200QJ Derin Kuyu Dalgıç Pompa

OEM işlemeyi üstlenin! Kullanıcı gereksinimlerine göre, standart dışı dalgıç motor ve pompanın çeşitli özel gereksinimlerinin tasarımı ve imalatı. Ürün uygulama standartları: GB/T2816-2014 "kuyu dalgıç pompa", GB/T2818-2014 "kuyu dalgıç asenkron motor". WhatsApp: 17855846335
PDF DOWNLOAD
Detaylar
Etiketler
 
Ürüne Genel Bakış

QJ series submersible pump is a kind of water lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small use area, compact structure, easy installation, easy maintenance and repair. Widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage and industrial and mining enterprises, drought relief and flood drainage and other fields. Flow range of 5-500m3/h, lift of 4-800m, power 3-315KW. The QJ series submersible pump has stable and reliable performance, suitable for various needs of pump applications.

 
kullanım Koşulları

1, güç kaynağı: üç fazlı AC 380V (tolerans +/- %5), 50HZ (tolerans +/- %1).

2, su kalitesi:

(1) water temperature is not higher than 20 °C;

(2) katı yabancı madde içeriği (kütle oranı) %0,01'den büyük değildir;

(3) PH değeri (pH) 6,5-8,5;

(4) hidrojen sülfit içeriği 1,5 mg/L'den büyük değildir;

(5) klorür iyonu içeriği 400 mg/L'den fazla değildir.

3, the motor is closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use.

4, dalgıç pompa tamamen suya daldırılmalıdır, dalış derinliği 70 m'den fazla olmamalıdır, dalgıç pompanın kuyunun dibinden tabanı 3 m'den az olmamalıdır.

5, kuyu suyu akışı dalgıç pompa su çıkışını ve sürekli çalışmayı karşılayabilmeli, dalgıç pompa su çıkışı nominal akışın 0,7 - 1,2 katı kadar kontrol edilmelidir.

6, kuyu düz olmalı, dalgıç pompa kullanılamaz veya boşaltılamaz, sadece dikey kullanım.

7, dalgıç pompa, gereksinimlere göre kabloyla ve harici aşırı yük koruma cihazıyla eşleştirilmelidir.

8, the pump is strictly prohibited without water no-load test machine.

 

 
Modelin Anlamı

200QJ Deep Well Submersible Pump

 
Kısmi Model Referansı
Modeli Akış (m3/saat) KAFA
(M)

Dönme hızı

(değişim noktası)

Su Pompası(%)  Çıkış
çap
(mm)
İyi uygulanabilir
çap(mm) 
 Oy
power(KW)
Oy
gerilim(V)
Oy
akım(A)
Motor verimliliği (%) power factorcosφ   Birim
Radyal Maksimum boyut (mm)
Açıklama
200QJ20-40 20 40 2850 66 50  200üstünde 4 380 10.1 76.0 0.79 184  
200QJ20-54 54 5.5 13.6 77.0 0.8  
200QJ20-81 81 7.5 18.0 78.0 0.81  
200QJ20-93 93 9.2 21.7 78.5 0.82  
200QJ20-108 108 11 25.8 79.0 0.82  
200QJ20-121 121 13 29.8 80.0 0.83  
200QJ20-148 148 15 33.9 81.0 0.83  
200QJ20-175 175 18.5 41.6 81.5 0.83  
200QJ20-202 202 22 48.2 82.5 0.84  
200QJ20-243 243 25 54.5 83.0 0.84  
200QJ20-270 270 30 65.4 83.0 0.84  
200QJ20-360 360 37 79.7 84.0 0.84  
200QJ20-442 442 45 96.9 84.0 0.84  
200QJ25-28 25 28 2850 68 65  200üstünde 4 380 10.1 76.0 0.79 184  
200QJ25-42 42 5.5 13.6 77.0 0.8  
200QJ25-56 56 7.5 18.0 78.0 0.81  
200QJ25-70 70 9.2 21.7 78.5 0.82  
200QJ25-98 98 11 25.8 79.0 0.82  
200QJ25-112 25 112 2850 68 65  200üstünde 13 380 29.8 80.0 0.83 184  
200QJ25-126 126 15 33.9 81.0 0.83  
200QJ25-154 154 18.5 41.6 81.5 0.83  
200QJ25-182 182 22 48.2 82.5 0.84  
200QJ25-210 210 25 54.5 83.0 0.84  
200QJ25-252 252 30 65.4 83.0 0.84  
200QJ25-308 308 37 79.7 84.0 0.84  
200QJ25-378 378 45 96.9 84.0 0.84  
200QJ32-26 32 26 2850 70 80  200üstünde 4 380 10.1 76.0 0.79 184  
200QJ32-39 39 5.5 13.6 77.0 0.8  
200QJ32-52 52 7.5 18.0 78.0 0.81  
200QJ32-65 65 9.2 21.7 78.5 0.82  
200QJ32-78 78 11 25.8 79.0 0.82  
200QJ32-91 91 13 29.8 80.0 0.83  
200QJ32-104 104 15 33.9 81.0 0.83  
200QJ32-130 130 18.5 41.6 81.5 0.83  
200QJ32-143 143 22 48.2 82.5 0.84  
200QJ32-169 169 25 54.5 83.0 0.84  
200QJ32-195 195 30 65.4 83.0 0.84  
200QJ32-247 247 37 79.7 84.0 0.84  
200QJ32-299 299 45 96.9 84.0 0.84  
200QJ40-26 40 26 2850 72 80  200üstünde 5.5 380 13.6 77.0 0.8 184  
200QJ40-39 39 7.5 18.0 78.0 0.81  
200QJ40-52 52 9.2 21.7 78.5 0.82  
200QJ40-65 65 11 25.8 79.0 0.82  
200QJ40-78 78 15 33.9 81.0 0.83  
200QJ40-104 104 18.5 41.6 81.5 0.83  
200QJ40-117 117 22 48.2 82.5 0.84  
200QJ40-143 143 25 54.5 83.0 0.84  
200QJ40-169 169 30 65.4 83.0 0.84  
200QJ40-208 208 37 79.7 84.0 0.84  
200QJ40-247 247 45 96.9 84.0 0.84  
200QJ50-26 50 26 2850 74 80  200üstünde 5.5 380 13.6 77.0 0.8 184  
200QJ50-39 39 9.2 21.7 78.5 0.82  
200QJ50-52 52 11 25.8 79.0 0.82  
200QJ50-65 65 15 33.9 81.0 0.83  
200QJ50-78 78 18.5 41.6 81.5 0.83  
200QJ50-91 91 22 48.2 82.5 0.84  
200QJ50-104 104 25 54.5 83.0 0.84  
200QJ50-130 130 30 65.4 83.0 0.84  
200QJ50-156 156 37 79.7 84.0 0.84  
200QJ50-208 208 45 96.9 84.0 0.84  
200QJ63-24 63 24 2850 74 80  200üstünde 7.5 380 18.0 78.0 0.81 184  
200QJ63-36 36 11 25.8 79.0 0.82  
200QJ63-60 60 18.5 41.6 81.5 0.83  
200QJ63-72 72 22 48.2 82.5 0.84  
200QJ63-84 84 25 54.5 83.0 0.84  
200QJ63-96 96 30 65.4 83.0 0.84  
200QJ63-120 120 37 79.7 84.0 0.84  
200QJ63-144 144 45 96.9 84.0 0.84  
200QJ80-22 80 22 2850 75 100  200üstünde 7.5 380 18.0 78.0 0.81 184  
200QJ80-33 33 11 25.8 79.0 0.82  
200QJ80-44 44 15 33.9 81.0 0.83  
200QJ80-55 55 18.5 41.6 81.5 0.83  
200QJ80-66 66 22 48.2 82.5 0.84  
200QJ80-88 88 30 65.4 83.0 0.84  
200QJ80-99 99 37 79.7 84.0 0.84  
200QJ80-121 121 45 96.9 84.0 0.84  
200QJ100-18 100 18 2850 75 100  200üstünde 9.2 380 21.7 78.5 0.82 184  
200QJ100-27 27 13 29.8 80.0 0.83  
200QJ100-36 36 18.5 41.6 81.5 0.83  
200QJ100-45 45 22 48.2 82.5 0.84  
200QJ100-54 54 25 54.5 83.0 0.84  
200QJ100-63 63 30 65.4 83.0 0.84  
200QJ100-72 100 72 2850 75 100  200üstünde 37 380 79.7 84.0 0.84 184  
200QJ100-90 90 45 96.9 84.0 0.84  

 

 

 
Güvenlik önlemleri

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, kesinlikle pompa kaldırma hükümlerine göre, düşük akış veya yüksek kaldırma pompalama kuvvetini önlemek için akış aralığı kullanım, baskı yatağı ve diğer parçaların aşınması, motor aşırı yük yandı 6, kuyuya pompalandıktan sonra, Motorun toprak izolasyon direncinin ölçümü 100M'den az olmamalıdır, voltaj ve akımı gözlemlemeye başladıktan sonra motor sargı izolasyonunun gereksinimlere uygun olup olmadığını kontrol edin; Pompanın depolandığı yerin sıcaklığı donma noktasından düşükse, motor boşluğu suyunun kurutulması gerekir, böylece düşük sıcaklıktan kaynaklanan motor boşluğu suyu buzunun hasar görmesi önlenir.

 

 
Yapıya Giriş

Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable and other components.


Ürünün ana özellikleri şunları içerir:

 1, Motor su dolu ıslak dalgıç üç fazlı asenkron motordur, motor boşluğu temiz suyla doludur, motoru soğutmak ve yatağı yağlamak için kullanılır, motorun altındaki basınç düzenleyici film ayarlamak için kullanılır motorun sıcaklık artışının değişmesinden dolayı gövde içindeki suyun genleşme ve büzülme basınç farkıdır.

 2, Kuyu suyundaki kumun motora girmesini önlemek için, motor milinin üst ucu iki yağ keçesi ile donatılmıştır ve kum önleme yapısı oluşturmak için bir kum halkası takılmıştır.

 3, Pompa şaftının çalıştırma sırasında çalışmasını önlemek için, pompa şaftı ve motor şaftı bir kaplin ile bağlanır ve motorun alt kısmına bir üst baskı yatağı monte edilir.

 4, Motorun ve pompa yatağının yağlanması su yağlamasıdır.

 5, Motor stator sargısı, yüksek yalıtım performansına sahip, yüksek kaliteli dalgıç motor sargı telinden yapılmıştır.

 6, Pompa, basit yapısı ve iyi teknik performansı ile bilgisayar CAD tarafından tasarlanmıştır.

200QJ Deep Well Submersible Pump
 
Düzenlemek

(1)Kurulumdan önce hazırlık:
1. Dalgıç pompanın kılavuzda belirtilen kullanım koşullarını ve kapsamını karşılayıp karşılamadığını kontrol edin.
2. Dalgıç pompanın maksimum dış çapına eşit çapta ağır bir cisim kullanarak kuyu deliğinin iç çapının dalgıç pompaya uyup uymadığını ve kuyu derinliğinin kurulum gereksinimlerini karşılayıp karşılamadığını ölçün.
3. Kuyu deliğinin temiz olup olmadığını ve kuyu suyunun bulanık olup olmadığını kontrol edin. Dalgıç elektrikli pompanın zamanından önce hasar görmesini önlemek için, Welor pompası çamurunu ve kum suyunu yıkamak için asla dalgıç elektrikli pompa kullanmayın.
4. Kaynaklı montaj kelepçesinin konumunun uygun olup olmadığını ve tüm ünitenin kalitesine dayanıp dayanamayacağını kontrol edin.
5. Dalgıç pompa bileşenlerinin eksiksiz olup olmadığını ve kılavuzdaki montaj şemasına göre düzgün şekilde monte edilip edilmediğini kontrol edin. Filtre süzgecini çıkarın ve esnek bir şekilde dönüp dönmediğini görmek için kaplini döndürün.
6. Su vidasını sökün ve motor boşluğunu temiz, aşındırıcı olmayan suyla doldurun (not: doldurduğunuzdan emin olun), ardından su vidasını sıkın. 12 saatlik su enjeksiyonundan sonra motorun izolasyon direnci, 500V sarsma tablası ile ölçüldüğünde 150M Q'dan az olmamalıdır.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Ekli kablo bağlantı işlemi şeması aşağıdaki gibidir:
200QJ Deep Well Submersible Pump

 

8. Üç fazlı kabloların bağlı olup olmadığını ve DC direncinin yaklaşık olarak dengeli olup olmadığını kontrol etmek için bir multimetre kullanın.
9. Devrenin ve transformatör kapasitesinin aşırı yüklü olup olmadığını kontrol edin ve ardından aşırı yük koruma anahtarını veya başlatma ekipmanını bağlayın. Belirli modeller için Tablo 2'ye bakın ve ardından pompadaki kauçuk yatakları yağlamak için su pompası çıkışından su pompasına bir kova su dökün ve ardından dalgıç elektrikli pompayı dik ve sabit bir şekilde yerleştirin.Başlat (bir saniyeden fazla değil) ve direksiyon yönünün direksiyon işaretiyle tutarlı olup olmadığını kontrol edin. Değilse, üç fazlı kablonun herhangi iki konnektörünü değiştirin. Ardından filtreyi takın ve kuyuya inmeye hazırlanın. Özel durumlarda (hendek, hendek, nehir, gölet, gölet vb.) kullanıldığında elektrikli pompanın güvenilir bir şekilde topraklanması gerekir.

 

(2) Kurulum ekipmanı ve araçları:
1. İki tondan fazla yük için bir çift kaldırma zinciri.
2. Dikey yüksekliği dört metreden az olmayan bir tripod.
3. Bir tondan fazla ağırlık taşıyabilen (komple bir su pompası setinin ağırlığını taşıyabilen) iki askı halatı (tel halatlar).
4. İki çift kelepçe (atel) takın.
5. Anahtarlar, çekiçler, tornavidalar, elektrikli aletler ve aletler vb.

 

(3)Elektrikli pompa kurulumu:
1. Dalgıç elektrikli pompanın kurulum şeması Şekil 2'de gösterilmektedir. Özel kurulum boyutları Tablo 3 "Dalgıç Elektrikli Pompanın Kurulum Boyutları Listesi"nde gösterilmektedir.

 

2. Yüksekliği 30 metreden az olan dalgıç elektrikli pompalar, tüm makinenin tüm ağırlığını, su borularını ve borulardaki suyu taşıyabilecek hortumlar ve tel halatlar veya diğer kenevir halatlar kullanılarak doğrudan kuyuya çekilebilir.

 

3. 30 metreden fazla basma yüksekliği olan pompalarda çelik borular kullanılır ve kurulum sırası aşağıdaki gibidir:
①Su pompası parçasının üst ucunu kelepçelemek için bir kelepçe kullanın (motor ve su pompası şu anda bağlanmıştır), asılı bir zincirle kaldırın ve kelepçeyi kuyu başına takıp çıkarıncaya kadar yavaşça kuyuya bağlayın. asılı zincir.
② Boruyu kelepçelemek için başka bir çift kelepçe kullanın, asılı zincirle flanştan 15 cm uzağa kaldırın ve yavaşça indirin. Boru flanşı ile pompa flanşı arasında Lastik tamponu yerine yerleştirin ve boruyu sıkın ve cıvatalar, somunlar ve yaylı rondelalarla eşit şekilde pompalayın.
③ Dalgıç pompayı hafifçe kaldırın, su pompasının üst ucundaki kelepçeyi çıkarın, kabloyu plastik bir bantla su borusuna sıkıca bağlayın ve kelepçe kuyu başına yerleşinceye kadar yavaşça bağlayın.
④Tüm su borularını kuyuya bağlamak için aynı yöntemi kullanın.
⑤Çıkış kablosu kontrol anahtarına bağlandıktan sonra üç fazlı güç kaynağına bağlanır.


(4)Kurulum sırasında dikkat edilmesi gerekenler:
1. Pompalama işlemi sırasında bir sıkışma durumu tespit edilirse, sıkışma noktasını aşmak için su borusunu çevirin veya çekin. Çeşitli önlemler hala işe yaramıyorsa, lütfen dalgıç elektrikli pompaya ve kuyuya zarar vermemek için pompayı aşağıya doğru zorlamayın.
2. Montaj sırasında her borunun flanşına lastik tampon yerleştirilmeli ve eşit şekilde sıkılmalıdır.
3. Su pompası kuyuya indirildiğinde, pompanın uzun süre kuyu duvarına karşı çalışıp pompanın titreşmesine ve motorun süpürüp yanmasına neden olmaması için kuyu borusunun ortasına yerleştirilmelidir. .
4. Kuyudaki akma kum ve silt durumuna göre su pompasının kuyu dibine kadar olan derinliğini belirleyin. Pompayı çamura gömmeyin. Su pompasından kuyu tabanına kadar olan mesafe genellikle 3 metreden az değildir (bkz. Şekil 2).
5. Su pompasının su giriş derinliği, dinamik su seviyesinden su giriş düğümüne kadar 1-1,5 metreden az olmamalıdır (bkz. Şekil 2). Aksi takdirde su pompası yatakları kolaylıkla zarar görebilir.
6. Su pompasının kaldırma kuvveti çok düşük olamaz. Aksi takdirde, motorun aşırı yüklenmesini ve büyük akış hızları nedeniyle yanmasını önlemek amacıyla pompa akışını nominal akış noktasında kontrol etmek için kuyu başı su boru hattına bir sürgülü vana takılması gerekir.
7. Su pompası çalışırken, su çıkışı sürekli ve eşit olmalı, akım sabit olmalı (nominal çalışma koşulları altında, genellikle nominal akımın 'undan fazla olmamalıdır) ve titreşim veya gürültü olmamalıdır. Herhangi bir anormallik varsa nedeninin bulunup ortadan kaldırılması için makine durdurulmalıdır.
8. Montajı yaparken motor topraklama kablosunun ayarına dikkat edin (bkz. Şekil 2). Su borusu çelik bir boru olduğunda, onu kuyu başı kelepçesinden geçirin; Su borusu plastik bir boru ise, onu elektrikli pompanın topraklama işaretinden geçirin.

 

 
Bakım ve Bakım
  1. (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  2. (2) After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3) After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal.If the following conditions are found, the pump should be shut down immediately to eliminate the fault:
  5. 1 under the rated working conditions, the current exceeds 20%;
  6. 2 the dynamic water level drops to the water inlet part, resulting in intermittent drainage;
  7. 3 the submersible pump vibrates seriously or emits huge noise;
  8. 4 the supply voltage is lower than 340 volts;
  9. 5 a fuse is blown out;
  10. 6 the water pipe is damaged;
  11. 7 the thermal insulation resistance between the motor and the ground is less than 0.5 megaohm. The discovery of these problems need to be handled in time to ensure the normal operation of the pump, improve its reliability, so as to ensure the stable operation of the equipment for a long time.

 

(5)unit disassembly:

 1 untie the cable tie, remove the pipeline part, remove the wire plate.

 2 su cıvatasını vidalayın, suyu motor bölmesine koyun.

 3 remove the filter, loose the fixing screw on the coupling to fix the motor shaft.

 4 screw down the bolt connecting the water inlet section with the motor, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)

 5 pump disassembly sequence is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.

 6 motor disassembly process is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and the upper guide bearing seat.

 7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.

  1. The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Depolama ve Saklama

 1, motor boşluğundaki suyu boşaltın (özellikle kışın motorun donmasını önlemek için) ve kabloyu iyice bağlayın.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, uzun süreli kullanımda dalgıç pompaların paslanmaya karşı korunmasına dikkat edilmelidir.

 

 
Aşınan Parçalar
  • Pervane
  • Mil kovanı
  • Kauçuk mil kovanı
  • Conta bileziği

 
Uygulama Senaryoları

01 Derin kuyu suyu alımı

02 Yüksek binalara su temini

03 dağ su temini 

04 kule suyu

05 Tarımsal sulama

06 bahçe sulama

07 nehir suyu girişi

08 evsel su

 

Ürünlerimizle ilgileniyorsanız bilgilerinizi buraya bırakmayı seçebilirsiniz, kısa sürede sizinle iletişime geçeceğiz.


Mesajınızı buraya yazıp bize gönderin

Ürünlerimizle ilgileniyorsanız bilgilerinizi buraya bırakmayı seçebilirsiniz, kısa sürede sizinle iletişime geçeceğiz.


tr_TRTurkish