135QJP Pompa Submersible Peep Sumur

Laksanakeun pamrosésan OEM! Numutkeun sarat pamaké, rarancang jeung pabrik rupa-rupa sarat husus motor submersible non-standar sarta pompa. Standar palaksanaan produk: GB / T2816-2014 "pompa sumur submersible", GB / T2818-2014 "motor Asynchronous ogé submersible". WhatsApp: 17855846335
PDF DOWNLOAD
Rincian
Tag
 
Tinjauan produk

Introducing the innovative QJP series fountain pump, a product of superior efficiency meticulously developed and researched by our factory. With a meticulously designed pump motor core crafted from premium cold rolled silicon steel, this fountain pump boasts exceptional magnetic conductivity, enabling seamless and heat-free starts. Unlike traditional fountain pumps, the 0JP series features motor rotor ends that utilize a unique water-lubricated alloy copper sleeve, replacing standard ball bearings. This innovative design not only mitigates issues of rust and wear caused by lack of oil but also ensures longevity and durability for the motor. Upgrade your fountain experience with the cutting-edge technology and superior performance of the QJP series fountain pump.

 

 
Kaayaan Pamakéan

The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply, and has strict requirements for clean water: water temperature shall not exceed 20 °C; solid impurities content (mass ratio) shall not exceed 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content shall not exceed 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product adopts a closed or water immersion structure motor, the submersible motor must be filled with clean water before use to prevent empty. In addition, the water can be used after filling and tightening the air release bolt. The submersible pump must be completely immersed in water to work, the diving depth shall not exceed 70m, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3m. The well water flow should meet the water output and continuous operation requirements of the submersible pump, and the water output shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally, and it must be installed vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to do no-load test without water.

 

 
Model Harti

 

135QJP Peep Well Submersible Pump

 
Rujukan Modél parsial
Modél Aliran (m3/h) Sirah
(m)

Laju puteran

(robah / titik)

 Pompa cai(%) Outlet
diameter
(mm)
Lumaku ogé
diaméterna (mm) 
Dipeunteun
kakuatan (KW)
Dipeunteun
tegangan (V)
 Dipeunteun
ayeuna (A)
Efisiensi motor (%)  power factorcosφ   Unit
Ukuran Radial Maximum (mm)
Nyarios
135QJ5-34 5 34 2850   40  135di luhur 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135di luhur 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135di luhur 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135di luhur 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135di luhur 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135di luhur 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135di luhur 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Precautions Kasalametan

Well submersible pump is a clean water pump, it is strictly prohibited to dig a new well to extract mud and silt. The voltage grade of the well pump is 380/50HZ, and the submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof and must be equipped with starting equipment, such as distribution box, etc. Starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be timely tripping. When installing and using the pump, the pump must be reliably grounded, and it is prohibited to push and pull the switch when the hands and feet are wet. Before installing and maintaining the pump, the power must be cut off, and the place where the pump is used must be clearly marked "anti-electric shock". Before going down the well or installing the pump, the motor must be filled with distilled water or clean cold water without corrosion, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be poured into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. When using the pump, the lift and flow range specified by the pump must be strictly followed to prevent the pump from having a large flow at low lift or a large pull at high lift, which will lead to serious wear and tear of the thrust bearing and other parts and components, and cause the motor to overload and burn out. After the pump is put into the well, the insulation resistance between the motor and the ground should be measured, which should not be less than 100MΩ. After the start, the voltage and current should be observed regularly, and the motor winding insulation should be checked to see if it meets the requirements; if the temperature of the pump storage location is below the freezing point, the water in the motor cavity should be drained to prevent the water in the motor cavity from freezing and damaging the motor due to low temperature.

 

 
Bubuka pikeun Struktur

bubuka ringkes struktur: bagian pompa utamana diwangun ku aci pompa, impeller, cangkang diversion, bearing karét, pariksa awak klep (bagian pilihan) jeung bagian komponén séjén.Motor utamana diwangun ku basa, tekanan régulasi pilem, dorong bearing, dorong plat , handap pituduh bearing korsi, stator, rotor, luhur pituduh bearing korsi, ring keusik, bagian inlet cai, kabel sareng komponenana séjén.


Fitur utama produk di antarana:

1, motor nyaéta motor asynchronous tilu-fase baseuh cai-kaeusi cai, rongga motor pinuh ku cai bersih, dipaké pikeun niiskeun motor jeung lubricate bearing nu, tekanan régulasi pilem di handapeun motor dipaké pikeun nyaluyukeun. bédana ékspansi jeung kontraksi tekanan cai di jero awak disababkeun ku parobahan naékna suhu motor.

 2, Dina raraga nyegah keusik dina cai sumur ti ngasupkeun motor, tungtung luhur aci motor dilengkepan dua segel minyak, sarta cingcin keusik dipasang pikeun ngabentuk struktur pencegahan keusik.

 3, Dina raraga nyegah aci pompa ti ngajalankeun up nalika dimimitian, aci pompa jeung aci motor disambungkeun ku gandeng a, sarta hiji bearing dorong luhur dipasang di bagian handap motor.

 4, The lubrication tina motor jeung bearing pompa nyaéta lubrication cai.

 5, The motor stator pungkal dijieunna tina kualitas luhur submersible motor pungkal kawat, kalawan kinerja insulasi tinggi.

 6, pompa dirancang ku komputer CAD, kalawan struktur basajan tur kinerja teknis alus.

135QJP Peep Well Submersible Pump
 
Masang

(1) Persiapan saméméh instalasi:
1. Pariksa naha pompa submersible meets kaayaan pamakéan sarta wengkuan spésifed dina manual.
2. Ngagunakeun obiect beurat kalawan diaméter sarua jeung diaméter luar maksimum pompa submersible, ngukur naha inneldiameter of wellbore nu bisa nyocogkeun ka pompa submersible, sarta ngukur naha jero sumur meets sarat instalasi.
3. Pariksa naha liang sumur beresih jeung cai sumur keruh. Pernah ngagunakeun pompa listrik submersible pikeun ngumbah leutak pompa welor jeung cai keusik pikeun nyegah karuksakan prématur kana pompa listrik submersible.
4. Pariksa naha posisi clamp pamasangan welhead cocog sareng naha éta tiasa tahan kualitas sadaya unit.
5. Pariksa lamun komponén pompa submersible geus réngsé sarta dipasang leres nurutkeun diagram assembly dina manualLeupaskeun layar filter sarta muterkeun gandeng pikeun nempo lamun rotates flexibly
6. Unscrew nu screw cai jeung fillthe rohangan motor jeung bersih, cai non corrosive (catetan. Pastikeun pikeun fil eta nepi), teras tighten waterscrew nu. Saatos 12 jam suntikan cai, résistansi insulasi motor henteu kedah kirang ti 150M Q nalika diukur nganggo méja oyag 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Diagram prosés wiring kabel napel nyaéta kieu:
135QJP Peep Well Submersible Pump

 

8. Paké multimeter pikeun pariksa naha kawat tilu-fase disambungkeun tur naha lalawanan DC kira saimbang.
9. Pariksa naha sirkuit jeung trafo kapasitas overloaded, lajeng sambungkeun switch panyalindungan overload atawa alat dimimitian. Tempo Table 2 pikeun model husus, lajengTuang ember cai kana pompa cai ti outlet pompa cai mun lubricate bantalan karét dina pompa, lajeng nempatkeun pompa listrik submersible orientasi tegak tur steady.Start (teu leuwih ti hiji detik) jeung pariksa naha arah steering konsisten jeung tanda steering. Lamun henteu, swap wae dua panyambungna tina kabel tilu-fase. Lajeng install filter sarta nyiapkeun turun sumur. Upami dianggo dina kaayaan anu khusus (sapertos parit, parit, walungan, balong, balong, jsb.), pompa listrik kedah didasarkeun sacara dipercaya.

 

(2) Alat sareng alat pamasangan:
1. Hiji pasangan ngangkat ranté pikeun leuwih ti dua ton.
2. A tripod kalayan jangkungna nangtung teu kurang ti opat méter.
3. Dua tali gantung (tali kawat) nu bisa nanggung beurat leuwih ti hiji ton (bisa nanggung beurat hiji set lengkep pompa cai).
4. Pasang dua pasang jepitan (splints).
5. Wrenches, palu, obeng, pakakas listrik jeung instrumen, jsb.

 

(3) pamasangan pompa listrik:
1. Diagram instalasi tina pompa listrik submersible ditémbongkeun dina Gambar 2. Dimensi instalasi husus ditémbongkeun dina Table 3 "Daptar Dimensi Instalasi Pompa Electric Submersible".

 

2. Pompa listrik submersible kalawan sirah kirang ti 30 méter bisa hoisted langsung kana sumur ngagunakeun hoses jeung tali kawat atawa tali hemp lianna nu bisa nanggung beurat pinuh ku sakabéh mesin, pipa cai, jeung cai dina pipa.

 

3. Pompa kalayan sirah leuwih ti 30 méter ngagunakeun pipa baja, sarta runtuyan instalasi nyaéta kieu:
①Pake jepitan pikeun ngajepit tungtung luhur bagian pompa cai (motor sareng pompa cai parantos nyambungkeun waktos ayeuna), angkat nganggo ranté gantung, teras dasikeun lalaunan kana sumur dugi ka Pasang jepitan dina sirah sumur teras cabut ranté gantung.
② Paké sapasang clamps séjén pikeun clamp pipa, angkat eta kalawan ranté gantung 15 cm jauh ti flange, sarta nurunkeun eta lalaunan. Antara flange pipe jeung flange pompa Pasang pad karét di tempat sarta tighten pipa na pompa merata kalawan bolts, kacangan sarta spring washers.
③ Angkat pompa beuleum saeutik, cabut jepitan dina tungtung luhur pompa cai, dasi kabelna pageuh kana pipa cai nganggo pita plastik, teras talitikeun lalaunan dugi ka jepitan disimpen dina sumur.
④Paké cara nu sarua pikeun ngabeungkeut sakabéh pipa cai kana sumur.
⑤Saatos kabel timbal-kaluar disambungkeun ka saklar kontrol, éta disambungkeun ka catu daya tilu-fase.


(4) Hal-hal anu kedah diperhatoskeun nalika instalasi:
1. Lamun fenomena jamming kapanggih salila prosés ngompa, balikkeun atawa tarik pipa cai pikeun nungkulan titik jamming. Lamun sagala rupa ukuran masih teu hasil, mangga Ulah maksakeun pompa ka handap pikeun nyegah karuksakan kana pompa listrik submersible jeung sumur.
2. Salila instalasi, a Pad karét kudu ditempatkeun di flange unggal pipa na tightened merata.
3. Nalika pompa cai diturunkeun kana sumur, éta kudu ditempatkeun di tengah-tengah pipa sumur pikeun nyegah pompa tina ngajalankeun kana témbok sumur pikeun lila, ngabalukarkeun pompa ngageter jeung motor keur nyapu jeung kaduruk. .
4. Nangtukeun jero pompa cai ka handapeun sumur dumasar kana keusik anu ngalir sareng kaayaan leutak sumur. Ulah ngubur pompa dina leutak. Jarak ti pompa cai ka handapeun sumur umumna teu kurang ti 3 méter (tingali Gambar 2).
5. Jero asupna cai tina pompa cai kedah teu kurang ti 1-1,5 méter ti tingkat cai dinamis ka titik inlet cai (tingali Gambar 2). Upami teu kitu, bantalan pompa cai tiasa gampang ruksak.
6. The lift tina pompa cai teu tiasa teuing low. Upami teu kitu, klep gerbang kedah dipasang dina pipa cai sumur pikeun ngontrol aliran pompa dina titik aliran anu dipeunteun pikeun nyegah motor kabeungharan sareng kaduruk kusabab laju aliran anu ageung.
7. Nalika pompa cai dijalankeun, kaluaran cai kedah kontinyu sareng malah, arus kedah stabil (dina kaayaan kerja anu dipeunteun, umumna henteu langkung ti 10% tina arus anu dipeunteun), sareng teu kedah aya geter atanapi bising. Upami aya abnormalitas, mesin kedah dieureunkeun pikeun milari panyababna sareng ngaleungitkeunana.
8. Nalika masang, nengetan setelan tina kawat grounding motor (tingali Gambar 2). Nalika pipa cai nyaéta pipa baja, ngarah tina clamp wellhead; lamun pipa cai téh pipa plastik, ngarah tina tanda grounding tina pompa listrik.

 

 
Pangropéa sareng Pangropéa
  • Pamasangan pompa 1.Submersible parantos réngsé, pariksa deui résistansi insulasi sareng konduksi tilu fase tina saklar, pariksa alat sareng ngamimitian kasalahan sambungan alat, upami teu aya masalah, tiasa ngamimitian sidang, saatos ngamimitian alat. nunjukkeun bacaan naha leuwih ti nameplate diatur tegangan dipeunteun jeung ayeuna, niténan noise pompa jeung fenomena Geter, sagalana geus normal bisa nempatkeun kana operasi.
  • 2.The operasi mimiti pompa pikeun opat jam, kudu Cicing turun gancang nguji résistansi insulasi termal motor, nilaina teu kudu kirang ti 0,5 megaohm.
  • 3.After nu shutdown pompa, kudu dimimitian sanggeus hiji interval lima menit, pikeun nyegah kolom cai dina pipe geus teu lengkep réfluks disababkeun ku arus motor kaleuleuwihan sarta burnout.
  • 4.After pompa kana operasi normal, guna manjangkeun umur layanan na, mariksa tegangan suplai, gawe arus jeung insulasi lalawanan téh normal, lamun kapanggih kaayaan di handap, kudu geuwat Cicing turun ngungkulan.
  • - dina kaayaan dipeunteun, ayeuna leuwih ti 20%.
  • - tingkat cai dinamis kana bagian inlet cai, ngabalukarkeun cai intermittent.
  • - pompa submersible Geter parna atawa noise.
  • - tegangan suplai leuwih handap 340 volt.
  • - sekering dibeuleum kaluar fase.
  • - karuksakan pipa cai.
  • - motor ka résistansi insulasi termal kirang ti 0,5 megaohm.
  •  
  • 5. Unit disassembly:
  • (1)untie cable tether, remove the pipeline part, remove the wire plate.
  • (2)screw down the water bolt, put out the motor cavity water.
  • (3)remove the filter, loosening the coupling fixed motor shaft fixed screw.
  • (4)screw down the inlet joint and motor bolt, the pump and motor separate (separation attention will unit mat flat, prevent the pump shaft bending)
  • (5)pump disassembly sequence is: (see figure 1) inlet joint, impeller, diversion shell, impeller...... check valve body, dismantle the impeller with special tools will first fix the conical sleeve loosening, the disassembly process to avoid the pump shaft bending and each bump.
  • (6)motor disassembly process is: (see figure 1) the motor placed on the platform, from the bottom of the motor in turn removed double head bolt (pull rod bolt) on the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt, and then take out the rotor (pay attention not to damage the wire package) finally removed the connecting section and upper guide bearing seat.
  • (7)unit assembly: before assembly should be the parts of the rust, dirt clean, each mating surface and fastener coated with sealant, and then in turn according to the reverse sequence of disassembly assembly (after assembly motor shaft up and down momentum is about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • 6.submersible pump every operation for a year, or less than a year of operation but the submersible time has reached two years, should be proposed in accordance with the fifth paragraph of the well to be dismantled and repaired, replace the worn parts.

 

 
Panyimpenan sarta dijagaan

This product is a brand new submersible pump, suitable for a variety of occasions for pump work needs. In order to ensure the long-term use and stable performance of the product, the user needs to clean the water in the motor cavity of the pump after use (especially in winter to prevent the motor from freezing), coil up and tie the cable, and then store the product in an environment free of corrosive substances and gases, with the temperature kept below 40 °C in the room. In addition, if the submersible pump is not used for a long time, special attention should be paid to prevent rust to protect the service life of the product. This submersible pump will provide users with convenient and efficient pump solutions to ensure the safe and stable operation of the pump equipment.

 

 
Ngagem Bagian
  • Impeller
  • leungeun baju aci
  • leungeun baju karét aci
  • Cingcin segel

 
Skenario Aplikasi

01 Asupan cai sumur jero

02 Pasokan cai luhur

03 suplai cai gunung 

04 cai munara

05 irigasi tatanén

06 irigasi kebon

07 asupan cai walungan

08 cai domestik

 

Mun anjeun kabetot dina produk urang, Anjeun bisa milih ninggalkeun informasi anjeun didieu, sarta kami bakal di kabaran ku anjeun teu lila.


Tulis pesen anjeun di dieu sareng kirimkeun ka kami

Mun anjeun kabetot dina produk urang, Anjeun bisa milih ninggalkeun informasi anjeun didieu, sarta kami bakal di kabaran ku anjeun teu lila.


suSundanese