QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.
This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Model | Akym (m3 / sag) | Baş (m) |
Rotatingspeed(change/point) | Suw nasosy (%) | Çykyş diametri (mm) |
Gowy ulanylýar diametri (mm) |
Bahalandyryldy power(KW) |
Bahalandyryldy naprýa .eniýe (V) |
Bahalandyryldy häzirki (A) |
Motorefficiency (%) | güýç faktorlary | Bölüm Radial Maksimu ululygy (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175ýokarda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175ýokarda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175ýokarda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175ýokarda | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175ýokarda | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175ýokarda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175ýokarda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175ýokarda | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175ýokarda | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175ýokarda | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175ýokarda | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175ýokarda | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175ýokarda | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, arassa suw nasosy üçin gowy suwa çümýän nasos, täze guýyny ýuwmagy, çökündi we palçyk suwy sormagy,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.
4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.
5, pes akymyň ýa-da ýokary göteriji nasos güýjüniň, zyňylýan rulmanyň we köýnegiň beýleki bölekleriniň öňüni almak üçin nasos göterijisiniň düzgünlerine, ulanyş aralygyna, motoryň artykmaç ýüklenmegi
6, nasos guýudan aşak düşenden soň, hereketlendirijiniň ýerdäki izolýasiýa garşylygy 100 M-den pes bolmaly däldir, naprýa andeniýäni we toky synlap başlandan soň, hereketlendirijiniň sargy izolýasiýasyny, talaplara laýykdygyny ýa-da ýokdugyny barlaň; nasos saklanylýan ýeriň temperaturasy, doňdurma nokadyndan az bolsa, motor boşlugynda suwy guratmaly, pes temperatura sebäpli motor boşlugynyň suw buzlarynyň zaýalanmagynyň öňüni almaly.
The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.
Önümiň esasy aýratynlyklary:
- 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
- 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
- 4. The motor and pump bearing are lubricated by water.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Gurmakdan öň taýýarlyk:
1. Suwa çümýän nasosyň gollanmada görkezilen ulanyş şertlerine we gerimine laýyk gelýändigini barlaň.
2. Suwa çümýän nasosyň daşky diametrine deň bolan agyr obýekte ulanmak, guýynyň inneldiametriniň suwa çümýän nasosyna laýyk bolup biljekdigini ýa-da guýynyň çuňlugynyň gurnama talaplaryna laýyk gelýändigini ölçäň.
3. Guýynyň arassa bolandygyny ýa-da guýynyň suwunyň bulaşykdygyny barlaň. Suwa çümýän elektrik nasosyna wagtyndan öň zeper ýetmezligi üçin, garşylaýjy nasos palçyklaryny we gum suwlaryny ýuwmak üçin hiç wagt suwa çümýän elektrik nasosyny ulanmaň.
4. Kelleli gurnama gysgyjynyň ýagdaýynyň laýykdygyny ýa-da tutuş bölümiň hiline çydap biljekdigini barlaň
5. Gollanma gurnama diagrammasyna laýyklykda suwa çümýän nasos bölekleriniň doly we dogry gurlandygyny barlaň Süzgüç ekranyny aýyryň we çeýe aýlanýandygyny ýa-da ýokdugyny aýlaň.
6. Suw nurbatyny aýryň we motor boşlugyny arassa, poslamaýan suw bilen dolduryň (bellik ediň. 12 sagat suw sanjymyndan soň, 500V titreýän stol bilen ölçelende motoryň izolýasiýa garşylygy 150M Q-dan pes bolmaly däldir.
7. Kabel birleşmesi, çykýan kabeliň bir ujundan 120 mm rezin ýeňi kesiň we elektrikçiniň pyçakly gabat gelýän kabeli basgançakly üç ýadro siminiň uzynlygyny 20 mm mis ýadrosyny gabyň, oksidiň galyndylaryny kesiň. mis simiň daşyndaky pyçak ýa-da gum mata bilen gatlak we iki sany birikdirilen simiň ujuny palirlere salyň. Gatlagy inçe mis sim bilen daňanyňyzdan soň, ony gowy we pugta lehimläň we islendik biriniň gumy. üstünde gabyklar. Soňra üç boguny berkitiň, üç sany söýgüli üçin ýarym gaplanan görnüşde poliwester izolýasiýa lentasyny ulanyň. Ionapylýan gatlagyň iki ujuny nyion ýüplügi bilen örtüň we lentany üç gatlak bilen örtmek üçin ýarym gaplanan usuly ulanyň. Daşky gatlagy üç gatlak üçin ýokary basyşly izolýasiýa lentasy bilen örtüň. Ahyrynda, üçburçluklary bir ýere jemläň we ýokary basyşly lenta bilen bäş oýunçy üçin birnäçe gezek örtüň. Her gat gaty berk daňylmalydyr we suwuň izolýasiýa girmeginiň we zaýalanmagynyň öňüni almak üçin birleşdiriji bogunlar berk we ýuka bolmaly, Gaplanylandan soň, 20 ° C temperaturada suwa 12 sagat çümdüriň we izolýasiýa garşylygyny titreýän stol bilen ölçäň. , 100M than-dan az bolmaly däldir
Berkidilen kabel simleriniň diagrammasy aşakdaky ýaly:
8. Üç fazaly simleriň birikdirilendigini ýa-da DC garşylygynyň takmynan deňagramlydygyny ýa-da ýokdugyny barlamak üçin multimetr ulanyň.
9. Zynjyryň we transformatoryň kuwwatynyň aşa ýüklenendigini ýa-da ýokdugyny barlaň, soňra bolsa artykmaç gorag wyklýuçatelini ýa-da başlangyç enjamlary birikdiriň. Specificörite modeller üçin 2-nji tablisa serediň, soňra nasosdaky rezin podşipnikleri ýaglamak üçin suw nasosynyň rozetkasyndan bir bedre suw guýuň, soňra suwa çümýän elektrik nasosyny dik we durnukly ýerleşdiriň. Başlaň (bir sekuntdan köp bolmaly däl) we ruluň rul belgisine laýyk gelýändigini barlaň. Notok bolsa, üç fazaly kabeliň islendik iki birikdirijisini çalyşyň. Soňra süzgüçi guruň we guýynyň aşagyna gitmäge taýynlaň. Specialörite ýagdaýlarda (garymlar, garymlar, derýalar, howuzlar, howuzlar we ş.m.) ulanylsa, elektrik nasosy ygtybarly bolmaly.
(2) Gurnama enjamlary we gurallary:
1. Iki tonnadan gowrak göteriji zynjyr.
2. Dikligi dört metrden az bolmadyk üçburçluk.
3. Bir tonnadan gowrak agramy göterip bilýän iki sany asma ýüp (simli ýüpler) (suw nasoslarynyň doly toplumynyň agramyny göterip biler).
4. Iki jübüt gysgyç guruň.
5. Kirpikler, çekiçler, otwýortkalar, elektrik gurallary we gurallar we ş.m.
(3) Elektrik nasosyny oturtmak:
1. Suwa çümýän elektrik nasosynyň gurnama diagrammasy 2-nji suratda görkezilýär. Gurluşyň anyk ölçegleri 3-nji tablisada "Suwasty elektrik nasosynyň gurnama ölçegleriniň sanawy" görkezilýär.
2. Kellesi 30 metrden az bolan suwa çümdürilen elektrik nasoslary, ähli maşynyň, suw turbalarynyň we turbalardaky suwuň doly agramyny göterip bilýän şlanglar we sim arkanlary ýa-da beýleki kenep ýüpleri bilen göni guýa çykarylyp bilner.
3. 30 metrden gowrak kellesi bolan nasoslar polat turbalary ulanýarlar we gurnama yzygiderliligi aşakdaky ýaly:
Water Suw nasos böleginiň ýokarky ujuny gysmak üçin gysgyç ulanyň (motor we suw nasosy şu wagt birikdirildi), asylan zynjyr bilen galdyryň we guýynyň başyna gysgyç goýýançaňyz we haýallyk bilen guýa daňyň. asma zynjyr.
A Turbany gysmak, flanesden 15 sm uzaklykda asylan zynjyr bilen götermek we haýallyk bilen aşak düşürmek üçin başga bir gysgyç ulanyň. Turbanyň flanesleri bilen nasos flanesleriniň arasynda rezin paneli ýerleşdiriň we turbany berkidiň we boltlar, hozlar we pru springina ýuwujylar bilen deň derejede nasoslaň.
Sub Çökýän nasosy birneme ýokaryk galdyryň, suw nasosynyň ýokarky ujundaky gysgyçlary aýyryň, kabeli suw turbasyna plastmassa lenta bilen berkidiň we gysgyç guýynyň başyna goýulýança ýuwaş-ýuwaşdan daňyň.
Water waterhli suw turbalaryny guýa baglamak üçin şol bir usuly ulanyň.
Lead Gurluş kabeli dolandyryş wyklýuçateline birikdirilenden soň, üç fazaly elektrik üpjünçiligine birikdirilýär.
(4) Gurmak wagtynda bellemeli zatlar:
1. Sordurmak prosesinde dykyzlyk hadysasy tapylsa, dykylýan nokady ýeňip geçmek üçin suw turbasyny öwüriň ýa-da çekiň. Dürli çäreler henizem işlemeýän bolsa, suwa çümýän elektrik nasosyna we guýa zeper ýetmezligi üçin nasosy aşak mejbur etmäň.
2. Gurmak wagtynda her turbanyň flanesine rezin pad goýulmaly we deň derejede berkidilmeli.
3. Suw nasosy guýa düşürilende, nasosyň titremegine we motoryň süpürilmegine we ýanmagyna sebäp bolup, nasosyň guýynyň diwaryna uzak wagtlap işlemezligi üçin guýynyň turbasynyň ortasyna goýulmalydyr. .
4. Guýynyň akýan çäge we palçyk şertlerine görä guýynyň düýbüne suw nasosynyň çuňlugyny kesgitläň. Nasosy palçykda jaýlamaň. Suw nasosyndan guýynyň düýbüne çenli aralyk, adatça, 3 metrden az däl (2-nji surata serediň).
5. Suw nasosynyň suw giriş çuňlugy dinamiki suw derejesinden suw girelgesine çenli 1-1,5 metrden az bolmaly däldir (2-nji surata serediň). Otherwiseogsam, suw nasosynyň podşipnikleri aňsat zaýalanmagy mümkin.
6. Suw nasosynyň göterilmegi gaty pes bolup bilmez. Otherwiseogsam, uly akym tizligi sebäpli motoryň aşa köp ýüklenmeginiň we ýanmagynyň öňüni almak üçin, kesgitlenen akym nokadyndaky nasos akymyna gözegçilik etmek üçin guýy suw geçirijisine derwezeli klapan oturdylmalydyr.
7. Suw nasosy işleýän mahaly, suw çykarylyşy üznüksiz bolmaly we hatda tok durnukly bolmaly (bahalandyrylan iş şertlerinde, adatça bahalandyrylan tokyň 10% -inden köp bolmaly däldir) we yrgyldy ýa-da ses bolmaly däldir. Anormallik bar bolsa, sebäbini bilmek we ýok etmek üçin enjamy saklamaly.
8. Gurnanyňyzda, hereketlendirijiniň toprak siminiň sazlanmagyna üns beriň (2-nji surata serediň). Suw turbasy polat turba bolanda, ony guýy gysgyjyndan alyp gidiň; suw turbasy plastik turba bolanda, ony elektrik nasosynyň toprak belgisinden alyp çykyň.
(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.
(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.
Bahalandyrylan ýagdaýda 1 tok 20% -den gowrak.
Aralyk suwuň döremegine sebäp bolup, suw girelgesine 2 dinamiki suw derejesi.
3 suwa çümdüriji nasos agyr yrgyldy ýa-da ses.
4 üpjünçilik naprýa 34eniýesi 340 woltdan pesdir.
5 predohranitel fazany ýakdy.
6 suw turbasynyň zaýalanmagy.
Malylylyk izolýasiýa garşylygy üçin 7 hereketlendiriji 0,5 megaohmdan az.
(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.
1, motor boşlugyna suw goýuň (esasanam gyşda motoryň doňmazlygy üçin) we kabeli gowy daňyň.
2, 40 ° C-den pes temperaturada poslaýjy maddalar we gazlar bolmazdan ýapyk otagda saklaň.
3, uzak wagtlap ulanmak suwa çümýän nasoslaryň posynyň öňüni almaga üns bermelidir.
- Impeller
- Mil ýeňi
- Kauçuk ýeň
-
Möhür halkasy
01 Çuň guýynyň suwy
02 -okary gatly suw üpjünçiligi
03 dag suw üpjünçiligi
04 diň suwy
05 Oba hojalygyny suwarmak
06 bag suwaryş
07 derýa suwuny kabul etmek
08 içerki suw