Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.
1, gutanga amashanyarazi: ibyiciro bitatu AC 380V (kwihanganira + / - 5%), 50HZ (kwihanganira + / - 1%).
2, ubwiza bw’amazi:
(1) ubushyuhe bwamazi ntiburenze 20 ° C;
(2) ibirimo umwanda ukomeye (igipimo rusange) ntabwo kirenze 0.01%;
(3) Agaciro PH (pH) 6.5-8.5;
(4) hydrogène sulfide irimo ntabwo irenze 1.5mg / L;
(5) ibirungo bya chloride ntabwo birenze 400mg / L.
3, moteri ifunze cyangwa yuzuye amazi yuzuye, mbere yo gukoresha umwobo wa moteri wamazi ugomba kuba wuzuye amazi meza, kugirango wirinde ibinyoma byuzuye, hanyuma ukomere inshinge zamazi, ibyuma bisohora ikirere, bitabaye ibyo ntibyemewe gukoresha
4, pompe irohama igomba kwibizwa mumazi rwose, ubujyakuzimu ntibushobora kurenga 70m, munsi ya pompe yarohamye munsi yiziba ntabwo iri munsi ya 3m.
5, iriba ryamazi meza agomba kuba ashobora guhura nibisohoka mumazi ya pompe yamazi no gukora ubudahwema, amazi ya pompe yamazi agomba kugenzurwa inshuro 0.7 - 1,2 yikigereranyo cyagenwe.
6, iriba rigomba kuba rigororotse, pompe yarohamye ntishobora gukoreshwa cyangwa gutabwa, gusa ikoreshwa rihagaritse.
7, pompe irohama igomba guhuzwa numuyoboro ukurikije ibisabwa, hamwe nibikoresho byo kurinda ibicuruzwa birenze. 8, pompe irabujijwe rwose nta mazi yipimisha imashini
Icyitegererezo | Gutemba (m3 / h) | Umutwe (m) |
Rotating speed(change/point) | Amazi meza (%) | Gusohoka diameter (mm) |
Bikurikizwa neza diameter (mm) |
Ikigereranyo imbaraga (KW) |
Rated voltage(V) | Ratedcurrent(A) | Imashanyarazi (%) | imbaraga | Igice Ingano ya radiyo nini (mm) |
Wibuke | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125hejuru | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125hejuru | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125hejuru | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125hejuru | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125hejuru | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125hejuru | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125hejuru | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125hejuru | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125hejuru | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125hejuru | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125hejuru | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125hejuru | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125hejuru | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125hejuru | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.
Ibintu nyamukuru biranga ibicuruzwa birimo:
1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

(1) Kwitegura mbere yo kwishyiriraho:
1. Reba niba pompe yarohamye yujuje imiterere yimikoreshereze nubunini bugaragara mu gitabo.
2. Ukoresheje obiect iremereye ifite diameter ingana na diameter ntarengwa yo hanze ya pompe yarohamye, bapima niba inneldiameter ya riba ishobora guhuza pompe irohama, hanyuma upime niba ubujyakuzimu bwujuje ibyangombwa bisabwa.
3. Reba niba iriba rifite isuku kandi niba iriba ryuzuye. Ntuzigere ukoresha pompe yamashanyarazi yogejwe kugirango ukarabe pompe ya welor icyondo namazi yumucanga kugirango wirinde kwangirika hakiri kare pompe yamashanyarazi.
4. Reba niba imyanya ya clamp yo kwishyiriraho ikwiye kandi niba ishobora kwihanganira ubuziranenge bwigice cyose
5. Reba niba ibice bya pompe byamazi byuzuye kandi byashyizweho neza ukurikije igishushanyo cyinteko kiri mu gitabo Kuramo akayunguruzo ka ecran hanyuma uzenguruke hamwe kugirango urebe niba izunguruka byoroshye.
6. Kuramo umugozi wamazi hanyuma wuzuze umwobo wa moteri amazi meza, adashobora kwangirika (icyitonderwa. Witondere kuyuzuza), hanyuma ukomereze kumazi. Nyuma yamasaha 12 yo guterwa amazi, kurwanya moteri ya moteri ntigomba kuba munsi ya 150M Q mugihe upimye hamwe nameza 500V yo kunyeganyega.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.
After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Igishushanyo cyometse kumugozi wigishushanyo nuburyo bukurikira:
8. Koresha multimeter kugirango urebe niba insinga z'ibyiciro bitatu zahujwe kandi niba DC irwanya hafi.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.
(2) Ibikoresho n'ibikoresho byo kwishyiriraho:
1. Ihuriro rimwe ryo guterura iminyururu kuri toni zirenga ebyiri.
2. Inyabutatu ifite uburebure buhagaritse butari munsi ya metero enye.
3. Umugozi ibiri umanitse (umugozi winsinga) ushobora kwihanganira uburemere burenze toni imwe (irashobora kwihanganira uburemere bwamazi yuzuye ya pompe).
4. Shyiramo ibice bibiri bya clamps (splints).
5. Wrenches, inyundo, screwdrivers, ibikoresho byamashanyarazi nibikoresho, nibindi.
(3) Gushyira pompe y'amashanyarazi:
1. Igishushanyo cyo kwishyiriraho pompe yamashanyarazi irengerwa irerekanwa mumashusho 2. Ibipimo byihariye byo kwishyiriraho bigaragara mu mbonerahamwe ya 3 "Urutonde rwibipimo byubushakashatsi bwa pompe yamashanyarazi".
2. Amashanyarazi yamashanyarazi afite umutwe uri munsi ya metero 30 arashobora kuzamurwa mu iriba akoresheje imiyoboro hamwe n’umugozi w’insinga cyangwa indi migozi y’imisozi ishobora kwihanganira uburemere bwuzuye bwimashini yose, imiyoboro y'amazi, n'amazi mu miyoboro.
3. Amapompe afite umutwe wa metero zirenga 30 koresha imiyoboro yicyuma, kandi gahunda yo kuyishyiraho nuburyo bukurikira:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
Kuzamura pompe yarohamye gato, kura clamp kumpera yo hejuru ya pompe yamazi, guhambira umugozi neza kumuyoboro wamazi hamwe na kaseti ya plastike, hanyuma ubihambire buhoro buhoro kugeza igihe clamp ishyizwe kumuriba.
④ Koresha uburyo bumwe bwo guhuza imiyoboro yose y'amazi mu iriba.
⑤Nyuma ya kabili yo kuyobora-ihujwe no kugenzura ibintu, ihuzwa n'amashanyarazi y'ibice bitatu.
(4) Ibintu ugomba kwitondera mugihe cyo kwishyiriraho:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Mugihe cyo kwishyiriraho, reberi igomba gushyirwa kuri flange ya buri muyoboro kandi igakomera neza.
3. Iyo pompe yamazi yamanuwe mwiriba, igomba gushyirwa hagati yumuyoboro wiriba kugirango irinde pompe kutiruka kurukuta rwiriba igihe kirekire, bigatuma pompe ihinda umushyitsi kandi moteri irahanagura kandi yaka .
4. Menya ubujyakuzimu bwa pompe yamazi munsi yiziba ukurikije umusenyi utemba hamwe nubutaka bwiriba. Ntugashyingure pompe mucyondo. Intera kuva pompe y'amazi kugeza hepfo y'iriba muri rusange ntabwo iri munsi ya metero 3 (reba Ishusho 2).
5. Ubujyakuzimu bw’amazi ya pompe yamazi ntibugomba kuba munsi ya metero 1-1,5 kuva kurwego rwamazi afite imbaraga kugeza aho amazi yinjira (reba Ishusho 2). Bitabaye ibyo, imiyoboro y'amazi irashobora kwangirika byoroshye.
6. Kuzamura pompe yamazi ntibishobora kuba hasi cyane. Bitabaye ibyo, hagomba gushyirwaho umuyoboro w’irembo ku muyoboro w’amazi kugira ngo ugenzure imigendekere ya pompe ku kigero cyagenwe kugira ngo moteri itaremerwa kandi igatwikwa kubera umuvuduko mwinshi.
7. Iyo pompe yamazi ikora, ibisohoka byamazi bigomba guhoraho kandi niyo, umuyoboro ugomba kuba uhagaze neza (mugihe cyakazi cyagenwe, mubisanzwe ntibirenza 10% byumuvuduko wagenwe), kandi ntihakagombye kubaho kunyeganyega cyangwa urusaku. Niba hari ibintu bidasanzwe, imashini igomba guhagarikwa kugirango imenye icyabimuteye.
8. Mugihe ushyiraho, witondere gushiraho insinga za moteri (reba Ishusho 2). Iyo umuyoboro w'amazi ari umuyoboro w'icyuma, iyiyobore uhereye kumatiba y'iriba; iyo umuyoboro wamazi ari umuyoboro wa pulasitike, iyiyobore uhereye ku kimenyetso cya pompe yamashanyarazi.
- 1.Nyuma ya pompe yo mumazi imaze gushyirwaho, reba irwanya insulasiyo hamwe nuyobora ibyiciro bitatu uhereye kuri wongeyeho, reba niba igikoresho noguhuza ibikoresho byo gutangira atari byo, niba ntakibazo, imashini igerageza irashobora gutangira, hanyuma urebe niba ibyasomwe byerekana igikoresho kirenze voltage yagenwe hamwe nubu byerekanwe ku cyapa nyuma yo gutangira, hanyuma urebe niba pompe ifite urusaku no guhindagurika, hanyuma igashyirwa mubikorwa niba byose ari ibisanzwe.
- 2.Nyuma yo gukora bwa mbere pompe mumasaha ane, moteri igomba gufungwa kugirango igerageze guhangana nubushyuhe bwumuriro byihuse, kandi agaciro kayo ntigomba kuba munsi ya megaohm 0.5.
- 3.Nyuma ya pompe imaze gufungwa, igomba gutangira nyuma yiminota itanu kugirango irinde inkingi yamazi yo mu muyoboro kutagaruka rwose kandi bigatera moteri ikabije n’umuriro.
- 4.Nyuma ya pompe ishyizwe mubikorwa bisanzwe, kugirango yongere igihe cyakazi cyayo, birakenewe kugenzura niba voltage itanga, amashanyarazi akora hamwe no kurwanya insuline nibisanzwe buri gihe. Niba ibintu bikurikira bibonetse, pompe igomba guhita ifungwa kugirango ikemure ibibazo.
- 1 In the rated condition, the current exceeds 20%.
- 2 Urwego rwamazi rugabanuka rugabanuka mugice cyamazi, bigatera amazi mugihe gito.
- 3 Pompe yibiza ifite ihindagurika rikabije cyangwa urusaku.
- 4 Amashanyarazi yatanzwe ari munsi ya 340 volt.
- 5 Fuse irashya.
- 6 Umuyoboro wo gutanga amazi wangiritse.
- 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- Unit disassembly:
- 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.
-
- Impeller
- Ikiboko
- Rubber shaft
-
Impeta
01 Amazi meza
02 Amazi maremare
03 amazi yo mumisozi
04 umunara
Kuhira imyaka
Kuvomera ubusitani
Amazi yo mu ruzi
08 amazi yo murugo