The product adopts special waterproof wire design, which can realize long-term stable conversion operation of the motor within the frequency range of 1HZ-50HZ. The frequency conversion winding design not only makes the frequency conversion deep well pump more energy saving, but also prolongs its service life. The motor winding adopts special water-resistant conductors that are resistant to high frequency impact, pulse peak voltage impact and high temperature aging, with excellent characteristics and stability.
The product is powered by three-phase AC 380V power supply, 50HZ frequency, suitable for the environment with harsh water quality conditions. Specific requirements include water temperature below 20 °C, solid impurities content is not greater than 0.01%, PH value is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The product adopts closed or water immersion structure of the motor, before use to ensure that the pump is fully filled with water, no-load test run is strictly prohibited. The pump must be completely immersed in water, not more than 70m water depth, water source to meet the requirements of the pump water output and continuous operation. In addition, the well must be vertical, the pump can only be used vertically. The wiring should be supported according to the requirements, and equipped with external overload protection device. This series of requirements to ensure the efficient and stable operation of the product, suitable for all kinds of special environment of the pump demand.
Mfano | Mtiririko (m3/h) | Kichwa (m) |
Kasi ya mzunguko (badilisha / uhakika) |
Pampu ya maji(%) | Kituo kipenyo (mm) |
Inatumika vizuri kipenyo(mm) |
Imekadiriwa power(KW) |
Imekadiriwa voltage (V) |
Imekadiriwa sasa (A) |
Ufanisi (%) | nguvu factorcos | Kitengo Ukubwa wa juu wa radial(mm) |
Toa maoni | |||||||||
250QJ50-40 | 50 | 40 | 2875 | 72 | 80 | 250juu | 9.2 | 380 | 21.7 | 78.5 | 0.82 | 233 | ||||||||||
250QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | |||||||||||||||||
250QJ50-80 | 80 | 18.5 | 40.8 | 82.0 | 0.84 | |||||||||||||||||
250QJ50-100 | 100 | 22 | 47.9 | 83.0 | 0.84 | |||||||||||||||||
250QJ50-120 | 120 | 25 | 53.8 | 84.0 | 0.84 | |||||||||||||||||
250QJ50-140 | 140 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ50-160 | 160 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ50-200 | 200 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ50-240 | 240 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ50-280 | 280 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ50-320 | 320 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ50-400 | 400 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ50-440 | 440 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ63-40 | 63 | 40 | 2875 | 74 | 80 | 250juu | 11 | 380 | 25.8 | 79.0 | 0.82 | 233 | ||||||||||
250QJ63-60 | 60 | 18.5 | 40.8 | 82.0 | 0.84 | |||||||||||||||||
250QJ63-80 | 80 | 22 | 47.9 | 83.0 | 0.84 | |||||||||||||||||
250QJ63-100 | 100 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ63-120 | 120 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ63-160 | 160 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ63-200 | 200 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ63-220 | 220 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ63-260 | 260 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ63-300 | 300 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ63-360 | 360 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ80-20 | 80 | 20 | 2875 | 75 | 100 | 250juu | 7.5 | 380 | 18.0 | 78.0 | 0.81 | 233 | ||||||||||
250QJ80-40 | 40 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
250QJ80-60 | 60 | 22 | 47.9 | 83.0 | 0.84 | |||||||||||||||||
250QJ80-80 | 80 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ80-100 | 100 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ80-120 | 120 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ80-160 | 80 | 160 | 2875 | 75 | 100 | 250juu | 55 | 380 | 114.3 | 86.0 | 0.85 | 233 | ||||||||||
250QJ80-180 | 180 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ80-200 | 200 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ80-240 | 240 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ80-280 | 280 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ100-18 | 100 | 18 | 2875 | 75 | 100 | 250juu | 7.5 | 380 | 18.0 | 78.0 | 0.81 | 233 | ||||||||||
250QJ100-36 | 36 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
250QJ100-54 | 54 | 25 | 53.8 | 84.0 | 0.84 | |||||||||||||||||
250QJ100-72 | 72 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ100-90 | 90 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ100-108 | 108 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ100-126 | 126 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ100-144 | 144 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ100-162 | 162 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ100-198 | 198 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ100-216 | 216 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ125-16 | 125 | 16 | 2875 | 76 | 125 | 250juu | 9.2 | 380 | 21.7 | 78.5 | 0.82 | 233 | ||||||||||
250QJ125-32 | 32 | 18.5 | 40.8 | 82.0 | 0.84 | |||||||||||||||||
250QJ125-48 | 48 | 25 | 53.8 | 84.0 | 0.84 | |||||||||||||||||
250QJ125-64 | 64 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ125-80 | 80 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ125-96 | 96 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ125-112 | 112 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ125-128 | 128 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ125-160 | 160 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ125-176 | 176 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ125-192 | 192 | 110 | 219.6 | 87.5 | 0.87 | |||||||||||||||||
250QJ140-15 | 140 | 15 | 2875 | 76 | 125 | 250juu | 9.2 | 380 | 21.7 | 78.5 | 0.82 | 233 | ||||||||||
250QJ140-30 | 30 | 18.5 | 40.8 | 82.0 | 0.84 | |||||||||||||||||
250QJ140-45 | 45 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ140-60 | 60 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ140-75 | 45 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ140-90 | 90 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ140-105 | 140 | 105 | 2875 | 76 | 125 | 250juu | 63 | 380 | 131.0 | 86.0 | 0.85 | 233 | ||||||||||
250QJ140-120 | 120 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ140-150 | 150 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ140-165 | 165 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ140-180 | 180 | 110 | 219.6 | 87.5 | 0.87 | |||||||||||||||||
250QJ200-20 | 200 | 20 | 2875 | 75 | 150 | 250juu | 18.5 | 380 | 40.8 | 82.0 | 0.84 | 233 | ||||||||||
250QJ200-40 | 40 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ200-60 | 60 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ200-80 | 80 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ200-100 | 100 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ200-120 | 120 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ200-140 | 140 | 125 | 249.5 | 87.5 | 0.87 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, madhubuti kulingana na masharti ya kuinua pampu, mtiririko mbalimbali ya matumizi, ili kuzuia mtiririko wa chini au kuinua high kusukumia nguvu, kuzaa kutia na sehemu nyingine ya kuvaa, overload motor kuchomwa moto.
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body and so on; the motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, cable lead, etc. The main characteristic of the product is that the motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is filled with water, used to cool the motor and lubricate the bearing; the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two sand sealing rings are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand prevention structure. To prevent the pump shaft from jumping when starting up, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed on the lower part of the motor. The motor and pump bearing adopt water lubrication technology, and the stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Maandalizi kabla ya ufungaji:
1. Angalia ikiwa pampu inayoweza kuzama inakidhi masharti ya matumizi na upeo uliobainishwa kwenye mwongozo.
2. Kwa kutumia kipenyo kizito chenye kipenyo sawa na kipenyo cha juu zaidi cha nje cha pampu inayoweza kuzamishwa, pima ikiwa kipenyo cha ndani cha kisima kinaweza kutoshea pampu inayoweza kuzamishwa, na kupima kama kina cha kisima kinakidhi mahitaji ya usakinishaji.
3. Angalia kama kisima ni safi na kama maji ya kisima ni machafu. Kamwe usitumie pampu ya umeme inayoweza kuzama ili kuosha tope la pampu ya kisima na maji ya mchanga ili kuepuka uharibifu wa mapema wa pampu ya umeme inayoweza kuzamishwa.
4. Angalia ikiwa nafasi ya bani ya usakinishaji ya welhead inafaa na ikiwa inaweza kuhimili ubora wa kitengo kizima.
5. Angalia ikiwa vijenzi vya pampu inayoweza kuzamishwa vimekamilika na kusakinishwa ipasavyo kulingana na mchoro wa kusanyiko kwenye mwongozoOndoa skrini ya kichujio na uzungushe kiunganishi ili kuona kama kinazunguka kwa urahisi.
6. Fungua skrubu ya skrubu ya maji na ujaze tundu la moshi kwa maji safi, yasiyo na babuzi (kumbuka. hakikisha umeichuja), kisha kaza screw ya maji. Baada ya masaa 12 ya sindano ya maji, upinzani wa insulation ya motor haipaswi kuwa chini ya 150M Q inapopimwa na meza ya 500V ya kutikisa.
7. Kiunganishi cha kebo, kata mkono wa mpira wa mm 120 kutoka mwisho mmoja wa kebo inayotoka na kebo inayolingana na kisu cha fundi umeme kisha uyumbe urefu wa nyaya tatu za msingi katika umbo la kupitiwa, ng'oa msingi wa shaba wa mm 20, ondoa oksidi. safu ya nje ya waya wa shaba na kisu au kitambaa cha mchanga, na ingiza ncha mbili za waya zilizounganishwa kwenye palirs.Baada ya kuifunga safu kwa ukali na waya mzuri wa shaba, solder kabisa na imara, na mchanga wa yoyote. burrs juu ya uso. Kisha, kwa viungo vitatu, tumia mkanda wa insulation ya polyvester ili kuvifunga kwa njia ya nusu iliyopangwa kwa birika tatu. Funga ncha mbili za safu ya kukunja vizuri kwa uzi wa nyion, na kisha utumie njia iliyopangwa nusu kufunga mkanda kwa tabaka tatu. Funga kifaa cha nje na mkanda wa insulation ya shinikizo la juu kwa tabaka tatu. Hatimaye, kunja nyuzi tatu pamoja na kuzifunga mara kwa mara kwa tabaka tano na mkanda wa shinikizo la juu. Kila safu lazima imefungwa vizuri, na viungo vya interlayer lazima ziwe tight na fimm ili kuzuia maji kupenya na kuharibu insulation, Baada ya kuifunga, loweka ndani ya maji kwenye joto la kawaida la 20 'c kwa masaa 12, na kupima upinzani wa insulation na meza ya kutikisa. , ambayo haipaswi kuwa chini ya 100M Ω
Mchoro wa mchakato wa wiring cable ni kama ifuatavyo:
8. Tumia multimeter ili uangalie ikiwa waya za awamu tatu zimeunganishwa na ikiwa upinzani wa DC ni takriban usawa.
9. Angalia ikiwa saketi na uwezo wa kibadilishaji umeme umejaa kupita kiasi, na kisha unganisha swichi ya ulinzi wa upakiaji au vifaa vya kuanzia. Tazama Jedwali la 2 kwa miundo mahususi, kisha Mimina ndoo ya maji kwenye pampu ya maji kutoka kwa pampu ya maji ili kulainisha fani za mpira kwenye pampu, na kisha uweke pampu ya umeme inayoweza kuzamishwa wima na thabiti. Anza (si zaidi ya sekunde moja) na uangalie ikiwa mwelekeo wa usukani unalingana na ishara ya usukani. Ikiwa sivyo, badilisha viunganishi vyovyote viwili vya kebo ya awamu ya tatu.Kisha sakinisha kichujio na ujiandae kwenda chini ya kisima. Ikiwa inatumiwa katika matukio maalum (kama vile mitaro, mifereji, mito, mabwawa, mabwawa, nk), pampu ya umeme lazima iwekwe chini kwa uhakika.
(2) Vifaa na zana za usakinishaji:
1. Jozi moja ya minyororo ya kuinua kwa zaidi ya tani mbili.
2. Tripod yenye urefu wa wima wa si chini ya mita nne.
3. Kamba mbili za kunyongwa (kamba za waya) zinazoweza kubeba uzito wa zaidi ya tani moja (zinaweza kubeba uzito wa seti kamili ya pampu za maji).
4. Weka jozi mbili za clamps (splints).
5. Wrenches, nyundo, screwdrivers, zana za umeme na vyombo, nk.
(3) Ufungaji wa pampu ya umeme:
1. Mchoro wa ufungaji wa pampu ya umeme ya chini ya maji umeonyeshwa kwenye Mchoro 2. Vipimo maalum vya ufungaji vinaonyeshwa kwenye Jedwali la 3 "Orodha ya Vipimo vya Ufungaji wa Pumpu ya Umeme ya Submersible".
2. Pampu za umeme zinazozamishwa na kichwa chini ya mita 30 zinaweza kuinuliwa moja kwa moja kwenye kisima kwa kutumia mabomba na kamba za waya au kamba nyingine za katani ambazo zinaweza kubeba uzito kamili wa mashine nzima, mabomba ya maji, na maji katika mabomba.
3. Pampu zilizo na kichwa cha zaidi ya mita 30 hutumia mabomba ya chuma, na mlolongo wa ufungaji ni kama ifuatavyo:
①Tumia kibano kubana ncha ya juu ya sehemu ya pampu ya maji (motor na pampu ya maji vimeunganishwa kwa wakati huu), inua kwa mnyororo wa kuning'inia, na polepole uifunge ndani ya kisima hadi Weka bani kwenye kichwa cha kisima na uondoe. mnyororo wa kunyongwa.
② Tumia vibano vingine ili kubana bomba, linyanyue kwa mnyororo wa kuning'inia umbali wa sm 15 kutoka kwenye ubao, na uushushe polepole. Kati ya flange ya bomba na flange ya pampuWeka pedi ya mpira mahali pake na kaza bomba na pampu sawasawa na bolts, karanga na washers wa spring.
③ Inua pampu inayoweza kuzama kidogo, ondoa kibano kwenye ncha ya juu ya pampu ya maji, funga kebo kwa uthabiti kwenye bomba la maji kwa mkanda wa plastiki, na uifunge polepole chini hadi Kinano kiwekwe kwenye kisima.
④Tumia njia sawa kufunga mabomba yote ya maji kwenye kisima.
⑤Baada ya kebo ya kuongoza kuunganishwa kwenye swichi ya kudhibiti, inaunganishwa kwenye usambazaji wa umeme wa awamu tatu.
(4) Mambo ya kuzingatia wakati wa usakinishaji:
1. Ikiwa jambo la jamming linapatikana wakati wa mchakato wa kusukuma, pindua au kuvuta bomba la maji ili kuondokana na hatua ya jamming. Ikiwa hatua mbalimbali bado hazifanyi kazi, tafadhaliUsilazimishe pampu chini ili kuepuka uharibifu wa pampu ya umeme inayozama na kisima.
2. Wakati wa ufungaji, pedi ya mpira inapaswa kuwekwa kwenye flange ya kila bomba na kuimarishwa sawasawa.
3. Wakati pampu ya maji inaposhushwa ndani ya kisima, inapaswa kuwekwa katikati ya bomba la kisima ili kuzuia pampu kukimbia dhidi ya ukuta wa kisima kwa muda mrefu, na kusababisha pampu kutetemeka na motor kufagia na kuwaka. .
4. Tambua kina cha pampu ya maji hadi chini ya kisima kulingana na mchanga unaopita na hali ya silt ya kisima. Usizike pampu kwenye matope. Umbali kutoka kwa pampu ya maji hadi chini ya kisima kwa ujumla sio chini ya mita 3 (ona Mchoro 2).
5. Kina cha kuingilia maji cha pampu ya maji haipaswi kuwa chini ya mita 1-1.5 kutoka ngazi ya maji yenye nguvu hadi nodi ya ingizo la maji (ona Mchoro 2). Vinginevyo, fani za pampu za maji zinaweza kuharibiwa kwa urahisi.
6. Kuinua kwa pampu ya maji hawezi kuwa chini sana. Vinginevyo, vali ya lango inahitaji kusakinishwa kwenye bomba la maji la kisima ili kudhibiti mtiririko wa pampu kwenye sehemu iliyokadiriwa ya mtiririko ili kuzuia injini isijazwe na kuteketezwa kwa sababu ya viwango vikubwa vya mtiririko.
7. Wakati pampu ya maji inapoendesha, pato la maji linapaswa kuendelea na hata, sasa inapaswa kuwa imara (chini ya hali ya kazi iliyopimwa, kwa ujumla si zaidi ya 10% ya sasa iliyopimwa), na haipaswi kuwa na vibration au kelele. Ikiwa kuna hali isiyo ya kawaida, mashine inapaswa kusimamishwa ili kujua sababu na kuiondoa.
8. Wakati wa kufunga, makini na mpangilio wa waya wa kutuliza motor (angalia Mchoro 2). Wakati bomba la maji ni bomba la chuma, liongoze kutoka kwenye kisima cha kisima; wakati bomba la maji ni bomba la plastiki, liongoze kutoka kwa alama ya kutuliza pampu ya umeme.
- 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start 2.equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on 3.the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- 4.After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- 5.After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- 6.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
- 1 In the rated condition, the current exceeds 20%.
- 2 Kiwango cha maji yanayobadilika hushuka hadi sehemu ya ingizo la maji, na kusababisha maji ya vipindi.
- 3 Pampu inayoweza kuzama ina mtetemo au kelele kali.
- 4 Voltage ya usambazaji ni ya chini kuliko 340 volts.
- 5 Fuse imechomwa.
- 6 Bomba la usambazaji wa maji limeharibiwa.
- 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- Unit disassembly:
- 1 Untie the cable tie, remove the pipeline part, and remove the wire plate. 2 screw down the water bolt, put the water in the motor chamber.
- 3 ondoa chujio, fungua screw fasta kwenye kuunganisha ili kurekebisha shimoni ya motor.
- 4 punguza boliti inayounganisha sehemu ya ingizo la maji na injini, na utenganishe pampu na injini (zingatia mto wa kitengo wakati wa kutenganisha, ili kuzuia kupinda kwa shimoni la pampu)
- 5 mlolongo wa disassembly ya pampu ni: (angalia takwimu 1) sehemu ya ingizo la maji, impela, ganda la diversion, impela...... angalia mwili wa valve, wakati wa kuondoa impela, tumia zana maalum kulegea sleeve ya conical ya fasta. impela kwanza, na epuka kuinama na kuponda shimoni la pampu katika mchakato wa kutenganisha.
- 6 mchakato wa kutenganisha injini ni: (ona mchoro 1) weka injini kwenye jukwaa, na uondoe nati, msingi, nati ya kufunga kichwa cha shimoni, sahani ya kusukuma, ufunguo, kiti cha chini cha kubeba mwongozo na boli ya kichwa mara mbili kutoka chini ya motor kwa upande wake, na kisha kuchukua rotor (makini si kuharibu mfuko waya) na hatimaye kuondoa sehemu ya kuunganisha na juu mwongozo kuzaa kiti.
- Mkusanyiko wa vitengo 7: kabla ya kusanyiko, kutu na uchafu wa sehemu zinapaswa kusafishwa, na uso wa kupandisha na vifungo vimefungwa na sealant, na kisha kukusanywa kwa mpangilio tofauti wa disassembly (shimoni ya motor husogea juu na chini baada ya kusanyiko kwa takriban moja. millimeter), baada ya kusanyiko, kuunganisha kunapaswa kubadilika, na kisha mashine ya mtihani wa skrini ya chujio. Pampu zinazoweza kuzama zitatolewa nje ya kisima kwa ajili ya kuvunjwa na matengenezo kulingana na Kifungu cha 5 baada ya mwaka wa kazi, au chini ya mwaka wa kazi lakini miaka miwili ya muda wa kupiga mbizi, na sehemu zilizovaliwa zitabadilishwa.
In order to ensure the long-term use and stable performance of submersible electric pump, we have launched a convenient and practical product. The product has a unique design, easy operation, and is perfect for various application scenarios. After use, remember to discharge all the water in the electric pump, especially in winter, so as not to freeze the motor. Wind the cable and bundle it. Store it in an environment without corrosive substances and gases, and keep the temperature below 40 °C. In addition, if you do not use it for a long time, you should pay attention to prevent the submersible electric pump from rusting. Choose our products to make your work more convenient and efficient.
- Msukumo
- Sleeve ya shimoni
- Sleeve ya shimoni ya mpira
-
Pete ya kuziba
01 Unywaji wa maji ya kisima kirefu
02 Ugavi wa maji wa hali ya juu
03 usambazaji wa maji wa mlima
04 maji ya mnara
05 Umwagiliaji wa kilimo
06 umwagiliaji wa bustani
07 ulaji wa maji ya mto
08 maji ya nyumbani