This product is designed for underground hot water mining and is suitable for water temperatures below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. This product is very suitable for use in underground hot water mining environments, which can effectively deal with high temperatures and corrosion of various chemical substances, while having good aging resistance, ensuring stable operation of equipment for a long time. Whether it is needed to be used in harsh mining environments or in the face of high water temperatures, this product can provide reliable protection, ensuring continuous operation and efficient work of equipment.
Product introduction: we recommend this product is equipped with three-phase AC 380V (tolerance + / - 1%), 50HZ (tolerance + / - 1%) power supply. Water quality requirements are strict, the water temperature shall not be higher than 20 °C, the content of solid impurities (mass ratio) shall not be greater than 0.01%; PH value (pH) between 6.5-8.5; hydrogen sulfide content shall not be greater than 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product is equipped with a closed or water-cooled wet structure motor. Before use, the inner cavity of the submersible motor shall be filled with clean water to prevent empty. Then tighten the water injection and air exhaust screws, otherwise it is prohibited to use. The submersible pump must be completely immersed in water to operate, the penetration depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The inflow of well water shall meet the water output and continuous operation requirements of the submersible pump, and the water output of the pump shall be controlled between 0.7 and 1.2 times the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or dumped, but only vertically. The submersible pump must be equipped with cables as required, and is equipped with external overload protection device. It is prohibited to test the pump without water and no load.
Modél | Aliran (m3/h) | Sirah (m) |
Laju puteran (robah / titik) |
Pompa cai(%) | Outlet diameter (mm) |
Lumaku ogé diaméterna (mm) |
Dipeunteun power(KW) |
Dipeunteun tegangan (V) |
Dipeunteun ayeuna (A) |
Efisiensi motor (%) | faktor kakuatan φ | Unit Ukuran Radial Maximum (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175di luhur | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175di luhur | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175di luhur | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175di luhur | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175di luhur | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175di luhur | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175di luhur | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175di luhur | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175di luhur | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175di luhur | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175di luhur | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175di luhur | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175di luhur | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, mastikeun nurutkeun dibekelan tina angkat pompa, rentang aliran pamakéan, pikeun nyegah aliran low atawa gaya ngompa angkat tinggi, dorong bearing jeung bagian séjén maké, motor overload dibeuleum.
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
bubuka ringkes struktur: bagian pompa utamana diwangun ku aci pompa, impeller, cangkang diversion, bearing karét, pariksa awak klep (bagian pilihan) jeung bagian komponén séjén.Motor utamana diwangun ku basa, tekanan régulasi pilem, dorong bearing, dorong plat , handap pituduh bearing korsi, stator, rotor, luhur pituduh bearing korsi, ring keusik, bagian inlet cai, kabel sareng komponenana séjén.
Fitur utama produk di antarana:
1, motor nyaéta motor asynchronous tilu-fase baseuh cai-kaeusi cai, rongga motor pinuh ku cai bersih, dipaké pikeun niiskeun motor jeung lubricate bearing nu, tekanan régulasi pilem di handapeun motor dipaké pikeun nyaluyukeun. bédana ékspansi jeung kontraksi tekanan cai di jero awak disababkeun ku parobahan naékna suhu motor.
2, Dina raraga nyegah keusik dina cai sumur ti ngasupkeun motor, tungtung luhur aci motor dilengkepan dua segel minyak, sarta cingcin keusik dipasang pikeun ngabentuk struktur pencegahan keusik.
3, Dina raraga nyegah aci pompa ti ngajalankeun up nalika dimimitian, aci pompa jeung aci motor disambungkeun ku gandeng a, sarta hiji bearing dorong luhur dipasang di bagian handap motor.
4, The lubrication tina motor jeung bearing pompa nyaéta lubrication cai.
5, The motor stator pungkal dijieunna tina kualitas luhur submersible motor pungkal kawat, kalawan kinerja insulasi tinggi.
6, pompa dirancang ku komputer CAD, kalawan struktur basajan tur kinerja teknis alus.

(1) Persiapan saméméh instalasi:
1. Pariksa naha pompa submersible meets kaayaan pamakéan sarta wengkuan spésifed dina manual.
2. Ngagunakeun obiect beurat kalawan diaméter sarua jeung diaméter luar maksimum pompa submersible, ngukur naha inneldiameter of wellbore nu bisa nyocogkeun ka pompa submersible, sarta ngukur naha jero sumur meets sarat instalasi.
3. Pariksa naha liang sumur beresih jeung cai sumur keruh. Pernah ngagunakeun pompa listrik submersible pikeun ngumbah leutak pompa welor jeung cai keusik pikeun nyegah karuksakan prématur kana pompa listrik submersible.
4. Pariksa naha posisi clamp pamasangan welhead cocog sareng naha éta tiasa tahan kualitas sadaya unit.
5. Pariksa lamun komponén pompa submersible geus réngsé sarta dipasang leres nurutkeun diagram assembly dina manualLeupaskeun layar filter sarta muterkeun gandeng pikeun nempo lamun rotates flexibly
6. Unscrew nu screw cai jeung fillthe rohangan motor jeung bersih, cai non corrosive (catetan. Pastikeun pikeun fil eta nepi), teras tighten waterscrew nu. Saatos 12 jam suntikan cai, résistansi insulasi motor henteu kedah kirang ti 150M Q nalika diukur nganggo méja oyag 500V.
7. Sambungan kabel, potong leungeun baju karét 120mm tina hiji tungtung kabel kaluar jeung kabel cocog jeung péso hiji tukang listrik urang stagger panjang tilu kawat inti dina bentuk stepped, mesek off inti tambaga 20mm, kerok tina oksida. lapisan on theoutside tina kawat tambaga jeung péso atawa lawon keusik, terus selapkeun dua kawat disambungkeun ends di palirs.After tying lapisan pageuh jeung kawat tambaga rupa, solder eta tuntas jeung pageuh, jeung keusik wae. burrs dina beungeut cai. Teras, pikeun tilu sambungan, anggo pita insulasi polyvester pikeun ngabungkus aranjeunna dina cara anu ditumpuk pikeun tilu laver. Bungkus dua tungtung lapisan bungkus sareng benang nyion, teras nganggo metode semi tumpuk pikeun mungkus pita tilu lapisan. Bungkus outellayer ku pita insulasi tekanan tinggi pikeun tilu lapisan. Tungtungna, tilelep tilu untaian babarengan jeung sababaraha kali bungkus eta pikeun lima lapisan jeung pita tekanan tinggi. Unggal lapisan kudu dihijikeun pageuh, sarta mendi interlayer kudu kedap tur fimm pikeun nyegah cai ti penetrating sarta ngaruksak insulasi nu, Saatos wrapping, soak dina cai dina suhu kamar 20 'c salila 12 jam, sarta ngukur lalawanan insulasi ku méja oyag. , nu teu kudu kirang ti 100M Ω
Diagram prosés wiring kabel napel nyaéta kieu:
8. Paké multimeter pikeun pariksa naha kawat tilu-fase disambungkeun tur naha lalawanan DC kira saimbang.
9. Pariksa naha sirkuit jeung trafo kapasitas overloaded, lajeng sambungkeun switch panyalindungan overload atawa alat dimimitian. Tempo Table 2 pikeun model husus, lajengTuang ember cai kana pompa cai ti outlet pompa cai mun lubricate bantalan karét dina pompa, lajeng nempatkeun pompa listrik submersible orientasi tegak tur steady.Start (teu leuwih ti hiji detik) jeung pariksa naha arah steering konsisten jeung tanda steering. Lamun henteu, swap wae dua panyambungna tina kabel tilu-fase. Lajeng install filter sarta nyiapkeun turun sumur. Upami dianggo dina kaayaan anu khusus (sapertos parit, parit, walungan, balong, balong, jsb.), pompa listrik kedah didasarkeun sacara dipercaya.
(2) Alat sareng alat pamasangan:
1. Hiji pasangan ngangkat ranté pikeun leuwih ti dua ton.
2. A tripod kalayan jangkungna nangtung teu kurang ti opat méter.
3. Dua tali gantung (tali kawat) nu bisa nanggung beurat leuwih ti hiji ton (bisa nanggung beurat hiji set lengkep pompa cai).
4. Pasang dua pasang jepitan (splints).
5. Wrenches, palu, obeng, pakakas listrik jeung instrumen, jsb.
(3) pamasangan pompa listrik:
1. Diagram instalasi tina pompa listrik submersible ditémbongkeun dina Gambar 2. Dimensi instalasi husus ditémbongkeun dina Table 3 "Daptar Dimensi Instalasi Pompa Electric Submersible".
2. Pompa listrik submersible kalawan sirah kirang ti 30 méter bisa hoisted langsung kana sumur ngagunakeun hoses jeung tali kawat atawa tali hemp lianna nu bisa nanggung beurat pinuh ku sakabéh mesin, pipa cai, jeung cai dina pipa.
3. Pompa kalayan sirah leuwih ti 30 méter ngagunakeun pipa baja, sarta runtuyan instalasi nyaéta kieu:
①Pake jepitan pikeun ngajepit tungtung luhur bagian pompa cai (motor sareng pompa cai parantos nyambungkeun waktos ayeuna), angkat nganggo ranté gantung, teras dasikeun lalaunan kana sumur dugi ka Pasang jepitan dina sirah sumur teras cabut ranté gantung.
② Paké sapasang clamps séjén pikeun clamp pipa, angkat eta kalawan ranté gantung 15 cm jauh ti flange, sarta nurunkeun eta lalaunan. Antara flange pipe jeung flange pompa Pasang pad karét di tempat sarta tighten pipa na pompa merata kalawan bolts, kacangan sarta spring washers.
③ Angkat pompa beuleum saeutik, cabut jepitan dina tungtung luhur pompa cai, dasi kabelna pageuh kana pipa cai nganggo pita plastik, teras talitikeun lalaunan dugi ka jepitan disimpen dina sumur.
④Paké cara nu sarua pikeun ngabeungkeut sakabéh pipa cai kana sumur.
⑤Saatos kabel timbal-kaluar disambungkeun ka saklar kontrol, éta disambungkeun ka catu daya tilu-fase.
(4) Hal-hal anu kedah diperhatoskeun nalika instalasi:
1. Lamun fenomena jamming kapanggih salila prosés ngompa, balikkeun atawa tarik pipa cai pikeun nungkulan titik jamming. Lamun sagala rupa ukuran masih teu hasil, mangga Ulah maksakeun pompa ka handap pikeun nyegah karuksakan kana pompa listrik submersible jeung sumur.
2. Salila instalasi, a Pad karét kudu ditempatkeun di flange unggal pipa na tightened merata.
3. Nalika pompa cai diturunkeun kana sumur, éta kudu ditempatkeun di tengah-tengah pipa sumur pikeun nyegah pompa tina ngajalankeun kana témbok sumur pikeun lila, ngabalukarkeun pompa ngageter jeung motor keur nyapu jeung kaduruk. .
4. Nangtukeun jero pompa cai ka handapeun sumur dumasar kana keusik anu ngalir sareng kaayaan leutak sumur. Ulah ngubur pompa dina leutak. Jarak ti pompa cai ka handapeun sumur umumna teu kurang ti 3 méter (tingali Gambar 2).
5. Jero asupna cai tina pompa cai kedah teu kurang ti 1-1,5 méter ti tingkat cai dinamis ka titik inlet cai (tingali Gambar 2). Upami teu kitu, bantalan pompa cai tiasa gampang ruksak.
6. The lift tina pompa cai teu tiasa teuing low. Upami teu kitu, klep gerbang kedah dipasang dina pipa cai sumur pikeun ngontrol aliran pompa dina titik aliran anu dipeunteun pikeun nyegah motor kabeungharan sareng kaduruk kusabab laju aliran anu ageung.
7. Nalika pompa cai dijalankeun, kaluaran cai kedah kontinyu sareng malah, arus kedah stabil (dina kaayaan kerja anu dipeunteun, umumna henteu langkung ti 10% tina arus anu dipeunteun), sareng teu kedah aya geter atanapi bising. Upami aya abnormalitas, mesin kedah dieureunkeun pikeun milari panyababna sareng ngaleungitkeunana.
8. Nalika masang, nengetan setelan tina kawat grounding motor (tingali Gambar 2). Nalika pipa cai nyaéta pipa baja, ngarah tina clamp wellhead; lamun pipa cai téh pipa plastik, ngarah tina tanda grounding tina pompa listrik.
- 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
- 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from burning due to excessive motor current.
- 4. After the pump is running normally, in order to prolong its service life, it is necessary to check whether the power supply voltage, running current and insulation resistance are normal on a regular basis.If the following conditions are found, the equipment should be shut down immediately to eliminate the fault:
- - Under the rated working conditions, the current exceeds 20%.
- - The dynamic water level drops to the inlet section, resulting in intermittent drainage.
- - The submersible pump vibrates violently or emits noisy sounds.
- - The power supply voltage is lower than 340 volts.
- - There is a phase blown out in the fuse.
- - The water pipe is damaged.
- - The thermal insulation resistance between the motor and the ground is less than 0.5 megaohm.
- 5. Disassembly device:
- - Untie the cable, take off the pipe part and remove the line protection plate.
- - Unscrew the drain screw and exclude all water in the motor chamber.
- - Take out the filter and loosen the fixing screw on the coupling fixed to the motor shaft.
- - Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (pay attention to the level of the device to prevent the bending of the pump shaft when separating).
- - The disassembly sequence of the pump is as follows: (see Figure 1) water inlet section, impeller, shunt shell, impeller, check valve body. When removing the impeller, use special tools to loosen the cone sleeve fixed to the impeller. In the process of disassembly, avoid bending the pump shaft and damaging various parts.
- - The disassembly process of the motor is as follows: (see Figure 1) place the motor on the platform, and remove the nuts, base, shaft head lock nut, thrust plate, key, lower guide bearing. seat, and tie rod bolts from the bottom of the motor in order (see Figure 1), and then take out the rotor (be careful not to damage the wiring harness) and finally take out the connector and upper guide bearing seat.
- - Assembly unit: before assembly, all parts should be cleaned of rust and dirt, and smear sealant on all the surfaces and fasteners, and then assemble in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then wear the filter for machine test. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
1, nempatkeun kaluar cai dina rohangan motor (utamana dina usum tiis pikeun nyegah motor ti katirisan), sarta dasi kabel ogé.
2, nyimpen di kamar indoor tanpa zat korosif jeung gas, kalawan suhu handap 40 °C.
3, pamakéan jangka panjang kedah nengetan pencegahan karat tina pompa submersible.
- Impeller
- leungeun baju aci
- leungeun baju karét aci
-
Cingcin segel
01 Asupan cai sumur jero
02 Pasokan cai luhur
03 suplai cai gunung
04 cai munara
05 irigasi tatanén
06 irigasi kebon
07 asupan cai walungan
08 cai domestik