QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.
This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Mfano | Mtiririko (m3/h) | Kichwa (m) |
Rotatingspeed(change/point) | Pampu ya maji(%) | Kituo kipenyo (mm) |
Inatumika vizuri kipenyo(mm) |
Imekadiriwa power(KW) |
Imekadiriwa voltage (V) |
Imekadiriwa sasa (A) |
Ufanisi (%) | power factorcosφ | Kitengo Ukubwa wa juu wa radial(mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175juu | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175juu | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175juu | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175juu | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175juu | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175juu | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175juu | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175juu | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175juu | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175juu | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175juu | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175juu | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175juu | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, pampu inayoweza kuzamishwa vizuri kwa pampu ya maji safi, inakataza kuosha kisima kipya, kusukuma mashapo na maji ya matope,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.
4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.
5, madhubuti kulingana na masharti ya kuinua pampu, mtiririko mbalimbali ya matumizi, ili kuzuia mtiririko wa chini au kuinua high kusukumia nguvu, kuzaa kutia na sehemu nyingine ya kuvaa, overload motor kuchomwa moto.
6, baada ya pampu chini ya kisima, kipimo cha motor kwa upinzani ardhi insulation haipaswi kuwa chini ya 100M, baada ya kuanza kuchunguza voltage na sasa, kuangalia motor vilima insulation, iwe kulingana na mahitaji; pampu kuhifadhi joto eneo kama chini ya kiwango kufungia, lazima kavu maji katika cavity motor, kuzuia cavity motor maji barafu uharibifu unaosababishwa na joto la chini.
The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.
Makala kuu ya bidhaa ni pamoja na:
- 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
- 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
- 4. The motor and pump bearing are lubricated by water.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Maandalizi kabla ya ufungaji:
1. Angalia ikiwa pampu inayoweza kuzama inakidhi masharti ya matumizi na upeo uliobainishwa kwenye mwongozo.
2. Kwa kutumia kipenyo kizito chenye kipenyo sawa na kipenyo cha juu zaidi cha nje cha pampu inayoweza kuzamishwa, pima ikiwa kipenyo cha ndani cha kisima kinaweza kutoshea pampu inayoweza kuzamishwa, na kupima kama kina cha kisima kinakidhi mahitaji ya usakinishaji.
3. Angalia kama kisima ni safi na kama maji ya kisima ni machafu. Kamwe usitumie pampu ya umeme inayoweza kuzama ili kuosha tope la pampu ya kisima na maji ya mchanga ili kuepuka uharibifu wa mapema wa pampu ya umeme inayoweza kuzamishwa.
4. Angalia ikiwa nafasi ya bani ya usakinishaji ya welhead inafaa na ikiwa inaweza kuhimili ubora wa kitengo kizima.
5. Angalia ikiwa vijenzi vya pampu inayoweza kuzamishwa vimekamilika na kusakinishwa ipasavyo kulingana na mchoro wa kusanyiko kwenye mwongozoOndoa skrini ya kichujio na uzungushe kiunganishi ili kuona kama kinazunguka kwa urahisi.
6. Fungua skrubu ya skrubu ya maji na ujaze tundu la moshi kwa maji safi, yasiyo na babuzi (kumbuka. hakikisha umeichuja), kisha kaza screw ya maji. Baada ya masaa 12 ya sindano ya maji, upinzani wa insulation ya motor haipaswi kuwa chini ya 150M Q inapopimwa na meza ya 500V ya kutikisa.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Mchoro wa mchakato wa wiring cable ni kama ifuatavyo:
8. Tumia multimeter ili uangalie ikiwa waya za awamu tatu zimeunganishwa na ikiwa upinzani wa DC ni takriban usawa.
9. Angalia ikiwa saketi na uwezo wa kibadilishaji umeme umejaa kupita kiasi, na kisha unganisha swichi ya ulinzi wa upakiaji au vifaa vya kuanzia. Tazama Jedwali la 2 kwa miundo mahususi, kisha Mimina ndoo ya maji kwenye pampu ya maji kutoka kwa pampu ya maji ili kulainisha fani za mpira kwenye pampu, na kisha uweke pampu ya umeme inayoweza kuzamishwa wima na thabiti. Anza (si zaidi ya sekunde moja) na uangalie ikiwa mwelekeo wa usukani unalingana na ishara ya usukani. Ikiwa sivyo, badilisha viunganishi vyovyote viwili vya kebo ya awamu ya tatu.Kisha sakinisha kichujio na ujiandae kwenda chini ya kisima. Ikiwa inatumiwa katika matukio maalum (kama vile mitaro, mifereji, mito, mabwawa, mabwawa, nk), pampu ya umeme lazima iwekwe chini kwa uhakika.
(2) Vifaa na zana za usakinishaji:
1. Jozi moja ya minyororo ya kuinua kwa zaidi ya tani mbili.
2. Tripod yenye urefu wa wima wa si chini ya mita nne.
3. Kamba mbili za kunyongwa (kamba za waya) zinazoweza kubeba uzito wa zaidi ya tani moja (zinaweza kubeba uzito wa seti kamili ya pampu za maji).
4. Weka jozi mbili za clamps (splints).
5. Wrenches, nyundo, screwdrivers, zana za umeme na vyombo, nk.
(3) Ufungaji wa pampu ya umeme:
1. Mchoro wa ufungaji wa pampu ya umeme ya chini ya maji umeonyeshwa kwenye Mchoro 2. Vipimo maalum vya ufungaji vinaonyeshwa kwenye Jedwali la 3 "Orodha ya Vipimo vya Ufungaji wa Pumpu ya Umeme ya Submersible".
2. Pampu za umeme zinazozamishwa na kichwa chini ya mita 30 zinaweza kuinuliwa moja kwa moja kwenye kisima kwa kutumia mabomba na kamba za waya au kamba nyingine za katani ambazo zinaweza kubeba uzito kamili wa mashine nzima, mabomba ya maji, na maji katika mabomba.
3. Pampu zilizo na kichwa cha zaidi ya mita 30 hutumia mabomba ya chuma, na mlolongo wa ufungaji ni kama ifuatavyo:
①Tumia kibano kubana ncha ya juu ya sehemu ya pampu ya maji (motor na pampu ya maji vimeunganishwa kwa wakati huu), inua kwa mnyororo wa kuning'inia, na polepole uifunge ndani ya kisima hadi Weka bani kwenye kichwa cha kisima na uondoe. mnyororo wa kunyongwa.
② Tumia vibano vingine ili kubana bomba, linyanyue kwa mnyororo wa kuning'inia umbali wa sm 15 kutoka kwenye ubao, na uushushe polepole. Kati ya flange ya bomba na flange ya pampuWeka pedi ya mpira mahali pake na kaza bomba na pampu sawasawa na bolts, karanga na washers wa spring.
③ Inua pampu inayoweza kuzama kidogo, ondoa kibano kwenye ncha ya juu ya pampu ya maji, funga kebo kwa uthabiti kwenye bomba la maji kwa mkanda wa plastiki, na uifunge polepole chini hadi Kinano kiwekwe kwenye kisima.
④Tumia njia sawa kufunga mabomba yote ya maji kwenye kisima.
⑤Baada ya kebo ya kuongoza kuunganishwa kwenye swichi ya kudhibiti, inaunganishwa kwenye usambazaji wa umeme wa awamu tatu.
(4) Mambo ya kuzingatia wakati wa usakinishaji:
1. Ikiwa jambo la jamming linapatikana wakati wa mchakato wa kusukuma, pindua au kuvuta bomba la maji ili kuondokana na hatua ya jamming. Ikiwa hatua mbalimbali bado hazifanyi kazi, tafadhaliUsilazimishe pampu chini ili kuepuka uharibifu wa pampu ya umeme inayozama na kisima.
2. Wakati wa ufungaji, pedi ya mpira inapaswa kuwekwa kwenye flange ya kila bomba na kuimarishwa sawasawa.
3. Wakati pampu ya maji inaposhushwa ndani ya kisima, inapaswa kuwekwa katikati ya bomba la kisima ili kuzuia pampu kukimbia dhidi ya ukuta wa kisima kwa muda mrefu, na kusababisha pampu kutetemeka na motor kufagia na kuwaka. .
4. Tambua kina cha pampu ya maji hadi chini ya kisima kulingana na mchanga unaopita na hali ya silt ya kisima. Usizike pampu kwenye matope. Umbali kutoka kwa pampu ya maji hadi chini ya kisima kwa ujumla sio chini ya mita 3 (ona Mchoro 2).
5. Kina cha kuingilia maji cha pampu ya maji haipaswi kuwa chini ya mita 1-1.5 kutoka ngazi ya maji yenye nguvu hadi nodi ya ingizo la maji (ona Mchoro 2). Vinginevyo, fani za pampu za maji zinaweza kuharibiwa kwa urahisi.
6. Kuinua kwa pampu ya maji hawezi kuwa chini sana. Vinginevyo, vali ya lango inahitaji kusakinishwa kwenye bomba la maji la kisima ili kudhibiti mtiririko wa pampu kwenye sehemu iliyokadiriwa ya mtiririko ili kuzuia injini isijazwe na kuteketezwa kwa sababu ya viwango vikubwa vya mtiririko.
7. Wakati pampu ya maji inapoendesha, pato la maji linapaswa kuendelea na hata, sasa inapaswa kuwa imara (chini ya hali ya kazi iliyopimwa, kwa ujumla si zaidi ya 10% ya sasa iliyopimwa), na haipaswi kuwa na vibration au kelele. Ikiwa kuna hali isiyo ya kawaida, mashine inapaswa kusimamishwa ili kujua sababu na kuiondoa.
8. Wakati wa kufunga, makini na mpangilio wa waya wa kutuliza motor (angalia Mchoro 2). Wakati bomba la maji ni bomba la chuma, liongoze kutoka kwenye kisima cha kisima; wakati bomba la maji ni bomba la plastiki, liongoze kutoka kwa alama ya kutuliza pampu ya umeme.
(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.
(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.
1 katika hali iliyokadiriwa, sasa ni zaidi ya 20%.
2 kiwango cha maji chenye nguvu kwenye sehemu ya ghuba ya maji, na kusababisha maji ya vipindi.
3 pampu ya chini ya maji mtetemo mkali au kelele.
Voltage 4 ya usambazaji ni chini ya 340 volts.
Fuse 5 ilichoma awamu.
6 uharibifu wa bomba la maji.
7 motor kwa upinzani wa insulation ya mafuta ni chini ya 0.5 megaohm.
(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.
1, kuweka maji katika cavity motor (hasa katika majira ya baridi ili kuzuia motor kutoka kufungia), na kufunga cable vizuri.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, matumizi ya muda mrefu lazima makini na kuzuia kutu ya pampu submersible.
- Msukumo
- Sleeve ya shimoni
- Sleeve ya shimoni ya mpira
-
Pete ya kuziba
01 Unywaji wa maji ya kisima kirefu
02 Ugavi wa maji wa hali ya juu
03 usambazaji wa maji wa mlima
04 maji ya mnara
05 Umwagiliaji wa kilimo
06 umwagiliaji wa bustani
07 ulaji wa maji ya mto
08 maji ya nyumbani