QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.
The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).
The water quality shall meet the following requirements:
(1) the water temperature shall not be higher than 20 °C;
(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;
(3) the PH value (acidity and alkalinity) is 6.5-8.5;
(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;
(5) the content of chloride ions shall not be higher than 400mg/L.
The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.
Modell | Átfolyás (m3/h) | Fej (m) |
Forgási sebesség (változtatás/pont) |
Vízszivattyú(%) | Kimenet átmérő (mm) |
Jól alkalmazható átmérő (mm) |
Névleges teljesítmény (KW) |
Névleges feszültség (V) |
Névleges áram (A) |
Motorhatás (%) | power factorcosφ | Mértékegység Radiális Maximális méret (mm) |
Megjegyzés | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135felett | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135felett | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135felett | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135felett | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135felett | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135felett | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135felett | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, kút búvárszivattyú tiszta víz szivattyúhoz, megtiltja az új kutat, üledék és sáros víz szivattyúzását,
2, a kútvízszivattyú feszültségi fokozata 380/50 HZ, a búvármotorok más feszültségi fokozatainak használatát testre kell szabni. A földalatti kábelnek vízálló kábelt kell használnia, fel kell szerelni indítóberendezéssel, például elosztódobozsal, az indítás nem készenlétben általánosan használt motoros átfogó védelmi funkcióval kell rendelkeznie, például rövidzárlat-túlterhelés-védelem, fázisvédelem, feszültségcsökkenés elleni védelem, földelésvédelem, alapjárati védelem , abnormális körülmények esetén a védőeszközt időben fel kell oldani.
3, a szivattyú telepítését és használatát megbízhatóan földelni kell, tiltja a nyomó- és húzókapcsolót, ha a kéz és a láb nedves, a szivattyú telepítése és karbantartása előtt meg kell szakítani az áramellátást, a szivattyú használati helye a beállításhoz az áramütés elkerülése érdekében" nyilvánvaló jelek:
4, le a kútba vagy beszerelés előtt a motor üregét fel kell tölteni desztillált vízzel vagy nem korrozív tiszta hideg forrásban lévő vízzel, húzza meg a / víz csavart, a szivattyút a földi próbaüzemben kell a szivattyúkamrához vízkenő gumival ellátni csapágyak, azonnali indítás legfeljebb egy másodperc, nézze meg, hogy a kormányzás megegyezik-e a kormányzási utasítással. Amikor a szivattyú függőlegesen áll, ügyeljen a biztonságra, és kerülje a felborulási sérülést.
5, szigorúan a szivattyú emelésére, az áramlási tartományra vonatkozó rendelkezéseknek megfelelően, hogy megakadályozzák az alacsony áramlást vagy a nagy emelőerőt, a nyomócsapágyat és a kopás egyéb részeit, a motor túlterhelése égett
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components
2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.
3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6. The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Előkészítés a telepítés előtt:
1. Ellenőrizze, hogy a búvárszivattyú megfelel-e a kézikönyvben megadott használati feltételeknek és hatókörnek.
2. A búvárszivattyú maximális külső átmérőjével megegyező átmérőjű nehéz obiect segítségével mérje meg, hogy a kút belső átmérője illeszkedik-e a búvárszivattyúhoz, és mérje meg, hogy a kút mélysége megfelel-e a telepítési követelményeknek.
3. Ellenőrizze, hogy a kútfúrás tiszta-e, és hogy a kút vize zavaros-e. Soha ne használjon elektromos búvárszivattyút a sár és homokvíz mosásához, hogy elkerülje a merülő elektromos szivattyú idő előtti károsodását.
4. Ellenőrizze, hogy a hegesztőfej szerelőbilincs helyzete megfelelő-e, és hogy kibírja-e az egész egység minőségét
5. Ellenőrizze, hogy a búvárszivattyú alkatrészei teljesek-e és megfelelően vannak-e beszerelve a kézikönyv összeszerelési rajza szerint. Távolítsa el a szűrőernyőt, és forgassa el a tengelykapcsolót, hogy lássa, rugalmasan forog-e
6. Csavarja ki a vízcsavart, és töltse fel a motor üregét tiszta, nem korrozív vízzel (megjegyzés: feltétlenül töltse fel), majd húzza meg a vízcsavart. 12 óra vízbefecskendezés után a motor szigetelési ellenállása nem lehet kisebb 150M Q-nál 500V-os rázóasztallal mérve.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
A mellékelt kábelezési folyamatábra a következő:
8. Multiméter segítségével ellenőrizze, hogy a háromfázisú vezetékek csatlakoztatva vannak-e, és hogy az egyenáramú ellenállás megközelítőleg kiegyensúlyozott-e.
9. Ellenőrizze, hogy nincs-e túlterhelve az áramkör és a transzformátor kapacitása, majd csatlakoztassa a túlterhelésvédő kapcsolót vagy az indítóberendezést. Lásd a 2. táblázatot az egyes modellekért, majd öntsön egy vödör vizet a vízszivattyúba a vízszivattyú kimeneténél, hogy megkenje a szivattyú gumicsapágyait, majd helyezze függőlegesen és stabilan a merülő elektromos szivattyút. Indítás (legfeljebb egy másodperc) és ellenőrizze, hogy a kormányzás iránya összhangban van-e a kormánytáblával. Ha nem, cserélje ki a háromfázisú kábel bármelyik két csatlakozóját. Ezután helyezze be a szűrőt, és készüljön fel a kútba való lejutásra. Ha különleges alkalmakkor (például árkok, árkok, folyók, tavak, tavak stb.) használják, az elektromos szivattyút megbízhatóan földelni kell.
(2) Szerelési berendezések és szerszámok:
1. Egy pár emelőlánc több mint két tonnához.
2. Legalább négy méter függőleges magasságú állvány.
3. Két akasztókötél (drótkötél), amelyek egy tonnánál nagyobb súlyt is elbírnak (elbírják egy teljes vízszivattyú-készlet súlyát).
4. Szereljen fel két pár bilincset (sínt).
5. Villáskulcsok, kalapácsok, csavarhúzók, elektromos szerszámok és műszerek stb.
(3) Elektromos szivattyú beszerelése:
1. A merülő elektromos szivattyú beépítési rajza a 2. ábrán látható. A konkrét beépítési méretek a 3. táblázatban láthatók "A merülő elektromos szivattyú beépítési méreteinek listája".
2. A 30 méternél kisebb emelőmagasságú búvárszivattyúk közvetlenül a kútba emelhetők tömlők és drótkötelek vagy más kenderkötelek segítségével, amelyek elbírják a teljes gép, a vízvezetékek és a csövekben lévő víz teljes súlyát.
3. A 30 méternél nagyobb fejű szivattyúk acélcsöveket használnak, és a telepítési sorrend a következő:
①Kilincs segítségével rögzítse a vízszivattyú alkatrészének felső végét (a motor és a vízszivattyú ekkor össze van kötve), emelje fel egy függőlánccal, és lassan kösse be a kútba, amíg Tegye fel a bilincset a kútfejre és távolítsa el a függő lánc.
② Használjon egy másik bilincspárt egy cső rögzítéséhez, emelje fel egy függőlánccal 15 cm-re a karimától, és lassan engedje le. A csőkarima és a szivattyú karima közé Helyezze a gumibetétet a helyére, és csavarokkal, anyákkal és rugós alátétekkel egyenletesen húzza meg a csövet és a szivattyút.
③ Enyhén emelje meg a búvárszivattyút, távolítsa el a bilincset a vízszivattyú felső végén, rögzítse a kábelt erősen a vízcsőhöz egy műanyag szalaggal, és lassan kösse le, amíg a bilincs a kútfejre nem kerül.
④ Ugyanezzel a módszerrel kösse be az összes vízvezetéket a kútba.
⑤ Miután a kivezető kábelt csatlakoztatta a vezérlőkapcsolóhoz, csatlakozik a háromfázisú tápegységhez.
(4) A telepítés során figyelni kell:
1. Ha a szivattyúzási folyamat során elakadást észlel, fordítsa el vagy húzza meg a vízcsövet, hogy kiküszöbölje az elakadási pontot. Ha a különféle intézkedések továbbra sem működnek, kérjük, ne erőltesse le a szivattyút, hogy elkerülje a merülő elektromos szivattyú és a kút sérülését.
2. A szerelés során minden cső karimájára gumibetétet kell helyezni, és egyenletesen meg kell húzni.
3. Amikor a vízszivattyút leengedik a kútba, a kútcső közepére kell helyezni, hogy a szivattyú ne futhasson hosszú ideig a kút falának, ami a szivattyú rezgését, a motor söpörését és égését okozza. .
4. Határozza meg a vízszivattyú mélységét a kút aljáig a kút folyó homok- és iszapviszonyoknak megfelelően. Ne temessük a szivattyút a sárba. A vízszivattyú és a kút alja közötti távolság általában nem kevesebb, mint 3 méter (lásd a 2. ábrát).
5. A vízszivattyú vízbevezetési mélysége nem lehet kevesebb, mint 1-1,5 méter a dinamikus vízszinttől a vízbevezető csomópontig (lásd 2. ábra). Ellenkező esetben a vízszivattyú csapágyai könnyen megsérülhetnek.
6. A vízszivattyú emelése nem lehet túl alacsony. Ellenkező esetben a kútfej vízvezetékére tolózárat kell felszerelni, amely szabályozza a szivattyú áramlását a névleges áramlási ponton, hogy megakadályozza a motor túlterhelését és kiégését a nagy áramlási sebességek miatt.
7. Amikor a vízszivattyú működik, a vízkimenetnek folyamatosnak és egyenletesnek kell lennie, az áramerősségnek stabilnak kell lennie (névleges üzemi körülmények között, általában nem haladhatja meg a névleges áram 10%-át), és nem lehet rezgés vagy zaj. Ha bármilyen rendellenességet észlel, le kell állítani a gépet, hogy megtudja az okot és megszüntesse azt.
8. Telepítéskor ügyeljen a motor földelő vezetékének beállítására (lásd 2. ábra). Ha a vízcső acélcső, vezesse ki a kútfej bilincséből; ha a vízcső műanyag cső, vezesse el az elektromos szivattyú földelési jelétől.
- (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 A dinamikus vízszint leesik a vízbevezető szakaszra, ami időszakos vízfolyást okoz.
3 A búvárszivattyú erős vibrációt vagy zajt mutat.
4 A tápfeszültség kisebb, mint 340 volt.
5 Egy biztosíték kiégett.
6 A vízellátó cső sérült.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
- 1 oldja ki a kábelkötelet, távolítsa el a csővezeték részt, távolítsa el a huzallemezt.
2 Csavarja le a vízcsavart, és tegye a vizet a motorkamrába.
3 távolítsa el a szűrőt, lazítsa meg a tengelykapcsolón lévő rögzített csavart a motor tengelyének rögzítéséhez.
4 csavarja le a bemeneti csatlakozást a motorral összekötő csavart, és válassza le a szivattyút a motorról (leválasztáskor ügyeljen az egység párnájára, hogy elkerülje a szivattyú tengelyének elhajlását)
5 a szivattyú szétszerelési sorrendje: (lásd az 1. ábrát) bemeneti csomópont, járókerék, terelőhéj, járókerék...... visszacsapó szelepház, a járókerék eltávolításakor speciális szerszámokkal lazítsa meg a rögzített járókerék kúpos hüvelyét először, és kerülje el a szivattyú tengelyének meghajlását és zúzódását a szétszerelés során.
6 a motor szétszerelése a következő: (lásd az 1. ábrát) helyezze a motort az emelőkosárra, és távolítsa el az anyákat, a talpat, a tengelyfej rögzítő anyát, a nyomólapot, a kulcsot, az alsó vezetőcsapágy ülését és a duplafejű csavart a sorjában a motort, majd vegye ki a forgórészt (ügyeljen arra, hogy ne sértse meg a huzalcsomagot), végül távolítsa el a csatlakozó részt és a felső vezetőcsapágy fészkét.
7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.
1, engedje ki a vizet a motor üregében (főleg télen, hogy ne fagyjon be a motor), és kösse be jól a kábelt.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, a hosszú távú használat során figyelmet kell fordítani a búvárszivattyúk rozsda megelőzésére.
- Járókerék
- Tengelyhüvely
- Gumi tengelyhüvely
-
Tömítőgyűrű
01 Mélykút vízvétele
02 Sokemeletes vízellátás
03 hegyi vízellátás
04 toronyvíz
05 Mezőgazdasági öntözés
06 kerti öntözés
07 folyami vízvétel
08 használati víz