135QJ گہرا کنواں سبمرسیبل پمپ

OEM پروسیسنگ شروع کریں! صارف کی ضروریات کے مطابق غیر معیاری آبدوز موٹر اور پمپ کی مختلف اقسام کی خصوصی ضروریات کا ڈیزائن اور تیاری۔ پروڈکٹ کے نفاذ کے معیارات: GB/T2816-2014 "اچھی طرح سے سبمرسبل پمپ"، GB/T2818-2014 "اچھی طرح سے سبمرسیبل اسینکرونس موٹر"۔ واٹس ایپ: 17855846335
PDF DOWNLOAD
تفصیلات
ٹیگز
 
پروڈکٹ کا جائزہ

QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.

 

 
استعمال کی شرائط

The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).

The water quality shall meet the following requirements:

(1) the water temperature shall not be higher than 20 °C;

(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;

(3) the PH value (acidity and alkalinity) is 6.5-8.5;

(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;

(5) the content of chloride ions shall not be higher than 400mg/L.

The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.

 

 
ماڈل کا مطلب

Read More About 3in submersible well pump

 
جزوی ماڈل حوالہ
ماڈل بہاؤ (m3/h)   سر
(m)

  گھومنے کی رفتار

(تبدیلی/نقطہ)

 پانی کا پمپ(٪)   آؤٹ لیٹ
قطر
(ملی میٹر)
اچھی طرح سے قابل اطلاق
قطر (ملی میٹر) 
درجہ بندی
طاقت (KW)
درجہ بندی
وولٹیج (V)
 درجہ بندی
موجودہ (A)
موٹر کارکردگی (%)  power factorcosφ   یونٹ
ریڈیل زیادہ سے زیادہ سائز (ملی میٹر)
تبصرہ
135QJ5-34 5 34 2850   40  135اوپر 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135اوپر 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135اوپر 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135اوپر 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135اوپر 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135اوپر 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135اوپر 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
احتیاطی تدابیر

1، صاف پانی کے پمپ کے لیے کنواں آبدوز پمپ، نئے کنویں، تلچھٹ اور کیچڑ والے پانی کو پمپ کرنے سے منع کرتا ہے،

2، کنواں واٹر پمپ وولٹیج گریڈ 380/50HZ، دیگر وولٹیج گریڈ کے سبمرسیبل موٹرز کے استعمال کو اپنی مرضی کے مطابق کرنے کی ضرورت ہے۔ زیر زمین کیبل کو واٹر پروف کیبل کا استعمال کرنا چاہیے، ابتدائی سامان سے لیس ہونا چاہیے، جیسے کہ ڈسٹری بیوشن باکس، اسٹارٹ ناٹ ریڈی میں عام طور پر موٹر کمپری ہینسو پروٹیکشن فنکشن کا استعمال ہونا چاہیے، جیسے شارٹ سرکٹ اوورلوڈ پروٹیکشن، فیز پروٹیکشن، انڈر وولٹیج پروٹیکشن، گراؤنڈنگ پروٹیکشن، آئیڈنگ پروٹیکشن ، غیر معمولی حالات کی صورت میں، تحفظ آلہ بروقت کارروائی کا سفر ہونا چاہئے.

3، پمپ کی تنصیب اور استعمال قابل اعتماد طریقے سے گراؤنڈ ہونا چاہیے، ہاتھ اور پاؤں گیلے ہونے پر پش اینڈ پل سوئچ کو منع کرتا ہے، پمپ کی تنصیب اور دیکھ بھال سے پہلے بجلی کی سپلائی منقطع کر دینا چاہیے، پمپ کو سیٹ اپ کرنے کی جگہ استعمال کرنا چاہیے" بجلی کے جھٹکے سے بچنے کے لیے" واضح علامات:

4، کنویں کے نیچے یا تنصیب سے پہلے، موٹر گہا کو آست پانی یا غیر corrosive صاف ٹھنڈے ابلتے پانی سے بھرنا چاہیے، /واٹر بولٹ کو سخت کریں، زمینی ٹیسٹ رن پر پمپ، پمپ چیمبر کے پانی کی چکنا ربڑ تک ہونا چاہیے۔ بیرنگ، فوری طور پر ایک سیکنڈ سے زیادہ نہیں شروع کریں، دیکھیں کہ کیا اسٹیئرنگ اسٹیئرنگ ہدایات کے مطابق ہے. جب پمپ سیدھا ہو، حفاظت پر توجہ دیں، الٹنے والی چوٹ کو روکیں۔

5، سختی سے پمپ لفٹ کی دفعات کے مطابق، استعمال کی روانی کی حد، کم بہاؤ یا ہائی لفٹ پمپنگ فورس کو روکنے کے لیے، تھرسٹ بیئرنگ اور پہننے کے دیگر حصے، موٹر اوورلوڈ جل گیا

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
ساخت کا تعارف

1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components

2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.

3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.

4.The lubrication of the motor and the pump bearing is water lubrication.

5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.

6. The pump is designed by computer CAD, with simple structure and good technical performance.

Read More About 1 2 hp water pump price
 
انسٹال کریں۔

(1) تنصیب سے پہلے تیاری:
1. چیک کریں کہ کیا آبدوز پمپ دستی میں بیان کردہ استعمال کی شرائط اور دائرہ کار کو پورا کرتا ہے۔
2. سبمرسیبل پمپ کے زیادہ سے زیادہ بیرونی قطر کے برابر قطر والے بھاری آبییکٹ کا استعمال کرتے ہوئے، پیمائش کریں کہ کنویں کا اندرونی قطر سبمرسیبل پمپ کو فٹ کر سکتا ہے، اور پیمائش کریں کہ کنویں کی گہرائی تنصیب کی ضروریات کو پورا کرتی ہے۔
3. چیک کریں کہ کنواں صاف ہے اور کنویں کا پانی گندا ہے یا نہیں۔ سبمرسیبل الیکٹرک پمپ کو ویلور پمپ کیچڑ اور ریت کے پانی سے دھونے کے لیے کبھی بھی استعمال نہ کریں تاکہ آبدوز برقی پمپ کو قبل از وقت نقصان سے بچا جا سکے۔
4. چیک کریں کہ آیا ویلہیڈ انسٹالیشن کلیمپ کی پوزیشن مناسب ہے اور کیا یہ پوری یونٹ کے معیار کو برداشت کر سکتی ہے
5. چیک کریں کہ کیا آبدوز پمپ کے اجزاء مکمل ہیں اور مینول میں اسمبلی ڈایاگرام کے مطابق صحیح طریقے سے انسٹال ہیں فلٹر اسکرین کو ہٹا دیں اور کپلنگ کو گھمائیں تاکہ یہ معلوم ہو سکے کہ آیا یہ لچکدار طریقے سے گھومتا ہے
6. واٹر اسکرو کو کھولیں اور موٹر کیویٹی کو صاف، غیر corrosive پانی سے بھریں (نوٹ۔ اسے بھرنا یقینی بنائیں)، پھر واٹر اسکرو کو سخت کریں۔ پانی کے انجیکشن کے 12 گھنٹے کے بعد، جب 500V ہلانے والی میز کے ساتھ پیمائش کی جائے تو موٹر کی موصلیت کی مزاحمت 150M Q سے کم نہیں ہونی چاہیے۔
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

منسلک کیبل وائرنگ کے عمل کا خاکہ مندرجہ ذیل ہے:
Read More About submersible well pump 1.5 hp

 

8. یہ چیک کرنے کے لیے ملٹی میٹر کا استعمال کریں کہ آیا تھری فیز تاریں جڑی ہوئی ہیں اور آیا ڈی سی مزاحمت تقریباً متوازن ہے۔
9. چیک کریں کہ آیا سرکٹ اور ٹرانسفارمر کی گنجائش اوورلوڈ ہے، اور پھر اوورلوڈ پروٹیکشن سوئچ یا شروع ہونے والے سامان کو جوڑیں۔ مخصوص ماڈلز کے لیے جدول 2 دیکھیں، اور پھر پمپ میں ربڑ کے بیرنگ کو چکنا کرنے کے لیے واٹر پمپ آؤٹ لیٹ سے پانی کے پمپ میں ایک بالٹی پانی ڈالیں، اور پھر آبدوز برقی پمپ کو سیدھا اور مستحکم رکھیں۔ اسٹارٹ کریں (ایک سیکنڈ سے زیادہ نہیں) اور چیک کریں کہ آیا اسٹیئرنگ کی سمت اسٹیئرنگ کے نشان کے مطابق ہے۔ اگر نہیں، تو تھری فیز کیبل کے کسی بھی دو کنیکٹرز کو تبدیل کریں۔ پھر فلٹر لگائیں اور کنویں کے نیچے جانے کی تیاری کریں۔ اگر خاص مواقع (جیسے گڑھے، گڑھے، ندی، تالاب، تالاب وغیرہ) میں استعمال کیا جائے تو الیکٹرک پمپ کو قابل اعتماد طریقے سے گراؤنڈ کیا جانا چاہیے۔

 

(2) تنصیب کا سامان اور اوزار:
1. دو ٹن سے زیادہ کے لیے لفٹنگ چینز کا ایک جوڑا۔
2. ایک تپائی جس کی عمودی اونچائی چار میٹر سے کم نہ ہو۔
3. دو لٹکنے والی رسیاں (تار کی رسیاں) جو ایک ٹن سے زیادہ وزن برداشت کر سکتی ہیں (پانی کے پمپ کے مکمل سیٹ کا وزن برداشت کر سکتی ہیں)۔
4. کلیمپ کے دو جوڑے (اسپلنٹ) لگائیں۔
5. رنچیں، ہتھوڑے، سکریو ڈرایور، برقی آلات اور آلات وغیرہ۔

 

(3) الیکٹرک پمپ کی تنصیب:
1. سبمرسیبل الیکٹرک پمپ کی تنصیب کا خاکہ شکل 2 میں دکھایا گیا ہے۔ مخصوص تنصیب کے طول و عرض جدول 3 میں "سبمرسیبل الیکٹرک پمپ کی تنصیب کے طول و عرض کی فہرست" میں دکھائے گئے ہیں۔

 

2. 30 میٹر سے کم سر والے آبدوز برقی پمپوں کو ہوز اور تار کی رسیوں یا دیگر بھنگ کی رسیوں کا استعمال کرتے ہوئے براہ راست کنویں میں لہرایا جا سکتا ہے جو پوری مشین، پانی کے پائپوں اور پائپوں میں پانی کا پورا وزن برداشت کر سکتے ہیں۔

 

3. 30 میٹر سے زیادہ سر والے پمپ سٹیل کے پائپ استعمال کرتے ہیں، اور تنصیب کی ترتیب حسب ذیل ہے:
①واٹر پمپ والے حصے کے اوپری سرے کو کلیمپ کرنے کے لیے کلیمپ کا استعمال کریں (موٹر اور واٹر پمپ اس وقت جڑے ہوئے ہیں)، اسے لٹکی ہوئی زنجیر کے ساتھ اٹھائیں، اور آہستہ آہستہ اسے کنویں میں باندھیں جب تک کہ کلیمپ کو کنویں کے سر پر نہ لگائیں اور اسے ہٹا دیں۔ پھانسی کی زنجیر.
② پائپ کو کلیمپ کرنے کے لیے کلیمپ کا دوسرا جوڑا استعمال کریں، اسے فلینج سے 15 سینٹی میٹر دور لٹکتی زنجیر کے ساتھ اٹھائیں، اور اسے آہستہ آہستہ نیچے کریں۔ پائپ فلینج اور پمپ فلینج کے درمیان ربڑ کے پیڈ کو جگہ پر رکھیں اور پائپ کو سخت کریں اور بولٹ، نٹ اور اسپرنگ واشر کے ساتھ یکساں طور پر پمپ کریں۔
③ آبدوز پمپ کو تھوڑا سا اٹھائیں، پانی کے پمپ کے اوپری سرے پر موجود کلیمپ کو ہٹائیں، کیبل کو پلاسٹک کے ٹیپ سے پانی کے پائپ سے مضبوطی سے باندھیں، اور اسے آہستہ آہستہ اس وقت تک باندھیں جب تک کہ کلیمپ کنویں کے سر پر نہ لگ جائے۔
④ پانی کے تمام پائپوں کو کنویں میں باندھنے کے لیے ایک ہی طریقہ استعمال کریں۔
⑤لیڈ آؤٹ کیبل کے کنٹرول سوئچ سے منسلک ہونے کے بعد، یہ تھری فیز پاور سپلائی سے منسلک ہے۔


(4) انسٹالیشن کے دوران نوٹ کرنے کی چیزیں:
1. اگر پمپنگ کے عمل کے دوران جیمنگ کا رجحان پایا جاتا ہے، تو پانی کے پائپ کو موڑ دیں یا کھینچیں تاکہ جیمنگ پوائنٹ پر قابو پایا جا سکے۔ اگر مختلف اقدامات اب بھی کام نہیں کرتے ہیں، تو براہ کرم آبدوز برقی پمپ اور کنویں کو پہنچنے والے نقصان سے بچنے کے لیے پمپ کو مجبور نہ کریں۔
2. تنصیب کے دوران، ربڑ کا پیڈ ہر پائپ کے کنارے پر رکھا جانا چاہیے اور یکساں طور پر سخت ہونا چاہیے۔
3. جب پانی کے پمپ کو کنویں میں اتارا جاتا ہے، تو اسے کنویں کے پائپ کے درمیان میں رکھنا چاہیے تاکہ پمپ کو زیادہ دیر تک کنویں کی دیوار کے خلاف چلنے سے روکا جا سکے، جس سے پمپ ہل جائے اور موٹر جھاڑو اور جل جائے۔ .
4. کنویں کی بہتی ریت اور گاد کے حالات کے مطابق کنویں کے نیچے تک پانی کے پمپ کی گہرائی کا تعین کریں۔ پمپ کو کیچڑ میں نہ دفن کریں۔ پانی کے پمپ سے کنویں کے نیچے تک کا فاصلہ عام طور پر 3 میٹر سے کم نہیں ہوتا ہے (شکل 2 دیکھیں)۔
5. پانی کے پمپ کی پانی کے اندراج کی گہرائی متحرک پانی کی سطح سے پانی کے انلیٹ نوڈ تک 1-1.5 میٹر سے کم نہیں ہونی چاہیے (تصویر 2 دیکھیں)۔ بصورت دیگر، پانی کے پمپ کے بیرنگ آسانی سے خراب ہو سکتے ہیں۔
6. واٹر پمپ کی لفٹ بہت کم نہیں ہو سکتی۔ بصورت دیگر، ویل ہیڈ واٹر پائپ لائن پر گیٹ والو نصب کرنے کی ضرورت ہے تاکہ درجہ بند بہاؤ پوائنٹ پر پمپ کے بہاؤ کو کنٹرول کیا جا سکے تاکہ موٹر کو اوور لوڈ ہونے اور زیادہ بہاؤ کی شرح کی وجہ سے جل جانے سے روکا جا سکے۔
7. جب پانی کا پمپ چل رہا ہو، پانی کی پیداوار مسلسل اور یکساں ہونی چاہیے، کرنٹ مستحکم ہونا چاہیے (درجہ بندی شدہ کام کے حالات کے تحت، عام طور پر ریٹیڈ کرنٹ کے 10% سے زیادہ نہیں)، اور کوئی کمپن یا شور نہیں ہونا چاہیے۔ اگر کوئی غیر معمولی بات ہو تو اس کی وجہ معلوم کرنے اور اسے ختم کرنے کے لیے مشین کو روک دینا چاہیے۔
8. انسٹال کرتے وقت، موٹر گراؤنڈنگ وائر کی ترتیب پر توجہ دیں (تصویر 2 دیکھیں)۔ جب پانی کا پائپ سٹیل کا پائپ ہو تو اسے ویل ہیڈ کلیمپ سے لیڈ کریں۔ جب پانی کا پائپ پلاسٹک کا پائپ ہو تو اسے الیکٹرک پمپ کے گراؤنڈ مارک سے لے جائیں۔

 

 
دیکھ بھال اور دیکھ بھال
  1. (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
  2. (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
  5.  

 1 In the rated condition, the current exceeds 20%.

 2 متحرک پانی کی سطح پانی کے داخلی حصے میں گرتی ہے، جس سے وقفے وقفے سے پانی آتا ہے۔

 3 آبدوز پمپ میں شدید کمپن یا شور ہوتا ہے۔

 4 سپلائی وولٹیج 340 وولٹ سے کم ہے۔

 5 ایک فیوز جل گیا ہے۔

 6 پانی کی فراہمی کا پائپ خراب ہو گیا ہے۔

 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.

 

  1. (5)Unit disassembly:
  2.  1 کیبل کی رسی کو کھولیں، پائپ لائن کا حصہ ہٹائیں، تار پلیٹ کو ہٹا دیں۔

 2 پانی کے بولٹ کو نیچے کھینچیں، پانی کو موٹر چیمبر میں ڈالیں۔

 3 فلٹر کو ہٹا دیں، موٹر شافٹ کو ٹھیک کرنے کے لیے کپلنگ پر لگے ہوئے سکرو کو ڈھیلا کریں۔

 4 انلیٹ جنکشن کو موٹر سے جوڑنے والے بولٹ کو نیچے سکرو کریں، اور پمپ کو موٹر سے الگ کریں (پمپ شافٹ کو موڑنے سے روکنے کے لیے الگ کرتے وقت یونٹ کشن پر توجہ دیں)

 5 پمپ کی جداگانہ ترتیب یہ ہے: (شکل 1 دیکھیں) انلیٹ جنکشن، امپیلر، ڈائیورژن شیل، امپیلر...... والو باڈی کو چیک کریں، امپیلر کو ہٹاتے وقت، فکسڈ امپیلر کی مخروطی آستین کو ڈھیلا کرنے کے لیے خصوصی ٹولز کا استعمال کریں۔ سب سے پہلے، اور بے ترکیبی کے عمل میں پمپ شافٹ کو موڑنے اور چوٹ لگنے سے گریز کریں۔

 6 موٹر کو جدا کرنے کا عمل یہ ہے: (شکل 1 دیکھیں) موٹر کو پلیٹ فارم پر رکھیں، اور نیچے سے گری دار میوے، بیس، شافٹ ہیڈ لاکنگ نٹ، تھرسٹ پلیٹ، چابی، نچلی گائیڈ بیئرنگ سیٹ اور ڈبل ہیڈ بولٹ کو ہٹا دیں۔ بدلے میں موٹر، ​​اور پھر روٹر کو نکالیں (وائر پیکج کو نقصان نہ پہنچنے پر توجہ دیں) اور آخر میں کنیکٹنگ سیکشن اور اوپری گائیڈ بیئرنگ سیٹ کو ہٹا دیں۔

 7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.

 

 
ذخیرہ اور تحویل

 1، موٹر کیویٹی میں پانی نکال دیں (خاص طور پر سردیوں میں موٹر کو جمنے سے روکنے کے لیے) اور کیبل کو اچھی طرح باندھ دیں۔

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3، طویل مدتی استعمال سبمرسیبل پمپ کے مورچا کی روک تھام پر توجہ دینا چاہئے.

 

 
پہننے کے حصے

 

  • امپیلر
  • شافٹ آستین
  • ربڑ شافٹ آستین
  • سگ ماہی کی انگوٹی

 
درخواست کے منظرنامے۔

01 گہرے کنویں کا پانی پینا

02 بلند و بالا پانی کی فراہمی

03 پہاڑی پانی کی فراہمی 

04 ٹاور پانی

05 زرعی آبپاشی

06 باغ کی آبپاشی

07 دریا کے پانی کی مقدار

08 گھریلو پانی

 

اگر آپ ہماری مصنوعات میں دلچسپی رکھتے ہیں، تو آپ اپنی معلومات یہاں چھوڑنے کا انتخاب کر سکتے ہیں، اور ہم جلد ہی آپ سے رابطہ کریں گے۔


اپنا پیغام یہاں لکھیں اور ہمیں بھیجیں۔

اگر آپ ہماری مصنوعات میں دلچسپی رکھتے ہیں، تو آپ اپنی معلومات یہاں چھوڑنے کا انتخاب کر سکتے ہیں، اور ہم جلد ہی آپ سے رابطہ کریں گے۔


urUrdu