QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.
This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Modelka | Průtok (m3/h) | Hlava (m) |
Rotatingspeed(change/point) | Vodní čerpadlo(%) | Outlet průměr (mm) |
Dobře aplikovatelné průměr (mm) |
Hodnocené power(KW) |
Hodnocené napětí (V) |
Hodnocené proud (A) |
Motorová účinnost (%) | účiníkcosφ | Jednotka Radiální maximální velikost (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175výše | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175výše | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175výše | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175výše | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175výše | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175výše | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175výše | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175výše | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175výše | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175výše | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175výše | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175výše | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175výše | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, ponorné čerpadlo pro čistou vodu, zákaz mytí nové studny, čerpání sedimentů a bahnité vody,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.
4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.
5, přesně podle ustanovení o zdvihu čerpadla, rozsahu použití, aby se zabránilo nízkému průtoku nebo vysokému zdvihu čerpací síly, axiálnímu ložisku a dalším částem opotřebení, přetížení motoru spáleno
6, poté, co čerpadlo do studny, měření motoru na zemní izolační odpor by neměl být menší než 100M, po startu pozorovat napětí a proud, zkontrolujte izolaci vinutí motoru, zda v souladu s požadavky; teplota místa uložení čerpadla, pokud je nižší než bod mrazu, měla by být voda v dutině motoru vysušena, aby se zabránilo poškození dutiny motoru vodním ledem způsobené nízkou teplotou.
The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.
Mezi hlavní vlastnosti produktu patří:
- 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
- 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
- 4. The motor and pump bearing are lubricated by water.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Příprava před instalací:
1. Zkontrolujte, zda ponorné čerpadlo splňuje podmínky použití a rozsah specifikovaný v návodu.
2. Pomocí těžkého předmětu o průměru rovném maximálnímu vnějšímu průměru ponorného čerpadla změřte, zda se vnitřní průměr vrtu vejde do ponorného čerpadla, a změřte, zda hloubka studny splňuje požadavky na instalaci.
3. Zkontrolujte, zda je vrt čistý a zda není voda ve studni zakalená. Nikdy nepoužívejte ponorné elektrické čerpadlo k mytí bahna a pískové vody z čerpadla welor, aby nedošlo k předčasnému poškození ponorného elektrického čerpadla.
4. Zkontrolujte, zda je poloha montážní svorky čalounické hlavy vhodná a zda snese kvalitu celé jednotky
5. Zkontrolujte, zda jsou součásti ponorného čerpadla kompletní a správně nainstalované podle montážního schématu v návodu Sejměte filtrační síto a otočte spojku, abyste zjistili, zda se pružně otáčí
6. Odšroubujte vodní šroub a naplňte dutinu motoru čistou, nekorozivní vodou (poznámka: nezapomeňte ji naplnit), poté vodní šroub utáhněte. Po 12 hodinách vstřikování vody by izolační odpor motoru neměl být menší než 150M Q při měření pomocí 500V vibračního stolu.
7. Kabelový spoj, odřízněte 120mm pryžovou manžetu z jednoho konce výstupního kabelu a odpovídající kabel elektrikářským nožem, poté přeložte délku tří žilových drátů do stupňovitého tvaru, odloupněte 20mm měděné jádro, seškrábněte oxid naneste na vnější stranu měděného drátu nožem nebo pískovou tkaninou a vložte dva spojené konce drátu do paliček. Po pevném uvázání vrstvy jemným měděným drátem ji důkladně a pevně zapájejte a případné obruste. otřepy na povrchu. Poté pro tři spoje použijte polyvesterovou izolační pásku, abyste je obalili poloskládaným způsobem pro tři umyvadla. Oba konce ovinovací vrstvy pevně omotejte nyionovou nití a poté použijte metodu poloskládání k zabalení pásky do tří vrstev. Obalte vnější vrstvu vysokotlakou izolační páskou ve třech vrstvách. Nakonec složte tři prameny dohromady a opakovaně je omotávejte do pěti vrstev vysokotlakou páskou. Každá vrstva musí být pevně svázána a spoje mezi vrstvami musí být těsné a pevné, aby se zabránilo pronikání vody a poškození izolace, Po zabalení namočte na 12 hodin do vody při pokojové teplotě 20 °C a změřte izolační odpor pomocí třepacího stolu , která by neměla být menší než 100M Ω
Přiložené schéma procesu zapojení kabelů je následující:
8. Pomocí multimetru zkontrolujte, zda jsou připojeny třífázové vodiče a zda je stejnosměrný odpor přibližně vyrovnaný.
9. Zkontrolujte, zda obvod a kapacita transformátoru nejsou přetížené, a poté připojte ochranný spínač proti přetížení nebo spouštěcí zařízení. Konkrétní modely viz Tabulka 2 a poté nalijte kbelík vody do vodního čerpadla z výstupu vodního čerpadla, abyste namazali pryžová ložiska v čerpadle, a poté postavte ponorné elektrické čerpadlo do vzpřímené polohy a stabilní. Spusťte (ne déle než jednu sekundu) a zkontrolujte, zda směr řízení odpovídá znaku řízení. Pokud ne, vyměňte libovolné dva konektory třífázového kabelu. Potom nainstalujte filtr a připravte se na výstup do studny. Při použití při zvláštních příležitostech (jako jsou příkopy, příkopy, řeky, rybníky, rybníky atd.) musí být elektrické čerpadlo spolehlivě uzemněno.
(2)Instalační zařízení a nástroje:
1. Jeden pár zvedacích řetězů na více než dvě tuny.
2. Stativ s vertikální výškou ne menší než čtyři metry.
3. Dvě závěsná lana (drátěná lana), která unesou hmotnost více než jednu tunu (unesou hmotnost kompletní sady vodních čerpadel).
4. Nainstalujte dva páry svorek (dlahy).
5. Klíče, kladiva, šroubováky, elektrické nářadí a nástroje atd.
(3) Instalace elektrického čerpadla:
1. Instalační schéma ponorného elektrického čerpadla je uvedeno na obrázku 2. Konkrétní instalační rozměry jsou uvedeny v tabulce 3 "Seznam instalačních rozměrů ponorného elektrického čerpadla".
2. Ponorná elektrická čerpadla s dopravní výškou menší než 30 metrů lze zvednout přímo do studny pomocí hadic a ocelových lan nebo jiných konopných lan, která unesou plnou váhu celého stroje, vodního potrubí a vody v potrubí.
3. Čerpadla s dopravní výškou větší než 30 metrů používají ocelové trubky a postup instalace je následující:
①Pomocí svorky upněte horní konec části vodní pumpy (motor a vodní pumpa jsou nyní připojeny), zvedněte ji pomocí závěsného řetězu a pomalu ji přivažte do studny, dokud svorku nasaďte na hlavu vrtu a odstraňte závěsný řetěz.
② Použijte další pár svorek k upnutí trubky, zvedněte ji pomocí závěsného řetězu 15 cm od příruby a pomalu spouštějte. Mezi přírubu potrubí a přírubu čerpadla Vložte pryžovou podložku na místo a rovnoměrně utáhněte potrubí a čerpadlo pomocí šroubů, matic a pružných podložek.
③ Ponorné čerpadlo mírně nadzvedněte, sejměte svorku na horním konci vodního čerpadla, pevně přivažte kabel k vodnímu potrubí plastovou páskou a pomalu jej přivažujte, dokud nebude svorka umístěna na ústí vrtu.
④Použít stejnou metodu k připojení všech vodovodních trubek do studny.
⑤Po připojení vývodového kabelu k ovládacímu spínači je tento připojen k třífázovému napájení.
(4) Na co si dát pozor při instalaci:
1. Pokud během procesu čerpání zjistíte ucpání, otočte nebo zatáhněte za vodní potrubí, abyste překonali bod zaseknutí. Pokud různá opatření stále nefungují, nenuťte čerpadlo dolů silou, aby nedošlo k poškození ponorného elektrického čerpadla a studny.
2. Během instalace by měla být na přírubu každé trubky umístěna pryžová podložka a rovnoměrně utažena.
3. Když je vodní čerpadlo spuštěno do studny, mělo by být umístěno uprostřed potrubí studny, aby se zabránilo tomu, že čerpadlo bude dlouhou dobu běžet proti stěně studny, což způsobí vibrace čerpadla a motor zametat a spálit .
4. Určete hloubku vodní pumpy ke dnu studny podle podmínek proudění písku a bahna ve studni. Nezahrabávejte čerpadlo do bahna. Vzdálenost od vodního čerpadla ke dnu studny není obecně menší než 3 metry (viz obrázek 2).
5. Hloubka vstupu vody vodního čerpadla by neměla být menší než 1-1,5 metru od dynamické hladiny vody k uzlu přívodu vody (viz obrázek 2). V opačném případě může dojít k snadnému poškození ložisek vodní pumpy.
6. Zdvih vodního čerpadla nesmí být příliš nízký. V opačném případě je třeba nainstalovat šoupátko na vodovodní potrubí u ústí studny, aby se řídil průtok čerpadla v bodě jmenovitého průtoku, aby se zabránilo přetížení a spálení motoru v důsledku velkých průtoků.
7. Když vodní čerpadlo běží, výstup vody by měl být nepřetržitý a rovnoměrný, proud by měl být stabilní (za jmenovitých pracovních podmínek obecně ne více než 10 % jmenovitého proudu) a neměly by docházet k vibracím ani hluku. Pokud dojde k jakékoli abnormalitě, stroj by měl být zastaven, aby se zjistila příčina a odstranila se.
8. Při instalaci věnujte pozornost nastavení zemnícího vodiče motoru (viz obrázek 2). Je-li vodovodní trubka ocelová, veďte ji ze svorky ústí vrtu; pokud je vodovodní potrubí plastové potrubí, veďte ho od zemnicí značky elektrického čerpadla.
(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.
(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.
1 ve jmenovitém stavu je proud větší než 20 %.
2 dynamická hladina vody k části přívodu vody, což způsobuje přerušovanou vodu.
3 ponorné čerpadlo silné vibrace nebo hluk.
4 napájecí napětí je nižší než 340 voltů.
5 pojistka spálila fázi.
6 poškození vodovodního potrubí.
7 tepelný izolační odpor motoru je menší než 0,5 megaohmu.
(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.
1, vylijte vodu v dutině motoru (zejména v zimě, aby motor nezamrzl) a dobře svažte kabel.
2, skladujte ve vnitřní místnosti bez korozivních látek a plynů, s teplotou do 40 °C.
3, dlouhodobé používání by mělo věnovat pozornost ochraně proti korozi ponorných čerpadel.
- Oběžné kolo
- Pouzdro hřídele
- Gumové pouzdro hřídele
-
Pečetní prsten
01 Příjem vody z hluboké studny
02 Výškový vodovod
03 horský vodovod
04 věžová voda
05 Zemědělské závlahy
06 zavlažování zahrady
07 Příjem říční vody
08 užitková voda