосқышын немесе іске қосу жабдығын қосыңыз. Арнайы үлгілер үшін 2-кестені қараңыз, содан кейін сорғыдағы резеңке мойынтіректерді майлау үшін су сорғысының розеткасынан су сорғысына бір шелек су құйыңыз, содан кейін суасты электр сорғысын тік және тұрақты орналастырыңыз. Іске қосу (бір секундтан артық емес) және руль бағыты рульдік белгімен сәйкес келетінін тексеріңіз. Олай болмаса, үш фазалы кабельдің кез келген екі қосқышын ауыстырыңыз. Содан кейін сүзгіні орнатып, ұңғымаға түсуге дайындалыңыз. Ерекше жағдайларда (мысалы, арықтар, арықтар, өзендер, тоғандар, тоғандар және т.б.) пайдаланылса, электр сорғы сенімді түрде жерге тұйықталуы керек.
(2) Орнату жабдықтары мен құралдары:
1. Екі тоннадан асатын бір жұп көтеру шынжырлары.
2. Тік биіктігі төрт метрден кем емес штатив.
3. Бір тоннадан астам салмақты көтере алатын (су сорғыларының толық жиынтығының салмағын көтере алатын) екі аспа арқан (сым арқан).
4. Екі жұп қысқышты (шпинттерді) орнатыңыз.
5. Кілттер, балғалар, бұрағыштар, электр құралдары мен аспаптары және т.б.
(3) Электр сорғыны орнату:
1. Сүңгуір электр сорғының орнату схемасы 2-суретте көрсетілген. Орнатудың нақты өлшемдері 3-кестеде «Сүңгуір электр сорғының орнату өлшемдерінің тізімі» көрсетілген.
2. Басы 30 метрден аспайтын суасты электр сорғыларын шлангтарды және сым арқандарды немесе бүкіл машинаның, су құбырларының және құбырлардағы судың толық салмағын көтере алатын басқа кендір арқандарды пайдаланып, тікелей ұңғымаға көтеруге болады.
3. Басын 30 метрден асатын сорғыларда болат құбырлар пайдаланылады, орнату реті келесідей:
①Су сорғы бөлігінің үстіңгі ұшын (қозғалтқыш пен су сорғысы осы уақытта қосылған) қысу үшін қысқышты пайдаланыңыз, оны ілулі шынжырмен көтеріп, қысқышты ұңғыма сағасына орнатып, оны алып тастағанша ұңғымаға баяу байлаңыз. ілулі тізбек.
② Құбырды қысу үшін басқа қысқыштарды пайдаланыңыз, оны фланецтен 15 см қашықтықта ілулі шынжырмен көтеріп, баяу түсіріңіз. Құбыр фланеці мен сорғы фланецінің арасы Резеңке төсемді орнына қойып, құбырды және сорғыны болттар, гайкалар және серіппелі шайбалармен біркелкі қатайтыңыз.
③ Суасты сорғыны сәл көтеріңіз, су сорғышының үстіңгі жағындағы қысқышты алыңыз, кабельді су құбырына пластик таспамен мықтап байлаңыз және қысқыш ұңғыма сағасына қойылғанша баяу байлаңыз.
④Барлық су құбырларын ұңғымаға байлау үшін бірдей әдісті қолданыңыз.
⑤Шығару кабелі басқару қосқышына қосылғаннан кейін ол үш фазалы қуат көзіне қосылады.
(4) Орнату кезінде ескеретін жайттар:
1. Егер сору процесінде кептелу құбылысы анықталса, кептелу нүктесін жеңу үшін су құбырын бұраңыз немесе тартыңыз. Егер әртүрлі шаралар әлі де жұмыс істемесе, суасты электр сорғы мен ұңғымаға зақым келтірмеу үшін сорғыны күштеп түсірмеңіз.
2. Орнату кезінде әрбір құбырдың фланеціне резеңке төсеніш салынып, біркелкі тартылуы керек.
3. Су сорғыны ұңғымаға түсіргенде, сорғы ұзақ уақыт бойы ұңғыма қабырғасына қарсы жұмыс істеп, сораптың дірілдеуіне және қозғалтқыштың сыпырылуына және жануына жол бермеу үшін оны ұңғыма құбырының ортасына қою керек. .
4. Ұңғыманың ағып жатқан құм және тұнба жағдайына сәйкес су сорғышының ұңғыма түбіне дейінгі тереңдігін анықтаңыз. Сорғыны балшыққа көмуге болмайды. Су сорғышынан ұңғыма түбіне дейінгі қашықтық әдетте 3 метрден кем емес (2-суретті қараңыз).
5. Су сорғышының судың кіру тереңдігі судың динамикалық деңгейінен су құятын торапқа дейін 1-1,5 метрден кем болмауы керек (2-суретті қараңыз). Әйтпесе, су сорғысының мойынтіректері оңай зақымдалуы мүмкін.
6. Су сорғышының көтергіштігі тым төмен болмауы керек. Әйтпесе, қозғалтқыштың шамадан тыс жүктелуін және үлкен дебиттің салдарынан жанып кетуін болдырмау үшін номиналды дебит нүктесінде сорғы шығынын бақылау үшін ұңғыма сағасының су құбырына қақпақ клапанын орнату қажет.
7. Су сорғы жұмыс істеп тұрған кезде судың шығуы үздіксіз және біркелкі болуы керек, ток тұрақты болуы керек (номиналды жұмыс жағдайында, әдетте номиналды токтың 10% -нан аспауы керек), діріл немесе шу болмауы керек. Қандай да бір ауытқулар болса, себебін анықтау және оны жою үшін машинаны тоқтату керек.
8. Орнатқан кезде қозғалтқышты жерге қосу сымының параметріне назар аударыңыз (2-суретті қараңыз). Су құбыры болат құбыр болса, оны ұңғыманың қысқышынан жүргізеді; су құбыры пластикалық құбыр болса, оны электр сорғысының жерге қосу белгісінен өткізіңіз.
(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.
(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.
1 номиналды күйде, ток 20% жоғары.
2 динамикалық су деңгейі су құятын бөлікке дейін, бұл үзіліссіз суды тудырады.
3 суасты сорғы қатты діріл немесе шу.
4 қоректену кернеуі 340 вольттан төмен.
5 сақтандырғыш фазаны өртеп жіберді.
6 су құбырының зақымдануы.
7 қозғалтқыштың жылу оқшаулау кедергісі 0,5 мегаомнан аз.
(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.
1, мотор қуысындағы суды сөндіріңіз (әсіресе қыста қозғалтқыш қатып қалмас үшін) және кабельді жақсылап байлаңыз.
2, коррозиялық заттар мен газдары жоқ, температурасы 40 °C төмен жабық бөлмеде сақтаңыз.
3, ұзақ мерзімді пайдалану суасты сорғыларының тоттануына назар аудару керек.
- Доңғалақ
- Білік жеңі
- Резеңке білік жеңі
-
Тығыздау сақинасы
01 Терең ұңғыма суын алу
02 Көп қабатты су құбыры
03 тау сумен жабдықтау
04 мұнара суы
05 Ауыл шаруашылық суару
06 бақшаны суару
07 өзен суын алу
08 тұрмыстық су