200QJ Deep Well Submersible Pump

Isagawa ang pagproseso ng OEM! Ayon sa mga kinakailangan ng gumagamit, disenyo at paggawa ng iba't ibang uri ng mga espesyal na pangangailangan ng non-standard na submersible motor at pump. Ang mga pamantayan sa pagpapatupad ng produkto: GB/T2816-2014 "well submersible pump", GB/T2818-2014 "well submersible asynchronous motor". WhatsApp:17855846335
PDF DOWNLOAD
Mga Detalye
Mga tag
 
Pangkalahatang-ideya ng Produkto

QJ series submersible pump is a kind of water lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small use area, compact structure, easy installation, easy maintenance and repair. Widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage and industrial and mining enterprises, drought relief and flood drainage and other fields. Flow range of 5-500m3/h, lift of 4-800m, power 3-315KW. The QJ series submersible pump has stable and reliable performance, suitable for various needs of pump applications.

 
Kondisyon sa Paggamit

1, power supply: tatlong-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%).

2, kalidad ng tubig:

(1) water temperature is not higher than 20 °C;

(2) solid impurities content (mass ratio) ay hindi hihigit sa 0.01%;

(3) PH value (pH) 6.5-8.5;

(4) ang nilalaman ng hydrogen sulfide ay hindi hihigit sa 1.5mg/L;

(5) ang nilalaman ng chloride ion ay hindi hihigit sa 400mg/L.

3, the motor is closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use.

4, ang submersible pump ay dapat na lubusang lumubog sa tubig, ang diving depth ay hindi hihigit sa 70m, ang ilalim ng submersible pump mula sa ilalim ng balon ay hindi mas mababa sa 3m.

5, ang mahusay na daloy ng tubig ay dapat na matugunan ang submersible pump tubig output at tuluy-tuloy na operasyon, ang submersible pump tubig output ay dapat na kontrolado sa 0.7 - 1.2 beses ang rate ng daloy.

6, ang balon ay dapat na tuwid, ang submersible pump ay hindi maaaring gamitin o dumped, tanging vertical na paggamit.

7, ang submersible pump ay dapat na tumugma sa cable ayon sa mga kinakailangan, at ang panlabas na overload na proteksyon na aparato.

8, the pump is strictly prohibited without water no-load test machine.

 

 
Kahulugan ng Modelo

200QJ Deep Well Submersible Pump

 
Bahagyang Sanggunian ng Modelo
Modelo Daloy (m3/h) Ulo
(m)

Bilis ng pag-ikot

(baguhin/punto)

Bomba ng tubig(%)  Outlet
diameter
(mm)
Applicable na rin
diameter(mm) 
 Na-rate
power(KW)
Na-rate
boltahe(V)
Na-rate
kasalukuyang(A)
Motorefficiency (%) power factorcosφ   Yunit
Radial Maximu size(mm)
Puna
200QJ20-40 20 40 2850 66 50  200sa itaas 4 380 10.1 76.0 0.79 184  
200QJ20-54 54 5.5 13.6 77.0 0.8  
200QJ20-81 81 7.5 18.0 78.0 0.81  
200QJ20-93 93 9.2 21.7 78.5 0.82  
200QJ20-108 108 11 25.8 79.0 0.82  
200QJ20-121 121 13 29.8 80.0 0.83  
200QJ20-148 148 15 33.9 81.0 0.83  
200QJ20-175 175 18.5 41.6 81.5 0.83  
200QJ20-202 202 22 48.2 82.5 0.84  
200QJ20-243 243 25 54.5 83.0 0.84  
200QJ20-270 270 30 65.4 83.0 0.84  
200QJ20-360 360 37 79.7 84.0 0.84  
200QJ20-442 442 45 96.9 84.0 0.84  
200QJ25-28 25 28 2850 68 65  200sa itaas 4 380 10.1 76.0 0.79 184  
200QJ25-42 42 5.5 13.6 77.0 0.8  
200QJ25-56 56 7.5 18.0 78.0 0.81  
200QJ25-70 70 9.2 21.7 78.5 0.82  
200QJ25-98 98 11 25.8 79.0 0.82  
200QJ25-112 25 112 2850 68 65  200sa itaas 13 380 29.8 80.0 0.83 184  
200QJ25-126 126 15 33.9 81.0 0.83  
200QJ25-154 154 18.5 41.6 81.5 0.83  
200QJ25-182 182 22 48.2 82.5 0.84  
200QJ25-210 210 25 54.5 83.0 0.84  
200QJ25-252 252 30 65.4 83.0 0.84  
200QJ25-308 308 37 79.7 84.0 0.84  
200QJ25-378 378 45 96.9 84.0 0.84  
200QJ32-26 32 26 2850 70 80  200sa itaas 4 380 10.1 76.0 0.79 184  
200QJ32-39 39 5.5 13.6 77.0 0.8  
200QJ32-52 52 7.5 18.0 78.0 0.81  
200QJ32-65 65 9.2 21.7 78.5 0.82  
200QJ32-78 78 11 25.8 79.0 0.82  
200QJ32-91 91 13 29.8 80.0 0.83  
200QJ32-104 104 15 33.9 81.0 0.83  
200QJ32-130 130 18.5 41.6 81.5 0.83  
200QJ32-143 143 22 48.2 82.5 0.84  
200QJ32-169 169 25 54.5 83.0 0.84  
200QJ32-195 195 30 65.4 83.0 0.84  
200QJ32-247 247 37 79.7 84.0 0.84  
200QJ32-299 299 45 96.9 84.0 0.84  
200QJ40-26 40 26 2850 72 80  200sa itaas 5.5 380 13.6 77.0 0.8 184  
200QJ40-39 39 7.5 18.0 78.0 0.81  
200QJ40-52 52 9.2 21.7 78.5 0.82  
200QJ40-65 65 11 25.8 79.0 0.82  
200QJ40-78 78 15 33.9 81.0 0.83  
200QJ40-104 104 18.5 41.6 81.5 0.83  
200QJ40-117 117 22 48.2 82.5 0.84  
200QJ40-143 143 25 54.5 83.0 0.84  
200QJ40-169 169 30 65.4 83.0 0.84  
200QJ40-208 208 37 79.7 84.0 0.84  
200QJ40-247 247 45 96.9 84.0 0.84  
200QJ50-26 50 26 2850 74 80  200sa itaas 5.5 380 13.6 77.0 0.8 184  
200QJ50-39 39 9.2 21.7 78.5 0.82  
200QJ50-52 52 11 25.8 79.0 0.82  
200QJ50-65 65 15 33.9 81.0 0.83  
200QJ50-78 78 18.5 41.6 81.5 0.83  
200QJ50-91 91 22 48.2 82.5 0.84  
200QJ50-104 104 25 54.5 83.0 0.84  
200QJ50-130 130 30 65.4 83.0 0.84  
200QJ50-156 156 37 79.7 84.0 0.84  
200QJ50-208 208 45 96.9 84.0 0.84  
200QJ63-24 63 24 2850 74 80  200sa itaas 7.5 380 18.0 78.0 0.81 184  
200QJ63-36 36 11 25.8 79.0 0.82  
200QJ63-60 60 18.5 41.6 81.5 0.83  
200QJ63-72 72 22 48.2 82.5 0.84  
200QJ63-84 84 25 54.5 83.0 0.84  
200QJ63-96 96 30 65.4 83.0 0.84  
200QJ63-120 120 37 79.7 84.0 0.84  
200QJ63-144 144 45 96.9 84.0 0.84  
200QJ80-22 80 22 2850 75 100  200sa itaas 7.5 380 18.0 78.0 0.81 184  
200QJ80-33 33 11 25.8 79.0 0.82  
200QJ80-44 44 15 33.9 81.0 0.83  
200QJ80-55 55 18.5 41.6 81.5 0.83  
200QJ80-66 66 22 48.2 82.5 0.84  
200QJ80-88 88 30 65.4 83.0 0.84  
200QJ80-99 99 37 79.7 84.0 0.84  
200QJ80-121 121 45 96.9 84.0 0.84  
200QJ100-18 100 18 2850 75 100  200sa itaas 9.2 380 21.7 78.5 0.82 184  
200QJ100-27 27 13 29.8 80.0 0.83  
200QJ100-36 36 18.5 41.6 81.5 0.83  
200QJ100-45 45 22 48.2 82.5 0.84  
200QJ100-54 54 25 54.5 83.0 0.84  
200QJ100-63 63 30 65.4 83.0 0.84  
200QJ100-72 100 72 2850 75 100  200sa itaas 37 380 79.7 84.0 0.84 184  
200QJ100-90 90 45 96.9 84.0 0.84  

 

 

 
Mga Pag-iingat sa Kaligtasan

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, mahigpit na ayon sa mga probisyon ng pump lift, daloy ng hanay ng paggamit, upang maiwasan ang mababang daloy o mataas na lift pumping puwersa, ang thrust tindig at iba pang mga bahagi ng wear, ang motor overload burn 6, pagkatapos ng pump pababa sa balon, ang pagsukat ng motor sa ground insulation resistance ay hindi dapat mas mababa sa 100M, pagkatapos ng simula upang obserbahan ang boltahe at kasalukuyang, suriin ang motor winding insulation, kung naaayon sa mga kinakailangan; magpahitit imbakan temperatura ng lokasyon kung mas mababa sa pagyeyelo point, ay dapat na tuyo ang motor lukab tubig, maiwasan ang motor lukab tubig yelo pinsala na dulot ng mababang temperatura.

 

 
Panimula sa Istruktura

Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable and other components.


Ang mga pangunahing tampok ng produkto ay kinabibilangan ng:

 1, Ang motor ay isang wet submersible three-phase asynchronous na motor na puno ng tubig, ang lukab ng motor ay puno ng malinis na tubig, ginagamit upang palamig ang motor at mag-lubricate ang tindig, ang pressure regulating film sa ilalim ng motor ay ginagamit upang ayusin ang pagkakaiba ng pagpapalawak at pag-urong ng presyon ng tubig sa loob ng katawan sanhi ng pagbabago ng pagtaas ng temperatura ng motor.

 2, Upang maiwasan ang pagpasok ng buhangin sa tubig ng balon sa motor, ang itaas na dulo ng baras ng motor ay nilagyan ng dalawang mga seal ng langis, at isang singsing ng buhangin ay naka-install upang bumuo ng isang istraktura ng pag-iwas sa buhangin.

 3, Upang maiwasan ang pagtakbo ng pump shaft kapag nagsisimula, ang pump shaft at ang motor shaft ay konektado sa pamamagitan ng isang coupling, at isang upper thrust bearing ay naka-install sa ibabang bahagi ng motor.

 4, Ang pagpapadulas ng motor at ang pump bearing ay water lubrication.

 5, Ang motor stator winding ay gawa sa mataas na kalidad na submersible motor winding wire, na may mataas na pagganap ng pagkakabukod.

 6, Ang bomba ay dinisenyo ng computer CAD, na may simpleng istraktura at mahusay na teknikal na pagganap.

200QJ Deep Well Submersible Pump
 
I-install

(1) Paghahanda bago i-install:
1. Suriin kung ang submersible pump ay nakakatugon sa mga kondisyon ng paggamit at saklaw na tinukoy sa manual.
2. Gamit ang isang mabigat na obiect na may diameter na katumbas ng maximum na panlabas na diameter ng submersible pump, sukatin kung ang inneldiameter ng wellbore ay maaaring magkasya sa submersible pump, at sukatin kung ang lalim ng balon ay nakakatugon sa mga kinakailangan sa pag-install.
3. Suriin kung malinis ang wellbore at kung ang tubig ng balon ay maputik. Huwag gumamit ng submersible electric pump upang hugasan ang welor pump na putik at tubig ng buhangin upang maiwasan ang maagang pagkasira ng submersible electric pump.
4. Suriin kung ang posisyon ng welhead installation clamp ay angkop at kung ito ay makatiis sa kalidad ng buong unit
5. Suriin kung ang mga bahagi ng submersible pump ay kumpleto at maayos na naka-install ayon sa assembly diagram sa manualAlisin ang filter screen at paikutin ang coupling upang makita kung ito ay umiikot nang flexible
6. Alisin ang turnilyo ng tubig at punan ang lukab ng motor ng malinis, hindi kinakaing unti-unti na tubig (tandaan. siguraduhing salaan ito), pagkatapos ay higpitan ang waterscrew. Pagkatapos ng 12 oras na pag-iniksyon ng tubig, ang insulation resistance ng motor ay hindi dapat mas mababa sa 150M Q kapag sinusukat sa isang 500V shaking table.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Ang naka-attach na cable wiring process diagram ay ang mga sumusunod:
200QJ Deep Well Submersible Pump

 

8. Gumamit ng multimeter upang suriin kung ang mga three-phase na wire ay konektado at kung ang DC resistance ay tinatayang balanse.
9. Suriin kung ang kapasidad ng circuit at transpormer ay na-overload, at pagkatapos ay ikonekta ang overload na proteksyon switch o panimulang kagamitan. Tingnan ang Talahanayan 2 para sa mga partikular na modelo, at pagkatapos ay ibuhos ang isang balde ng tubig sa water pump mula sa outlet ng water pump upang lubricate ang rubber bearings sa pump, at pagkatapos ay ilagay ang submersible electric pump nang patayo at matatag. Magsimula (hindi hihigit sa isang segundo) at suriin kung ang direksyon ng pagpipiloto ay pare-pareho sa sign ng pagpipiloto. Kung hindi, palitan ang alinmang dalawang connector ng three-phase cable. Pagkatapos ay i-install ang filter at maghanda na bumaba sa balon. Kung ginagamit sa mga espesyal na okasyon (tulad ng mga kanal, kanal, ilog, pond, pond, atbp.), ang electric pump ay dapat na mapagkakatiwalaang naka-ground.

 

(2) Kagamitan at kasangkapan sa pag-install:
1. Isang pares ng lifting chain para sa higit sa dalawang tonelada.
2. Isang tripod na may patayong taas na hindi bababa sa apat na metro.
3. Dalawang nakabitin na lubid (wire ropes) na kayang magdala ng bigat na higit sa isang tonelada (maaaring pasanin ang bigat ng isang kumpletong hanay ng mga water pump).
4. Mag-install ng dalawang pares ng clamps (splints).
5. Wrenches, martilyo, distornilyador, mga kasangkapang elektrikal at instrumento, atbp.

 

(3)Pag-install ng electric pump:
1. Ang diagram ng pag-install ng submersible electric pump ay ipinapakita sa Figure 2. Ang mga partikular na sukat ng pag-install ay ipinapakita sa Talahanayan 3 "Listahan ng Mga Dimensyon ng Pag-install ng Submersible Electric Pump".

 

2. Ang mga submersible electric pump na may ulo na wala pang 30 metro ay maaaring iangat nang direkta sa balon gamit ang mga hose at wire rope o iba pang mga lubid ng abaka na kayang pasanin ang buong bigat ng buong makina, mga tubo ng tubig, at tubig sa mga tubo.

 

3. Ang mga pump na may ulo na higit sa 30 metro ay gumagamit ng mga bakal na tubo, at ang pagkakasunud-sunod ng pag-install ay ang mga sumusunod:
①Gumamit ng clamp upang i-clamp ang itaas na dulo ng bahagi ng water pump (ang motor at water pump ay konektado sa oras na ito), iangat ito gamit ang isang nakabitin na kadena, at dahan-dahang itali ito sa balon hanggang sa Ilagay ang clamp sa wellhead at alisin ang nakasabit na kadena.
② Gumamit ng isa pang pares ng clamp para i-clamp ang isang tubo, iangat ito gamit ang nakabitin na kadena 15 cm ang layo mula sa flange, at ibaba ito ng dahan-dahan. Sa pagitan ng pipe flange at pump flangeIlagay ang rubber pad sa lugar at higpitan ang pipe at pump nang pantay-pantay gamit ang bolts, nuts at spring washers.
③ Bahagyang iangat ang submersible pump, tanggalin ang clamp sa itaas na dulo ng water pump, itali ang cable sa pipe ng tubig gamit ang plastic tape, at dahan-dahang itali ito hanggang sa mailagay ang clamp sa wellhead.
④Gamitin ang parehong paraan upang itali ang lahat ng tubo ng tubig sa balon.
⑤Pagkatapos maikonekta ang lead-out cable sa control switch, ito ay konektado sa three-phase power supply.


(4) Mga bagay na dapat tandaan sa panahon ng pag-install:
1. Kung may nakitang jamming phenomenon sa panahon ng proseso ng pumping, paikutin o hilahin ang tubo ng tubig upang malampasan ang jamming point. Kung ang iba't ibang mga hakbang ay hindi pa rin gumagana, mangyaring Huwag pilitin ang pump upang maiwasan ang pinsala sa submersible electric pump at sa balon.
2. Sa panahon ng pag-install, ang isang rubber pad ay dapat ilagay sa flange ng bawat pipe at higpitan nang pantay-pantay.
3. Kapag ang bomba ng tubig ay ibinaba sa balon, dapat itong ilagay sa gitna ng tubo ng balon upang maiwasan ang pagtakbo ng bomba sa dingding ng balon nang mahabang panahon, na nagiging sanhi ng pag-vibrate ng bomba at pagwalis at pagkasunog ng motor. .
4. Tukuyin ang lalim ng water pump sa ilalim ng balon ayon sa dumadaloy na buhangin at silt na kondisyon ng balon. Huwag ibaon ang bomba sa putik. Ang distansya mula sa water pump hanggang sa ilalim ng balon ay karaniwang hindi bababa sa 3 metro (tingnan ang Larawan 2).
5. Ang lalim ng pagpasok ng tubig ng water pump ay dapat na hindi bababa sa 1-1.5 metro mula sa dynamic na lebel ng tubig hanggang sa water inlet node (tingnan ang Larawan 2). Kung hindi, ang water pump bearings ay maaaring madaling masira.
6. Ang pagtaas ng water pump ay hindi maaaring masyadong mababa. Kung hindi, kailangang mag-install ng gate valve sa wellhead water pipeline para makontrol ang pump flow sa rated flow point para maiwasang ma-overload at masunog ang motor dahil sa malalaking flow rate.
7. Kapag ang water pump ay tumatakbo, ang tubig na output ay dapat na tuluy-tuloy at kahit na, ang kasalukuyang ay dapat na stable (sa ilalim ng rated working conditions, sa pangkalahatan ay hindi hihigit sa 10% ng rated current), at dapat walang vibration o ingay. Kung mayroong anumang abnormalidad, dapat na ihinto ang makina upang malaman ang sanhi at maalis ito.
8. Kapag nag-i-install, bigyang-pansin ang setting ng grounding wire ng motor (tingnan ang Figure 2). Kapag ang tubo ng tubig ay isang bakal na tubo, akayin ito mula sa wellhead clamp; kapag ang tubo ng tubig ay isang plastik na tubo, akayin ito mula sa marka ng saligan ng electric pump.

 

 
Pagpapanatili at Pagpapanatili
  1. (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  2. (2) After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3) After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal.If the following conditions are found, the pump should be shut down immediately to eliminate the fault:
  5. 1 under the rated working conditions, the current exceeds 20%;
  6. 2 the dynamic water level drops to the water inlet part, resulting in intermittent drainage;
  7. 3 the submersible pump vibrates seriously or emits huge noise;
  8. 4 the supply voltage is lower than 340 volts;
  9. 5 a fuse is blown out;
  10. 6 the water pipe is damaged;
  11. 7 the thermal insulation resistance between the motor and the ground is less than 0.5 megaohm. The discovery of these problems need to be handled in time to ensure the normal operation of the pump, improve its reliability, so as to ensure the stable operation of the equipment for a long time.

 

(5)unit disassembly:

 1 untie the cable tie, remove the pipeline part, remove the wire plate.

 2 i-screw down ang water bolt, ilagay ang tubig sa motor chamber.

 3 remove the filter, loose the fixing screw on the coupling to fix the motor shaft.

 4 screw down the bolt connecting the water inlet section with the motor, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)

 5 pump disassembly sequence is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.

 6 motor disassembly process is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and the upper guide bearing seat.

 7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.

  1. The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Imbakan at Kustodiya

 1, ilabas ang tubig sa cavity ng motor (lalo na sa taglamig upang maiwasan ang pagyeyelo ng motor), at itali ng mabuti ang cable.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, ang pang-matagalang paggamit ay dapat magbayad ng pansin sa pag-iwas sa kalawang ng mga submersible pump.

 

 
Nagsusuot ng mga Bahagi
  • Impeller
  • manggas ng baras
  • manggas ng goma shaft
  • Singsing sa pagbubuklod

 
Mga Sitwasyon ng Application

01 Deep well water intake

02 Mataas na suplay ng tubig

03 suplay ng tubig sa bundok 

04 tubig sa tore

05 Pang-agrikultura na patubig

06 patubig sa hardin

07 pag-inom ng tubig sa ilog

08 tubig sa bahay

 

Kung interesado ka sa aming mga produkto, maaari mong piliing iwanan ang iyong impormasyon dito, at makikipag-ugnayan kami sa iyo sa ilang sandali.


Isulat ang iyong mensahe dito at ipadala ito sa amin

Kung interesado ka sa aming mga produkto, maaari mong piliing iwanan ang iyong impormasyon dito, at makikipag-ugnayan kami sa iyo sa ilang sandali.


tlTagalog