QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.
The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).
The water quality shall meet the following requirements:
(1) the water temperature shall not be higher than 20 °C;
(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;
(3) the PH value (acidity and alkalinity) is 6.5-8.5;
(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;
(5) the content of chloride ions shall not be higher than 400mg/L.
The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.
Eredua | Emaria (m3/h) | Burua (m) |
Biraketa-abiadura (aldaketa/puntua) |
Ur-ponpa (%) | Saltokia diametroa (mm) |
Ondo aplikatzekoa diametroa (mm) |
Baloratua potentzia (KW) |
Baloratua tentsioa (V) |
Baloratua korrontea (A) |
Motor-eraginkortasuna (%) | potentzia-faktoreacosφ | Unitatea Gehienezko tamaina erradiala (mm) |
Oharra | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135goian | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135goian | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135goian | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135goian | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135goian | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135goian | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135goian | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, putzu urpeko ponpa ur garbirako ponparako, putzu berria debekatzen du, sedimentuak eta ur lokaztuak ponpatzea,
2, putzu ur ponpa tentsio-maila 380/50HZ, urpeko motorraren beste tentsio-maila batzuk pertsonalizatu behar dira. Lurpeko kableak kable iragazgaitza erabili behar du, hasierako ekipamenduz hornitu behar da, hala nola banaketa-kutxa, abiarazte prest ez dagoen motorra ohiko babes-funtzioa izan behar du, hala nola, zirkuitu laburreko gainkarga babesa, faseen babesa, azpitentsioaren babesa, lurrerako babesa, idling babesa. , Baldintza anormalen kasuan, babes-gailuak ekintza puntuala bidaia izan behar du.
3, ponparen instalazioa eta erabilera fidagarrian lurretik egon behar da, bultza eta tira etengailua debekatu egiten du eskuak eta oinak bustita daudenean, elikadura hornidura moztu behar da ponpa instalatu eta mantentzea baino lehen, ponpak konfiguratzeko lekua erabiltzen du " deskarga elektrikoa saihesteko" seinale nabariak:
4, putzuan behera edo instalatu aurretik, motorraren barrunbea ur destilatuarekin edo ur irakin hotza ez-korrosiboarekin bete behar da, estutu / ur-torloia, lurreko proban ponpa, ponpa-ganberako ura lubrifikatzeko kautxura egon behar da. Errodamenduak, berehalako abiarazte ez segundo bat baino gehiago, ikusi direkzioa direkzio instrukzioaren berdina den. Ponpa tente dagoenean, arreta jarri segurtasunari, saihestu lesio iraultzea.
5, ponpa-igogailuaren xedapenen arabera, erabilera-emariaren erabilera-eremuaren arabera, fluxu baxua edo igoera handiko ponpaketa-indarra, bultzada-errodamenduak eta higaduraren beste atal batzuk, motorren gainkarga erretzea saihesteko.
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components
2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.
3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6. The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Instalazio aurretik prestatzea:
1. Egiaztatu urpeko ponpak eskuliburuan zehaztutako erabilera-baldintzak eta esparruak betetzen dituen ala ez.
2. Urpeko ponparen kanpoko diametroaren gehienezko diametroa duen objektu astun bat erabiliz, neurtu putzuaren barneko diametroa ponpa urperagarrira egoki daitekeen, eta neurtu putzuaren sakonerak instalazio-baldintzak betetzen dituen.
3. Egiaztatu putzua garbi dagoen eta putzuko ura uhera den. Inoiz ez erabili urpeko ponpa elektrikorik welor pump lokatza eta harea ura garbitzeko, ponpa elektriko urperagarriari kalte goiztiarra ekiditeko.
4. Egiaztatu welhead instalazioaren posizioa egokia den eta unitate osoaren kalitatea jasan dezakeen ala ez.
5. Egiaztatu urpeko ponpa osagaiak osatuta dauden eta behar bezala instalatuta dauden eskuliburuko muntaketa-diagramaren arabera. Kendu iragazkia pantaila eta biratu akoplamendua malgutasunez biratzen duen ikusteko.
6. Askatu ur-torlojua eta bete motorraren barrunbea ur garbi eta ez korrosiboarekin (kontuan izan. ziurtatu bete egin duzula), eta estutu ur-torlojua. Ura injektatu 12 ordu igaro ondoren, motorraren isolamendu-erresistentzia ez da 150 M Q baino txikiagoa izan behar 500 V-ko astindu-mahai batekin neurtuta.
7. Kable-juntura, moztu 120 mm-ko gomazko mahuka bat irteerako kablearen mutur batetik eta bat datorren kablea elektrizistaren aizto batekin, gero hiru nukleoko harien luzera mailakatu forman mailakatu, kendu 20 mm-ko kobre-nukleoa, oxidoa urratu. geruza kobrezko alanbrearen kanpoaldean labana edo hareazko zapi batekin, eta sartu konektatutako alanbre bi muturrak paliretan. Geruza kobrezko alanbre finarekin ondo lotu ondoren, ondo eta irmo soldatu eta edozein harea. gainazalean errebak. Ondoren, hiru junturetarako, erabili polibester zinta isolatzaile horiek erdi pilatuta biltzeko hiru labeletarako. Itzulbiratu biltzeko geruzaren bi muturrak nyion hariarekin, eta erabili erdi pilatutako metodo bat zinta hiru geruzetarako biltzeko. Itzulbi ezazu kanpoko geruza hiru geruzetarako presio handiko isolamendu-zintarekin. Azkenik, tolestu hiru kateak elkarrekin eta behin eta berriz bildu bost geruza presio handiko zintarekin. Geruza bakoitza ondo lotu behar da, eta geruzen arteko junturak estu eta finkoak izan behar dira ura ez dadin sartzea eta isolamendua kaltetzea saihesteko. Bilatu ondoren, busti uretan 20 ºC-ko giro-tenperaturan 12 orduz, eta neurtu isolamendu-erresistentzia dardarka mahai batekin. , 100M Ω baino txikiagoa izan behar ez duena
Erantsitako kablearen kableatu-prozesuaren diagrama hau da:
8. Erabili multimetroa hari trifasikoak konektatuta dauden eta DC erresistentzia gutxi gorabehera orekatuta dagoen egiaztatzeko.
9. Egiaztatu zirkuitua eta transformadorearen ahalmena gainkargatuta dauden ala ez, eta gero konektatu gainkarga babesteko etengailua edo abiarazte-ekipoa. Ikusi 2. taula eredu zehatzetarako, eta, ondoren, isuri ur-ontzi bat ur-ponparen irteeratik ponparen gomazko errodamenduak lubrifikatzeko, eta jarri urpeko ponpa elektrikoa zutik eta egonkor. Hasi (segundo bat baino gehiago). eta egiaztatu direkzio-norabidea koherentea den direkzio-seinalearekin. Hala ez bada, aldatu kable trifasikoko bi konektoreak. Ondoren, instalatu iragazkia eta prestatu putzutik jaisteko. Kasu berezietan erabiltzen bada (adibidez, lubakiak, lubakiak, ibaiak, urmaelak, urmaelak, etab.), ponpa elektrikoa fidagarritasunez lurreratu behar da.
(2) Instalazio ekipoak eta tresnak:
1. Bi tona baino gehiagoko altxatze-kate pare bat.
2. Lau metrotik beherako altuera bertikala duen tripode bat.
3. Tona bat baino gehiagoko pisua jasan dezaketen bi soka zintzilik (alanbrezko sokak) (ur-ponpa multzo oso baten pisua jasan dezakete).
4. Jarri bi besarkada pare (ferulak).
5. Giltzak, mailuak, bihurkinak, erreminta eta tresna elektrikoak, etab.
(3) Ponpa elektrikoaren instalazioa:
1. Urpeko ponpa elektrikoaren instalazio-diagrama 2. Irudian ageri da. Instalazio-neurri espezifikoak 3. Taulan agertzen dira "Sumergigarriko ponpa elektrikoaren instalazio-neurrien zerrenda".
2. 30 metrotik beherako burua duten ponpa elektriko urperagarriak zuzenean putzura igo daitezke, makina osoaren, ur-hodien eta hodietako uraren pisu osoa jasan dezaketen mahukak eta alanbre-sokak edo beste kalamu-soka batzuk erabiliz.
3. 30 metro baino gehiagoko burua duten ponpek altzairuzko hodiak erabiltzen dituzte, eta instalazioaren sekuentzia hau da:
①Erabili besarkada bat ur-ponparen zatiaren goiko muturra estutzeko (motorea eta ur-ponpa konektatuta daude momentu honetan), altxa ezazu zintzilik dagoen kate batekin eta lotu poliki-poliki putzuan. Jarri besarkada putzu-buruan eta kendu zintzilik katea.
② Erabili beste besarkada pare bat hodi bat estutzeko, altxa ezazu zintzilik dagoen kate batekin bridatik 15 cm-ra, eta jaitsi poliki-poliki. Hodiaren bridenaren eta ponparen bridenaren artean. Jarri gomazko kupoia eta estutu hodia eta ponpatu uniformeki torlojuekin, azkoinekin eta malguki-zirrindarekin.
③ Altxatu urpeko ponpa apur bat, kendu ur-ponparen goiko muturrean dagoen besarkada, lotu kablea tinko ur-hodiari plastikozko zinta batekin eta lotu poliki-poliki besarkada putzu-buruan jarri arte.
④Erabili metodo bera ur-hodi guztiak putzuan lotzeko.
⑤ Irteerako kablea kontrol-etengailura konektatu ondoren, elikadura trifasikora konektatzen da.
(4) Instalazioan kontuan izan beharrekoak:
1. Ponpatze-prozesuan blokeo-fenomeno bat aurkitzen bada, bira eman edo tira ur-hodiari traba-puntua gainditzeko. Hainbat neurrik oraindik ez badute funtzionatzen, mesedez, ez behartu ponpa behera urpean dagoen ponpa elektrikoa eta putzua ez kaltetzeko.
2. Instalazioan, gomazko kuskulina bat jarri behar da hodi bakoitzaren bridan eta uniformeki estutu.
3. Ur-ponpa putzuan jaisten denean, putzuaren erdian jarri behar da ponpa putzuaren hormaren kontra denbora luzez ibil ez dadin, ponpa dardara eta motorra miaketa eta erretzea eraginez. .
4. Zehaztu ur-ponparen sakonera putzuaren hondoraino, putzuaren harea eta limo-baldintzen arabera. Ez lurperatu ponpa lokatzetan. Ur-ponpatik putzuaren hondorainoko distantzia, oro har, ez da 3 metro baino gutxiagokoa (ikus 2. irudia).
5. Ur ponparen ura sartzeko sakonera ez da 1-1,5 metro baino txikiagoa izan behar uraren maila dinamikotik uraren sarrerako nodoraino (ikus 2. irudia). Bestela, ur ponparen errodamenduak erraz honda daitezke.
6. Ur-ponparen igoera ezin da baxuegia izan. Bestela, ate-balbula bat instalatu behar da putzu-buruko ur-hodietan ponparen emaria kontrolatzeko emari-puntuan emari handien ondorioz motorra gainkargatu eta erre ez dadin.
7. Ur-ponpa martxan dagoenean, ur-irteera etengabea eta berdina izan behar da, korrontea egonkorra izan behar da (lan-baldintzetan, oro har, korronte nominalaren % 10 baino gehiago), eta ez da bibraziorik edo zaratarik egon behar. Anormaltasunik badago, makina gelditu egin behar da kausa ezagutzeko eta ezabatzeko.
8. Instalatzerakoan, arreta jarri motorra lurreratzeko kablearen ezarpenari (ikus 2. irudia). Ur-hodia altzairuzko hodia denean, eraman ezazu putzu-buruko besarkadatik; ur-hodia plastikozko hodia denean, eraman ezazu ponpa elektrikoaren lurreratze-markatik.
- (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 Ur-maila dinamikoa uraren sarrerako sekziora jaisten da, eta tarteka ura eragiten du.
3 Urpeko ponpak bibrazio edo zarata handiak ditu.
4 Hornidura-tentsioa 340 voltio baino txikiagoa da.
5 Fusible bat erreta dago.
6 Ura hornitzeko hodia hondatuta dago.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
- 1 askatu kable-soka, kendu hodiaren zatia, kendu alanbre-plaka.
2 Torloju ur-torlojua, jarri ura motorraren ganbaran.
3 kendu iragazkia, askatu akoplamenduko torloju finkoa motorraren ardatza finkatzeko.
4 torlojutu sarrerako juntura motorra lotzen duen torlojua eta bereizi ponpa motorretik (kontuan izan unitateko kuxinari banantzean, ponparen ardatza tolestu ez dadin)
5 ponparen desmuntatze-sekuentzia hau da: (ikusi 1. irudia) sarrerako lotunea, bultzatzailea, desbideratze-oskola, bultzatzailea...... egiaztapen-balbularen gorputza, bultzatzailea kentzean, erabili tresna bereziak bultzatzaile finkoaren mahuka konikoa askatzeko. lehenik eta behin, eta saihestu ponparen ardatza okertu eta ubeldurak desmuntatzeko prozesuan.
6 motorra desmuntatzeko prozesua hau da: (ikus 1. irudia) jarri motorra plataforman, eta kendu azkoinak, oinarria, ardatzaren burua blokeatzeko azkoina, bultzada-plaka, giltza, beheko gida-eserlekua eta buru bikoitzeko torlojua behetik. motorra aldi berean, eta gero errotorea atera (kontuz hari paketea ez kaltetzeko) eta, azkenik, kendu konexio-atala eta goiko gida-errodamenduaren eserlekua.
7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.
1, jarri ura motorraren barrunbean (batez ere neguan, motorra izoztea saihesteko), eta lotu kablea ondo.
2, gorde substantzia eta gas korrosiborik gabeko barruko gela batean, 40 °C-tik beherako tenperaturan.
3, epe luzerako erabilera ponpa urperagarrien herdoilaren prebentzioari arreta jarri behar zaio.
- Buldagailua
- Ardatz mahuka
- Gomazko ardatzaren mahuka
-
Zigilatzeko eraztuna
01 Putzu sakoneko ura hartzea
02 Goiko ur-hornidura
03 mendiko ur hornidura
04 dorre ura
05 Nekazaritzako ureztatzea
06 lorategiko ureztatzea
07 ibaiko ur-hartunea
08 etxeko ura