175QJR Ipompe Yimbitse

Kora gutunganya OEM! Ukurikije ibyifuzo byabakoresha, gushushanya no gukora ubwoko butandukanye bwibisabwa byihariye bya moteri na pompe bidasanzwe. Ibipimo ngenderwaho byo gushyira mu bikorwa ibicuruzwa: GB / T2816-2014 "pompe yarohamye neza", GB / T2818-2014 "moteri ya moteri idahwitse". WhatsApp : 17855846335
PDF DOWNLOAD
Ibisobanuro
Etiquetas
 
Incamake y'ibicuruzwa

This product is designed for underground hot water mining and is suitable for water temperatures below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. This product is very suitable for use in underground hot water mining environments, which can effectively deal with high temperatures and corrosion of various chemical substances, while having good aging resistance, ensuring stable operation of equipment for a long time. Whether it is needed to be used in harsh mining environments or in the face of high water temperatures, this product can provide reliable protection, ensuring continuous operation and efficient work of equipment.

 

 
Ibisabwa

 Product introduction: we recommend this product is equipped with three-phase AC 380V (tolerance + / - 1%), 50HZ (tolerance + / - 1%) power supply. Water quality requirements are strict, the water temperature shall not be higher than 20 °C, the content of solid impurities (mass ratio) shall not be greater than 0.01%; PH value (pH) between 6.5-8.5; hydrogen sulfide content shall not be greater than 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product is equipped with a closed or water-cooled wet structure motor. Before use, the inner cavity of the submersible motor shall be filled with clean water to prevent empty. Then tighten the water injection and air exhaust screws, otherwise it is prohibited to use. The submersible pump must be completely immersed in water to operate, the penetration depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The inflow of well water shall meet the water output and continuous operation requirements of the submersible pump, and the water output of the pump shall be controlled between 0.7 and 1.2 times the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or dumped, but only vertically. The submersible pump must be equipped with cables as required, and is equipped with external overload protection device. It is prohibited to test the pump without water and no load.

 

 
Icyitegererezo

175QJR Deep Well Submersible Pump

 
Icyitegererezo Cyicyitegererezo
Icyitegererezo Gutemba (m3 / h) Umutwe
(m)

Kwihuta

(guhindura / ingingo)

Amazi meza (%)  Gusohoka
diameter
(mm)
Bikurikizwa neza
diameter (mm) 
 Ikigereranyo
power(KW)
Ikigereranyo
voltage (V)
Ikigereranyo
ikigezweho (A)
Imashanyarazi (%) power factorcosφ   Igice
Ingano ya radiyo nini (mm)
175QJ10-42 10 42 2850 53 50  175hejuru 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175hejuru 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175hejuru 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175hejuru 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175hejuru 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175hejuru 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80  175hejuru 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175hejuru 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175hejuru 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175hejuru 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175hejuru 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175hejuru 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175hejuru 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Kwirinda Umutekano

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, ukurikije byimazeyo ibiteganijwe guterura pompe, uburyo bwo gukoresha, kugirango wirinde umuvuduko muke cyangwa imbaraga zo kuvoma hejuru, gutwara ibintu hamwe nibindi bice byimyenda, umutwaro urenze moteri watwitse

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Intangiriro ku miterere

Gutangiza muri make imiterere: igice cya pompe kigizwe ahanini na pompe ya pompe, impeller, shell diverion, reberi, kugenzura umubiri wa valve (ibice bidahitamo) nibindi bice. Igice cya moteri kigizwe ahanini na base, igitutu kigenga firime, gutwara, gusunika isahani , ubuyobozi bwo hasi bufite intebe, stator, rotor, ubuyobozi bwo hejuru butwara intebe, impeta yumucanga, igice cyinjira mumazi, umugozi nibindi bice.


Ibintu nyamukuru biranga ibicuruzwa birimo:

 1, Moteri ni amazi yuzuye amazi yuzuye yibice bitatu moteri idafite asinchronous, cavit ya moteri yuzuyemo amazi meza, ikoreshwa mugukonjesha moteri no gusiga amavuta, igitutu kigenga firime hepfo ya moteri ikoreshwa muguhindura kwaguka no kugabanya umuvuduko w'amazi imbere mumubiri uterwa nihinduka ryubushyuhe bwa moteri.

 2, Mu rwego rwo gukumira umucanga uri mu iriba kwinjira muri moteri, impera yo hejuru y’uruziga rwa moteri ifite kashe ebyiri z’amavuta, kandi hashyizweho impeta y’umucanga kugira ngo habeho urwego rwo gukumira umucanga.

 3, Kugirango wirinde pompe ya pompe gukora mugihe utangiye, pompe ya pompe na moteri ya moteri bihuzwa hamwe, kandi hashyizweho icyuma cyo hejuru cyo hejuru gishyirwa mugice cyo hepfo ya moteri.

 4, Amavuta ya moteri hamwe na pompe ni amavuta yo kwisiga.

 5, moteri ya stator ihindagurika ikozwe mumashanyarazi yo mu rwego rwohejuru yogeza moteri, hamwe nubushakashatsi bukomeye.

 6, pompe yateguwe na mudasobwa CAD, ifite imiterere yoroshye nibikorwa byiza bya tekiniki.

175QJR Deep Well Submersible Pump
 
Shyiramo

(1) Kwitegura mbere yo kwishyiriraho:
1. Reba niba pompe yarohamye yujuje imiterere yimikoreshereze nubunini bugaragara mu gitabo.
2. Ukoresheje obiect iremereye ifite diameter ingana na diameter ntarengwa yo hanze ya pompe yarohamye, bapima niba inneldiameter ya riba ishobora guhuza pompe irohama, hanyuma upime niba ubujyakuzimu bwujuje ibyangombwa bisabwa.
3. Reba niba iriba rifite isuku kandi niba iriba ryuzuye. Ntuzigere ukoresha pompe yamashanyarazi yogejwe kugirango ukarabe pompe ya welor icyondo namazi yumucanga kugirango wirinde kwangirika hakiri kare pompe yamashanyarazi.
4. Reba niba imyanya ya clamp yo kwishyiriraho ikwiye kandi niba ishobora kwihanganira ubuziranenge bwigice cyose
5. Reba niba ibice bya pompe byamazi byuzuye kandi byashyizweho neza ukurikije igishushanyo cyinteko kiri mu gitabo Kuramo akayunguruzo ka ecran hanyuma uzenguruke hamwe kugirango urebe niba izunguruka byoroshye.
6. Kuramo umugozi wamazi hanyuma wuzuze umwobo wa moteri amazi meza, adashobora kwangirika (icyitonderwa. Witondere kuyuzuza), hanyuma ukomereze kumazi. Nyuma yamasaha 12 yo guterwa amazi, kurwanya moteri ya moteri ntigomba kuba munsi ya 150M Q mugihe upimye hamwe nameza 500V yo kunyeganyega.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Igishushanyo cyometse kumugozi wigishushanyo nuburyo bukurikira:
175QJR Deep Well Submersible Pump

 

8. Koresha multimeter kugirango urebe niba insinga z'ibyiciro bitatu zahujwe kandi niba DC irwanya hafi.
9. Reba niba ubushobozi bwumuzunguruko na transformateur burenze, hanyuma uhuze uburyo bwo kurinda ibintu birenze cyangwa ibikoresho byo gutangira. Reba Imbonerahamwe ya 2 kuri moderi yihariye, hanyuma Suka indobo y'amazi muri pompe y'amazi uva mumasoko y'amazi kugirango usige amavuta ya reberi muri pompe, hanyuma ushyire pompe y'amashanyarazi yibiza neza kandi bihamye. Tangira (bitarenze isegonda imwe) hanyuma urebe niba icyerekezo kiyobora gihuye nikimenyetso cyo kuyobora. Niba atariyo, hinduranya ibice bibiri bihuza umugozi wibyiciro bitatu. Noneho shyiramo akayunguruzo hanyuma witegure kumanuka kuriba. Niba ikoreshejwe mugihe kidasanzwe (nk'imyobo, imyobo, inzuzi, ibyuzi, ibyuzi, nibindi), pompe y'amashanyarazi igomba kuba ihagaze neza.

 

(2) Ibikoresho n'ibikoresho byo kwishyiriraho:
1. Ihuriro rimwe ryo guterura iminyururu kuri toni zirenga ebyiri.
2. Inyabutatu ifite uburebure buhagaritse butari munsi ya metero enye.
3. Umugozi ibiri umanitse (umugozi winsinga) ushobora kwihanganira uburemere burenze toni imwe (irashobora kwihanganira uburemere bwamazi yuzuye ya pompe).
4. Shyiramo ibice bibiri bya clamps (splints).
5. Wrenches, inyundo, screwdrivers, ibikoresho byamashanyarazi nibikoresho, nibindi.

 

(3) Gushyira pompe y'amashanyarazi:
1. Igishushanyo cyo kwishyiriraho pompe yamashanyarazi irengerwa irerekanwa mumashusho 2. Ibipimo byihariye byo kwishyiriraho bigaragara mu mbonerahamwe ya 3 "Urutonde rwibipimo byubushakashatsi bwa pompe yamashanyarazi".

 

2. Amashanyarazi yamashanyarazi afite umutwe uri munsi ya metero 30 arashobora kuzamurwa mu iriba akoresheje imiyoboro hamwe n’umugozi w’insinga cyangwa indi migozi y’imisozi ishobora kwihanganira uburemere bwuzuye bwimashini yose, imiyoboro y'amazi, n'amazi mu miyoboro.

 

3. Amapompe afite umutwe wa metero zirenga 30 koresha imiyoboro yicyuma, kandi gahunda yo kuyishyiraho nuburyo bukurikira:
① Koresha clamp kugirango ufate impera yo hejuru yigice cya pompe yamazi (pompe na pompe yamazi byahujwe muriki gihe), ubizamure numunyururu umanitse, hanyuma ubihambire buhoro buhoro kuriba kugeza ushyire clamp kumuriba hanyuma ukureho kumanika urunigi.
② Koresha irindi jambo rya clamp kugirango ufate umuyoboro, uzamure numunyururu umanitse kuri cm 15 uvuye kuri flange, hanyuma umanure buhoro. Hagati ya flange ya pompe na pompe flange Shyira reberi mumwanya wawe hanyuma uhambire umuyoboro hanyuma uvome neza hamwe na bolts, nuts hamwe nogeshe isoko.
Kuzamura pompe yarohamye gato, kura clamp kumpera yo hejuru ya pompe yamazi, guhambira umugozi neza kumuyoboro wamazi hamwe na kaseti ya plastike, hanyuma ubihambire buhoro buhoro kugeza igihe clamp ishyizwe kumuriba.
④ Koresha uburyo bumwe bwo guhuza imiyoboro yose y'amazi mu iriba.
⑤Nyuma ya kabili yo kuyobora-ihujwe no kugenzura ibintu, ihuzwa n'amashanyarazi y'ibice bitatu.


(4) Ibintu ugomba kwitondera mugihe cyo kwishyiriraho:
1. Niba ikintu cyo kuvanga kiboneka mugihe cyo kuvoma, hindura cyangwa ukure umuyoboro wamazi kugirango utsinde aho bahurira. Niba ingamba zitandukanye zitagikora, nyamuneka Ntugahate pompe hasi kugirango wirinde kwangirika kwa pompe yamashanyarazi niriba.
2. Mugihe cyo kwishyiriraho, reberi igomba gushyirwa kuri flange ya buri muyoboro kandi igakomera neza.
3. Iyo pompe yamazi yamanuwe mwiriba, igomba gushyirwa hagati yumuyoboro wiriba kugirango irinde pompe kutiruka kurukuta rwiriba igihe kirekire, bigatuma pompe ihinda umushyitsi kandi moteri irahanagura kandi yaka .
4. Menya ubujyakuzimu bwa pompe yamazi munsi yiziba ukurikije umusenyi utemba hamwe nubutaka bwiriba. Ntugashyingure pompe mucyondo. Intera kuva pompe y'amazi kugeza hepfo y'iriba muri rusange ntabwo iri munsi ya metero 3 (reba Ishusho 2).
5. Ubujyakuzimu bw’amazi ya pompe yamazi ntibugomba kuba munsi ya metero 1-1,5 kuva kurwego rwamazi afite imbaraga kugeza aho amazi yinjira (reba Ishusho 2). Bitabaye ibyo, imiyoboro y'amazi irashobora kwangirika byoroshye.
6. Kuzamura pompe yamazi ntibishobora kuba hasi cyane. Bitabaye ibyo, hagomba gushyirwaho umuyoboro w’irembo ku muyoboro w’amazi kugira ngo ugenzure imigendekere ya pompe ku kigero cyagenwe kugira ngo moteri itaremerwa kandi igatwikwa kubera umuvuduko mwinshi.
7. Iyo pompe yamazi ikora, ibisohoka byamazi bigomba guhoraho kandi niyo, umuyoboro ugomba kuba uhagaze neza (mugihe cyakazi cyagenwe, mubisanzwe ntibirenza 10% byumuvuduko wagenwe), kandi ntihakagombye kubaho kunyeganyega cyangwa urusaku. Niba hari ibintu bidasanzwe, imashini igomba guhagarikwa kugirango imenye icyabimuteye.
8. Mugihe ushyiraho, witondere gushiraho insinga za moteri (reba Ishusho 2). Iyo umuyoboro w'amazi ari umuyoboro w'icyuma, iyiyobore uhereye kumatiba y'iriba; iyo umuyoboro wamazi ari umuyoboro wa pulasitike, iyiyobore uhereye ku kimenyetso cya pompe yamashanyarazi.

 

 
Kubungabunga no Kubungabunga
  1. 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  2. 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from burning due to excessive motor current.
  4. 4. After the pump is running normally, in order to prolong its service life, it is necessary to check whether the power supply voltage, running current and insulation resistance are normal on a regular basis.If the following conditions are found, the equipment should be shut down immediately to eliminate the fault:
  5. - Under the rated working conditions, the current exceeds 20%.
  6. - The dynamic water level drops to the inlet section, resulting in intermittent drainage.
  7. - The submersible pump vibrates violently or emits noisy sounds.
  8. - The power supply voltage is lower than 340 volts.
  9. - There is a phase blown out in the fuse.
  10. - The water pipe is damaged.
  11. - The thermal insulation resistance between the motor and the ground is less than 0.5 megaohm.

 

  1. 5. Disassembly device:
  2. - Untie the cable, take off the pipe part and remove the line protection plate.
  3. - Unscrew the drain screw and exclude all water in the motor chamber.
  4. - Take out the filter and loosen the fixing screw on the coupling fixed to the motor shaft.
  5. - Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (pay attention to the level of the device to prevent the bending of the pump shaft when separating).
  6. - The disassembly sequence of the pump is as follows: (see Figure 1) water inlet section, impeller, shunt shell, impeller, check valve body. When removing the impeller, use special tools to loosen the cone sleeve fixed to the impeller. In the process of disassembly, avoid bending the pump shaft and damaging various parts.
  7. - The disassembly process of the motor is as follows: (see Figure 1) place the motor on the platform, and remove the nuts, base, shaft head lock nut, thrust plate, key, lower guide bearing. seat, and tie rod bolts from the bottom of the motor in order (see Figure 1), and then take out the rotor (be careful not to damage the wiring harness) and finally take out the connector and upper guide bearing seat.
  8. - Assembly unit: before assembly, all parts should be cleaned of rust and dirt, and smear sealant on all the surfaces and fasteners, and then assemble in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then wear the filter for machine test. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Ububiko hamwe nububiko

 1, shyira amazi mu cyuho cya moteri (cyane cyane mu gihe cy'itumba kugirango moteri idakonja), hanyuma uhambire umugozi neza.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, gukoresha igihe kirekire bigomba kwitondera kwirinda ingese zo kwirinda pompe zirohama.

 

 
Kwambara Ibice
  • Impeller
  • Ikiboko
  • Rubber shaft
  • Impeta

 
Gusaba

01 Amazi meza

02 Amazi maremare

03 amazi yo mumisozi 

04 umunara

Kuhira imyaka

Kuvomera ubusitani

Amazi yo mu ruzi

08 amazi yo murugo

 

Niba ushimishijwe nibicuruzwa byacu, urashobora guhitamo gusiga amakuru yawe hano, kandi tuzahuza nawe vuba.


Andika ubutumwa bwawe hano hanyuma utwohereze

Niba ushimishijwe nibicuruzwa byacu, urashobora guhitamo gusiga amakuru yawe hano, kandi tuzahuza nawe vuba.


rwRwandese