135QJ Dränkbar pump med djup brunn

Genomför OEM-bearbetning! Enligt användarkrav, design och tillverkning av olika typer av särskilda krav på icke-standardiserade dränkbara motorer och pumpar. Produktimplementeringsstandarder: GB/T2816-2014 "brunnsänkbar pump", GB/T2818-2014 "brunnsänkbar asynkronmotor". WhatsApp: 17855846335
PDF DOWNLOAD
Detaljer
Taggar
 
Produktöversikt

QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.

 

 
Användarvillkor

The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).

The water quality shall meet the following requirements:

(1) the water temperature shall not be higher than 20 °C;

(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;

(3) the PH value (acidity and alkalinity) is 6.5-8.5;

(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;

(5) the content of chloride ions shall not be higher than 400mg/L.

The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.

 

 
Modellens betydelse

Read More About 3in submersible well pump

 
Delmodellreferens
Modell Flöde (m3/h)   Huvud
(m)

  Roterande hastighet

(ändring/punkt)

 Vattenpump(%)   Utlopp
diameter
(mm)
Tillämplig väl
diameter (mm) 
Betygsatt
effekt (KW)
Betygsatt
spänning (V)
 Betygsatt
ström(A)
Motoreffektivitet (%)  power factorcosφ   Enhet
Radiell maximal storlek (mm)
Anmärkning
135QJ5-34 5 34 2850   40  135ovan 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135ovan 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135ovan 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135ovan 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135ovan 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135ovan 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135ovan 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Säkerhetsåtgärder

1, brunns dränkbar pump för rentvattenpump, förbjuder den nya brunnen, pumpar sediment och lerigt vatten,

2, brunnsvattenpump spänningsklass 380/50HZ, användningen av andra spänningsgrader av dränkbara motorer måste anpassas. Jordkabeln måste använda vattentät kabel, måste vara utrustad med startutrustning, såsom distributionslåda, start ej klar bör ha allmänt använt motoromfattande skyddsfunktion, såsom kortslutningsöverbelastningsskydd, fasskydd, underspänningsskydd, jordningsskydd, tomgångsskydd , i händelse av onormala förhållanden, bör skyddsanordningen åtgärdas i tid.

3, installation och användning av pumpen måste vara tillförlitligt jordad, förbjuder tryck- och dragbrytaren när händer och fötter är våta, måste stänga av strömförsörjningen före installation och underhåll av pumpen, pumpens användningsplats för att installera " för att förhindra elektriska stötar" uppenbara tecken:

4, ner i brunnen eller före installation, måste motorhåligheten fyllas med destillerat vatten eller icke-korrosivt rent kallt kokande vatten, dra åt / vattenbulten, pumpen på marken testkörning, måste vara till pumpkammaren vattensmörjning gummi kullager, omedelbar start inte mer än en sekund, se om styrningen är densamma som styrinstruktionen. När pumpen står upprätt, var uppmärksam på säkerheten, förhindra vältningsskada.

5, strikt enligt bestämmelserna i pumplyften, flödesområde för användning, för att förhindra lågt flöde eller hög lyftkraft, axiallagret och andra delar av slitaget, motorn överbelastning brändes

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introduktion till struktur

1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components

2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.

3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.

4.The lubrication of the motor and the pump bearing is water lubrication.

5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.

6. The pump is designed by computer CAD, with simple structure and good technical performance.

Read More About 1 2 hp water pump price
 
Installera

(1) Förberedelse före installation:
1. Kontrollera om den dränkbara pumpen uppfyller de användningsvillkor och omfattning som anges i manualen.
2. Använd ett tungt föremål med en diameter som är lika med den maximala ytterdiametern för den dränkbara pumpen, mät om borrhålets innerdiameter kan passa den dränkbara pumpen och mät om brunnsdjupet uppfyller installationskraven.
3. Kontrollera om borrhålet är rent och om brunnsvattnet är grumligt. Använd aldrig en dränkbar elektrisk pump för att tvätta lera och sandvatten från välorpumpen för att undvika för tidig skada på den dränkbara elektriska pumpen.
4. Kontrollera om monteringsklämmans placering är lämplig och om den tål hela enhetens kvalitet
5. Kontrollera om de dränkbara pumpkomponenterna är kompletta och korrekt installerade enligt monteringsschemat i manualen. Ta bort filtersilen och vrid kopplingen för att se om den roterar flexibelt
6. Skruva loss vattenskruven och fyll motorrummet med rent, icke-frätande vatten (obs. se till att fylla på det), dra sedan åt vattenskruven. Efter 12 timmars vatteninjektion bör motorns isolationsmotstånd inte vara mindre än 150M Q mätt med ett 500V skakbord.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Det bifogade processschemat för kabeldragning är som följer:
Read More About submersible well pump 1.5 hp

 

8. Använd en multimeter för att kontrollera om trefasledningarna är anslutna och om DC-resistansen är ungefär balanserad.
9. Kontrollera om krets- och transformatorkapaciteten är överbelastade och anslut sedan överbelastningsskyddsbrytaren eller startutrustningen. Se tabell 2 för specifika modeller och häll sedan en hink med vatten i vattenpumpen från vattenpumpens utlopp för att smörja gummilagren i pumpen, och placera sedan den dränkbara elektriska pumpen upprätt och stadigt. Starta (högst en sekund) och kontrollera om styrriktningen överensstämmer med styrskylten. Om inte, byt två kontakter på trefaskabeln. Installera sedan filtret och förbered dig för att gå ner i brunnen. Om den används vid speciella tillfällen (som diken, diken, floder, dammar, dammar, etc.), måste den elektriska pumpen vara tillförlitligt jordad.

 

(2) Installationsutrustning och verktyg:
1. Ett par lyftkedjor för mer än två ton.
2. Ett stativ med en vertikal höjd på minst fyra meter.
3. Två hängrep (stålrep) som kan bära en vikt på mer än ett ton (kan bära vikten av en komplett uppsättning vattenpumpar).
4. Montera två par klämmor (skenor).
5. Skiftnycklar, hammare, skruvmejslar, elverktyg och instrument m.m.

 

(3) Installation av elektrisk pump:
1. Installationsschemat för den dränkbara elektriska pumpen visas i figur 2. De specifika installationsmåtten visas i Tabell 3 "Lista över installationsmått för den dränkbara elektriska pumpen".

 

2. Dränkbara elektriska pumpar med en lyfthöjd mindre än 30 meter kan hissas upp direkt i brunnen med hjälp av slangar och stållinor eller andra hamparep som kan bära hela vikten av hela maskinen, vattenledningar och vatten i rören.

 

3. Pumpar med en lyfthöjd på mer än 30 meter använder stålrör, och installationssekvensen är som följer:
①Använd en klämma för att klämma fast den övre änden av vattenpumpsdelen (motorn och vattenpumpen har anslutits vid denna tidpunkt), lyft den med en hängande kedja och knyt den långsamt i brunnen tills Sätt klämman på brunnshuvudet och ta bort hängande kedja.
② Använd ytterligare ett par klämmor för att klämma fast ett rör, lyft det med en hängande kedja 15 cm från flänsen och sänk det långsamt. Mellan rörfläns och pumpfläns Sätt gummidynan på plats och dra åt röret och pumpen jämnt med bultar, muttrar och fjäderbrickor.
③ Lyft den dränkbara pumpen något, ta bort klämman på den övre änden av vattenpumpen, bind fast kabeln ordentligt i vattenröret med en plasttejp och fäst den långsamt tills klämman är placerad vid brunnshuvudet.
④Använd samma metod för att binda alla vattenrör i brunnen.
⑤När utledningskabeln har anslutits till kontrollomkopplaren ansluts den till trefasströmförsörjningen.


(4) Saker att notera under installationen:
1. Om ett blockeringsfenomen upptäcks under pumpningsprocessen, vrid eller dra i vattenröret för att övervinna blockeringspunkten. Om olika åtgärder fortfarande inte fungerar, tvinga inte ner pumpen för att undvika skador på den dränkbara elektriska pumpen och brunnen.
2. Under installationen ska en gummikudde placeras vid flänsen på varje rör och dras åt jämnt.
3. När vattenpumpen sänks ner i brunnen ska den placeras i mitten av brunnsröret för att förhindra att pumpen löper mot brunnsväggen under lång tid, vilket får pumpen att vibrera och motorn att svepa och brinna .
4. Bestäm vattenpumpens djup till botten av brunnen enligt brunnens strömmande sand och siltförhållanden. Gräv inte ner pumpen i leran. Avståndet från vattenpumpen till botten av brunnen är i allmänhet inte mindre än 3 meter (se figur 2).
5. Vattenpumpens vatteninloppsdjup bör inte vara mindre än 1-1,5 meter från den dynamiska vattennivån till vatteninloppsnoden (se figur 2). Annars kan vattenpumpens lager lätt skadas.
6. Vattenpumpens lyftkraft får inte vara för låg. Annars måste en slussventil installeras på brunnshuvudets vattenledning för att styra pumpflödet vid den nominella flödespunkten för att förhindra att motorn överbelastas och brinner ut på grund av stora flödeshastigheter.
7. När vattenpumpen är igång ska vattenuttaget vara kontinuerligt och jämnt, strömmen ska vara stabil (under nominella arbetsförhållanden, i allmänhet inte mer än 10 % av märkströmmen), och det ska inte förekomma vibrationer eller buller. Om det finns något onormalt ska maskinen stoppas för att ta reda på orsaken och eliminera den.
8. Var uppmärksam på inställningen av motorns jordledning vid installation (se figur 2). När vattenröret är ett stålrör, led det från brunnshuvudklämman; när vattenröret är ett plaströr, led det från jordningsmärket på den elektriska pumpen.

 

 
Underhåll och underhåll
  1. (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
  2. (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
  5.  

 1 In the rated condition, the current exceeds 20%.

 2 Den dynamiska vattennivån sjunker till vatteninloppssektionen, vilket orsakar intermittent vatten.

 3 Den dränkbara pumpen har kraftiga vibrationer eller buller.

 4 Matningsspänningen är lägre än 340 volt.

 5 En säkring är utbränd.

 6 Vattenledningen är skadad.

 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.

 

  1. (5)Unit disassembly:
  2.  1 lossa kabelrep, ta bort rörledningsdelen, ta bort vajerplattan.

 2 skruva ner vattenbulten, häll vattnet i motorkammaren.

 3 ta bort filtret, lossa den fasta skruven på kopplingen för att fixera motoraxeln.

 4 skruva ner bulten som förbinder inloppskopplingen med motorn och separera pumpen från motorn (var uppmärksam på enhetens kudde när du separerar, för att förhindra att pumpaxeln böjs)

 5 demonteringssekvensen för pumpen är: (se figur 1) inloppskoppling, impeller, avledningsskal, impeller...... backventilkropp, när du tar bort impellern, använd specialverktyg för att lossa den koniska hylsan på det fasta pumphjulet först och undvik böjning och blåmärken på pumpaxeln under demonteringsprocessen.

 6 demonteringsprocessen för motorn är: (se figur 1) placera motorn på plattformen och ta bort muttrarna, basen, axelhuvudets låsmutter, tryckplatta, nyckel, nedre styrlagersäte och dubbelhuvudbult från botten av motorn i sin tur, och ta sedan ut rotorn (var uppmärksam på att inte skada vajerpaketet) och ta slutligen bort anslutningssektionen och det övre styrlagersätet.

 7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.

 

 
Förvaring och förvaring

 1, häll ut vattnet i motorhålet (särskilt på vintern för att förhindra att motorn fryser) och bind fast kabeln väl.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, långvarig användning bör vara uppmärksam på rostskydd av dränkbara pumpar.

 

 
Slitdelar

 

  • Impeller
  • Skafthylsa
  • Skafthylsa av gummi
  • Tätningsring

 
Applikationsscenarier

01 Djupt brunnsvattenintag

02 Vattenförsörjning i höghus

03 bergsvattenförsörjning 

04 tornet vatten

05 Jordbruksbevattning

06 trädgårdsbevattning

07 flodvattenintag

08 hushållsvatten

 

Om du är intresserad av våra produkter kan du välja att lämna dina uppgifter här, så kontaktar vi dig inom kort.


Skriv ditt meddelande här och skicka det till oss

Om du är intresserad av våra produkter kan du välja att lämna dina uppgifter här, så kontaktar vi dig inom kort.


sv_SESwedish