Uretan murgildutako motor urpekorraren erabilera, errotorearen higadura-erresistentea den aleaziozko mahuka eta aleaziozko bultzada-diskoaren diseinua. (olioan murgildutako harilkatzea, errotorearen motorra baino iraunkorragoa), ingurumena errespetatzen duena. putzuko ura, erabilera seguruagoa. Indar handiko harearen aurkako higadura-erresistenteak PC polimerozko material konposatuak erabiliz, hiru dimentsioko diseinu hidrauliko berria, flotatzaile flotatzailea, harearen aurkako egitura zeramikazko higadura-erresistentzia, altxatze osoa, fluxu handia. motorrak 300 metroko sakoneran murgil dezake.
This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply system, designed for strict water quality requirements. The product is suitable for water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) between 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L environment. This product is equipped with a closed or water-filled wet structure motor, before use must be submersible motor inner cavity filled with clean water to prevent false full, and then tighten the water and air bolts, otherwise not to use. The submersible pump must be completely immersed in water to work, penetration depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. In addition, the well water flow should meet the continuous operation requirements of the submersible pump, the water output of the submersible pump should be controlled at 0.7-1.2 times the rated flow. When used, the well must be vertical, and the submersible pump can not be used horizontally or dumped, only vertical installation. To ensure safety, the submersible pump must match the cable according to the requirements and be equipped with external overload protection device, and it is strictly prohibited to conduct no-load test on the pump without water. This product is an ideal choice for providing high quality water source, and can be widely used in various industrial and civil water processing fields.
105QJ series water-filled stainless steel deep well pump |
|||||
Eredua |
Emaria m³/h |
Burua (m) |
Motorra Boterea (KW) |
Unitatea diametroa (mm) |
diameter (mm) |
105QJ2-230/36 |
2 |
230 |
4kw |
103 |
105 |
105QJ2-300/50 |
300 |
5,5kw |
|||
105QJ2-390/65 |
390 |
7,5kw |
|||
105QJ4-50/10 |
4 |
50 |
1,1kw |
103 |
105 |
105QJ4-60/12 |
60 |
1,5kw |
|||
105QJ4-80/16 |
80 |
2,2kw |
|||
105QJ4-100/20 |
100 |
3kw |
|||
105QJ4-140/28 |
140 |
4kw |
|||
105QJ4-200/40 |
200 |
5,5kw |
|||
105QJ4-275/55 |
275 |
7,5kw |
|||
105QJ6-35/10 |
6 |
35 |
1,1kw |
103 |
105 |
105QJ6-40/12 |
40 |
1,5kw |
|||
105QJ6-60/16 |
60 |
2,2kw |
|||
105QJ6-75/20 |
75 |
3kw |
|||
105QJ6-105/28 |
105 |
4kw |
|||
105QJ6-140/40 |
140 |
5,5kw |
|||
105QJ6-192/55 |
192 |
7,5kw |
|||
105QJ8-25/5 |
8 |
25 |
1,1kw |
103 |
105 |
105QJ8-40/8 |
40 |
1,5kw |
|||
105QJ8-55/11 |
55 |
2,2kw |
|||
105QJ8-75/15 |
75 |
3kw |
|||
105QJ8-95/19 |
95 |
4kw |
|||
105QJ8-125/25 |
125 |
5,5kw |
|||
105QJ8-160/32 |
160 |
7,5kw |
|||
105QJ10-20/5 |
10 |
20 |
1,1kw |
103 |
105 |
105QJ10-30/8 |
30 |
1,5kw |
|||
105QJ10-40/11 |
40 |
2,2kw |
|||
105QJ10-55/15 |
55 |
3kw |
|||
105QJ10-75/19 |
75 |
4kw |
|||
105QJ10-90/25 |
90 |
5,5kw |
|||
105QJ10-120/32 |
120 |
7,5kw |
|||
105QJ16-22/9 |
16 |
22 |
2,2kw |
103 |
105 |
105QJ16-28/12 |
28 |
3kw |
|||
105QJ16-35/15 |
35 |
4kw |
|||
105QJ16-50/20 |
50 |
5,5kw |
|||
105QJ16-68/27 |
68 |
7,5kw |
130QJ series water-filled stainless steel deep well pump |
|||||
Eredua |
Emaria m³/h |
Burua (m) |
Motorra Boterea (KW) |
Unitatea diametroa (mm) |
diameter (mm) |
130QJ10-60/7 |
10 |
60 |
1,5kw |
130 |
135 |
130QJ10-80/12 |
80 |
2,2kw |
|||
130QJ10-100/15 |
100 |
3kw |
|||
130QJ10-130/20 |
130 |
4kw |
|||
130QJ10-160/25 |
160 |
5,5kw |
|||
130QJ10-220/32 |
220 |
7,5kw |
|||
130QJ10-250/38 |
250 |
9,2kw |
|||
130QJ10-300/42 |
300 |
11kw |
|||
130QJ10-350/50 |
350 |
13kw |
|||
130QJ10-400/57 |
400 |
15kw |
|||
130QJ10-450/64 |
450 |
18,5kw |
|||
130QJ10-500/70 |
500 |
22kw |
|||
130QJ15-40/5 |
15 |
40 |
1,5kw |
130 |
135 |
130QJ15-50/7 |
50 |
2,2kw |
|||
130QJ15-60/10 |
60 |
3kw |
|||
130QJ15-80/12 |
80 |
4kw |
|||
130QJ15-105/15 |
105 |
5,5kw |
|||
130QJ15-150/22 |
150 |
7,5kw |
|||
130QJ15-170/25 |
170 |
9,2kw |
|||
130QJ15-200/28 |
200 |
11kw |
|||
130QJ15-240/34 |
240 |
13kw |
|||
130QJ15-280/40 |
280 |
15kw |
|||
130QJ15-300/42 |
300 |
18,5kw |
|||
130QJ15-336/48 |
336 |
18,5kw |
|||
130QJ15-350/50 |
350 |
22kw |
|||
130QJ15-400/56 |
400 |
22kw |
130QJ series water-filled stainless steel deep well pump |
|||||
Eredua |
Emaria m³/h |
Burua (m) |
Motorra Boterea (KW) |
Unitatea diametroa (mm) |
diameter (mm) |
130QJ20-22/3 |
20 |
30 |
2,2kw |
130 |
135 |
130QJ20-30/5 |
42 |
3kw |
|||
130QJ20-42/6 |
54 |
4kw |
|||
130QJ20-52/8 |
65 |
5,5kw |
|||
130QJ20-72/11 |
85 |
7,5kw |
|||
130QJ20-90/14 |
110 |
9,2kw |
|||
130QJ20-105/16 |
128 |
11kw |
|||
130QJ20-130/19 |
145 |
13kw |
|||
130QJ20-150/22 |
164 |
15kw |
|||
130QJ20-182/27 |
182 |
18,5kw |
|||
130QJ20-208/31 |
208 |
22kw |
|||
130QJ20-240/35 |
240 |
25kw |
|||
130QJ20-286/42 |
286 |
30kw |
|||
130QJ25-35/6 |
25 |
35 |
3kw |
130 |
135 |
130QJ25-40/7 |
40 |
4kw |
|||
130QJ25-52/9 |
52 |
5,5kw |
|||
130QJ25-70/12 |
70 |
7,5kw |
|||
130QJ25-85/15 |
85 |
9,2kw |
|||
130QJ25-105/18 |
105 |
11kw |
|||
130QJ25-120/21 |
120 |
13kw |
|||
130QJ25-140/24 |
140 |
15kw |
150QJ series water-filled stainless steel deep well pump |
|||||
Eredua |
Emaria m³/h |
Burua (m) |
Motorra Boterea (KW) |
Unitatea diametroa (mm) |
diameter (mm) |
150QJ12-40/3 |
12 |
40 |
2,2kw |
143 |
150 |
150QJ12-55/5 |
55 |
3kw |
|||
150QJ12-80/7 |
80 |
4kw |
|||
150QJ12-107/9 |
107 |
5,5kw |
|||
150QJ12-142/11 |
142 |
7,5kw |
|||
150QJ12-175/14 |
175 |
9,2kw |
|||
150QJ12-200/16 |
200 |
11kw |
|||
150QJ12-242/19 |
242 |
13kw |
|||
150QJ12-268/21 |
268 |
15kw |
|||
150QJ12-293/23 |
293 |
18,5kw |
|||
150QJ20-28/3 |
20 |
28 |
3kw |
143 |
150 |
150QJ20-48/5 |
48 |
4kw |
|||
150QJ20-70/7 |
70 |
5,5kw |
|||
150QJ20-90/9 |
90 |
7,5kw |
|||
150QJ20-107/11 |
107 |
9,2kw |
|||
150QJ20-135/14 |
135 |
11kw |
|||
150QJ20-155/16 |
155 |
13kw |
|||
150QJ20-175/18 |
175 |
15kw |
|||
150QJ20-195/20 |
195 |
18,5kw |
|||
150QJ20-220/22 |
220 |
18,5kw |
|||
150QJ20-235/25 |
235 |
22kw |
|||
150QJ20-255/28 |
255 |
25kw |
150QJ series water-filled stainless steel deep well pump |
|||||
Eredua |
Emaria m³/h |
Burua (m) |
Motorra Boterea (KW) |
Unitatea diametroa (mm) |
diameter (mm) |
150QJ45-18/2 |
45 |
18 |
4KW |
143 |
150 |
150QJ45-28/3 |
28 |
5,5 kW |
|||
150QJ45-46/5 |
46 |
7,5 kW |
|||
150QJ45-57/6 |
57 |
9,2 kW |
|||
150QJ45-65/7 |
65 |
11KW |
|||
150QJ45-75/8 |
75 |
13KW |
|||
150QJ45-90/10 |
90 |
15KW |
|||
150QJ45-108/12 |
108 |
18,5 kW |
|||
150QJ45-125/14 |
125 |
22KW |
|||
150QJ45-145/16 |
145 |
25KW |
|||
150QJ45-168/18 |
168 |
30KW |
|||
150QJ32-20/2 |
32 |
20 |
3kw |
143 |
150 |
150QJ32-30/3 |
30 |
4kw |
|||
150QJ32-43/4 |
43 |
5,5kw |
|||
150QJ32-60/5 |
60 |
7,5kw |
|||
150QJ32-65/6 |
65 |
7,5kw |
|||
150QJ32-75/7 |
75 |
9,2kw |
|||
150QJ32-85/8 |
85 |
11kw |
|||
150QJ32-100/9 |
100 |
13kw |
|||
150QJ32-110/10 |
110 |
15kw |
|||
150QJ32-118/11 |
118 |
18,5kw |
|||
150QJ32-140/13 |
140 |
18,5kw |
|||
150QJ32-155/15 |
155 |
22kw |
|||
150QJ32-185/18 |
185 |
25kw |
|||
150QJ32-215/21 |
215 |
30kw |
This kind of well submersible pump is a clean water pump. It is strictly prohibited to dig new wells and extract sediments and turbid water. The voltage grade of the well pump is 380/50HZ. The submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common comprehensive motor protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc., to prevent timely tripping when abnormal conditions occur. The pump must be reliably grounded during installation and use, and it is strictly prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water in the internal chamber, and the drain bolt must be fastened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instantaneous start time shall not exceed one second to check whether the direction is correct, and the direction is the same as the direction indicator. When the pump is erected, pay attention to safety to prevent injury from tilting. Strictly in accordance with the provisions of the pump lift and flow range of use, to avoid the pump in the low flow when the large flow or in the high lift appears in the large pull, resulting in extreme wear of thrust bearings and other components, the motor overload and burn. After the pump into the well, the insulation resistance between the motor and the ground should be measured, not less than 100MΩ. After the start, regular observation of voltage and current, and check whether the motor winding insulation meets the requirements of the provisions. If the location temperature of the pump storage is below the freezing point, the water in the motor cavity should be drained, so as not to damage the motor in winter low temperature freezing.
- 1.Superatutako ponpa instalazioa amaitu da, berriro egiaztatu isolamendu-erresistentzia eta etengailutik hiru faseko eroapena, egiaztatu tresna eta abiarazi ekipamenduaren konexio-errorea, arazorik ez badago, proba hasi daiteke, tresna hasi ondoren. tentsio eta korronte nominalak ezarritako plakak baino gehiago, ponparen zarata eta bibrazio fenomenoa behatu, dena normala den martxan jarri daitekeen irakurketak adieraziz.
- 2.Lau orduz ponparen lehen funtzionamendua, azkar itzali behar da motorraren isolamendu termikoaren erresistentzia probatu, balioa ez da 0,5 megaohm baino txikiagoa izan behar.
- 3.Ponpa itzali ondoren, bost minutuko tarte baten ondoren martxan jarri behar da, hodiko ur-zutabeak motor-korronte gehiegizko eta erretzeak eragindako errefluxu guztiz ez izateko.
- 4.Ponpa funtzionamendu arruntean jarri ondoren, bere bizitza irautea luzatzeko, hornidura-tentsioa, lan-korrontea eta isolamendu-erresistentzia normala da egiaztatzeko, honako egoera hau aurkitzen bada, berehala itxi beharko luke arazoak konpontzeko.
1 baldintza nominalean, korrontea % 20 baino gehiago da.
2 ur-maila dinamikoa uraren sarrerako sekziora, tarteka ura eraginez.
3 urpeko ponpa bibrazio edo zarata larria.
4 hornidura-tentsioa 340 voltio baino txikiagoa da.
5 metxa fase bat erre zuten.
6 ur-hodien kalteak.
7 motor isolamendu termikoko erresistentzia 0,5 megaohm baino txikiagoa da.
- 5.Unitatearen desmuntatzea:
1 askatu kable-lotura, kendu hodiaren zatia, kendu alanbre-plaka.
2 Torloju ur-torlojua, jarri ura motorraren ganbaran.
3 kendu iragazkia, askatu akoplamenduko torloju finkoa motorraren ardatza finkatzeko.
4 torlojutu uraren sarrerako atala motorrekin lotzen duen torlojua, eta bereizi ponpa motorretik (erreparatu unitateko kuxinari banantzean, ponparen ardatza tolestu ez dadin)
5 ponparen desmuntatze-sekuentzia hau da: (ikusi 1. irudia) uraren sarrerako atala, bulkada, desbideratze-oskola, bultzada...... egiaztapen-balbularen gorputza, bultzatzailea kentzean, erabili tresna bereziak finkoaren mahuka konikoa askatzeko. bultzatzailea lehenik, eta saihestu ponparen ardatza desmuntatzeko prozesuan tolestu eta ubeltzea.
6 motorra desmuntatzeko prozesua hau da: (ikus 1. irudia) jarri motorra plataforman, eta kendu azkoinak, oinarria, ardatzaren burua blokeatzeko azkoina, bultzada-plaka, giltza, beheko gida-eserlekua eta buru bikoitzeko torlojua behetik. motorra aldi berean, eta gero errotorea atera (kontuz hari paketea ez kaltetzeko) eta, azkenik, kendu konexio-atala eta goiko gida-errodamenduaren eserlekua.
7 unitateen muntaketa: muntatu aurretik, piezen herdoila eta zikinkeria garbitu behar dira, eta uztartze-azalera eta finkagailuak zigilatzailez estalita, eta, ondoren, desmuntatzeko ordenaren kontrako ordenan muntatu (motorraren ardatza gora eta behera mugitzen da muntatu ondoren gutxi gorabehera. milimetro), muntatu ondoren, akoplamendua malgua izan behar da eta, ondoren, iragazki pantaila probatzeko makina. Urpeko ponpak putzutik aterako dira desmuntatzeko eta mantentzeko 5. artikuluaren arabera funtzionamendu-urte bat igaro ondoren, edo urtebete baino gutxiago funtzionatzen baina urpekaritza-denbora bi urte igaro ondoren, eta gastatutako piezak ordezkatuko dira.
Produktu hau errendimendu bikaina duen ponpa elektriko urperagarria da. Bere diseinu berezia egokia da hainbat alditan erabiltzeko. Neguan motorra izoztea saihesteko edo denbora luzez erabiltzen ez denean herdoila saihesteko, ponpa elektriko urperagarri honek ekipoen mantentze-lanetarako zure beharrak ase ditzake. Funtzionatzeko erraza eta mantentzea erosoa da. Jarraitu eskuliburuko urratsak behar bezala mantentzeko eta biltegiratzeko, produktuaren bizitza eraginkortasunez luzatzeko. Eskuratu urpeko ponpa elektriko hau eta egin zure lana leunagoa eta eraginkorragoa!
01 Putzu sakoneko ura hartzea
02 Goiko ur-hornidura
03 mendiko ur hornidura
04 dorre ura
05 Nekazaritzako ureztatzea
06 lorategiko ureztatzea
07 ibaiko ur-hartunea
08 etxeko ura