QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.
The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).
The water quality shall meet the following requirements:
(1) the water temperature shall not be higher than 20 °C;
(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;
(3) the PH value (acidity and alkalinity) is 6.5-8.5;
(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;
(5) the content of chloride ions shall not be higher than 400mg/L.
The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.
Modelo | Daloy (m3/h) | Ulo (m) |
Bilis ng pag-ikot (baguhin/punto) |
Bomba ng tubig(%) | Outlet diameter (mm) |
Applicable na rin diameter(mm) |
Na-rate kapangyarihan(KW) |
Na-rate boltahe(V) |
Na-rate kasalukuyang(A) |
Motorefficiency (%) | power factorcosφ | Yunit Radial Maximu size(mm) |
Puna | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135sa itaas | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135sa itaas | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135sa itaas | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135sa itaas | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135sa itaas | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135sa itaas | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135sa itaas | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, well submersible pump para sa malinis na tubig pump, ipinagbabawal ang bagong balon, pumping sediment at maputik na tubig,
2, well water pump boltahe grade 380/50HZ, ang paggamit ng iba pang mga boltahe grado ng submersible Motors ay kailangang ipasadya. Ang underground cable ay dapat gumamit ng hindi tinatagusan ng tubig cable, dapat na nilagyan ng panimulang kagamitan, tulad ng distribution box, simula hindi handa ay dapat na karaniwang ginagamit motor comprehensive protection function, tulad ng short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection , sa kaso ng mga abnormal na kondisyon, ang proteksyon na aparato ay dapat na nasa napapanahong pagkilos na paglalakbay.
3, ang pag-install at paggamit ng pump ay dapat na mapagkakatiwalaan na pinagbabatayan, ipinagbabawal ang push at pull switch kapag ang mga kamay at paa ay basa, dapat putulin ang power supply bago ang pag-install at pagpapanatili ng pump, ang pump use place to set up " upang maiwasan ang electric shock" malinaw na mga palatandaan:
4, pababa sa balon o bago i-install, ang motor lukab ay dapat na puno ng dalisay na tubig o hindi kinakaing unti-unti malinis na malamig na tubig na kumukulo, higpitan ang / water bolt, ang bomba sa ground test run, dapat na sa pump chamber water lubrication goma bearings, instant start nang hindi hihigit sa isang segundo, tingnan kung ang pagpipiloto ay pareho sa pagtuturo ng pagpipiloto. Kapag ang pump ay patayo, bigyang-pansin ang kaligtasan, maiwasan ang overturning pinsala.
5, mahigpit na ayon sa mga probisyon ng pump lift, daloy ng saklaw ng paggamit, upang maiwasan ang mababang daloy o mataas na lift pumping puwersa, ang thrust tindig at iba pang mga bahagi ng wear, ang motor overload burn
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components
2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.
3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6. The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Paghahanda bago i-install:
1. Suriin kung ang submersible pump ay nakakatugon sa mga kondisyon ng paggamit at saklaw na tinukoy sa manual.
2. Gamit ang isang mabigat na obiect na may diameter na katumbas ng maximum na panlabas na diameter ng submersible pump, sukatin kung ang inneldiameter ng wellbore ay maaaring magkasya sa submersible pump, at sukatin kung ang lalim ng balon ay nakakatugon sa mga kinakailangan sa pag-install.
3. Suriin kung malinis ang wellbore at kung ang tubig ng balon ay maputik. Huwag gumamit ng submersible electric pump upang hugasan ang welor pump na putik at tubig ng buhangin upang maiwasan ang maagang pagkasira ng submersible electric pump.
4. Suriin kung ang posisyon ng welhead installation clamp ay angkop at kung ito ay makatiis sa kalidad ng buong unit
5. Suriin kung ang mga bahagi ng submersible pump ay kumpleto at maayos na naka-install ayon sa assembly diagram sa manualAlisin ang filter screen at paikutin ang coupling upang makita kung ito ay umiikot nang flexible
6. Alisin ang turnilyo ng tubig at punan ang lukab ng motor ng malinis, hindi kinakaing unti-unti na tubig (tandaan. siguraduhing salaan ito), pagkatapos ay higpitan ang waterscrew. Pagkatapos ng 12 oras na pag-iniksyon ng tubig, ang insulation resistance ng motor ay hindi dapat mas mababa sa 150M Q kapag sinusukat sa isang 500V shaking table.
7. Cable joint, putulin ang isang 120mm rubber sleeve mula sa isang dulo ng papalabas na cable at ang katugmang cable na may kutsilyo ng electrician at i-stagger ang haba ng tatlong core wire sa isang stepped shape, alisan ng balat ang isang 20mm copper core, scrape ang oxide layer sa labas ng tansong wire na may kutsilyo o buhangin na tela, at ipasok ang dalawang konektadong wire na nagtatapos sa palirs.Pagkatapos itali ang layer nang mahigpit gamit ang pinong tansong wire, maghinang ito nang lubusan at matatag, at buhangin ng anuman. burrs sa ibabaw. Pagkatapos, para sa tatlong joints, gumamit ng polyvester insulation tape upang balutin ang mga ito sa isang semi stacked na paraan para sa tatlong lavers. I-wrap ang dalawang dulo ng layer ng pambalot nang mahigpit sa sinulid ng nyion, at pagkatapos ay gumamit ng semi stacked na paraan upang ibalot ang tape para sa tatlong layer. I-wrap ang outellayer ng high-pressure insulation tape para sa tatlong layer. Panghuli, tiklupin ang tatlong hibla at paulit-ulit na balutin ang mga ito para sa limang layer na may high-pressure tape. Ang bawat layer ay dapat na mahigpit na nakatali, at ang mga interlayer joints ay dapat na mahigpit at mahigpit upang maiwasan ang tubig na tumagos at makapinsala sa pagkakabukod, Pagkatapos balutin, ibabad sa tubig sa temperatura ng silid na 20 'c sa loob ng 12 oras, at sukatin ang insulation resistance gamit ang isang nanginginig na mesa , na hindi dapat mas mababa sa 100M Ω
Ang naka-attach na cable wiring process diagram ay ang mga sumusunod:
8. Gumamit ng multimeter upang suriin kung ang mga three-phase na wire ay konektado at kung ang DC resistance ay tinatayang balanse.
9. Suriin kung ang kapasidad ng circuit at transpormer ay na-overload, at pagkatapos ay ikonekta ang overload na proteksyon switch o panimulang kagamitan. Tingnan ang Talahanayan 2 para sa mga partikular na modelo, at pagkatapos ay ibuhos ang isang balde ng tubig sa water pump mula sa outlet ng water pump upang lubricate ang rubber bearings sa pump, at pagkatapos ay ilagay ang submersible electric pump nang patayo at matatag. Magsimula (hindi hihigit sa isang segundo) at suriin kung ang direksyon ng pagpipiloto ay pare-pareho sa sign ng pagpipiloto. Kung hindi, palitan ang alinmang dalawang connector ng three-phase cable. Pagkatapos ay i-install ang filter at maghanda na bumaba sa balon. Kung ginagamit sa mga espesyal na okasyon (tulad ng mga kanal, kanal, ilog, pond, pond, atbp.), ang electric pump ay dapat na mapagkakatiwalaang naka-ground.
(2) Kagamitan at kasangkapan sa pag-install:
1. Isang pares ng lifting chain para sa higit sa dalawang tonelada.
2. Isang tripod na may patayong taas na hindi bababa sa apat na metro.
3. Dalawang nakabitin na lubid (wire ropes) na kayang magdala ng bigat na higit sa isang tonelada (maaaring pasanin ang bigat ng isang kumpletong hanay ng mga water pump).
4. Mag-install ng dalawang pares ng clamps (splints).
5. Wrenches, martilyo, distornilyador, mga kasangkapang elektrikal at instrumento, atbp.
(3)Pag-install ng electric pump:
1. Ang diagram ng pag-install ng submersible electric pump ay ipinapakita sa Figure 2. Ang mga partikular na sukat ng pag-install ay ipinapakita sa Talahanayan 3 "Listahan ng Mga Dimensyon ng Pag-install ng Submersible Electric Pump".
2. Ang mga submersible electric pump na may ulo na wala pang 30 metro ay maaaring iangat nang direkta sa balon gamit ang mga hose at wire rope o iba pang mga lubid ng abaka na kayang pasanin ang buong bigat ng buong makina, mga tubo ng tubig, at tubig sa mga tubo.
3. Ang mga pump na may ulo na higit sa 30 metro ay gumagamit ng mga bakal na tubo, at ang pagkakasunud-sunod ng pag-install ay ang mga sumusunod:
①Gumamit ng clamp upang i-clamp ang itaas na dulo ng bahagi ng water pump (ang motor at water pump ay konektado sa oras na ito), iangat ito gamit ang isang nakabitin na kadena, at dahan-dahang itali ito sa balon hanggang sa Ilagay ang clamp sa wellhead at alisin ang nakasabit na kadena.
② Gumamit ng isa pang pares ng clamp para i-clamp ang isang tubo, iangat ito gamit ang nakabitin na kadena 15 cm ang layo mula sa flange, at ibaba ito ng dahan-dahan. Sa pagitan ng pipe flange at pump flangeIlagay ang rubber pad sa lugar at higpitan ang pipe at pump nang pantay-pantay gamit ang bolts, nuts at spring washers.
③ Bahagyang iangat ang submersible pump, tanggalin ang clamp sa itaas na dulo ng water pump, itali ang cable sa pipe ng tubig gamit ang plastic tape, at dahan-dahang itali ito hanggang sa mailagay ang clamp sa wellhead.
④Gamitin ang parehong paraan upang itali ang lahat ng tubo ng tubig sa balon.
⑤Pagkatapos maikonekta ang lead-out cable sa control switch, ito ay konektado sa three-phase power supply.
(4) Mga bagay na dapat tandaan sa panahon ng pag-install:
1. Kung may nakitang jamming phenomenon sa panahon ng proseso ng pumping, paikutin o hilahin ang tubo ng tubig upang malampasan ang jamming point. Kung ang iba't ibang mga hakbang ay hindi pa rin gumagana, mangyaring Huwag pilitin ang pump upang maiwasan ang pinsala sa submersible electric pump at sa balon.
2. Sa panahon ng pag-install, ang isang rubber pad ay dapat ilagay sa flange ng bawat pipe at higpitan nang pantay-pantay.
3. Kapag ang bomba ng tubig ay ibinaba sa balon, dapat itong ilagay sa gitna ng tubo ng balon upang maiwasan ang pagtakbo ng bomba sa dingding ng balon nang mahabang panahon, na nagiging sanhi ng pag-vibrate ng bomba at pagwalis at pagkasunog ng motor. .
4. Tukuyin ang lalim ng water pump sa ilalim ng balon ayon sa dumadaloy na buhangin at silt na kondisyon ng balon. Huwag ibaon ang bomba sa putik. Ang distansya mula sa water pump hanggang sa ilalim ng balon ay karaniwang hindi bababa sa 3 metro (tingnan ang Larawan 2).
5. Ang lalim ng pagpasok ng tubig ng water pump ay dapat na hindi bababa sa 1-1.5 metro mula sa dynamic na lebel ng tubig hanggang sa water inlet node (tingnan ang Larawan 2). Kung hindi, ang water pump bearings ay maaaring madaling masira.
6. Ang pagtaas ng water pump ay hindi maaaring masyadong mababa. Kung hindi, kailangang mag-install ng gate valve sa wellhead water pipeline para makontrol ang pump flow sa rated flow point para maiwasang ma-overload at masunog ang motor dahil sa malalaking flow rate.
7. Kapag ang water pump ay tumatakbo, ang tubig na output ay dapat na tuluy-tuloy at kahit na, ang kasalukuyang ay dapat na stable (sa ilalim ng rated working conditions, sa pangkalahatan ay hindi hihigit sa 10% ng rated current), at dapat walang vibration o ingay. Kung mayroong anumang abnormalidad, dapat na ihinto ang makina upang malaman ang sanhi at maalis ito.
8. Kapag nag-i-install, bigyang-pansin ang setting ng grounding wire ng motor (tingnan ang Figure 2). Kapag ang tubo ng tubig ay isang bakal na tubo, akayin ito mula sa wellhead clamp; kapag ang tubo ng tubig ay isang plastik na tubo, akayin ito mula sa marka ng saligan ng electric pump.
- (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 Ang pabagu-bagong lebel ng tubig ay bumababa sa bahaging pumapasok ng tubig, na nagiging sanhi ng pasulput-sulpot na tubig.
3 Ang submersible pump ay may matinding vibration o ingay.
4 Ang supply boltahe ay mas mababa sa 340 volts.
5 Ang isang piyus ay nasunog.
6 Nasira ang tubo ng suplay ng tubig.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
- 1 kalasin ang lubid ng kable, tanggalin ang bahagi ng pipeline, tanggalin ang wire plate.
2 i-screw down ang water bolt, ilagay ang tubig sa motor chamber.
3 tanggalin ang filter, maluwag ang nakapirming tornilyo sa pagkabit upang ayusin ang baras ng motor.
4 i-screw down ang bolt na kumukonekta sa inlet junction sa motor, at paghiwalayin ang pump mula sa motor (pansinin ang unit cushion kapag naghihiwalay, upang maiwasan ang baluktot ng pump shaft)
5 ang pagkakasunud-sunod ng disassembly ng pump ay: (tingnan ang figure 1) inlet junction, impeller, diversion shell, impeller...... check valve body, kapag inaalis ang impeller, gumamit ng mga espesyal na tool upang paluwagin ang conical sleeve ng fixed impeller una, at iwasan ang baluktot at pasa ng pump shaft sa proseso ng disassembly.
6 ang proseso ng disassembly ng motor ay: (tingnan ang figure 1) ilagay ang motor sa platform, at alisin ang mga nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat at double head bolt mula sa ibaba ng ang motor naman, at pagkatapos ay kunin ang rotor (pansinin na huwag masira ang wire package) at sa wakas ay tanggalin ang connecting section at upper guide bearing seat.
7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.
1, ilabas ang tubig sa cavity ng motor (lalo na sa taglamig upang maiwasan ang pagyeyelo ng motor), at itali ng mabuti ang cable.
2, mag-imbak sa isang panloob na silid na walang kinakaing unti-unti na mga sangkap at gas, na may temperatura sa ibaba 40 °C.
3, ang pang-matagalang paggamit ay dapat magbayad ng pansin sa pag-iwas sa kalawang ng mga submersible pump.
- Impeller
- manggas ng baras
- manggas ng goma shaft
-
Singsing sa pagbubuklod
01 Deep well water intake
02 Mataas na suplay ng tubig
03 suplay ng tubig sa bundok
04 tubig sa tore
05 Pang-agrikultura na patubig
06 patubig sa hardin
07 pag-inom ng tubig sa ilog
08 tubig sa bahay