QJ series submersible pump is a water lifting machine that submersible motor and pump directly connected to work in the water. The series of pumps are vertical, with small use area, compact structure, simple installation, easy maintenance and operation. Widely used in agricultural irrigation municipal engineering, water conservancy engineering, urban and industrial and mining enterprises water supply and drainage, drought relief and flood relief. Flow range 5-500m3/h, lift 4-800m, power 3-315KW.
1, Stroumversuergung: Dräi-Phase AC 380V (Toleranz +/- 5%), 50HZ (Toleranz +/- 1%).
2, Waasserqualitéit:
(1) water temperature is not higher than 20 °C;
(2) fest Gëftstoffer Inhalt (Mass Verhältnis) ass net méi wéi 0,01%;
(3) PH Wäert (pH) 6,5-8,5;
(4) Waasserstoff sulfide Inhalt ass net méi grouss wéi 1.5mg / L;
(5) Chloridiongehalt ass net méi wéi 400mg/L.
3, the motor is closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use 4, submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m. 5, the well water flow should be able to meet the submersible pump water output and continuous operation, the submersible pump water output should be controlled at 0.7 - 1.2 times the rated flow.
6, the well should be straight, the submersible pump can not be used or dumped, only vertical use. 7, the submersible pump must be matched with the cable according to the requirements, and the external overload protection device. 8, the pump is strictly prohibited without water no-load test machine
Modell | Flow (m3/h) | Kapp (m) |
Rotatingspeed(change/point) | Waasserpompel (%) | Outlet Duerchmiesser (mm) |
Gutt applicabel Duerchmiesser (mm) |
Bewäert Muecht (KW) |
Bewäert Spannung (V) |
Bewäert aktuell (A) |
Motoreffizienz (%) | power factorcosφ | Eenheet Radial Maximum Gréisst (mm) |
Remarque | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125uewen | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125uewen | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125uewen | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125uewen | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125uewen | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125uewen | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125uewen | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125uewen | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125uewen | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125uewen | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125uewen | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125uewen | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125uewen | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125uewen | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
1, gutt submersible Pompel fir propper Waasser Pompel, verbitt déi nei gutt, Pompel Sediment a Bulli Waasser,
2, Well Waasser Pompel Spannungsgrad 380/50HZ, d'Benotzung vun anere Spannungsgraden vun Tauchmotoren muss personaliséiert ginn. Den ënnerierdesche Kabel muss waasserdichte Kabel benotzen, muss mat Startausrüstung ausgestatt sinn, sou wéi Verdeelungsbox, Start net prett sollt allgemeng benotzt Motor iwwergräifend Schutzfunktioun hunn, sou wéi Kuerzschluss Iwwerlaaschtschutz, Phaseschutz, Ënnerspannungsschutz, Buedemschutz, Leedungsschutz , Am Fall vun anormal Konditiounen, soll de Schutz Apparat virgesinnen Aktioun Rees ginn.
3, d'Installatioun an d'Benotzung vun der Pompel muss zouverlässeg Buedem sinn, verbitt de Push- a Pull-Schalter wann d'Hänn a Féiss naass sinn, muss d'Energieversuergung virun der Installatioun an der Ënnerhalt vun der Pompel ofschneiden, d'Pompel benotzt Plaz fir opzestellen " fir elektresch Schock ze vermeiden" evident Zeechen:
4, erof an d'Wuel oder virun der Installatioun, de Motor Kavitéit muss mat destilléiert Waasser oder net-corrosive propper kal kache Waasser gefëllt ginn, zouzedrécken der / Waasser bolt, d'Pompel um Buedem Test Laf, muss zu der Pompel Chamber Waasser Schmierstoff Gummistécker ginn Lager, Instant Start net méi wéi eng Sekonn, kuckt ob d'Lenkung d'selwecht ass wéi d'Steierungsinstruktioun. Wann d'Pompel oprecht ass, oppassen op d'Sécherheet, verhënnert d'Verletzung vun ëmdréinen.
5, strikt no de Bestëmmunge vun der Pompel Lift, Flux Gamme vun benotzen, niddereg Flux oder héich Lift Pompel Kraaft ze verhënneren, de Schub Lager an aner Deeler vun der zouzedrécken, de Motor iwwerlaascht verbrannt
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
Structure brief introduction: the pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, and cable.
D'Haaptmerkmale vum Produkt enthalen:
1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

(1) Virbereedung virun der Installatioun:
1. Iwwerpréift ob d'Tauchtpompel d'Benotzungsbedéngungen an den Ëmfang entsprécht, déi am Handbuch spezifizéiert sinn.
2. Benotzt e schwéieren Objet mat engem Duerchmiesser gläich wéi de maximalen äusseren Duerchmiesser vun der Tauchpompel, moosst ob den Inneldiameter vun der Wellbore d'Tauchpompel passt, a moosst ob d'Wueldéift d'Installatiounsufuerderunge entsprécht.
3. Iwwerpréift ob de Wellbore propper ass an ob d'Wuelwasser türbid ass. Benotzt ni eng submersibel elektresch Pompel fir de Welor Pompel Schlamm a Sand Waasser ze wäschen fir virzäitegen Schued un der Tauchtpompel ze vermeiden.
4. Iwwerpréift ob d'Positioun vun der Wellhead Installatiounsklem gëeegent ass an ob et d'Qualitéit vun der ganzer Eenheet widderstoen kann
5. Iwwerpréift ob d'Tauchpompelkomponenten komplett sinn a richteg installéiert sinn no dem Montagediagramm am Handbuch De Filterbildschierm ewechhuelen an d'Kupplung rotéieren fir ze kucken ob se flexibel rotéiert
6. Schrauwen d'Waasserschrauwen un a fëllt d'Motorhuelraum mat propperem, net ätzendem Waasser (Notiz. Gitt sécher datt Dir se fillt), da dréit d'Waasserschraube fest. No 12 Stonnen Waasserinjektioun, däerf d'Isolatiounsresistenz vum Motor net manner wéi 150M Q sinn wann se mat engem 500V Schüttdësch gemooss ginn.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Dat befestegt Kabelverdrahtungsdiagramm ass wéi follegt:
8. Benotzt e Multimeter fir z'iwwerpréiwen ob d'Drei-Phas-Drähte verbonne sinn an ob d'DC-Resistenz ongeféier ausgeglach ass.
9. Kontrolléiert ob de Circuit an den Transformatorkapazitéit iwwerlaascht sinn, a verbënnt dann den Iwwerlaaschtschutzschalter oder Startausrüstung. Gesinn Table 2 fir spezifesch Modeller, an dann Pour engem Eemer Waasser an d'Waasser Pompel aus dem Waasser Pompel Outlet der Gummistécker Lager an der Pompel ze schmieren, an dann Plaz der submersible elektresch Pompel oprecht a steady.Start (net méi wéi eng Sekonn) a kontrolléiert ob d'Steierungsrichtung mat dem Lenkzeechen konsequent ass. Wann net, swap all zwee Stecker vun der dräi-Phase Kabel. Dann installéiert de Filter a preparéieren der gutt erof goen. Wann se a speziellen Occasiounen benotzt ginn (wéi Grape, Gruef, Flëss, Weiere, Weiere, etc.), muss d'elektresch Pompel zouverlässeg Buedem sinn.
(2) Installatioun Ausrüstung an Tools:
1. Ee Paar Liftketten fir méi wéi zwee Tonnen.
2. E Stativ mat enger vertikaler Héicht vun net manner wéi véier Meter.
3. Zwee hängend Seeler (Draadseeler), déi e Gewiicht vu méi wéi engem Ton droen kënnen (kann d'Gewiicht vun engem komplette Set vu Waasserpompelen droen).
4. Installéiert zwee Puer Klameren (Splint).
5. Wrenches, Hammers, screwdrivers, elektresch Handwierksgeschir an Instrumenter, etc.
(3) Elektresch Pompel Installatioun:
1. D'Installatiounsdiagramm vun der Tauchpompel gëtt an der Figur 2. Déi spezifesch Installatiounsdimensioune ginn an der Tabell 3 "Lëscht vun Installatiounsdimensioune vun der Tauchtpompel" gewisen.
2. Submersibel elektresch Pompelen mat engem Kapp manner wéi 30 Meter kënnen direkt an d'Brunn geheien ginn mat Schlauchen a Drahtseeler oder aner Hanf Seeler, déi de ganze Gewiicht vun der ganzer Maschinn, Waasserleitungen a Waasser an de Päifen droen kënnen.
3. Pompelen mat engem Kapp vu méi wéi 30 Meter benotzen Stahlleitungen, an d'Installatiounssequenz ass wéi follegt:
①Benotzt eng Klemm fir den ieweschten Enn vum Waasserpompeldeel ze klemmen (de Motor a Waasserpompel sinn zu dësem Zäitpunkt ugeschloss), hieft se mat enger hängender Kette op, a bindt se lues an d'Brunn bis d'Klemm op de Brunnkopf setzt an d'Klemm erofhuelen. hängend Kette.
② Benotzt en anert Pair vu Klameren fir e Päif ze klemmen, hieft et mat enger hängender Kette 15 cm ewech vum Flange, a setzt se lues erof. Zwëschen Päifflens a Pompelflens Setzt d'Gummi-Pad op der Plaz a spannen d'Päif a pompelen gläichméisseg mat Bolzen, Nëss a Fréijoerswäschen.
③ Lift d'Tauchtpompel liicht op, huelt d'Klemm op der ieweschter Enn vun der Waasserpompel erof, bannen de Kabel fest an d'Waasserleitung mat engem Plastiksband, a bannen se lues erof bis D'Klemm op der Wellhead plazéiert ass.
④Benotz déiselwecht Method fir all Waasserleitungen an d'Bunn ze verbannen.
⑤Nodeems de Lead-Out-Kabel un de Kontrollschalter ugeschloss ass, ass et mat der Dräi-Phase-Energieversuergung ugeschloss.
(4) Saachen ze notéieren während der Installatioun:
1. Wann e Stau-Phänomen während dem Pompelprozess fonnt gëtt, dréit oder zitt d'Waasserleitung fir de Staupunkt ze iwwerwannen. Wann verschidde Moossnamen nach ëmmer net funktionnéieren, w.e.g. Kraaft d'Pompel net erof fir Schued un der Tauchtpompel an der Brunn ze vermeiden.
2. Bei der Installatioun sollt e Gummi-Pad am Flange vun all Päif plazéiert ginn a gläichméisseg festgehalen ginn.
3. Wann d'Waasserpompel an d'Wuel erofgesat gëtt, sollt et an der Mëtt vun der Brunnpipe plazéiert ginn, fir datt d'Pompel net laang géint d'Wuelmauer leeft, sou datt d'Pompel vibréiert an de Motor schëdden a brennt. .
4. Bestëmmt d'Tiefe vun der Waasserpompel bis zum Buedem vun der Brunn no de fléissende Sand a Siltbedingunge vun der Brunn. Begruewen d'Pompel net am Bulli. D'Distanz vun der Waasserpompel bis zum Enn vun der Brunn ass normalerweis net manner wéi 3 Meter (kuckt Figur 2).
5. D'Waasserentrée Tiefe vun der Waasserpompel sollt net manner wéi 1-1,5 Meter vum dynamesche Waasserniveau op d'Waasserinletknuet sinn (kuckt Figur 2). Soss kënnen d'Waasserpompellager liicht beschiedegt ginn.
6. De Lift vun der Waasserpompel kann net ze niddreg sinn. Soss muss e Paartventil op der Wellhead Waasserleitung installéiert ginn fir de Pompelstroum um bewäertte Flosspunkt ze kontrolléieren fir ze verhënneren datt de Motor iwwerlaascht a verbrannt gëtt wéinst grousse Flowraten.
7. Wann d'Waasserpompel leeft, soll d'Waasserausgang kontinuéierlech sinn a souguer, de Stroum soll stabil sinn (ënner bewäertte Aarbechtsbedingunge, allgemeng net méi wéi 10% vum bewäerten Stroum), an et sollt keng Schwéngung oder Kaméidi sinn. Wann et eng Anomalie ass, sollt d'Maschinn gestoppt ginn fir d'Ursaach erauszefannen an ze eliminéieren.
8. Beim Installatioun, oppassen op d'Astellung vum Motor Buedemdraad (kuckt Bild 2). Wann d'Waasser Päif e Stol Päif ass, féiert et aus der wellhead clamp; wann d'Waasserleitung e Plastiksleit ass, féiert se vun der Äerdmarke vun der elektrescher Pompel.
- (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
- 1 In the rated condition, the current exceeds 20%.
- 2 Den dynamesche Waasserniveau fällt op d'Waasserintaksektioun, wat intermittéiert Waasser verursaacht.
- 3 D'Tauchtpompel huet schwéier Schwéngungen oder Kaméidi.
- 4 D'Versuergungsspannung ass manner wéi 340 Volt.
- 5 Eng Sicherung ass ausgebrannt.
- 6 D'Waasserversuergungsleitung ass beschiedegt.
- 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
- 1 Untie the cable tie, remove the pipeline part, and remove the wire plate.
- 2 d'Waasserschrauwen erofschrauwen, d'Waasser an d'Motorkammer setzen.
- 3 Huelt de Filter erof, loosst déi fix Schraube op der Kupplung fir de Motorwellen ze fixéieren.
- 4 Schrauwen de Bolzen erof, deen d'Waasserinntakssektioun mam Motor verbënnt, a trennt d'Pompel vum Motor (opgepasst op d'Eenheetskëssen beim Trennen, fir d'Biege vum Pompelschacht ze vermeiden)
- 5 der Demontage Sequenz vun der Pompel ass: (kuckt Figur 1) Waasser Inlet Sektioun, Impeller, Diversioun Shell, Impeller ...... Kontrollventil Kierper, wann Dir de Impeller erofhuelen, benotzt speziell Tools fir d'konesch Hülse vum fixen ze loosen Impeller als éischt, a vermeit d'Pompelwelle beim Ofbau ze béien an ze briechen.
- 6 den Demontageprozess vum Motor ass: (kuckt Figur 1) setzt de Motor op der Plattform, a läscht d'Nëss, d'Basis, d'Schafkopfschlossmutter, d'Schubplack, d'Schlëssel, den ënneschte Guidelagersitz an d'Doppelkopbolt vun ënnen vun de Motor ofwiesselnd, an dann de Rotor huelen eraus (opgepasst net der Drot Pak ze Schued) an ewechzehuelen endlech der Verbindung Rubrik an ieweschte Guide Lager Sëtz.
- 7 Eenheet Assemblée: virun der Assemblée, de Rost an Dreck vun den Deeler soll gebotzt ginn, an der mating Uewerfläch an fasteners mat Dichtstoff Beschichtete ginn, an dann am Géigendeel Uerdnung vun Demontage versammelt (de Motor Aarsch bewegt op an erof no Montage fir ongeféier eent) Millimeter), no der Montage soll d'Kupplung flexibel sinn, an dann d'Filterbildschierm Testmaschinn. Submersible Pompelen ginn aus der Brunn fir Ofbau an Ënnerhalt no Artikel 5 no engem Joer vun Operatioun, oder manner wéi engem Joer vun Operatioun, mä zwee Joer vun Tauchen Zäit, an d'verschratt Deeler ersat ginn.
1, setzt d'Waasser an d'Motorkavitéit eraus (besonnesch am Wanter fir ze verhënneren datt de Motor gefruer ass), a verbënnt de Kabel gutt.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, laangfristeg Notzung sollt op d'Rostverhënnerung vun Tauchpompelen oppassen.
- Impeller
- Schaft Hülse
- Gummistécker Schacht Hülse
-
Dichtungsring
01 Déift gutt Waasser ofgeroden
02 Héichwaasserversuergung
03 Bierg Waasser Fourniture
04 Tuerm Waasser
05 Landwirtschaftlech Bewässerung
06 Gaart Bewässerung
07 Floss Waasser ofgeroden
08 Hauswaasser