300QJB Deep Sumur Submersible Pompa

Laksanakeun pamrosésan OEM! Numutkeun sarat pamaké, rarancang jeung pabrik rupa-rupa sarat husus motor submersible non-standar sarta pompa. Standar palaksanaan produk: GB / T2816-2014 "pompa sumur submersible", GB / T2818-2014 "motor Asynchronous ogé submersible". WhatsApp: 17855846335
PDF DOWNLOAD
Rincian
Tag
 
Tinjauan produk

This product adopts a variable frequency winding design, ensuring the motor's smooth conversion operation between 1HZ and 50HZ for a long time. This innovative design not only saves energy and prolongs service life, but also provides lasting and reliable performance in the work process. Whether in a home or industrial environment, this product will provide users with excellent efficiency and reliability, making it an indispensable tool in the manufacturing and production process.

 

Kaayaan Pamakéan

1, catu daya: tilu-fase AC 380V (kasabaran + / - 5%), 50HZ (kasabaran + / - 1%).

2, kualitas cai:

(1) suhu cai teu leuwih luhur ti 20 °C;

(2) eusi najis padet (rasio massa) teu leuwih gede ti 0,01%;

(3) Nilai PH (pH) 6,5-8,5;

(4) eusi hidrogén sulfida teu leuwih gede ti 1.5mg/L;

(5) eusi ion klorida teu leuwih gede ti 400mg/L.

3, motor ditutup atawa struktur baseuh cai-kaeusi, saméméh pamakéan rongga motor submersible kudu pinuh ku cai bersih, pikeun nyegah palsu pinuh, lajeng tighten suntik cai, bolts release hawa, disebutkeun teu diwenangkeun ngagunakeun.

4, submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m. 5, the well water flow should be able to meet the submersible pump water output and continuous operation, the submersible pump water output should be controlled at 0.7 - 1.2 times the rated flow.

6, sumur kudu lempeng, pompa submersible teu bisa dipaké atawa dumped, ngan pamakéan nangtung.

7, pompa submersible kudu loyog jeung kabel nurutkeun sarat, jeung alat panyalindungan overload éksternal.

8, pompa nu mastikeun dilarang tanpa cai no-beban mesin test

 

 
Model Harti

 
Rujukan Modél parsial
Modél Aliran (m3/h) Sirah
(m)

Laju puteran

(robah / titik)

Pompa cai(%)  Outlet
diameter
(mm)
Lumaku ogé
diaméterna (mm) 
 Dipeunteun
power(KW)
Dipeunteun
tegangan (V)
Dipeunteun
ayeuna (A)
Efisiensi motor (%) faktor kakuatan φ   Unit
Ukuran Radial Maximum (mm)
Nyarios
300QJ200-40 200 40 2900 76 150  300di luhur 37 380 77.8 85.0 0.85 281  
300QJ200-60 60 55 115 85.5 0.85  
300QJ200-80 80 75 154.1 86.0 0.86  
300QJ200-100 100 90 183.8 86.5 0.86  
300QJ200-120 120 100 204.3 86.5 0.86  
300QJ200-140 140 125 249.5 87.5 0.87  
300QJ200-160 160 140 277.8 88.0 0.87  
300QJ200-180 180 160 317.5 88.0 0.87  
300QJ200-200 200 185 367.2 88.0 0.87  
300QJ200-240 240 220 436.6 88.0 0.87  
300QJ320-30 320 30 2900 77 200  300di luhur 45 380 94.6 85.0 0.85 281  
300QJ320-60 60 90 183.8 86.5 0.86  
300QJ320-90 90 125 249.5 87.5 0.87  
300QJ320-120 120 160 317.5 88.0 0.87  

 

 
Precautions Kasalametan

 This well submersible pump is a pump suitable for clean water. It is strictly prohibited to dig new wells and pump dirty water containing sediment. The voltage grade of the pump is 380/50HZ, and other submersible motors with different voltage grades need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as short circuit overload protection, dephase protection, undervoltage protection, grounding protection and idling protection, etc., in order to prevent timely tripping when abnormal conditions occur. During the installation and use process, the pump must have reliable grounding. It is strictly prohibited to push and pull the switch when your hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. An obvious sign "anti-electric shock" must be set up where the pump is used. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water, and the water inlet and outlet bolts must be tightened. When testing the pump on the ground, water must be filled into the pump chamber to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the steering is correct. Pay attention to safety when the pump is upright to prevent toppling and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump with a large flow at low lift or produce a large pull at high lift, resulting in extreme wear of thrust bearings and other parts, the motor overload and burn. After the pump into the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ. After starting, regularly observe the voltage and current, and check whether the motor winding insulation meets the requirements; if the pump storage temperature below freezing point, should be drained to prevent the water in the motor cavity from freezing and cause the motor damage due to low temperature.

 

 
Bubuka pikeun Struktur

The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components.


Fitur utama produk di antarana:

  1. 1.The motor is a water-filled wet submersible three-phase asynchronous motor. The motor cavity is filled with clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water in the body caused by the temperature rise of the motor.
  2. 2. In order to prevent the sand particles from entering the motor, two sand seals are installed at the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring.
  3. 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed at the bottom of the motor.
  4. 4. The lubrication method of the motor and the pump bearing is water lubrication.
  5. 5. The stator winding of the motor adopts high quality submersible motor winding wire with high insulation performance.
  6. 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.
 
Masang

(1) Persiapan saméméh instalasi:
1. Pariksa naha pompa submersible meets kaayaan pamakéan sarta wengkuan spésifed dina manual.
2. Ngagunakeun obiect beurat kalawan diaméter sarua jeung diaméter luar maksimum pompa submersible, ngukur naha inneldiameter of wellbore nu bisa nyocogkeun ka pompa submersible, sarta ngukur naha jero sumur meets sarat instalasi.
3. Pariksa naha liang sumur beresih jeung cai sumur keruh. Pernah ngagunakeun pompa listrik submersible pikeun ngumbah leutak pompa welor jeung cai keusik pikeun nyegah karuksakan prématur kana pompa listrik submersible.
4. Pariksa naha posisi clamp pamasangan welhead cocog sareng naha éta tiasa tahan kualitas sadaya unit.
5. Pariksa lamun komponén pompa submersible geus réngsé sarta dipasang leres nurutkeun diagram assembly dina manualLeupaskeun layar filter sarta muterkeun gandeng pikeun nempo lamun rotates flexibly
6. Unscrew nu screw cai jeung fillthe rohangan motor jeung bersih, cai non corrosive (catetan. Pastikeun pikeun fil eta nepi), teras tighten waterscrew nu. Saatos 12 jam suntikan cai, résistansi insulasi motor henteu kedah kirang ti 150M Q nalika diukur nganggo méja oyag 500V.
7. Sambungan kabel, potong leungeun baju karét 120mm tina hiji tungtung kabel kaluar jeung kabel cocog jeung péso hiji tukang listrik urang stagger panjang tilu kawat inti dina bentuk stepped, mesek off inti tambaga 20mm, kerok tina oksida. lapisan on theoutside tina kawat tambaga jeung péso atawa lawon keusik, terus selapkeun dua kawat disambungkeun ends di palirs.After tying lapisan pageuh jeung kawat tambaga rupa, solder eta tuntas jeung pageuh, jeung keusik wae. burrs dina beungeut cai. Teras, pikeun tilu sambungan, anggo pita insulasi polyvester pikeun ngabungkus aranjeunna dina cara anu ditumpuk pikeun tilu laver. Bungkus dua tungtung lapisan bungkus sareng benang nyion, teras nganggo metode semi tumpuk pikeun mungkus pita tilu lapisan. Bungkus outellayer ku pita insulasi tekanan tinggi pikeun tilu lapisan. Tungtungna, tilelep tilu untaian babarengan jeung sababaraha kali bungkus eta pikeun lima lapisan jeung pita tekanan tinggi. Unggal lapisan kudu dihijikeun pageuh, sarta mendi interlayer kudu kedap tur fimm pikeun nyegah cai ti penetrating sarta ngaruksak insulasi nu, Saatos wrapping, soak dina cai dina suhu kamar 20 'c salila 12 jam, sarta ngukur lalawanan insulasi ku méja oyag. , nu teu kudu kirang ti 100M Ω

 

Diagram prosés wiring kabel napel nyaéta kieu:

 

8. Paké multimeter pikeun pariksa naha kawat tilu-fase disambungkeun tur naha lalawanan DC kira saimbang.
9. Pariksa naha sirkuit jeung trafo kapasitas overloaded, lajeng sambungkeun switch panyalindungan overload atawa alat dimimitian. Tempo Table 2 pikeun model husus, lajengTuang ember cai kana pompa cai ti outlet pompa cai mun lubricate bantalan karét dina pompa, lajeng nempatkeun pompa listrik submersible orientasi tegak tur steady.Start (teu leuwih ti hiji detik) jeung pariksa naha arah steering konsisten jeung tanda steering. Lamun henteu, swap wae dua panyambungna tina kabel tilu-fase. Lajeng install filter sarta nyiapkeun turun sumur. Upami dianggo dina kaayaan anu khusus (sapertos parit, parit, walungan, balong, balong, jsb.), pompa listrik kedah didasarkeun sacara dipercaya.

 

(2) Alat sareng alat pamasangan:
1. Hiji pasangan ngangkat ranté pikeun leuwih ti dua ton.
2. A tripod kalayan jangkungna nangtung teu kurang ti opat méter.
3. Dua tali gantung (tali kawat) nu bisa nanggung beurat leuwih ti hiji ton (bisa nanggung beurat hiji set lengkep pompa cai).
4. Pasang dua pasang jepitan (splints).
5. Wrenches, palu, obeng, pakakas listrik jeung instrumen, jsb.

 

(3) pamasangan pompa listrik:
1. Diagram instalasi tina pompa listrik submersible ditémbongkeun dina Gambar 2. Dimensi instalasi husus ditémbongkeun dina Table 3 "Daptar Dimensi Instalasi Pompa Electric Submersible".

 

2. Pompa listrik submersible kalawan sirah kirang ti 30 méter bisa hoisted langsung kana sumur ngagunakeun hoses jeung tali kawat atawa tali hemp lianna nu bisa nanggung beurat pinuh ku sakabéh mesin, pipa cai, jeung cai dina pipa.

 

3. Pompa kalayan sirah leuwih ti 30 méter ngagunakeun pipa baja, sarta runtuyan instalasi nyaéta kieu:
①Pake jepitan pikeun ngajepit tungtung luhur bagian pompa cai (motor sareng pompa cai parantos nyambungkeun waktos ayeuna), angkat nganggo ranté gantung, teras dasikeun lalaunan kana sumur dugi ka Pasang jepitan dina sirah sumur teras cabut ranté gantung.
② Paké sapasang clamps séjén pikeun clamp pipa, angkat eta kalawan ranté gantung 15 cm jauh ti flange, sarta nurunkeun eta lalaunan. Antara flange pipe jeung flange pompa Pasang pad karét di tempat sarta tighten pipa na pompa merata kalawan bolts, kacangan sarta spring washers.
③ Angkat pompa beuleum saeutik, cabut jepitan dina tungtung luhur pompa cai, dasi kabelna pageuh kana pipa cai nganggo pita plastik, teras talitikeun lalaunan dugi ka jepitan disimpen dina sumur.
④Paké cara nu sarua pikeun ngabeungkeut sakabéh pipa cai kana sumur.
⑤Saatos kabel timbal-kaluar disambungkeun ka saklar kontrol, éta disambungkeun ka catu daya tilu-fase.


(4) Hal-hal anu kedah diperhatoskeun nalika instalasi:
1. Lamun fenomena jamming kapanggih salila prosés ngompa, balikkeun atawa tarik pipa cai pikeun nungkulan titik jamming. Lamun sagala rupa ukuran masih teu hasil, mangga Ulah maksakeun pompa ka handap pikeun nyegah karuksakan kana pompa listrik submersible jeung sumur.
2. Salila instalasi, a Pad karét kudu ditempatkeun di flange unggal pipa na tightened merata.
3. Nalika pompa cai diturunkeun kana sumur, éta kudu ditempatkeun di tengah-tengah pipa sumur pikeun nyegah pompa tina ngajalankeun kana témbok sumur pikeun lila, ngabalukarkeun pompa ngageter jeung motor keur nyapu jeung kaduruk. .
4. Nangtukeun jero pompa cai ka handapeun sumur dumasar kana keusik anu ngalir sareng kaayaan leutak sumur. Ulah ngubur pompa dina leutak. Jarak ti pompa cai ka handapeun sumur umumna teu kurang ti 3 méter (tingali Gambar 2).
5. Jero asupna cai tina pompa cai kedah teu kurang ti 1-1,5 méter ti tingkat cai dinamis ka titik inlet cai (tingali Gambar 2). Upami teu kitu, bantalan pompa cai tiasa gampang ruksak.
6. The lift tina pompa cai teu tiasa teuing low. Upami teu kitu, klep gerbang kedah dipasang dina pipa cai sumur pikeun ngontrol aliran pompa dina titik aliran anu dipeunteun pikeun nyegah motor kabeungharan sareng kaduruk kusabab laju aliran anu ageung.
7. Nalika pompa cai dijalankeun, kaluaran cai kedah kontinyu sareng malah, arus kedah stabil (dina kaayaan kerja anu dipeunteun, umumna henteu langkung ti 10% tina arus anu dipeunteun), sareng teu kedah aya geter atanapi bising. Upami aya abnormalitas, mesin kedah dieureunkeun pikeun milari panyababna sareng ngaleungitkeunana.
8. Nalika masang, nengetan setelan tina kawat grounding motor (tingali Gambar 2). Nalika pipa cai nyaéta pipa baja, ngarah tina clamp wellhead; lamun pipa cai téh pipa plastik, ngarah tina tanda grounding tina pompa listrik.

 

 
Pangropéa sareng Pangropéa
  • 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  • 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  • 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  •  
  • 4.After the pump is running normally, in order to prolong its service life, it is necessary to check the power supply voltage, running current and insulation resistance regularly to see if they are normal.If the following conditions are found, the equipment should be shut down immediately to troubleshoot.
  • (1)Under the rated working conditions, the current exceeds 20% of the rated value.
  • (2)The dynamic water level drops to the inlet part, resulting in intermittent water discharge.
  • (3)The submersible pump vibrates violently or emits noisy noise.
  • (4)The power supply voltage is lower than 340 volts.
  • (5)A fuse is burned out.
  • (6)The water pipe is damaged.
  • (7)The thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
  • These inspections will help to ensure the normal operation of the pump, improve its reliability and stability, so as to ensure its durability and service life.
  •  
  • 5.unit disassembly:
  • - untie cable rope, remove the pipeline part, remove the wire plate.
  • - screw handap baud cai, nempatkeun cai dina chamber motor.
  • - remove the filter, loose the fixed screw on the coupling fixed motor shaft.
  • - screw down the bolt connected with the motor at the inlet junction, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)
  • - pump disassembly sequence is: (see figure 1) inlet junction, impeller, guide housing, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.
  • - motor disassembly process is: (see figure 1) place the motor on the platform, remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn, then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • - unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • 6.The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Panyimpenan sarta dijagaan

 1, nempatkeun kaluar cai dina rohangan motor (utamana dina usum tiis pikeun nyegah motor ti katirisan), sarta dasi kabel ogé.

 2, nyimpen di kamar indoor tanpa zat korosif jeung gas, kalawan suhu handap 40 °C.

 3, pamakéan jangka panjang kedah nengetan pencegahan karat tina pompa submersible.

 

 
Ngagem Bagian
  • Impeller
  • leungeun baju aci
  • leungeun baju karét aci
  • Cingcin segel

 
Skenario Aplikasi

01 Asupan cai sumur jero

02 Pasokan cai luhur

03 suplai cai gunung 

04 cai munara

05 irigasi tatanén

06 irigasi kebon

07 asupan cai walungan

08 cai domestik

 

Mun anjeun kabetot dina produk urang, Anjeun bisa milih ninggalkeun informasi anjeun didieu, sarta kami bakal di kabaran ku anjeun teu lila.


Tulis pesen anjeun di dieu sareng kirimkeun ka kami

Mun anjeun kabetot dina produk urang, Anjeun bisa milih ninggalkeun informasi anjeun didieu, sarta kami bakal di kabaran ku anjeun teu lila.


suSundanese