The product adopts special waterproof wire design, which can realize long-term stable conversion operation of the motor within the frequency range of 1HZ-50HZ. The frequency conversion winding design not only makes the frequency conversion deep well pump more energy saving, but also prolongs its service life. The motor winding adopts special water-resistant conductors that are resistant to high frequency impact, pulse peak voltage impact and high temperature aging, with excellent characteristics and stability.
The product is powered by three-phase AC 380V power supply, 50HZ frequency, suitable for the environment with harsh water quality conditions. Specific requirements include water temperature below 20 °C, solid impurities content is not greater than 0.01%, PH value is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The product adopts closed or water immersion structure of the motor, before use to ensure that the pump is fully filled with water, no-load test run is strictly prohibited. The pump must be completely immersed in water, not more than 70m water depth, water source to meet the requirements of the pump water output and continuous operation. In addition, the well must be vertical, the pump can only be used vertically. The wiring should be supported according to the requirements, and equipped with external overload protection device. This series of requirements to ensure the efficient and stable operation of the product, suitable for all kinds of special environment of the pump demand.
Modelo | Daloy (m3/h) | Ulo (m) |
Bilis ng pag-ikot (baguhin/punto) |
Bomba ng tubig(%) | Outlet diameter (mm) |
Applicable na rin diameter(mm) |
Na-rate power(KW) |
Na-rate boltahe(V) |
Na-rate kasalukuyang(A) |
Motorefficiency (%) | power factorcosφ | Yunit Radial Maximu size(mm) |
Puna | |||||||||
250QJ50-40 | 50 | 40 | 2875 | 72 | 80 | 250sa itaas | 9.2 | 380 | 21.7 | 78.5 | 0.82 | 233 | ||||||||||
250QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | |||||||||||||||||
250QJ50-80 | 80 | 18.5 | 40.8 | 82.0 | 0.84 | |||||||||||||||||
250QJ50-100 | 100 | 22 | 47.9 | 83.0 | 0.84 | |||||||||||||||||
250QJ50-120 | 120 | 25 | 53.8 | 84.0 | 0.84 | |||||||||||||||||
250QJ50-140 | 140 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ50-160 | 160 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ50-200 | 200 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ50-240 | 240 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ50-280 | 280 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ50-320 | 320 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ50-400 | 400 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ50-440 | 440 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ63-40 | 63 | 40 | 2875 | 74 | 80 | 250sa itaas | 11 | 380 | 25.8 | 79.0 | 0.82 | 233 | ||||||||||
250QJ63-60 | 60 | 18.5 | 40.8 | 82.0 | 0.84 | |||||||||||||||||
250QJ63-80 | 80 | 22 | 47.9 | 83.0 | 0.84 | |||||||||||||||||
250QJ63-100 | 100 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ63-120 | 120 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ63-160 | 160 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ63-200 | 200 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ63-220 | 220 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ63-260 | 260 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ63-300 | 300 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ63-360 | 360 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ80-20 | 80 | 20 | 2875 | 75 | 100 | 250sa itaas | 7.5 | 380 | 18.0 | 78.0 | 0.81 | 233 | ||||||||||
250QJ80-40 | 40 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
250QJ80-60 | 60 | 22 | 47.9 | 83.0 | 0.84 | |||||||||||||||||
250QJ80-80 | 80 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ80-100 | 100 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ80-120 | 120 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ80-160 | 80 | 160 | 2875 | 75 | 100 | 250sa itaas | 55 | 380 | 114.3 | 86.0 | 0.85 | 233 | ||||||||||
250QJ80-180 | 180 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ80-200 | 200 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ80-240 | 240 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ80-280 | 280 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ100-18 | 100 | 18 | 2875 | 75 | 100 | 250sa itaas | 7.5 | 380 | 18.0 | 78.0 | 0.81 | 233 | ||||||||||
250QJ100-36 | 36 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
250QJ100-54 | 54 | 25 | 53.8 | 84.0 | 0.84 | |||||||||||||||||
250QJ100-72 | 72 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ100-90 | 90 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ100-108 | 108 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ100-126 | 126 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ100-144 | 144 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ100-162 | 162 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ100-198 | 198 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ100-216 | 216 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ125-16 | 125 | 16 | 2875 | 76 | 125 | 250sa itaas | 9.2 | 380 | 21.7 | 78.5 | 0.82 | 233 | ||||||||||
250QJ125-32 | 32 | 18.5 | 40.8 | 82.0 | 0.84 | |||||||||||||||||
250QJ125-48 | 48 | 25 | 53.8 | 84.0 | 0.84 | |||||||||||||||||
250QJ125-64 | 64 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ125-80 | 80 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ125-96 | 96 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ125-112 | 112 | 63 | 131.0 | 86.0 | 0.85 | |||||||||||||||||
250QJ125-128 | 128 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ125-160 | 160 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ125-176 | 176 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ125-192 | 192 | 110 | 219.6 | 87.5 | 0.87 | |||||||||||||||||
250QJ140-15 | 140 | 15 | 2875 | 76 | 125 | 250sa itaas | 9.2 | 380 | 21.7 | 78.5 | 0.82 | 233 | ||||||||||
250QJ140-30 | 30 | 18.5 | 40.8 | 82.0 | 0.84 | |||||||||||||||||
250QJ140-45 | 45 | 30 | 64.2 | 84.5 | 0.84 | |||||||||||||||||
250QJ140-60 | 60 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ140-75 | 45 | 45 | 94.1 | 85.5 | 0.85 | |||||||||||||||||
250QJ140-90 | 90 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ140-105 | 140 | 105 | 2875 | 76 | 125 | 250sa itaas | 63 | 380 | 131.0 | 86.0 | 0.85 | 233 | ||||||||||
250QJ140-120 | 120 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ140-150 | 150 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ140-165 | 165 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ140-180 | 180 | 110 | 219.6 | 87.5 | 0.87 | |||||||||||||||||
250QJ200-20 | 200 | 20 | 2875 | 75 | 150 | 250sa itaas | 18.5 | 380 | 40.8 | 82.0 | 0.84 | 233 | ||||||||||
250QJ200-40 | 40 | 37 | 77.8 | 85.0 | 0.85 | |||||||||||||||||
250QJ200-60 | 60 | 55 | 114.3 | 86.0 | 0.85 | |||||||||||||||||
250QJ200-80 | 80 | 75 | 152.3 | 87.0 | 0.86 | |||||||||||||||||
250QJ200-100 | 100 | 90 | 182.8 | 87.0 | 0.86 | |||||||||||||||||
250QJ200-120 | 120 | 100 | 203.1 | 87.0 | 0.86 | |||||||||||||||||
250QJ200-140 | 140 | 125 | 249.5 | 87.5 | 0.87 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, mahigpit na ayon sa mga probisyon ng pump lift, daloy ng saklaw ng paggamit, upang maiwasan ang mababang daloy o mataas na lift pumping puwersa, ang thrust tindig at iba pang mga bahagi ng wear, ang motor overload burn
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body and so on; the motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, cable lead, etc. The main characteristic of the product is that the motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is filled with water, used to cool the motor and lubricate the bearing; the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two sand sealing rings are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand prevention structure. To prevent the pump shaft from jumping when starting up, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed on the lower part of the motor. The motor and pump bearing adopt water lubrication technology, and the stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Paghahanda bago i-install:
1. Suriin kung ang submersible pump ay nakakatugon sa mga kondisyon ng paggamit at saklaw na tinukoy sa manual.
2. Gamit ang isang mabigat na obiect na may diameter na katumbas ng maximum na panlabas na diameter ng submersible pump, sukatin kung ang inneldiameter ng wellbore ay maaaring magkasya sa submersible pump, at sukatin kung ang lalim ng balon ay nakakatugon sa mga kinakailangan sa pag-install.
3. Suriin kung malinis ang wellbore at kung ang tubig ng balon ay maputik. Huwag gumamit ng submersible electric pump upang hugasan ang welor pump na putik at tubig ng buhangin upang maiwasan ang maagang pagkasira ng submersible electric pump.
4. Suriin kung ang posisyon ng welhead installation clamp ay angkop at kung ito ay makatiis sa kalidad ng buong unit
5. Suriin kung ang mga bahagi ng submersible pump ay kumpleto at maayos na naka-install ayon sa assembly diagram sa manualAlisin ang filter screen at paikutin ang coupling upang makita kung ito ay umiikot nang flexible
6. Alisin ang turnilyo ng tubig at punan ang lukab ng motor ng malinis, hindi kinakaing unti-unti na tubig (tandaan. siguraduhing salaan ito), pagkatapos ay higpitan ang waterscrew. Pagkatapos ng 12 oras na pag-iniksyon ng tubig, ang insulation resistance ng motor ay hindi dapat mas mababa sa 150M Q kapag sinusukat sa isang 500V shaking table.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Ang naka-attach na cable wiring process diagram ay ang mga sumusunod:
8. Gumamit ng multimeter upang suriin kung ang mga three-phase na wire ay konektado at kung ang DC resistance ay tinatayang balanse.
9. Suriin kung ang kapasidad ng circuit at transpormer ay na-overload, at pagkatapos ay ikonekta ang overload na proteksyon switch o panimulang kagamitan. Tingnan ang Talahanayan 2 para sa mga partikular na modelo, at pagkatapos ay ibuhos ang isang balde ng tubig sa water pump mula sa outlet ng water pump upang lubricate ang rubber bearings sa pump, at pagkatapos ay ilagay ang submersible electric pump nang patayo at matatag. Magsimula (hindi hihigit sa isang segundo) at suriin kung ang direksyon ng pagpipiloto ay pare-pareho sa sign ng pagpipiloto. Kung hindi, palitan ang alinmang dalawang connector ng three-phase cable. Pagkatapos ay i-install ang filter at maghanda na bumaba sa balon. Kung ginagamit sa mga espesyal na okasyon (tulad ng mga kanal, kanal, ilog, pond, pond, atbp.), ang electric pump ay dapat na mapagkakatiwalaang naka-ground.
(2) Kagamitan at kasangkapan sa pag-install:
1. Isang pares ng lifting chain para sa higit sa dalawang tonelada.
2. Isang tripod na may patayong taas na hindi bababa sa apat na metro.
3. Dalawang nakabitin na lubid (wire ropes) na kayang magdala ng bigat na higit sa isang tonelada (maaaring pasanin ang bigat ng isang kumpletong hanay ng mga water pump).
4. Mag-install ng dalawang pares ng clamps (splints).
5. Wrenches, martilyo, distornilyador, mga kasangkapang elektrikal at instrumento, atbp.
(3)Pag-install ng electric pump:
1. Ang diagram ng pag-install ng submersible electric pump ay ipinapakita sa Figure 2. Ang mga partikular na sukat ng pag-install ay ipinapakita sa Talahanayan 3 "Listahan ng Mga Dimensyon ng Pag-install ng Submersible Electric Pump".
2. Ang mga submersible electric pump na may ulo na wala pang 30 metro ay maaaring iangat nang direkta sa balon gamit ang mga hose at wire rope o iba pang mga lubid ng abaka na kayang pasanin ang buong bigat ng buong makina, mga tubo ng tubig, at tubig sa mga tubo.
3. Ang mga pump na may ulo na higit sa 30 metro ay gumagamit ng mga bakal na tubo, at ang pagkakasunud-sunod ng pag-install ay ang mga sumusunod:
①Gumamit ng clamp upang i-clamp ang itaas na dulo ng bahagi ng water pump (ang motor at water pump ay konektado sa oras na ito), iangat ito gamit ang isang nakabitin na kadena, at dahan-dahang itali ito sa balon hanggang sa Ilagay ang clamp sa wellhead at alisin ang nakasabit na kadena.
② Gumamit ng isa pang pares ng clamp para i-clamp ang isang tubo, iangat ito gamit ang nakabitin na kadena 15 cm ang layo mula sa flange, at ibaba ito ng dahan-dahan. Sa pagitan ng pipe flange at pump flangeIlagay ang rubber pad sa lugar at higpitan ang pipe at pump nang pantay-pantay gamit ang bolts, nuts at spring washers.
③ Bahagyang iangat ang submersible pump, tanggalin ang clamp sa itaas na dulo ng water pump, itali ang cable sa pipe ng tubig gamit ang plastic tape, at dahan-dahang itali ito hanggang sa mailagay ang clamp sa wellhead.
④Gamitin ang parehong paraan upang itali ang lahat ng tubo ng tubig sa balon.
⑤Pagkatapos maikonekta ang lead-out cable sa control switch, ito ay konektado sa three-phase power supply.
(4) Mga bagay na dapat tandaan sa panahon ng pag-install:
1. Kung may nakitang jamming phenomenon sa panahon ng proseso ng pumping, paikutin o hilahin ang tubo ng tubig upang malampasan ang jamming point. Kung ang iba't ibang mga hakbang ay hindi pa rin gumagana, mangyaring Huwag pilitin ang pump upang maiwasan ang pinsala sa submersible electric pump at sa balon.
2. Sa panahon ng pag-install, ang isang rubber pad ay dapat ilagay sa flange ng bawat pipe at higpitan nang pantay-pantay.
3. Kapag ang bomba ng tubig ay ibinaba sa balon, dapat itong ilagay sa gitna ng tubo ng balon upang maiwasan ang pagtakbo ng bomba sa dingding ng balon nang mahabang panahon, na nagiging sanhi ng pag-vibrate ng bomba at pagwalis at pagkasunog ng motor. .
4. Tukuyin ang lalim ng water pump sa ilalim ng balon ayon sa dumadaloy na buhangin at silt na kondisyon ng balon. Huwag ibaon ang bomba sa putik. Ang distansya mula sa water pump hanggang sa ilalim ng balon ay karaniwang hindi bababa sa 3 metro (tingnan ang Larawan 2).
5. Ang lalim ng pagpasok ng tubig ng water pump ay dapat na hindi bababa sa 1-1.5 metro mula sa dynamic na lebel ng tubig hanggang sa water inlet node (tingnan ang Larawan 2). Kung hindi, ang water pump bearings ay maaaring madaling masira.
6. Ang pagtaas ng water pump ay hindi maaaring masyadong mababa. Kung hindi, kailangang mag-install ng gate valve sa wellhead water pipeline para makontrol ang pump flow sa rated flow point para maiwasang ma-overload at masunog ang motor dahil sa malalaking flow rate.
7. Kapag ang water pump ay tumatakbo, ang tubig na output ay dapat na tuluy-tuloy at kahit na, ang kasalukuyang ay dapat na stable (sa ilalim ng rated working conditions, sa pangkalahatan ay hindi hihigit sa 10% ng rated current), at dapat walang vibration o ingay. Kung mayroong anumang abnormalidad, dapat na ihinto ang makina upang malaman ang sanhi at maalis ito.
8. Kapag nag-i-install, bigyang-pansin ang setting ng grounding wire ng motor (tingnan ang Figure 2). Kapag ang tubo ng tubig ay isang bakal na tubo, akayin ito mula sa wellhead clamp; kapag ang tubo ng tubig ay isang plastik na tubo, akayin ito mula sa marka ng saligan ng electric pump.
- 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start 2.equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on 3.the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- 4.After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- 5.After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- 6.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
- 1 In the rated condition, the current exceeds 20%.
- 2 Ang pabagu-bagong lebel ng tubig ay bumababa sa bahaging pumapasok ng tubig, na nagiging sanhi ng pasulput-sulpot na tubig.
- 3 Ang submersible pump ay may matinding vibration o ingay.
- 4 Ang supply boltahe ay mas mababa sa 340 volts.
- 5 Ang isang piyus ay nasunog.
- 6 Nasira ang tubo ng suplay ng tubig.
- 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- Unit disassembly:
- 1 Untie the cable tie, remove the pipeline part, and remove the wire plate. 2 screw down the water bolt, put the water in the motor chamber.
- 3 tanggalin ang filter, maluwag ang nakapirming tornilyo sa pagkabit upang ayusin ang baras ng motor.
- 4 i-screw down ang bolt na kumukonekta sa water inlet section sa motor, at paghiwalayin ang pump mula sa motor (pansinin ang unit cushion kapag naghihiwalay, para maiwasan ang baluktot ng pump shaft)
- 5 ang disassembly sequence ng pump ay: (tingnan ang figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, kapag inaalis ang impeller, gumamit ng mga espesyal na tool para paluwagin ang conical sleeve ng fixed impeller muna, at iwasan ang baluktot at pasa ang pump shaft sa proseso ng disassembly.
- 6 ang proseso ng disassembly ng motor ay: (tingnan ang figure 1) ilagay ang motor sa platform, at alisin ang mga nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat at double head bolt mula sa ibaba ng ang motor naman, at pagkatapos ay kunin ang rotor (pansinin na huwag masira ang wire package) at sa wakas ay tanggalin ang connecting section at upper guide bearing seat.
- 7 yunit ng pagpupulong: bago ang pagpupulong, ang kalawang at dumi ng mga bahagi ay dapat linisin, at ang ibabaw ng isinangkot at mga fastener ay pinahiran ng sealant, at pagkatapos ay tipunin sa kabaligtaran na pagkakasunud-sunod ng disassembly (ang motor shaft ay gumagalaw pataas at pababa pagkatapos ng pagpupulong para sa halos isa millimeter), pagkatapos ng pagpupulong, ang pagkabit ay dapat na nababaluktot, at pagkatapos ay ang filter screen test machine. Ang mga submersible pump ay dapat ilabas mula sa balon para sa pagtatanggal-tanggal at pagpapanatili ayon sa Artikulo 5 pagkatapos ng isang taon ng operasyon, o mas mababa sa isang taon ng operasyon ngunit dalawang taon ng diving time, at ang mga pagod na bahagi ay dapat palitan.
In order to ensure the long-term use and stable performance of submersible electric pump, we have launched a convenient and practical product. The product has a unique design, easy operation, and is perfect for various application scenarios. After use, remember to discharge all the water in the electric pump, especially in winter, so as not to freeze the motor. Wind the cable and bundle it. Store it in an environment without corrosive substances and gases, and keep the temperature below 40 °C. In addition, if you do not use it for a long time, you should pay attention to prevent the submersible electric pump from rusting. Choose our products to make your work more convenient and efficient.
- Impeller
- manggas ng baras
- manggas ng goma shaft
-
Singsing sa pagbubuklod
01 Deep well water intake
02 Mataas na suplay ng tubig
03 suplay ng tubig sa bundok
04 tubig sa tore
05 Pang-agrikultura na patubig
06 patubig sa hardin
07 pag-inom ng tubig sa ilog
08 tubig sa bahay