QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.
The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).
The water quality shall meet the following requirements:
(1) the water temperature shall not be higher than 20 °C;
(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;
(3) the PH value (acidity and alkalinity) is 6.5-8.5;
(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;
(5) the content of chloride ions shall not be higher than 400mg/L.
The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.
Modelo | Caudal (m3/h) | Cabeza (m) |
Velocidade de rotación (cambio/punto) |
Bomba de auga (%) | Outlet diámetro (mm) |
Aplicable ben diámetro (mm) |
Calificado potencia (KW) |
Calificado tensión (V) |
Calificado corrente (A) |
Eficiencia do motor (%) | factor de potencia cosφ | Unidade Tamaño máximo radial (mm) |
Observación | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135arriba | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135arriba | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135arriba | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135arriba | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135arriba | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135arriba | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135arriba | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, bomba sumerxible de pozo para bomba de auga limpa, prohibe o novo pozo, bombear sedimentos e auga lamada,
2, grao de tensión da bomba de auga de pozo 380/50HZ, o uso doutros graos de tensión de motores sumerxibles debe ser personalizado. O cable subterráneo debe usar un cable impermeable, debe estar equipado con equipos de arranque, como a caixa de distribución, o arranque non listo debería ter unha función de protección integral do motor de uso común, como protección contra sobrecarga de curtocircuíto, protección de fase, protección de subtensión, protección de toma de terra, protección de ralentí. , en caso de condicións anormais, o dispositivo de protección debe ser viaxe de acción oportuna.
3, a instalación e o uso da bomba deben estar conectados a terra de forma fiable, prohibe o interruptor de empurrar e tirar cando as mans e os pés están mollados, debe cortar a fonte de alimentación antes da instalación e mantemento da bomba, a bomba usa o lugar para configurar " para evitar descargas eléctricas" sinais obvios:
4, abaixo do pozo ou antes da instalación, a cavidade do motor debe encherse con auga destilada ou auga fervendo fría e limpa non corrosiva, aperte o parafuso de auga /, a bomba na proba do chan, debe ser para a goma de lubricación de auga da cámara da bomba. rodamentos, arranque instantáneo non máis dun segundo, ver se a dirección é a mesma que a instrución de dirección. Cando a bomba estea en posición vertical, preste atención á seguridade e evite lesións por envorco.
5, estrictamente de acordo coas disposicións do elevador da bomba, o intervalo de uso de fluxo, para evitar a forza de bombeo de baixo fluxo ou alta elevación, o rolamento de empuxe e outras partes do desgaste, a sobrecarga do motor queimado
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components
2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.
3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6. The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Preparación antes da instalación:
1. Comprobe se a bomba sumerxible cumpre as condicións de uso e o alcance especificados no manual.
2. Usando un obxecto pesado cun diámetro igual ao diámetro exterior máximo da bomba sumerxible, medir se o diámetro interior do pozo pode caber na bomba sumerxible e medir se a profundidade do pozo cumpre os requisitos de instalación.
3. Comproba se o pozo está limpo e se a auga do pozo está turbia. Nunca use unha bomba eléctrica sumerxible para lavar a auga de barro e area da bomba welor para evitar danos prematuros na bomba eléctrica sumerxible.
4. Comprobe se a posición da pinza de instalación da cabeza de welhead é adecuada e se pode soportar a calidade de toda a unidade
5. Comprobe se os compoñentes da bomba sumerxible están completos e instalados correctamente segundo o diagrama de montaxe do manual. Retire a pantalla do filtro e xire o acoplamento para ver se xira con flexibilidade.
6. Desenrosque o parafuso de auga e enche a cavidade do motor con auga limpa e non corrosiva (ten en conta. Asegúrese de enchelo), despois aperte o parafuso. Despois de 12 horas de inxección de auga, a resistencia de illamento do motor non debe ser inferior a 150 M Q cando se mide cunha mesa de axitación de 500 V.
7. Articulación do cable, corte unha manga de goma de 120 mm dun extremo do cable de saída e o cable correspondente cun coitelo de electricista, a continuación, escalone a lonxitude dos tres fíos do núcleo en forma escalonada, retire un núcleo de cobre de 20 mm, raspe o óxido. capa no exterior do fío de cobre cun coitelo ou pano de area, e inserir os dous extremos do fío conectados en palirs.Despois de atar a capa firmemente con fío de cobre fino, soldar a fondo e firmemente, e area de calquera. rebabas na superficie. A continuación, para as tres xuntas, use cinta de illamento de poliéster para envolvelas de forma semiapilada para tres lavas. Envolve os dous extremos da capa de envoltura axustadamente con fío nyion e despois usa un método semiempilado para envolver a cinta en tres capas. Envolve a capa exterior con cinta illante de alta presión para tres capas. Finalmente, dobre os tres fíos xuntos e envólveos repetidamente para cinco capas con cinta de alta presión. Cada capa debe estar ben unida e as unións entre capas deben estar axustadas e firmes para evitar que a auga penetre e dane o illamento. Despois de envolver, móllase en auga a unha temperatura ambiente de 20 °C durante 12 horas e mida a resistencia do illamento cunha mesa axitada. , que non debe ser inferior a 100 M Ω
O diagrama de proceso de cableado anexo é o seguinte:
8. Use un multímetro para comprobar se os cables trifásicos están conectados e se a resistencia de CC está aproximadamente equilibrada.
9. Comprobe se o circuíto e a capacidade do transformador están sobrecargados e, a continuación, conecte o interruptor de protección contra sobrecarga ou o equipo de arranque. Consulte a Táboa 2 para coñecer modelos específicos e, a continuación, verte un balde de auga na bomba de auga desde a saída da bomba de auga para lubricar os rodamentos de goma da bomba e, a continuación, coloque a bomba eléctrica sumerxible en posición vertical e firme. Arranque (non máis dun segundo) e verifique se a dirección de dirección é coherente co sinal de dirección. Se non, intercambia dous conectores calquera do cable trifásico. Despois instala o filtro e prepárate para baixar polo pozo. Se se usa en ocasións especiais (como gabias, gabias, ríos, estanques, estanques, etc.), a bomba eléctrica debe estar conectada a terra de forma fiable.
(2) Equipos e ferramentas de instalación:
1. Un par de cadeas de elevación de máis de dúas toneladas.
2. Un trípode cunha altura vertical non inferior a catro metros.
3. Dúas cordas colgantes (cables de arame) que poden soportar un peso superior a unha tonelada (poden soportar o peso dun conxunto completo de bombas de auga).
4. Instale dous pares de abrazaderas (férulas).
5. Chaves inglesas, martelos, desaparafusadores, ferramentas e instrumentos eléctricos, etc.
(3) Instalación de bombas eléctricas:
1. O diagrama de instalación da bomba eléctrica sumerxible móstrase na Figura 2. As dimensións específicas da instalación móstranse na Táboa 3 "Lista de dimensións de instalación da bomba eléctrica sumerxible".
2. As bombas eléctricas sumerxibles cunha cabeza inferior a 30 metros pódense izar directamente ao pozo mediante mangueiras e cables de arame ou outras cordas de cánabo que poidan soportar todo o peso de toda a máquina, tubos de auga e auga nos tubos.
3. As bombas cunha cabeza de máis de 30 metros utilizan tubos de aceiro, e a secuencia de instalación é a seguinte:
①Usa unha abrazadeira para suxeitar o extremo superior da parte da bomba de auga (o motor e a bomba de auga están conectados neste momento), levántaa cunha cadea colgante e átea lentamente ao pozo ata que coloque a abrazadeira na cabeza do pozo e retire o cadea colgante.
② Use outro par de abrazaderas para suxeitar un tubo, levántao cunha cadea colgante a 15 cm de distancia da brida e báixao lentamente. Entre a brida do tubo e a brida da bomba Coloque a almofada de goma no seu lugar e aperte o tubo e bombee uniformemente con parafusos, porcas e arandelas de resorte.
③ Levante lixeiramente a bomba sumerxible, retire a abrazadeira do extremo superior da bomba de auga, ate o cable firmemente á tubería de auga cunha cinta de plástico e áteo lentamente ata que a abrazadeira estea colocada na cabeza do pozo.
④Usa o mesmo método para amarrar todos os tubos de auga ao pozo.
⑤ Despois de conectar o cable de saída ao interruptor de control, conéctase á fonte de alimentación trifásica.
(4) Cousas a ter en conta durante a instalación:
1. Se se atopa un fenómeno de atasco durante o proceso de bombeo, xire ou tire da tubaxe de auga para superar o punto de atasco. Se varias medidas aínda non funcionan, non forzar a bomba abaixo para evitar danos á bomba eléctrica sumerxible e ao pozo.
2. Durante a instalación, debe colocarse unha almofada de goma na brida de cada tubo e apertar uniformemente.
3. Cando se baixa a bomba de auga no pozo, debe colocarse no medio do tubo do pozo para evitar que a bomba funcione contra a parede do pozo durante moito tempo, provocando que a bomba vibre e que o motor varrer e queimar. .
4. Determine a profundidade da bomba de auga ata o fondo do pozo segundo as condicións de area e limo fluídos do pozo. Non enterre a bomba na lama. A distancia desde a bomba de auga ata o fondo do pozo xeralmente non é inferior a 3 metros (ver Figura 2).
5. A profundidade de entrada de auga da bomba de auga non debe ser inferior a 1-1,5 metros desde o nivel dinámico da auga ata o nó de entrada de auga (ver Figura 2). En caso contrario, os rodamentos da bomba de auga poden danar facilmente.
6. A elevación da bomba de auga non pode ser demasiado baixa. En caso contrario, é necesario instalar unha válvula de compuerta na canalización de auga da cabeza do pozo para controlar o fluxo da bomba no punto de fluxo nominal para evitar que o motor se sobrecargue e se queime debido a grandes caudais.
7. Cando a bomba de auga está funcionando, a saída de auga debe ser continua e uniforme, a corrente debe ser estable (en condicións de traballo nominales, xeralmente non máis do 10% da corrente nominal), e non debe haber vibracións ou ruídos. Se hai algunha anormalidade, a máquina debe pararse para descubrir a causa e eliminala.
8. Ao instalar, preste atención á configuración do cable de posta a terra do motor (consulte a Figura 2). Cando o tubo de auga é un tubo de aceiro, lévao desde a abrazadeira da cabeza do pozo; cando o tubo de auga é un tubo de plástico, lévao desde a marca de conexión a terra da bomba eléctrica.
- (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 O nivel dinámico da auga baixa ata a sección de entrada de auga, provocando auga intermitente.
3 A bomba sumerxible presenta vibracións ou ruídos graves.
4 A tensión de alimentación é inferior a 340 voltios.
5 Un fusible está queimado.
6 O tubo de abastecemento de auga está danado.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
- 1 Desatar a corda do cable, eliminar a parte da canalización, eliminar a placa de arame.
2 Atornille o parafuso de auga, coloque a auga na cámara do motor.
3 Retire o filtro, solte o parafuso fixo do acoplamento para fixar o eixe do motor.
4 Atornille o parafuso que conecta a unión de entrada co motor e separe a bomba do motor (preste atención ao almofada da unidade ao separar, para evitar que se dobra o eixe da bomba)
5 a secuencia de desmontaxe da bomba é: (ver figura 1) unión de entrada, impulsor, carcasa de derivación, impulsor...... corpo da válvula de retención, ao retirar o impulsor, use ferramentas especiais para afrouxar a manga cónica do impulsor fixo. primeiro, e evite dobrar e magullar o eixe da bomba no proceso de desmontaxe.
6 o proceso de desmontaxe do motor é: (ver figura 1) coloque o motor na plataforma e retire as porcas, a base, a porca de bloqueo da cabeza do eixe, a placa de empuxe, a chave, o asento do rodamento de guía inferior e o parafuso de dobre cabeza da parte inferior do motor. o motor á súa vez e, a continuación, saque o rotor (preste atención a non danar o paquete de fío) e, finalmente, retire a sección de conexión e o asento do rolamento da guía superior.
7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.
1, apague a auga na cavidade do motor (especialmente no inverno para evitar que o motor se conxele) e amarre ben o cable.
2, almacénase nun cuarto interior sen substancias corrosivas e gases, cunha temperatura inferior a 40 °C.
3, o uso a longo prazo debe prestar atención á prevención da ferruxe das bombas sumerxibles.
- Impulsor
- Manga do eixe
- Funda de eixe de goma
-
Anel de selado
01 Toma de auga de pozo profundo
02 Subministro de auga en rañaceos
03 abastecemento de auga de montaña
04 torre de auga
05 Rego agrícola
06 rego do xardín
07 captación de auga do río
08 auga doméstica