135QJ Deep Well Submersible Ponp

Antreprann pwosesis OEM! Dapre kondisyon itilizatè, konsepsyon ak fabrikasyon divès kalite kondisyon espesyal nan motè ki pa estanda submersible ak ponp. Estanda aplikasyon pwodwi yo: GB/T2816-2014 "byen submersible ponp", GB/T2818-2014 "byen submersible asynchrone motè". WhatsApp: 17855846335
PDF DOWNLOAD
Detay yo
Tags
 
Apèsi sou pwodwi a

QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.

 

 
Kondisyon pou itilize

The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).

The water quality shall meet the following requirements:

(1) the water temperature shall not be higher than 20 °C;

(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;

(3) the PH value (acidity and alkalinity) is 6.5-8.5;

(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;

(5) the content of chloride ions shall not be higher than 400mg/L.

The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.

 

 
Modèl siyifikasyon

Read More About 3in submersible well pump

 
Referans Modèl Pasyèl
Modèl Koule (m3/h)   Tèt
(m)

  Vitès wotasyon

(chanje/pwen)

 Ponp dlo (%)   Debouche
dyamèt
(mm)
Aplikab byen
dyamèt (mm) 
Rated
pouvwa (KW)
Rated
vòltaj (V)
 Rated
aktyèl (A)
Efikasite motè (%)  power factorcosφ   Inite
Gwosè maksimòm radial (mm)
Remak
135QJ5-34 5 34 2850   40  135pi wo a 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135pi wo a 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135pi wo a 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135pi wo a 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135pi wo a 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135pi wo a 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135pi wo a 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Prekosyon sekirite

1, ponp byen submersible pou ponp dlo pwòp, entèdi nouvo pi a, ponpe sediman ak dlo labou,

2, byen dlo ponp vòltaj klas 380/50HZ, itilize lòt vòltaj klas motè submersible bezwen pou fè personnalisé. Kab la anba tè dwe sèvi ak kab ki enpèmeyab, yo dwe ekipe ak ekipman kòmanse, tankou bwat distribisyon, kòmanse pa pare yo ta dwe gen souvan itilize motè fonksyon pwoteksyon konplè, tankou pwoteksyon surcharge sikwi kout, pwoteksyon faz, pwoteksyon undervoltage, pwoteksyon baz, pwoteksyon idling. , nan ka kondisyon nòmal, aparèy pwoteksyon an ta dwe vwayaj aksyon alè.

3, enstalasyon an ak itilizasyon ponp lan dwe seryezman chita, entèdi pouse ak rale switch la lè men yo ak pye yo mouye, yo dwe koupe ekipman pou pouvwa a anvan enstalasyon ak antretyen nan ponp lan, ponp lan itilize kote yo mete kanpe " pou anpeche chòk elektrik" siy evidan:

4, desann pi a oswa anvan enstalasyon, kavite motè a dwe ranpli ak dlo distile oswa ki pa korozivite pwòp dlo bouyi frèt, sere boulon boulon an / dlo, ponp lan sou tès la tè kouri, yo dwe nan ponp lan chanm dlo lubrification kawotchou BEARINGS, enstantane kòmanse pa plis pase yon segonn, wè si volan an se menm jan ak enstriksyon an volan. Lè ponp lan mache dwat, peye atansyon sou sekirite, anpeche aksidan ranvèse.

5, estrikteman dapre dispozisyon ki nan leve ponp lan, ranje koule nan itilize, yo anpeche koule ki ba oswa segondè leve ponpe fòs, portant la pouse ak lòt pati nan mete a, surcharge motè a boule

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Entwodiksyon nan Estrikti

1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components

2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.

3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.

4.The lubrication of the motor and the pump bearing is water lubrication.

5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.

6. The pump is designed by computer CAD, with simple structure and good technical performance.

Read More About 1 2 hp water pump price
 
Enstale

(1) Preparasyon anvan enstalasyon:
1. Tcheke si ponp lan submersible satisfè kondisyon itilizasyon yo ak dimansyon ki espesifye nan manyèl la.
2. Sèvi ak yon objè lou ki gen yon dyamèt ki egal a maksimòm dyamèt ekstèn ponp submersible a, mezire si wi ou non dyamèt inelbore a ka anfòm ponp submersible a, epi mezire si pwofondè pi a satisfè kondisyon enstalasyon yo.
3. Tcheke si twou a pwòp epi si dlo a twoub. Pa janm sèvi ak yon ponp elektrik submersible pou lave welor ponp labou ak dlo sab pou evite domaj twò bonè nan ponp elektrik submersible a.
4. Tcheke si pozisyon nan kranpon enstalasyon welhead la apwopriye epi si li ka kenbe tèt ak kalite a nan tout inite a.
5. Tcheke si konpozan ponp submersible yo konplè epi yo enstale byen dapre dyagram asanble a nan manyèl la Retire ekran filtre a epi vire kouple a pou wè si li vire fleksib.
6. Devise vis dlo a ak fillthe motè kavite ak dlo pwòp, ki pa korozivite (nòt. asire w ke ou fil li moute), Lè sa a, sere boulon waterscrew la. Apre 12 èdtan nan piki dlo, rezistans izolasyon motè a pa ta dwe mwens pase 150M Q lè yo mezire ak yon tab tranbleman 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Dyagram pwosesis fil elektrik kab atache a se jan sa a:
Read More About submersible well pump 1.5 hp

 

8. Sèvi ak yon miltimèt pou tcheke si wi ou non fil twa-faz yo konekte epi si rezistans DC a apeprè ekilibre.
9. Tcheke si sikwi a ak kapasite transfòmatè yo twò chaje, ak Lè sa a, konekte switch la pwoteksyon surcharge oswa ekipman kòmanse. Gade Tablo 2 pou modèl espesifik, ak Lè sa a, Vide yon bokit dlo nan ponp dlo a soti nan priz ponp dlo a wile BEARINGS kawotchou yo nan ponp lan, ak Lè sa a, mete ponp lan submersible elektrik dwat ak fiks. Kòmanse (pa plis pase yon segonn) epi tcheke si direksyon volan an konsistan avèk siy volan an. Si ou pa, chanje nenpòt ki de konektè nan twa-faz kab la. Lè sa a, enstale filtè a epi prepare yo desann pi a. Si yo itilize nan okazyon espesyal (tankou twou, twou, rivyè, etan, etan, elatriye), ponp elektrik la dwe fyab sou tè.

 

(2) Enstalasyon ekipman ak zouti:
1. Yon pè chenn leve pou plis pase de tòn.
2. Yon trépied ak yon wotè vètikal pa mwens pase kat mèt.
3. De kòd pandye (kòd fil) ki ka pote yon pwa ki gen plis pase yon tòn (ka pote pwa a nan yon seri konplè ponp dlo).
4. Enstale de pè kranpon (atèl).
5. Kle, mato, tournevis, zouti elektrik ak enstriman, elatriye.

 

(3) Enstalasyon ponp elektrik:
1. Dyagram enstalasyon ponp elektrik submersible a montre nan Figi 2. Dimansyon enstalasyon espesifik yo montre nan Tablo 3 "Lis Dimansyon Enstalasyon ponp elektrik Submersible a".

 

2. Ponp elektrik submersible ak yon tèt mwens pase 30 mèt ka leve dirèkteman nan pi a lè l sèvi avèk kawotchou ak kòd fil oswa lòt kòd chanv ki ka pote pwa a plen nan machin nan tout antye, tiyo dlo, ak dlo nan tiyo yo.

 

3. Ponp ak yon tèt ki gen plis pase 30 mèt itilize tiyo asye, ak sekans enstalasyon an se jan sa a:
①Sèvi ak yon kranpon pou sere pwent anwo nan pati ponp dlo a (motè a ak ponp dlo yo te konekte nan moman sa a), leve l ak yon chèn pandye, epi tou dousman mare l nan pi a jiskaske Mete kranpon an sou tèt pi a epi retire li. pandye chèn.
② Sèvi ak yon lòt pè kranpon pou sere yon tiyo, leve l ak yon chenn pandye 15 cm lwen bride a, epi bese l tou dousman. Ant bride tiyo ak bride ponp Mete pad kawotchou a an plas epi sere boulon tiyo a ak ponpe respire ak boulon, nwa ak rondelles prentan.
③ Leve ponp submersible a yon ti kras, retire kranpon an sou pwent anwo ponp dlo a, mare kab la byen fèm nan tiyo dlo a ak yon kasèt plastik, epi tou dousman mare li desann jiskaske kranpon an mete nan tèt pi a.
④Sèvi ak menm metòd pou mare tout tiyo dlo nan pi a.
⑤Apre kab plon an konekte ak switch kontwòl la, li konekte ak ekipman pou pouvwa twa faz la.


(4) Bagay ou dwe sonje pandan enstalasyon:
1. Si yo jwenn yon fenomèn blokis pandan pwosesis ponp lan, vire oswa rale tiyo dlo a simonte pwen an blocage. Si plizyè mezi toujou pa travay, tanpri pa fòse ponp lan desann pou evite domaj nan ponp elektrik submersible ak pi a.
2. Pandan enstalasyon, yo ta dwe mete yon pad kawotchou nan bride chak tiyo epi sere boulon respire.
3. Lè ponp dlo a bese nan pi a, li ta dwe mete l nan mitan tiyo a pou anpeche ponp lan kouri kont miray la byen pou yon tan long, sa ki lakòz ponp lan vibre ak motè a bale ak boule. .
4. Detèmine pwofondè ponp dlo a nan fon pi a dapre sab koule ak kondisyon limon nan pi a. Pa antere ponp lan nan labou. Distans ki soti nan ponp dlo a nan anba a nan pi a se jeneralman pa mwens pase 3 mèt (gade Figi 2).
5. Pwofondè dlo a antre nan ponp dlo a ta dwe pa mwens pase 1-1.5 mèt soti nan nivo dlo dinamik nan ne inlet dlo a (gade Figi 2). Sinon, bi ponp dlo yo ka fasil domaje.
6. Leve ponp dlo a pa ka twò ba. Sinon, yon tiyo pòtay bezwen yo dwe enstale sou tiyo dlo a pou kontwole koule ponp lan nan pwen an koule rated pou anpeche motè a twò chaje ak boule akòz gwo pousantaj koule.
7. Lè ponp dlo a ap kouri, pwodiksyon dlo a ta dwe kontinyèl e menm, aktyèl la ta dwe estab (anba kondisyon travay rated, jeneralman pa plis pase 10% aktyèl la nominal), epi pa ta dwe gen okenn vibrasyon oswa bri. Si gen nenpòt anòmal, yo ta dwe sispann machin nan pou chèche konnen kòz la epi elimine li.
8. Lè w ap enstale, peye atansyon sou anviwònman fil motè a (gade Figi 2). Lè tiyo dlo a se yon tiyo asye, mennen li soti nan kranpon nan wellhead; lè tiyo dlo a se yon tiyo plastik, mennen li soti nan mak baz la nan ponp elektrik la.

 

 
Antretyen ak Antretyen
  1. (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
  2. (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
  5.  

 1 In the rated condition, the current exceeds 20%.

 2 Nivo dlo dinamik desann nan seksyon inlet dlo a, sa ki lakòz dlo tanzantan.

 3 Ponp submersible a gen gwo Vibwasyon oswa bri.

 4 Vòltaj ekipman an pi ba pase 340 vòlt.

 5 Yon fuzib boule.

 6 Tiyo rezèv dlo a domaje.

 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.

 

  1. (5)Unit disassembly:
  2.  1 demare kòd kab, retire pati tiyo a, retire plak fil la.

 2 vis desann boulon dlo a, mete dlo a nan chanm motè a.

 3 retire filtè a, lage vis fiks la sou kouple a pou ranje arbr motè a.

 4 vis desann boulon ki konekte junction inlet la ak motè a, epi separe ponp lan soti nan motè a (peye atansyon sou kousen inite a lè w ap separe, pou anpeche koube arbr ponp lan)

 5 sekans demonte ponp lan se: (gade figi 1) junction inlet, roue, kokiy devye, roue ...... tcheke kò valv la, lè w retire impeller la, sèvi ak zouti espesyal pou dekole manch konik roue fiks la. premyèman, epi evite koube ak ematom nan arbr ponp lan nan pwosesis la nan demonte.

 6 pwosesis la demonte nan motè a se: (gade figi 1) mete motè a sou platfòm la, epi retire nwa yo, baz, arbr tèt nwa bloke, plak poussée, kle, pi ba chèz kote yo pote gid ak boulon tèt doub anba a nan motè a nan vire, ak Lè sa a, pran rotor la (peye atansyon pa domaje pake a fil) epi finalman retire seksyon an konekte ak chèz anwo kote yo pote gid.

 7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.

 

 
Depo ak Gad

 1, mete dlo a nan kavite motè a (sitou nan sezon fredi pou anpeche motè a konjel), epi mare kab la byen.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, itilizasyon alontèm yo ta dwe peye atansyon sou prevansyon rouye ponp submersible yo.

 

 
Mete Pati

 

  • Impeller
  • Manch manch arbr
  • Kawotchou manch manch arbr
  • Bag sele

 
Senaryo aplikasyon

01 Konsomasyon dlo byen fon

02 Pwovizyon dlo ki wo

03 rezèv dlo mòn 

04 gwo kay won dlo

05 Irigasyon agrikòl

06 irigasyon jaden

07 konsomasyon dlo rivyè

08 dlo domestik

 

Si ou enterese nan pwodwi nou yo, ou ka chwazi kite enfòmasyon ou isit la, epi nou pral kontakte ou yon ti tan.


Ekri mesaj ou la a epi voye l ba nou

Si ou enterese nan pwodwi nou yo, ou ka chwazi kite enfòmasyon ou isit la, epi nou pral kontakte ou yon ti tan.


htHaitian Creole