135QJP Peep Well dykpumpe

Foretag OEM-behandling! I henhold til brugernes krav, design og fremstilling af forskellige typer af særlige krav til ikke-standard dykmotor og pumpe. Produktimplementeringsstandarder: GB/T2816-2014 "brøndsænkbar pumpe", GB/T2818-2014 "brøndsænkbar asynkronmotor". WhatsApp: 17855846335
PDF DOWNLOAD
detaljer
Tags
 
Produkt oversigt

Introducing the innovative QJP series fountain pump, a product of superior efficiency meticulously developed and researched by our factory. With a meticulously designed pump motor core crafted from premium cold rolled silicon steel, this fountain pump boasts exceptional magnetic conductivity, enabling seamless and heat-free starts. Unlike traditional fountain pumps, the 0JP series features motor rotor ends that utilize a unique water-lubricated alloy copper sleeve, replacing standard ball bearings. This innovative design not only mitigates issues of rust and wear caused by lack of oil but also ensures longevity and durability for the motor. Upgrade your fountain experience with the cutting-edge technology and superior performance of the QJP series fountain pump.

 

 
Betingelser for brug

The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply, and has strict requirements for clean water: water temperature shall not exceed 20 °C; solid impurities content (mass ratio) shall not exceed 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content shall not exceed 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product adopts a closed or water immersion structure motor, the submersible motor must be filled with clean water before use to prevent empty. In addition, the water can be used after filling and tightening the air release bolt. The submersible pump must be completely immersed in water to work, the diving depth shall not exceed 70m, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3m. The well water flow should meet the water output and continuous operation requirements of the submersible pump, and the water output shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally, and it must be installed vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to do no-load test without water.

 

 
Model Betydning

 

135QJP Peep Well Submersible Pump

 
Delvis modelreference
Model Flow (m3/h) Hoved
(m)

Roterende hastighed

(ændring/punkt)

 Vandpumpe(%) Udtag
diameter
(mm)
Velegnet
diameter (mm) 
Bedømt
effekt (KW)
Bedømt
spænding (V)
 Bedømt
strøm(A)
Motoreffektivitet (%)  power factorcosφ   Enhed
Radial maksimal størrelse (mm)
Bemærkning
135QJ5-34 5 34 2850   40  135over 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135over 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135over 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135over 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135over 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135over 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135over 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Sikkerhedsforanstaltninger

Well submersible pump is a clean water pump, it is strictly prohibited to dig a new well to extract mud and silt. The voltage grade of the well pump is 380/50HZ, and the submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof and must be equipped with starting equipment, such as distribution box, etc. Starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be timely tripping. When installing and using the pump, the pump must be reliably grounded, and it is prohibited to push and pull the switch when the hands and feet are wet. Before installing and maintaining the pump, the power must be cut off, and the place where the pump is used must be clearly marked "anti-electric shock". Before going down the well or installing the pump, the motor must be filled with distilled water or clean cold water without corrosion, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be poured into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. When using the pump, the lift and flow range specified by the pump must be strictly followed to prevent the pump from having a large flow at low lift or a large pull at high lift, which will lead to serious wear and tear of the thrust bearing and other parts and components, and cause the motor to overload and burn out. After the pump is put into the well, the insulation resistance between the motor and the ground should be measured, which should not be less than 100MΩ. After the start, the voltage and current should be observed regularly, and the motor winding insulation should be checked to see if it meets the requirements; if the temperature of the pump storage location is below the freezing point, the water in the motor cavity should be drained to prevent the water in the motor cavity from freezing and damaging the motor due to low temperature.

 

 
Introduktion til struktur

Kort introduktion af struktur: pumpedelen består hovedsageligt af pumpeaksel, pumpehjul, afledningsskal, gummileje, kontraventilhus (valgfri dele) og andre komponenter. Motordelen består hovedsageligt af basis, trykregulerende film, trykleje, trykplade , nederste styrelejesæde, stator, rotor, øvre styrelejesæde, sandring, vandindløbssektion, kabel og andre komponenter.


De vigtigste egenskaber ved produktet omfatter:

1, Motoren er en vandfyldt våd nedsænkelig trefaset asynkronmotor, motorhulrummet er fyldt med rent vand, bruges til at køle motoren og smøre lejet, den trykregulerende film i bunden af ​​motoren bruges til at justere ekspansions- og kontraktionstrykforskellen af ​​vandet inde i kroppen forårsaget af ændringen af ​​motorens temperaturstigning.

 2, For at forhindre, at sandet i brøndvandet kommer ind i motoren, er den øvre ende af motorakslen udstyret med to olietætninger, og en sandring er installeret for at danne en sandforebyggende struktur.

 3, For at forhindre, at pumpeakslen løber op ved start, er pumpeakslen og motorakslen forbundet med en kobling, og et øvre trykleje er monteret i den nederste del af motoren.

 4, Smøringen af ​​motoren og pumpelejet er vandsmøring.

 5, Motorens statorvikling er lavet af højkvalitets dykmotorviklingstråd med høj isoleringsevne.

 6, Pumpen er designet af computer CAD, med enkel struktur og god teknisk ydeevne.

135QJP Peep Well Submersible Pump
 
Installere

(1) Forberedelse før installation:
1. Kontroller, om dykpumpen opfylder de brugsbetingelser og omfang, der er specificeret i manualen.
2. Brug en tung genstand med en diameter svarende til den maksimale ydre diameter af dykpumpen, mål om brøndboringens indvendige diameter kan passe til dykpumpen, og mål om brønddybden opfylder installationskravene.
3. Tjek om brøndboringen er ren, og om brøndvandet er grumset. Brug aldrig en elektrisk dykpumpe til at vaske welorpumpens mudder og sandvand for at undgå for tidlig beskadigelse af den elektriske dykpumpe.
4. Kontroller, om placeringen af ​​brøndhovedinstallationsklemmen er passende, og om den kan modstå hele enhedens kvalitet
5. Tjek om dykpumpens komponenter er komplette og installeret korrekt i henhold til monteringsdiagrammet i manualen Fjern filterskærmen og drej koblingen for at se om den roterer fleksibelt
6. Skru vandskruen af ​​og fyld motorhulrummet med rent, ikke-ætsende vand (bemærk. sørg for at fylde det op), og spænd derefter vandskruen. Efter 12 timers vandindsprøjtning bør motorens isolationsmodstand ikke være mindre end 150M Q målt med et 500V rystebord.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Det vedhæftede kabelledningsdiagram er som følger:
135QJP Peep Well Submersible Pump

 

8. Brug et multimeter til at kontrollere, om de trefasede ledninger er tilsluttet, og om DC-modstanden er tilnærmelsesvis afbalanceret.
9. Kontroller, om kredsløbs- og transformatorkapaciteten er overbelastet, og tilslut derefter overbelastningsbeskyttelsesafbryderen eller startudstyret. Se tabel 2 for specifikke modeller, og hæld derefter en spand vand i vandpumpen fra vandpumpens udløb for at smøre gummilejerne i pumpen, og placer derefter den elektriske dykpumpe oprejst og stabilt. Start (ikke mere end et sekund) og kontroller, om styreretningen stemmer overens med styretegnet. Hvis ikke, så skift to vilkårlige stik på trefasekablet. Installer derefter filteret og forbered dig på at gå ned i brønden. Hvis den bruges til særlige lejligheder (såsom grøfter, grøfter, floder, damme, damme osv.), skal den elektriske pumpe være pålideligt jordet.

 

(2) Installationsudstyr og værktøjer:
1. Et par løftekæder til mere end to tons.
2. Et stativ med en lodret højde på ikke mindre end fire meter.
3. To hængereb (wirereb), der kan bære en vægt på mere end et ton (kan bære vægten af ​​et komplet sæt vandpumper).
4. Installer to par klemmer (skinne).
5. Skruenøgler, hamre, skruetrækkere, elektrisk værktøj og instrumenter mv.

 

(3) Installation af elektrisk pumpe:
1. Installationsdiagrammet for den dyk-elektriske pumpe er vist i figur 2. De specifikke installationsdimensioner er vist i Tabel 3 "Liste over installationsdimensioner for den dyk-elektriske pumpe".

 

2. Dykpumper med en løftehøjde på mindre end 30 meter kan hejses direkte ned i brønden ved hjælp af slanger og ståltove eller andre hamperove, der kan bære den fulde vægt af hele maskinen, vandrør og vand i rørene.

 

3. Pumper med en løftehøjde på mere end 30 meter anvender stålrør, og installationsrækkefølgen er som følger:
①Brug en klemme til at klemme den øvre ende af vandpumpedelen (motoren og vandpumpen er blevet forbundet på dette tidspunkt), løft den med en hængende kæde, og bind den langsomt ind i brønden, indtil Sæt klemmen på brøndhovedet og fjern hængende kæde.
② Brug endnu et par klemmer til at klemme et rør, løft det med en hængende kæde 15 cm væk fra flangen, og sænk det langsomt. Mellem rørflange og pumpeflange Sæt gummipuden på plads og spænd røret og pumpen jævnt med bolte, møtrikker og fjederskiver.
③ Løft dykpumpen lidt, fjern klemmen på den øverste ende af vandpumpen, bind kablet fast til vandrøret med et plastikbånd, og bind det langsomt ned, indtil klemmen er placeret ved brøndhovedet.
④Brug samme metode til at binde alle vandrør i brønden.
⑤ Efter at udløbskablet er tilsluttet kontrolkontakten, tilsluttes det til den trefasede strømforsyning.


(4) Ting at bemærke under installationen:
1. Hvis der konstateres et blokeringsfænomen under pumpningsprocessen, skal du dreje eller trække i vandrøret for at overvinde blokeringspunktet. Hvis forskellige foranstaltninger stadig ikke virker, bedes du ikke tvinge pumpen ned for at undgå beskadigelse af den elektriske dykpumpe og brønden.
2. Under installationen skal der placeres en gummipude ved flangen på hvert rør og strammes jævnt.
3. Når vandpumpen sænkes ned i brønden, skal den placeres i midten af ​​brøndrøret for at forhindre pumpen i at køre mod brøndvæggen i lang tid, hvilket får pumpen til at vibrere og motoren til at feje og brænde .
4. Bestem dybden af ​​vandpumpen til bunden af ​​brønden i henhold til brøndens flydende sand- og siltforhold. Begrav ikke pumpen i mudderet. Afstanden fra vandpumpen til bunden af ​​brønden er generelt ikke mindre end 3 meter (se figur 2).
5. Vandpumpens vandindgangsdybde bør ikke være mindre end 1-1,5 meter fra den dynamiske vandstand til vandindløbsknuden (se figur 2). Ellers kan vandpumpens lejer let blive beskadiget.
6. Vandpumpens løft må ikke være for lavt. Ellers skal der installeres en skydeventil på brøndhovedets vandrørledning for at styre pumpeflowet ved det nominelle flowpunkt for at forhindre, at motoren bliver overbelastet og brændt ud på grund af store flowhastigheder.
7. Når vandpumpen kører, skal vandudgangen være kontinuerlig og jævn, strømmen skal være stabil (under nominelle arbejdsforhold, generelt ikke mere end 10% af nominel strøm), og der bør ikke være vibrationer eller støj. Hvis der er noget unormalt, skal maskinen standses for at finde ud af årsagen og eliminere den.
8. Når du installerer, skal du være opmærksom på indstillingen af ​​motorens jordledning (se figur 2). Når vandrøret er et stålrør, før det fra brøndhovedklemmen; når vandrøret er et plastikrør, før det fra jordingsmærket på den elektriske pumpe.

 

 
Vedligeholdelse og vedligeholdelse
  • 1. Installation af dykpumpe er afsluttet, tjek igen isolationsmodstanden og trefaset ledning fra kontakten, tjek instrumentet og start udstyrsforbindelsesfejlen, hvis der ikke er noget problem, kan du starte forsøget efter starten af ​​instrumentet angiver aflæsninger, om mere end navneskiltet foreskrev nominel spænding og strøm, observer pumpens støj og vibrationsfænomen, alt er normalt kan sættes i drift.
  • 2.Den første drift af pumpen i fire timer, bør lukkes ned hurtigt test den termiske isolationsmodstand af motoren, bør værdien ikke være mindre end 0,5 megaohm.
  • 3. Efter nedlukning af pumpen, bør den startes efter et interval på fem minutter, for at forhindre, at vandsøjlen i røret ikke har fuldstændig tilbagesvaling forårsaget af for stor motorstrøm og udbrænding.
  • 4. Efter pumpen i normal drift, for at forlænge dens levetid, for at kontrollere forsyningsspændingen, arbejdsstrøm og isolationsmodstand er normal, hvis fundet følgende situation, bør straks lukke fejlfinding.
  • - i den nominelle tilstand er strømmen mere end 20 %.
  • - dynamisk vandstand til vandindløbssektionen, hvilket forårsager intermitterende vand.
  • - dykpumpe kraftige vibrationer eller støj.
  • - forsyningsspændingen er lavere end 340 volt.
  • - sikringen brændte en fase ud.
  • - skader på vandrør.
  • - motor til den termiske isolationsmodstand er mindre end 0,5 megaohm.
  •  
  • 5. Demontering af enhed:
  • (1)untie cable tether, remove the pipeline part, remove the wire plate.
  • (2)screw down the water bolt, put out the motor cavity water.
  • (3)remove the filter, loosening the coupling fixed motor shaft fixed screw.
  • (4)screw down the inlet joint and motor bolt, the pump and motor separate (separation attention will unit mat flat, prevent the pump shaft bending)
  • (5)pump disassembly sequence is: (see figure 1) inlet joint, impeller, diversion shell, impeller...... check valve body, dismantle the impeller with special tools will first fix the conical sleeve loosening, the disassembly process to avoid the pump shaft bending and each bump.
  • (6)motor disassembly process is: (see figure 1) the motor placed on the platform, from the bottom of the motor in turn removed double head bolt (pull rod bolt) on the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt, and then take out the rotor (pay attention not to damage the wire package) finally removed the connecting section and upper guide bearing seat.
  • (7)unit assembly: before assembly should be the parts of the rust, dirt clean, each mating surface and fastener coated with sealant, and then in turn according to the reverse sequence of disassembly assembly (after assembly motor shaft up and down momentum is about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • 6.submersible pump every operation for a year, or less than a year of operation but the submersible time has reached two years, should be proposed in accordance with the fifth paragraph of the well to be dismantled and repaired, replace the worn parts.

 

 
Opbevaring og depot

This product is a brand new submersible pump, suitable for a variety of occasions for pump work needs. In order to ensure the long-term use and stable performance of the product, the user needs to clean the water in the motor cavity of the pump after use (especially in winter to prevent the motor from freezing), coil up and tie the cable, and then store the product in an environment free of corrosive substances and gases, with the temperature kept below 40 °C in the room. In addition, if the submersible pump is not used for a long time, special attention should be paid to prevent rust to protect the service life of the product. This submersible pump will provide users with convenient and efficient pump solutions to ensure the safe and stable operation of the pump equipment.

 

 
Sliddele
  • Løbehjul
  • Skaftbøsning
  • Skaftbøsning af gummi
  • Pakning

 
Applikationsscenarier

01 Dyb brønds vandindtag

02 Vandforsyning i højhuse

03 bjergvandforsyning 

04 tårnvand

05 Landbrugsvanding

06 havevanding

07 flodvandindtag

08 brugsvand

 

Hvis du er interesseret i vores produkter, kan du vælge at efterlade dine oplysninger her, så kontakter vi dig snarest.


Skriv din besked her og send den til os

Hvis du er interesseret i vores produkter, kan du vælge at efterlade dine oplysninger her, så kontakter vi dig snarest.


da_DKDanish