Bomba submersível para poço profundo 135QJ

Realize o processamento OEM! De acordo com as necessidades do usuário, projeto e fabricação de vários tipos de requisitos especiais de motores e bombas submersíveis não padronizados. Os padrões de implementação do produto: GB/T2816-2014 "bomba submersível de poço", GB/T2818-2014 "motor assíncrono bem submersível". WhatsApp: 17855846335
PDF DOWNLOAD
Detalhes
Tag
 
Resumo do Produto

QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.

 

 
Condições de Uso

The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).

The water quality shall meet the following requirements:

(1) the water temperature shall not be higher than 20 °C;

(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;

(3) the PH value (acidity and alkalinity) is 6.5-8.5;

(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;

(5) the content of chloride ions shall not be higher than 400mg/L.

The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.

 

 
Significado do modelo

Read More About 3in submersible well pump

 
Referência parcial do modelo
Modelo Fluxo (m3/h)   Cabeça
(m)

  Velocidade de rotação

(mudança/ponto)

 Bomba d'água (%)   Tomada
diâmetro
(milímetros)
Bem aplicável
diâmetro (mm) 
Avaliado
potência (KW)
Avaliado
tensão (V)
 Avaliado
corrente (A)
Eficiência motora (%)  power factorcosφ   Unidade
Tamanho máximo radial (mm)
Observação
135QJ5-34 5 34 2850   40  135acima 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135acima 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135acima 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135acima 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135acima 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135acima 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135acima 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Precauções de segurança

1, bomba submersível de poço para bomba de água limpa, proíbe o novo poço, bombeando sedimentos e água lamacenta,

2, grau de tensão da bomba de água de poço 380/50 Hz, o uso de outros graus de tensão de motores submersíveis precisa ser personalizado. O cabo subterrâneo deve usar cabo à prova d'água, deve ser equipado com equipamento de partida, como caixa de distribuição, partida não pronta deve ter função de proteção abrangente do motor comumente usada, como proteção contra sobrecarga de curto-circuito, proteção de fase, proteção de subtensão, proteção de aterramento, proteção de marcha lenta , em caso de condições anormais, o dispositivo de proteção deve ser acionado em tempo hábil.

3, a instalação e o uso da bomba devem ser aterrados de forma confiável, proíbe o interruptor push and pull quando as mãos e os pés estão molhados, deve cortar a fonte de alimentação antes da instalação e manutenção da bomba, o local de uso da bomba para configurar " para evitar choque elétrico" sinais óbvios:

4, no poço ou antes da instalação, a cavidade do motor deve ser preenchida com água destilada ou água fervente limpa não corrosiva, aperte o parafuso / água, a bomba no teste de solo, deve ser para a borracha de lubrificação de água da câmara da bomba rolamentos, partida instantânea não mais que um segundo, veja se a direção é igual às instruções de direção. Quando a bomba estiver na vertical, preste atenção à segurança, evite ferimentos por capotamento.

5, estritamente de acordo com as disposições do elevador da bomba, faixa de fluxo de uso, para evitar baixo fluxo ou força de bombeamento de alta elevação, o rolamento axial e outras partes do desgaste, a sobrecarga do motor queimada

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introdução à Estrutura

1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components

2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.

3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.

4.The lubrication of the motor and the pump bearing is water lubrication.

5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.

6. The pump is designed by computer CAD, with simple structure and good technical performance.

Read More About 1 2 hp water pump price
 
Instalar

(1)Preparação antes da instalação:
1. Verifique se a bomba submersível atende às condições de uso e escopo especificados no manual.
2. Usando um objeto pesado com diâmetro igual ao diâmetro externo máximo da bomba submersível, meça se o diâmetro interno do poço pode caber na bomba submersível e meça se a profundidade do poço atende aos requisitos de instalação.
3. Verifique se o poço está limpo e se a água do poço está turva. Nunca use uma bomba elétrica submersível para lavar a lama da bomba Welor e água de areia para evitar danos prematuros à bomba elétrica submersível.
4. Verifique se a posição da braçadeira de instalação da cabeça de poço é adequada e se ela pode suportar a qualidade de toda a unidade
5. Verifique se os componentes da bomba submersível estão completos e instalados corretamente de acordo com o diagrama de montagem no manualRemova a tela do filtro e gire o acoplamento para ver se ele gira de forma flexível
6. Desaparafuse o parafuso de água e encha a cavidade do motor com água limpa e não corrosiva (nota: certifique-se de enchê-la) e, em seguida, aperte o parafuso de água. Após 12 horas de injeção de água, a resistência de isolamento do motor não deve ser inferior a 150M Q quando medida com uma mesa vibratória de 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

O diagrama do processo de fiação do cabo anexado é o seguinte:
Read More About submersible well pump 1.5 hp

 

8. Use um multímetro para verificar se os fios trifásicos estão conectados e se a resistência CC está aproximadamente equilibrada.
9. Verifique se o circuito e a capacidade do transformador estão sobrecarregados e, em seguida, conecte a chave de proteção contra sobrecarga ou o equipamento de partida. Consulte a Tabela 2 para modelos específicos e, em seguida, despeje um balde de água na bomba d'água a partir da saída da bomba d'água para lubrificar os rolamentos de borracha da bomba e, em seguida, coloque a bomba elétrica submersível na posição vertical e estável.Inicie (não mais que um segundo) e verifique se a direção da direção é consistente com o sinal de direção. Caso contrário, troque quaisquer dois conectores do cabo trifásico. Em seguida, instale o filtro e prepare-se para descer no poço. Se utilizada em ocasiões especiais (como valas, valas, rios, lagoas, lagoas, etc.), a bomba elétrica deve ser aterrada de forma confiável.

 

(2) Equipamentos e ferramentas de instalação:
1. Um par de correntes de elevação para mais de duas toneladas.
2. Um tripé com altura vertical não inferior a quatro metros.
3. Duas cordas suspensas (cabos de aço) que podem suportar um peso de mais de uma tonelada (podem suportar o peso de um conjunto completo de bombas d'água).
4. Instale dois pares de grampos (talas).
5. Chaves, martelos, chaves de fenda, ferramentas e instrumentos elétricos, etc.

 

(3)Instalação da bomba elétrica:
1. O diagrama de instalação da bomba elétrica submersível é mostrado na Figura 2. As dimensões específicas de instalação são mostradas na Tabela 3 “Lista de Dimensões de Instalação da Bomba Elétrica Submersível”.

 

2. Bombas elétricas submersíveis com altura manométrica inferior a 30 metros podem ser içadas diretamente para o poço usando mangueiras e cabos de aço ou outras cordas de cânhamo que possam suportar o peso total de toda a máquina, canos de água e água nos canos.

 

3. As bombas com altura manométrica superior a 30 metros utilizam tubos de aço e a sequência de instalação é a seguinte:
①Use uma braçadeira para prender a extremidade superior da parte da bomba de água (o motor e a bomba de água foram conectados neste momento), levante-a com uma corrente suspensa e amarre-a lentamente no poço atéColoque a braçadeira na cabeça do poço e remova o corrente pendurada.
② Use outro par de braçadeiras para prender um tubo, levante-o com uma corrente suspensa a 15 cm de distância do flange e abaixe-o lentamente. Entre o flange do tubo e o flange da bombaColoque a almofada de borracha no lugar e aperte o tubo e a bomba uniformemente com parafusos, porcas e arruelas de pressão.
③ Levante ligeiramente a bomba submersível, remova a braçadeira na extremidade superior da bomba d'água, amarre o cabo firmemente ao tubo de água com uma fita plástica e amarre-o lentamente até que a braçadeira seja colocada na cabeça do poço.
④Use o mesmo método para amarrar todos os canos de água ao poço.
⑤Depois que o cabo de saída é conectado à chave de controle, ele é conectado à fonte de alimentação trifásica.


(4)Observações durante a instalação:
1. Se for encontrado um fenômeno de travamento durante o processo de bombeamento, gire ou puxe o tubo de água para superar o ponto de travamento. Se várias medidas ainda não funcionarem, não force a bomba para baixo para evitar danos à bomba elétrica submersível e ao poço.
2. Durante a instalação, uma almofada de borracha deve ser colocada no flange de cada tubo e apertada uniformemente.
3. Quando a bomba de água é abaixada no poço, ela deve ser colocada no meio do tubo do poço para evitar que a bomba funcione contra a parede do poço por um longo tempo, fazendo com que a bomba vibre e o motor varra e queime .
4. Determine a profundidade da bomba d'água até o fundo do poço de acordo com o fluxo de areia e lodo do poço. Não enterre a bomba na lama. A distância da bomba de água ao fundo do poço geralmente não é inferior a 3 metros (ver Figura 2).
5. A profundidade de entrada de água da bomba de água não deve ser inferior a 1-1,5 metros do nível dinâmico de água até o nó de entrada de água (ver Figura 2). Caso contrário, os rolamentos da bomba de água podem ser facilmente danificados.
6. A elevação da bomba d'água não pode ser muito baixa. Caso contrário, uma válvula gaveta precisa ser instalada na tubulação de água da cabeça do poço para controlar o fluxo da bomba no ponto de fluxo nominal para evitar que o motor fique sobrecarregado e queime devido a grandes vazões.
7. Quando a bomba de água está funcionando, a saída de água deve ser contínua e uniforme, a corrente deve ser estável (sob condições nominais de trabalho, geralmente não mais que 10% da corrente nominal) e não deve haver vibração ou ruído. Se houver alguma anormalidade, a máquina deve ser parada para descobrir a causa e eliminá-la.
8. Ao instalar preste atenção ao ajuste do fio terra do motor (ver Figura 2). Quando o cano de água for de aço, conduza-o pela braçadeira da cabeça do poço; quando a tubulação de água for de plástico, conduza-a a partir da marca de aterramento da bomba elétrica.

 

 
Manutenção e Manutenção
  1. (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
  2. (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
  5.  

 1 In the rated condition, the current exceeds 20%.

 2 O nível dinâmico da água cai para a seção de entrada de água, causando água intermitente.

 3 A bomba submersível apresenta vibração ou ruído intenso.

 4 A tensão de alimentação é inferior a 340 volts.

 5 Um fusível está queimado.

 6 O tubo de abastecimento de água está danificado.

 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.

 

  1. (5)Unit disassembly:
  2.  1 desamarre o cabo, remova a parte da tubulação e remova a placa de arame.

 2 aperte o parafuso de água, coloque a água na câmara do motor.

 3 remova o filtro, afrouxe o parafuso fixo no acoplamento para fixar o eixo do motor.

 4 aparafuse o parafuso que conecta a junção de entrada ao motor e separe a bomba do motor (preste atenção à almofada da unidade ao separar, para evitar a flexão do eixo da bomba)

 5 a sequência de desmontagem da bomba é: (ver figura 1) junção de entrada, impulsor, carcaça de desvio, impulsor...... corpo da válvula de retenção, ao remover o impulsor, use ferramentas especiais para afrouxar a luva cônica do impulsor fixo primeiro, e evite dobrar e machucar o eixo da bomba no processo de desmontagem.

 6 o processo de desmontagem do motor é: (ver figura 1) coloque o motor na plataforma e remova as porcas, base, porca de travamento da cabeça do eixo, placa de encosto, chaveta, assento do rolamento guia inferior e parafuso de cabeça dupla da parte inferior do o motor por sua vez e, em seguida, retire o rotor (preste atenção para não danificar o pacote de fios) e, finalmente, remova a seção de conexão e o assento do rolamento guia superior.

 7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.

 

 
Armazenamento e Custódia

 1, retire a água da cavidade do motor (principalmente no inverno para evitar que o motor congele) e amarre bem o cabo.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, o uso a longo prazo deve prestar atenção à prevenção da ferrugem das bombas submersíveis.

 

 
Peças de desgaste

 

  • Impulsor
  • Manga do eixo
  • Luva do eixo de borracha
  • Anel de vedação

 
Cenários de aplicação

01 Tomada de água de poço profundo

02 Abastecimento de água em arranha-céus

03 abastecimento de água na montanha 

04 torre de água

05 Irrigação agrícola

06 irrigação de jardim

07 captação de água do rio

08 água doméstica

 

Se você está interessado em nossos produtos, pode optar por deixar aqui seus dados, e entraremos em contato com você em breve.


Escreva aqui sua mensagem e envie para nós

Se você está interessado em nossos produtos, pode optar por deixar aqui seus dados, e entraremos em contato com você em breve.


pt_PTPortuguese