Suitable for underground hot water mining with water temperature below 100°C, with heat resistance, corrosion resistance, aging resistance and other characteristics
This product is a powerful three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) electric pump, suitable for all kinds of occasions need high-power pump. Its design considers a variety of water quality factors, including water temperature not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L, etc. The product adopts a closed or water immersion wet structure of the motor, before use in the submersible motor chamber filled with clean water to prevent empty fill. Requirements in strict accordance with the requirements of the matching cable and equipped with external overload protection device. To ensure stable operation, the submersible pump must be completely immersed in water operation, the insertion depth shall not exceed 70 meters, and the distance from the bottom of the well shall not be less than 3 meters. In addition, the pump shall not be a no-load test before start. In general, this product has the characteristics of high efficiency and stability, suitable for a variety of pump tasks in harsh environment.
Modelo | Caudal (m3/h) | Cabeza (metro) |
Velocidad de rotación (punto de cambio) |
Bomba de agua(%) | Salida diámetro (mm) |
Aplicable bien diámetro (mm) |
Clasificado potencia (kilovatios) |
Clasificado voltaje(V) |
Clasificado corriente(A) |
Eficiencia motora (%) | power factorcosφ | Unidad Tamaño máximo radial (mm) |
Observación | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125arriba | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125arriba | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125arriba | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125arriba | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125arriba | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125arriba | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125arriba | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125arriba | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125arriba | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125arriba | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125arriba | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125arriba | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125arriba | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125arriba | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, strictly according to the provisions of the pump lift, flow range of use, to prevent low flow or high lift pumping force, the thrust bearing and other parts of the wear, the motor overload burned 6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the water in the motor cavity, prevent the motor cavity water ice damage caused by low temperature.
The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other components. The motor is a water-filled submersible three-phase asynchronous motor, which is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom is used to adjust the difference in internal water expansion and contraction pressure caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor. The lubrication of the motor and the pump bearing is water lubrication. The stator winding of the motor adopts high quality submersible motor winding wire, with high insulation performance. The pump adopts computer CAD design, with simple structure and excellent technical performance.

(1)Preparación antes de la instalación:
1. Verifique si la bomba sumergible cumple con las condiciones de uso y el alcance especificado en el manual.
2. Utilizando un objeto pesado con un diámetro igual al diámetro exterior máximo de la bomba sumergible, mida si el diámetro interior del pozo puede adaptarse a la bomba sumergible y mida si la profundidad del pozo cumple con los requisitos de instalación.
3. Verifique si el pozo está limpio y si el agua del pozo está turbia. Nunca utilice una bomba eléctrica sumergible para lavar el agua de lodo y arena de la bomba welor para evitar daños prematuros a la bomba eléctrica sumergible.
4. Compruebe si la posición de la abrazadera de instalación del cabezal de pozo es adecuada y si puede soportar la calidad de toda la unidad.
5. Verifique si los componentes de la bomba sumergible están completos e instalados correctamente de acuerdo con el diagrama de ensamblaje en el manual. Retire la pantalla del filtro y gire el acoplamiento para ver si gira con flexibilidad.
6. Desenrosque el tornillo de agua y llene la cavidad del motor con agua limpia y no corrosiva (nota: asegúrese de llenarla), luego apriete el tornillo de agua. Después de 12 horas de inyección de agua, la resistencia de aislamiento del motor no debe ser inferior a 150 M Q cuando se mide con una mesa vibratoria de 500 V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
El diagrama del proceso de cableado del cable adjunto es el siguiente:
8. Utilice un multímetro para comprobar si los cables trifásicos están conectados y si la resistencia de CC está aproximadamente equilibrada.
9. Verifique si el circuito y la capacidad del transformador están sobrecargados y luego conecte el interruptor de protección contra sobrecarga o el equipo de arranque. Consulte la Tabla 2 para conocer modelos específicos y luego vierta un balde de agua en la bomba de agua desde la salida de la bomba de agua para lubricar los cojinetes de goma de la bomba y luego coloque la bomba eléctrica sumergible en posición vertical y estable. Inicio (no más de un segundo) y compruebe si la dirección de dirección es consistente con la señal de dirección. De lo contrario, cambie los dos conectores del cable trifásico. Luego instale el filtro y prepárese para bajar al pozo. Si se utiliza en ocasiones especiales (como zanjas, acequias, ríos, estanques, estanques, etc.), la bomba eléctrica debe estar conectada a tierra de manera confiable.
(2) Equipos y herramientas de instalación:
1. Un par de cadenas de elevación para más de dos toneladas.
2. Un trípode con una altura vertical no inferior a cuatro metros.
3. Dos cuerdas para colgar (cables de alambre) que pueden soportar un peso de más de una tonelada (pueden soportar el peso de un juego completo de bombas de agua).
4. Instale dos pares de abrazaderas (férulas).
5. Llaves, martillos, destornilladores, herramientas e instrumentos eléctricos, etc.
(3)Instalación de bomba eléctrica:
1. El diagrama de instalación de la bomba eléctrica sumergible se muestra en la Figura 2. Las dimensiones de instalación específicas se muestran en la Tabla 3 "Lista de dimensiones de instalación de la bomba eléctrica sumergible".
2. Las bombas eléctricas sumergibles con una altura inferior a 30 metros se pueden izar directamente al pozo utilizando mangueras y cables metálicos u otros cables de cáñamo que puedan soportar todo el peso de toda la máquina, las tuberías de agua y el agua en las tuberías.
3. Las bombas con una altura de más de 30 metros utilizan tuberías de acero y la secuencia de instalación es la siguiente:
①Utilice una abrazadera para sujetar el extremo superior de la parte de la bomba de agua (el motor y la bomba de agua se han conectado en este momento), levántelo con una cadena colgante y átelo lentamente al pozo hasta que coloque la abrazadera en la boca del pozo y retire la cadena colgante.
② Utilice otro par de abrazaderas para sujetar un tubo, levántelo con una cadena colgante a 15 cm de la brida y bájelo lentamente. Entre la brida de la tubería y la brida de la bomba Coloque la almohadilla de goma en su lugar y apriete la tubería y la bomba de manera uniforme con pernos, tuercas y arandelas de resorte.
③ Levante ligeramente la bomba sumergible, retire la abrazadera en el extremo superior de la bomba de agua, ate el cable firmemente a la tubería de agua con una cinta plástica y átelo lentamente hasta que la abrazadera quede colocada en la boca del pozo.
④Utilice el mismo método para conectar todas las tuberías de agua al pozo.
⑤Después de conectar el cable de salida al interruptor de control, se conecta a la fuente de alimentación trifásica.
(4) Cosas a tener en cuenta durante la instalación:
1. Si se encuentra un fenómeno de atasco durante el proceso de bombeo, gire o tire de la tubería de agua para superar el punto de atasco. Si varias medidas aún no funcionan, no fuerce la bomba hacia abajo para evitar daños a la bomba eléctrica sumergible y al pozo.
2. Durante la instalación, se debe colocar una almohadilla de goma en la brida de cada tubería y apretarla uniformemente.
3. Cuando la bomba de agua se baja al pozo, debe colocarse en el medio de la tubería del pozo para evitar que la bomba funcione contra la pared del pozo durante mucho tiempo, lo que hace que la bomba vibre y el motor barre y quema. .
4. Determine la profundidad de la bomba de agua hasta el fondo del pozo de acuerdo con las condiciones del flujo de arena y limo del pozo. No entierre la bomba en el barro. La distancia desde la bomba de agua hasta el fondo del pozo generalmente no es inferior a 3 metros (ver Figura 2).
5. La profundidad de entrada de agua de la bomba de agua no debe ser inferior a 1-1,5 metros desde el nivel dinámico del agua hasta el nodo de entrada de agua (consulte la Figura 2). De lo contrario, los cojinetes de la bomba de agua podrían dañarse fácilmente.
6. La elevación de la bomba de agua no puede ser demasiado baja. De lo contrario, se debe instalar una válvula de compuerta en la tubería de agua de la boca del pozo para controlar el flujo de la bomba en el punto de flujo nominal y evitar que el motor se sobrecargue y se queme debido a grandes caudales.
7. Cuando la bomba de agua está funcionando, la salida de agua debe ser continua y uniforme, la corriente debe ser estable (en condiciones de trabajo nominales, generalmente no más del 10% de la corriente nominal) y no debe haber vibraciones ni ruidos. Si hay alguna anomalía, se debe detener la máquina para descubrir la causa y eliminarla.
8. Al realizar la instalación, preste atención a la configuración del cable de tierra del motor (consulte la Figura 2). Cuando la tubería de agua sea de acero, condúzcala desde la abrazadera del cabezal del pozo; Cuando la tubería de agua sea de plástico, condúzcala desde la marca de conexión a tierra de la bomba eléctrica.
- (1)With the continuous development of modern technology, submersible pumps play a crucial role in the field of pumps. After installing the submersible pump, check the insulation resistance and three-phase continuity repeatedly to ensure that there are no errors in the connection between the instrument and the starting equipment. If everything is normal, the test equipment can be started. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, pay attention to observe whether the pump has any noise or vibration. If everything is normal, it can be put into operation. After the pump runs for four hours for the first time, it should be closed and the thermal insulation resistance of the motor should be tested quickly, and its value should not be less than 0.5 megaohms. After stopping the pump, restart it after five minutes to prevent the water column in the pipeline from completely reversing, resulting in the motor burning due to overcurrent. After the pump is running normally, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the equipment should be shut down immediately to troubleshoot. The current exceeds 20% under the rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the submersible pump vibrates violently or makes noisy sounds; the supply voltage is lower than 340 volts; any fuse is broken; the water pipe is damaged; The thermal insulation resistance between the motor and the ground is less than 0.5 megaohm.These recommended operating procedures and safety measures ensure the safe operation of the submersible pump, prolong the service life of the equipment, and provide users with a reliable pump choice.
- (2)Unit disassembly:
- 1 untie the cable tie, remove the pipeline part, remove the wire plate.
- 2 unscrew the water release bolt, put the water in the motor chamber.
- 3 remove the filter, loose the fixing screw of the motor shaft on the coupling.
- 4 unscrew the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5 the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending the pump shaft and various bumps in the disassembly process.
- 6 the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
- (3)The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.
1, saque el agua de la cavidad del motor (especialmente en invierno para evitar que el motor se congele) y ate bien el cable.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3. El uso prolongado debe prestar atención a la prevención de la oxidación de las bombas sumergibles.
- Impulso
- Camisa del eje
- Manguito de eje de goma
-
anillo de sellado
01 Toma de agua de pozo profundo
02 Suministro de agua en altura
03 suministro de agua de montaña
04 torre de agua
05 Riego agrícola
06 riego de jardines
07 toma de agua del río
08 agua sanitaria