Introducing the innovative QJP series fountain pump, a product of superior efficiency meticulously developed and researched by our factory. With a meticulously designed pump motor core crafted from premium cold rolled silicon steel, this fountain pump boasts exceptional magnetic conductivity, enabling seamless and heat-free starts. Unlike traditional fountain pumps, the 0JP series features motor rotor ends that utilize a unique water-lubricated alloy copper sleeve, replacing standard ball bearings. This innovative design not only mitigates issues of rust and wear caused by lack of oil but also ensures longevity and durability for the motor. Upgrade your fountain experience with the cutting-edge technology and superior performance of the QJP series fountain pump.
The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply, and has strict requirements for clean water: water temperature shall not exceed 20 °C; solid impurities content (mass ratio) shall not exceed 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content shall not exceed 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product adopts a closed or water immersion structure motor, the submersible motor must be filled with clean water before use to prevent empty. In addition, the water can be used after filling and tightening the air release bolt. The submersible pump must be completely immersed in water to work, the diving depth shall not exceed 70m, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3m. The well water flow should meet the water output and continuous operation requirements of the submersible pump, and the water output shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally, and it must be installed vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
ماڊل | وهڪري (m3/h) | سر (م) |
گھمڻ جي رفتار (تبديلي/پوائنٽ) |
واٽر پمپ (٪) | آئوٽليٽ قطر (mm) |
چڱي طرح لاڳو قطر (mm) |
درجه بندي طاقت (KW) |
درجه بندي وولٹیج (V) |
درجه بندي موجوده (A) |
موٽر ڪارڪردگي (٪) | power factorcosφ | يونٽ ريڊيل وڌ ۾ وڌ سائيز (ايم ايم) |
تبصرو | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135مٿي | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135مٿي | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135مٿي | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135مٿي | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135مٿي | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135مٿي | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135مٿي | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
Well submersible pump is a clean water pump, it is strictly prohibited to dig a new well to extract mud and silt. The voltage grade of the well pump is 380/50HZ, and the submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof and must be equipped with starting equipment, such as distribution box, etc. Starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be timely tripping. When installing and using the pump, the pump must be reliably grounded, and it is prohibited to push and pull the switch when the hands and feet are wet. Before installing and maintaining the pump, the power must be cut off, and the place where the pump is used must be clearly marked "anti-electric shock". Before going down the well or installing the pump, the motor must be filled with distilled water or clean cold water without corrosion, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be poured into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. When using the pump, the lift and flow range specified by the pump must be strictly followed to prevent the pump from having a large flow at low lift or a large pull at high lift, which will lead to serious wear and tear of the thrust bearing and other parts and components, and cause the motor to overload and burn out. After the pump is put into the well, the insulation resistance between the motor and the ground should be measured, which should not be less than 100MΩ. After the start, the voltage and current should be observed regularly, and the motor winding insulation should be checked to see if it meets the requirements; if the temperature of the pump storage location is below the freezing point, the water in the motor cavity should be drained to prevent the water in the motor cavity from freezing and damaging the motor due to low temperature.
ساخت جو مختصر تعارف: پمپ جو حصو خاص طور تي پمپ شافٽ، امپيلر، ڊائيورشن شيل، ربر بيئرنگ، چيڪ والو باڊي (اختياري حصا) ۽ ٻين حصن تي مشتمل هوندو آهي. موٽر جو حصو بنيادي طور تي ٺهيل هوندو آهي، پريشر ريگيوليٽنگ فلم، ٿُرسٽ بيئرنگ، ٿُرسٽ پليٽ هيٺيون گائيڊ بيئرنگ سيٽ، اسٽيٽر، روٽر، اپر گائيڊ بيئرنگ سيٽ، سينڊ انگ، واٽر انليٽ سيڪشن، ڪيبل ۽ ٻيا حصا.
پيداوار جي مکيه خاصيتون شامل آهن:
1، موٽر هڪ پاڻي سان ڀريل گندي آبدوز واري ٽن مرحلن واري اسيئنڪرونس موٽر آهي، موٽر جي گفا صاف پاڻي سان ڀريل آهي، موٽر کي ٿڌو ڪرڻ ۽ بيئرنگ کي لوڻ لاء استعمال ڪيو ويندو آهي، موٽر جي تري ۾ پريشر ريگيوليٽنگ فلم کي ترتيب ڏيڻ لاء استعمال ڪيو ويندو آهي. جسم جي اندر پاڻي جي توسيع ۽ دٻاءُ جو فرق جيڪو موٽر جي گرمي پد جي تبديلي جي ڪري ٿي.
2، کوهه جي پاڻيءَ ۾ واريءَ کي موٽر ۾ داخل ٿيڻ کان روڪڻ لاءِ، موٽر شافٽ جي مٿئين پڇاڙيءَ کي ٻن تيل جي سيلن سان ليس ڪيو ويو آهي، ۽ رين جي روڪٿام واري ڍانچي کي ٺاهڻ لاءِ هڪ ريل جو انگ نصب ڪيو ويو آهي.
3، پمپ شافٽ کي هلڻ کان روڪڻ لاءِ جڏهن شروع ٿئي ٿي، پمپ شافٽ ۽ موٽر شافٽ هڪ جوڙي سان ڳنڍيل آهن، ۽ موٽر جي هيٺئين حصي تي هڪ اپر زور بيئرنگ نصب ٿيل آهي.
4، موٽر جي سڻڪ ۽ پمپ بيئرنگ پاڻي جي لوڻ آهي.
5، موٽر اسٽيٽر وائنڊنگ اعليٰ معيار جي سبمرسيبل موٽر وائنڊنگ وائر مان ٺهيل آهي، اعليٰ موصليت جي ڪارڪردگيءَ سان.
6، پمپ ڪمپيوٽر CAD پاران ٺهيل آهي، سادي جوڙجڪ ۽ سٺي فني ڪارڪردگي سان.

(1) انسٽاليشن کان اڳ تياري:
1. چيڪ ڪريو ته ڇا سبمرسيبل پمپ استعمال جي شرطن کي پورو ڪري ٿو ۽ دستياب ۾ بيان ڪيل گنجائش.
2. سبمرسيبل پمپ جي وڌ ۾ وڌ ٻاهرين قطر جي برابر قطر سان ڳري اوبائيڪٽ استعمال ڪندي، ماپ ڪريو ته ڇا ويلبور جو اندريون قطر سبمرسيبل پمپ سان فٽ ٿي سگهي ٿو، ۽ ماپ ڪريو ته ڇا کوهه جي کوٽائي انسٽاليشن جي گهرج پوري ڪري ٿي.
3. چيڪ ڪريو ته ڇا کوهه صاف آهي ۽ ڇا کوهه جو پاڻي گندو آهي. آبدوز اليڪٽرڪ پمپ کي ڪڏهن به استعمال نه ڪريو ويلر پمپ مٽي ۽ ريت واري پاڻي کي ڌوئڻ لاءِ ته جيئن آبدوز برقي پمپ کي وقت کان اڳ نقصان نه ٿئي.
4. چيڪ ڪريو ته ڇا ويل هيڊ انسٽاليشن ڪلمپ جي پوزيشن مناسب آهي ۽ ڇا اهو پوري يونٽ جي معيار کي برداشت ڪري سگهي ٿو
5. چيڪ ڪريو ته ڇا سبمرسيبل پمپ جا حصا مڪمل ۽ صحيح طرح سان انسٽال ٿيل آھن دستي ۾ موجود اسيمبلي ڊاگرام موجب فلٽر اسڪرين کي ھٽايو ۽ ڪپلنگ کي گھمايو ته ڏسو ته اھو لچڪدار طور تي گھمندو آھي يا نه
6. واٽر اسڪرو کي کوليو ۽ موٽر جي گفا کي صاف، غير corrosive پاڻي سان ڀريو (نوٽ. پڪ ڪريو ته ان کي ڀريو)، پوءِ واٽر اسڪرو کي سخت ڪريو. 12 ڪلاڪ پاڻي جي انجڻ کان پوء، موٽر جي موصليت جي مزاحمت 150M Q کان گهٽ نه هجڻ گهرجي جڏهن 500V شيڪنگ ٽيبل سان ماپي ويندي آهي.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
منسلڪ ڪيبل وائرنگ جي عمل جو خاڪو هن ريت آهي:
8. چيڪ ڪرڻ لاءِ ملٽي ميٽر استعمال ڪريو ته ڇا ٽي-مرحلي تارون ڳنڍيل آهن ۽ ڇا ڊي سي جي مزاحمت تقريبن متوازن آهي.
9. چيڪ ڪريو ته ڇا سرڪٽ ۽ ٽرانسفارمر جي گنجائش اوورلوڊ ٿيل آهي، ۽ پوء اوورلوڊ تحفظ واري سوئچ يا شروعاتي سامان کي ڳنڍيو. مخصوص ماڊلز لاءِ ٽيبل 2 ڏسو، ۽ پوءِ واٽر پمپ جي آئوٽ ليٽ مان پاڻيءَ جي هڪ بالٽي پاڻيءَ جي پمپ ۾ ڀريو ته جيئن پمپ ۾ رٻڙ جي بيرنگ کي لبريٽ ڪيو وڃي، ۽ پوءِ سبمرسيبل اليڪٽرڪ پمپ کي سڌو ۽ مستحڪم رکو. شروع ڪريو (هڪ سيڪنڊ کان وڌيڪ نه) ۽ چيڪ ڪريو ته ڇا اسٽيئرنگ جو رخ اسٽيئرنگ جي نشاني سان مطابقت رکي ٿو. جيڪڏهن نه، ته ٽن مرحلن واري ڪيبل جي ڪنهن به ٻن ڪنيڪٽرن کي مٽايو. پوءِ فلٽر انسٽال ڪريو ۽ کوهه جي هيٺان وڃڻ لاءِ تيار ٿيو. جيڪڏهن خاص موقعن تي استعمال ڪيو وڃي (جهڙوڪ ڊچ، ڊچ، درياء، تلاء، تلاء، وغيره)، برقي پمپ کي قابل اعتماد طور تي گرائونڊ ڪيو وڃي.
(2) لڳائڻ جو سامان ۽ اوزار:
1. ٻن ٽنن کان وڌيڪ زنجيرن کي کڻڻ جو هڪ جوڙو.
2. هڪ تپائي جنهن جي عمودي اوچائي چار ميٽر کان گهٽ نه هجي.
3. ٻه لٽڪندڙ رسيون (تار رسيون) جيڪي هڪ ٽين کان وڌيڪ وزن کڻن ٿيون (واٽر پمپ جي مڪمل سيٽ جو وزن برداشت ڪري سگهن ٿيون).
4. ڪلمپ جا ٻه جوڙا نصب ڪريو (اسپلنٽ).
5. رنچ، هيمر، اسڪرو ڊرائيور، برقي اوزار ۽ اوزار، وغيره.
(3) اليڪٽرڪ پمپ لڳائڻ:
1. سبمرسيبل اليڪٽرڪ پمپ جي انسٽاليشن ڊاگرام تصوير 2 ۾ ڏيکاريل آھي. انسٽاليشن جي مخصوص ماپون جدول 3 ۾ ڏيکاريل آھن "سبمرسيبل اليڪٽرڪ پمپ جي تنصيب جي ماپن جي فهرست" ۾.
2. 30 ميٽرن کان گھٽ مٿاھين سان سبمرسيبل اليڪٽرڪ پمپ، ھوز ۽ تار جي رسيءَ يا ٻي ڀنگ جي رسيءَ جي مدد سان سڌو کوھ ۾ لھرائي سگھجن ٿا جيڪي پوري مشين، پاڻيءَ جي پائپن ۽ پائپن ۾ پاڻي جو پورو وزن برداشت ڪري سگھن ٿا.
3. 30 ميٽرن کان مٿي جي مٿاڇري سان پمپ اسٽيل پائپ استعمال ڪن ٿا، ۽ تنصيب جي ترتيب هن ريت آهي:
①واٽر پمپ واري حصي جي مٿئين پاسي کي ڪلمپ ڪرڻ لاءِ ڪلمپ استعمال ڪريو (هن وقت موٽر ۽ واٽر پمپ ڳنڍجي ويا آهن)، ان کي لٽڪندڙ زنجير سان اٿاريو، ۽ آهستي آهستي ان کي کوهه ۾ ڳنڍيو، جيستائين ڪلمپ کي کوهه جي مٿاڇري تي وجھو ۽ ان کي هٽائي ڇڏيو. لٽڪندڙ زنجير.
② پائپ کي ڪليپ ڪرڻ لاءِ ڪليمپ جو ٻيو جوڙو استعمال ڪريو، ان کي لٽڪي زنجير سان 15 سينٽي پري فلانج کان مٿي ڪريو، ۽ ان کي آهستي آهستي هيٺ ڪريو. پائپ فلانج ۽ پمپ فلانج جي وچ ۾ ربر جي پيڊ کي جاءِ تي رکو ۽ پائپ کي مضبوط ڪريو ۽ بولٽ، نٽ ۽ اسپرنگ واشر سان برابر پمپ ڪريو.
③ سبمرسيبل پمپ کي ٿورو مٿي کڻو، واٽر پمپ جي مٿئين پاسي واري ڪلمپ کي هٽايو، ڪيبل کي مضبوطيءَ سان پاڻي جي پائپ سان پلاسٽڪ جي ٽيپ سان ڳنڍيو، ۽ ان کي آهستي آهستي ان وقت تائين ڳنڍيو، جيستائين ڪليمپ کوهه جي مٿاڇري تي نه رکيو وڃي.
④ پاڻي جي سڀني پائپن کي کوهه ۾ ڳنڍڻ لاءِ ساڳيو طريقو استعمال ڪريو.
⑤ ليڊ آئوٽ ڪيبل کي ڪنٽرول سوئچ سان ڳنڍڻ کان پوء، اهو ٽن مرحلن واري بجلي جي فراهمي سان ڳنڍيل آهي.
(4) انسٽاليشن دوران نوٽ ڪرڻ جون شيون:
1. جيڪڏهن پمپنگ جي عمل دوران جامنگ جو رجحان ملي ٿو، پاڻي جي پائپ کي موڙ يا ڇڪيو ته جيئن جمنگ پوائنٽ کي ختم ڪري. جيڪڏهن مختلف اپاءَ اڃا به ڪم نه ٿا ڪن، مهرباني ڪري پمپ کي دٻاءُ نه وجهو ته جيئن آبدوز اليڪٽرڪ پمپ ۽ کوهه کي نقصان نه ٿئي.
2. انسٽاليشن دوران، هڪ ربر پيڊ هر پائپ جي ڦل تي رکڻ گهرجي ۽ هڪجهڙائي سان مضبوط ڪيو وڃي.
3. جڏهن واٽر پمپ کي کوهه ۾ هيٺ ڪيو وڃي ته ان کي کوهه جي پائپ جي وچ ۾ رکڻ گهرجي ته جيئن پمپ کي گهڻي وقت تائين کوهه جي ڀت تي هلڻ کان روڪيو وڃي، جنهن ڪري پمپ وائبرٽ ٿئي ۽ موٽر سڙي ۽ سڙي. .
4. کوهه جي وهندڙ ريتي ۽ مٽيءَ جي حالتن مطابق کوهه جي تري تائين واٽر پمپ جي کوٽائي جو اندازو لڳايو. پمپ کي مٽيءَ ۾ دفن نه ڪريو. واٽر پمپ کان کوهه جي تري تائين فاصلو عام طور تي 3 ميٽر کان گهٽ نه هوندو آهي (ڏسو شڪل 2).
5. واٽر پمپ جي پاڻي جي داخل ٿيڻ جي کوٽائي 1-1.5 ميٽر کان گهٽ نه هجڻ گهرجي متحرڪ پاڻي جي سطح کان پاڻي جي انٽ نوڊ تائين (ڏسو شڪل 2). ٻي صورت ۾، پاڻي پمپ بيرنگ آساني سان خراب ٿي سگهي ٿو.
6. واٽر پمپ جي لفٽ تمام گھٽ نه ٿي سگھي. ٻي صورت ۾، هڪ دروازي والو کي نصب ڪرڻ جي ضرورت آهي ويل هيڊ واٽر پائپ لائن تي پمپ جي وهڪري کي ڪنٽرول ڪرڻ لاء ريڊ فلو پوائنٽ تي موٽر کي اوورلوڊ ٿيڻ کان روڪڻ ۽ وڏي وهڪري جي شرح جي ڪري سڙي وڃڻ کان.
7. جڏهن پاڻي جو پمپ هلي رهيو آهي، پاڻي جي پيداوار مسلسل هجڻ گهرجي ۽ اڃا به، موجوده مستحڪم هجڻ گهرجي (درجه بندي ڪم ڪندڙ حالتن جي تحت، عام طور تي 10 سيڪڙو کان وڌيڪ درجه بندي ٿيل موجوده)، ۽ ڪو به وائيبريشن يا شور نه هجڻ گهرجي. جيڪڏهن ڪو غير معمولي آهي، مشين کي روڪڻ گهرجي ته ان جو سبب ڳولڻ ۽ ان کي ختم ڪرڻ لاء.
8. انسٽال ڪرڻ وقت، موٽر گرائونڊنگ تار جي سيٽنگ تي ڌيان ڏيو (شڪل 2 ڏسو). جڏهن پاڻي جو پائپ هڪ اسٽيل پائپ آهي، ان کي ويل هيڊ ڪلمپ کان وٺي؛ جڏهن پاڻي جو پائپ هڪ پلاسٽڪ پائپ آهي، ان کي برقي پمپ جي گرائونڊ نشان کان وٺي.
- 1.Submersible پمپ جي انسٽاليشن مڪمل ٿي وئي آهي، موصليت جي مزاحمت ۽ سوئچ مان ٽن مرحلن جي وهڪري کي ٻيهر چيڪ ڪريو، اوزار کي چيڪ ڪريو ۽ سامان جي ڪنيڪشن جي غلطي کي شروع ڪريو، جيڪڏهن ڪو مسئلو ناهي، آزمائش شروع ڪري سگهو ٿا، اوزار جي شروعات کان پوء پڙهڻ جو اشارو آهي ته ڇا نالو پليٽ مقرر ڪيل وولٽيج ۽ ڪرنٽ کان وڌيڪ، پمپ شور ۽ وائبريشن رجحان جو مشاهدو ڪيو، سڀ ڪجهه عام آهي آپريشن ۾ رکي سگهجي ٿو.
- 2. چئن ڪلاڪن لاء پمپ جو پهريون آپريشن، جلدي بند ڪيو وڃي موٽر جي حرارتي موصليت جي مزاحمت کي جانچيو، قيمت 0.5 ميگاوام کان گهٽ نه هجڻ گهرجي.
- 3. پمپ بند ٿيڻ کان پوء، پنجن منٽن جي وقفي کان پوء شروع ڪيو وڃي، ان کي روڪڻ لاء پائپ ۾ پاڻي جي ڪالمن کي مڪمل طور تي ريفلوڪس نه ڪيو ويو آهي جيڪو گهڻو ڪري موٽر ڪرنٽ ۽ جلڻ سبب آهي.
- 4. عام آپريشن ۾ پمپ کان پوء، ان جي خدمت جي زندگي کي ڊگھو ڪرڻ لاء، سپلائي وولٹیج کي جانچڻ لاء، ڪم ڪندڙ موجوده ۽ موصليت جي مزاحمت عام آهي، جيڪڏهن هيٺين صورتحال ملي ٿي، فوري طور تي خرابي جي حل کي بند ڪرڻ گهرجي.
- - درجه بندي جي حالت ۾، موجوده 20٪ کان وڌيڪ آهي.
- - پاڻي جي داخل ٿيڻ واري حصي ڏانهن متحرڪ پاڻي جي سطح، وقفي وقفي سان پاڻي جو سبب.
- - آبدوز پمپ سخت کمپن يا شور.
- - سپلائي وولٽيج 340 وولٽ کان گهٽ آهي.
- - فيوز ساڙيو هڪ مرحلو.
- - پاڻي جي پائپ کي نقصان.
- - موٽر جي حرارتي موصليت جي مزاحمت 0.5 ميگا اوم کان گهٽ آهي.
- 5. يونٽ ڌار ڪرڻ:
- (1)untie cable tether, remove the pipeline part, remove the wire plate.
- (2)screw down the water bolt, put out the motor cavity water.
- (3)remove the filter, loosening the coupling fixed motor shaft fixed screw.
- (4)screw down the inlet joint and motor bolt, the pump and motor separate (separation attention will unit mat flat, prevent the pump shaft bending)
- (5)pump disassembly sequence is: (see figure 1) inlet joint, impeller, diversion shell, impeller...... check valve body, dismantle the impeller with special tools will first fix the conical sleeve loosening, the disassembly process to avoid the pump shaft bending and each bump.
- (6)motor disassembly process is: (see figure 1) the motor placed on the platform, from the bottom of the motor in turn removed double head bolt (pull rod bolt) on the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt, and then take out the rotor (pay attention not to damage the wire package) finally removed the connecting section and upper guide bearing seat.
- (7)unit assembly: before assembly should be the parts of the rust, dirt clean, each mating surface and fastener coated with sealant, and then in turn according to the reverse sequence of disassembly assembly (after assembly motor shaft up and down momentum is about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine.
- 6.submersible pump every operation for a year, or less than a year of operation but the submersible time has reached two years, should be proposed in accordance with the fifth paragraph of the well to be dismantled and repaired, replace the worn parts.
This product is a brand new submersible pump, suitable for a variety of occasions for pump work needs. In order to ensure the long-term use and stable performance of the product, the user needs to clean the water in the motor cavity of the pump after use (especially in winter to prevent the motor from freezing), coil up and tie the cable, and then store the product in an environment free of corrosive substances and gases, with the temperature kept below 40 °C in the room. In addition, if the submersible pump is not used for a long time, special attention should be paid to prevent rust to protect the service life of the product. This submersible pump will provide users with convenient and efficient pump solutions to ensure the safe and stable operation of the pump equipment.
- امپيلر
- شافٽ بازو
- رٻڙ جي شافٽ بازو
-
مهر لڳڻ واري انگوٽي
01 گہرے کوهه جو پاڻي
02 مٿاھين پاڻي جي فراهمي
03 جبلن جي پاڻي جي فراهمي
04 ٽاور پاڻي
05 زرعي آبپاشي
06 باغ آبپاشي
07 درياهه جي پاڻي جي کوٽ
08 گهريلو پاڻي