135QJP Subakvigebla Pumpilo Peep Well

Entreprenu OEM-pretigon! Laŭ uzantpostuloj, dezajno kaj fabrikado de diversaj specoj de specialaj postuloj de ne-norma subakvigebla motoro kaj pumpilo. La produktaj efektivignormoj: GB/T2816-2014 "bone subakvigebla pumpilo", GB/T2818-2014 "bone subakvigebla nesinkrona motoro". WhatsApp: 17855846335
PDF DOWNLOAD
Detaloj
Etikedoj
 
Produkta Superrigardo

Introducing the innovative QJP series fountain pump, a product of superior efficiency meticulously developed and researched by our factory. With a meticulously designed pump motor core crafted from premium cold rolled silicon steel, this fountain pump boasts exceptional magnetic conductivity, enabling seamless and heat-free starts. Unlike traditional fountain pumps, the 0JP series features motor rotor ends that utilize a unique water-lubricated alloy copper sleeve, replacing standard ball bearings. This innovative design not only mitigates issues of rust and wear caused by lack of oil but also ensures longevity and durability for the motor. Upgrade your fountain experience with the cutting-edge technology and superior performance of the QJP series fountain pump.

 

 
Kondiĉoj de Uzo

The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply, and has strict requirements for clean water: water temperature shall not exceed 20 °C; solid impurities content (mass ratio) shall not exceed 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content shall not exceed 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product adopts a closed or water immersion structure motor, the submersible motor must be filled with clean water before use to prevent empty. In addition, the water can be used after filling and tightening the air release bolt. The submersible pump must be completely immersed in water to work, the diving depth shall not exceed 70m, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3m. The well water flow should meet the water output and continuous operation requirements of the submersible pump, and the water output shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally, and it must be installed vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to do no-load test without water.

 

 
Modela Signifo

 

135QJP Peep Well Submersible Pump

 
Parta Modela Referenco
Modelo Fluo (m3/h) Kapo
(m)

Rotacia rapido

(ŝanĝo/punkto)

 Akvopumpilo(%) Elirejo
diametro
(mm)
Aplika bone
diametro (mm) 
Taksita
potenco (KW)
Taksita
tensio (V)
 Taksita
aktuala (A)
Motorefikeco (%)  power factorcosφ   Unuo
Radiala Maksimuma grandeco (mm)
Rimarko
135QJ5-34 5 34 2850   40  135supre 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135supre 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135supre 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135supre 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135supre 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135supre 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135supre 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Sekurecaj Antaŭzorgoj

Well submersible pump is a clean water pump, it is strictly prohibited to dig a new well to extract mud and silt. The voltage grade of the well pump is 380/50HZ, and the submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof and must be equipped with starting equipment, such as distribution box, etc. Starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be timely tripping. When installing and using the pump, the pump must be reliably grounded, and it is prohibited to push and pull the switch when the hands and feet are wet. Before installing and maintaining the pump, the power must be cut off, and the place where the pump is used must be clearly marked "anti-electric shock". Before going down the well or installing the pump, the motor must be filled with distilled water or clean cold water without corrosion, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be poured into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. When using the pump, the lift and flow range specified by the pump must be strictly followed to prevent the pump from having a large flow at low lift or a large pull at high lift, which will lead to serious wear and tear of the thrust bearing and other parts and components, and cause the motor to overload and burn out. After the pump is put into the well, the insulation resistance between the motor and the ground should be measured, which should not be less than 100MΩ. After the start, the voltage and current should be observed regularly, and the motor winding insulation should be checked to see if it meets the requirements; if the temperature of the pump storage location is below the freezing point, the water in the motor cavity should be drained to prevent the water in the motor cavity from freezing and damaging the motor due to low temperature.

 

 
Enkonduko al Strukturo

Mallonga enkonduko de strukturo: pumpila parto estas ĉefe kunmetita de pumpila ŝafto, impulsilo, distra ŝelo, kaŭĉuka lagro, kontrolvalva korpo (laŭvolaj partoj) kaj aliaj komponantoj.Motora parto estas ĉefe kunmetita de bazo, premo reguliga filmo, puŝo lagro, puŝoplato. , malsupra gvidilo portanta sidloko, statoro, rotoro, supra gvidilo portanta sidloko, sabloringo, akvo enirsekcio, kablo kaj aliaj komponantoj.


La ĉefaj trajtoj de la produkto inkluzivas:

1, La motoro estas akvoplena malseka subakvigebla trifaza nesinkrona motoro, la motora kavo estas plena de pura akvo, uzata por malvarmigi la motoron kaj lubriki la lagron, la premo reguliga filmo ĉe la fundo de la motoro estas uzata por ĝustigi. la disvastiĝo kaj kuntiriĝa premodiferenco de la akvo ene de la korpo kaŭzita de la ŝanĝo de la temperaturaltiĝo de la motoro.

 2, Por malhelpi la sablon en la puta akvo eniri la motoron, la supra fino de la motora ŝafto estas ekipita per du oleaj sigeloj, kaj sabla ringo estas instalita por formi sablan preventan strukturon.

 3, Por malhelpi, ke la pumpila ŝafto ekkuru dum la ekfunkciigo, la pumpila ŝafto kaj la motora ŝafto estas konektitaj per kuplado, kaj supra puŝa lagro estas instalita ĉe la malsupra parto de la motoro.

 4, La lubrikado de la motoro kaj la pumpila lagro estas akva lubrikado.

 5, La motora statora bobenaĵo estas farita el altkvalita submergebla motora bobena drato, kun alta izola rendimento.

 6, La pumpilo estas desegnita de komputila CAD, kun simpla strukturo kaj bona teknika rendimento.

135QJP Peep Well Submersible Pump
 
Instali

(1) Preparado antaŭ instalado:
1. Kontrolu ĉu la subakvigebla pumpilo plenumas la uzajn kondiĉojn kaj amplekson specifitajn en la manlibro.
2. Uzante pezan objekton kun diametro egala al la maksimuma ekstera diametro de la subakvigebla pumpilo, mezuru ĉu la interna diametro de la puttruo povas konveni al la subakvigebla pumpilo, kaj mezuru ĉu la putoprofundo plenumas la instalajn postulojn.
3. Kontrolu ĉu la puttruo estas pura kaj ĉu la putakvo estas malklara. Neniam uzu subakvigan elektran pumpilon por lavi la koton kaj sablan akvon por eviti trofruan damaĝon al la subakvigebla elektra pumpilo.
4. Kontrolu ĉu la pozicio de la welhead instala krampo taŭgas kaj ĉu ĝi povas elteni la kvaliton de la tuta unuo.
5. Kontrolu ĉu la subakvigeblaj pumpiloj estas kompletaj kaj instalitaj konvene laŭ la aro-diagramo en la manlibroForigu la filtrilan ekranon kaj turnu la kuplilon por vidi ĉu ĝi turniĝas flekseble.
6. Malŝraŭbi la akvoŝraŭbon kaj plenigi la motoran kavon per pura, ne koroda akvo (notu. nepre plenigu ĝin), tiam streĉu la akvoŝraŭbon. Post 12 horoj da akva injekto, la izolaj rezisto de la motoro ne devus esti malpli ol 150M Q kiam mezurita kun 500V skuanta tablo.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

La alkroĉita kablokabla procezo-diagramo estas kiel sekvas:
135QJP Peep Well Submersible Pump

 

8. Uzu multimetron por kontroli ĉu la trifazaj dratoj estas konektitaj kaj ĉu la DC-rezisto estas proksimume ekvilibra.
9. Kontrolu ĉu la cirkvito kaj transformilo-kapacito estas troŝarĝitaj, kaj tiam konektu la superŝarĝan protektoŝaltilon aŭ startigan ekipaĵon. Vidu Tabelon 2 por specifaj modeloj, kaj tiam Verŝu sitelon da akvo en la akvopumpilon de la akvopumpila ellasejo por lubriki la kaŭĉukaj lagroj en la pumpilo, kaj poste metu la subakvigan elektran pumpilon vertikale kaj stabile.Komencu (ne pli ol unu sekundo) kaj kontrolu ĉu la direkta direkto kongruas kun la stira signo. Se ne, interŝanĝu iujn ajn du konektilojn de la trifaza kablo. Tiam instalu la filtrilon kaj pretiĝu por malsupreniri la puton. Se uzata en specialaj okazoj (kiel fosaĵoj, fosaĵoj, riveroj, lagetoj, lagetoj, ktp.), la elektra pumpilo devas esti fidinde surterigita.

 

(2) Instalaj ekipaĵoj kaj iloj:
1. Unu paro da levaj ĉenoj por pli ol du tunoj.
2. Tripiedo kun vertikala alteco ne malpli ol kvar metroj.
3. Du pendantaj ŝnuroj (drataj ŝnuroj), kiuj povas porti pezon de pli ol unu tuno (povas porti la pezon de kompleta aro da akvopumpiloj).
4. Instalu du parojn da krampoj (splitaĵoj).
5. Ŝlosiloj, marteloj, ŝraŭbturniloj, elektraj iloj kaj instrumentoj, ktp.

 

(3) Instalado de elektra pumpilo:
1. La instala diagramo de la subakvigebla elektra pumpilo estas montrita en Figuro 2. La specifaj instalaj dimensioj estas montritaj en Tabelo 3 "Listo de Instalaj Dimensioj de la Submergebla Elektra Pumpilo".

 

2. Submergeblaj elektraj pumpiloj kun kapo malpli ol 30 metroj povas esti levitaj rekte en la puton per hosoj kaj drataj ŝnuroj aŭ aliaj kanabaj ŝnuroj, kiuj povas porti la plenan pezon de la tuta maŝino, akvotuboj kaj akvo en la tuboj.

 

3. Pumpiloj kun kapo de pli ol 30 metroj uzas ŝtalajn tubojn, kaj la instala sekvenco estas jena:
①Uzu krampon por fiksi la supran finon de la akvopumpila parto (la motoro kaj akvopumpilo estas konektitaj ĉi-momente), levu ĝin per pendanta ĉeno kaj malrapide ligu ĝin en la puton ĝis Metu la krampon sur la puton kaj forigu la krampon. pendanta ĉeno.
② Uzu alian paron da krampoj por krampi pipon, levu ĝin per pendanta ĉeno 15 cm for de la flanĝo, kaj malrapide mallevu ĝin. Inter tubflanĝo kaj pumpflanĝo Metu la kaŭĉukan kuseneton en lokon kaj streĉu la tubon kaj pumpu egale per rigliloj, nuksoj kaj printempaj laviloj.
③ Levu la subakvigeblan pumpilon iomete, forigu la krampon sur la supra fino de la akvopumpilo, ligu la kablon firme al la akvotubo per plasta bendo, kaj malrapide ligu ĝin malsupren ĝis La krampo estas metita ĉe la puto.
④Uzu la saman metodon por ligi ĉiujn akvotubojn en la puton.
⑤Post kiam la elkonduka kablo estas konektita al la kontrolŝaltilo, ĝi estas konektita al la trifaza nutrado.


(4) Aferoj notindaj dum instalado:
1. Se oni trovas fenomenon de blokado dum la pumpado, turnu aŭ tiru la akvotubon por venki la blokadon. Se diversaj mezuroj ankoraŭ ne funkcias, bonvolu ne devigu la pumpilon malsupren por eviti damaĝon al la subakvigebla elektra pumpilo kaj la puto.
2. Dum instalado, kaŭĉuka kuseneto devas esti metita ĉe la flanĝo de ĉiu tubo kaj streĉita egale.
3. Kiam la akvopumpilo estas malaltigita en la puton, ĝi devas esti metita en la mezon de la putotubo por malhelpi la pumpilon kuri kontraŭ la putmuro dum longa tempo, kaŭzante la pumpilon vibri kaj la motoro balai kaj bruli. .
4. Determini la profundon de la akvopumpilo al la fundo de la puto laŭ la fluantaj sablo kaj siltaj kondiĉoj de la puto. Ne enterigu la pumpilon en la koto. La distanco de la akvopumpilo ĝis la fundo de la puto estas ĝenerale ne malpli ol 3 metroj (vidu Figuro 2).
5. La akvo-enira profundo de la akvopumpilo devas esti ne malpli ol 1-1,5 metroj de la dinamika akvonivelo ĝis la akva enirnodo (vidu Figuro 2). Alie, la akvopumpilaj lagroj povas esti facile difektitaj.
6. La lifto de la akvopumpilo ne povas esti tro malalta. Alie, pordega valvo devas esti instalita sur la putokapa akvodukto por kontroli la pumpilfluon ĉe la taksita flupunkto por malhelpi la motoron esti troŝarĝita kaj forbrulita pro grandaj flukvantoj.
7. Kiam la akvopumpilo funkcias, la akvoproduktado devas esti kontinua kaj eĉ, la fluo estu stabila (sub taksitaj laborkondiĉoj, ĝenerale ne pli ol 10% de la taksita kurento), kaj ne estu vibro aŭ bruo. Se estas ia anomalio, la maŝino devas esti haltigita por ekscii la kaŭzon kaj forigi ĝin.
8. Kiam vi instalas, atentu la agordon de la motora tera drato (vidu Figuro 2). Kiam la akvotubo estas ŝtala tubo, konduku ĝin de la putkapa krampo; kiam la akvotubo estas plasta tubo, konduku ĝin de la surgrunda marko de la elektra pumpilo.

 

 
Prizorgado kaj Bontenado
  • 1.Sumersebla pumpilo-instalado estas kompleta, rekontrolu la izolan reziston kaj trifazan kondukadon de la ŝaltilo, kontrolu la instrumenton kaj komencu la ekipaĵan konekton eraron, se ne estas problemo, povas komenci la provon, post la komenco de la instrumento. indikante legadoj, ĉu pli ol la nomplato kondiĉis taksita tensio kaj fluo, observu la pumpilo bruo kaj vibro fenomeno, ĉio estas normala povas esti metita en operacio.
  • 2.La unua operacio de la pumpilo dum kvar horoj, devus esti fermita rapide provi la termika izolado rezisto de la motoro, la valoro ne devus esti malpli ol 0,5 megaohm.
  • 3.After la pumpilo halto, devus esti komencita post intervalo de kvin minutoj, por malhelpi la akvo kolumno en la tubo ne tute refluo kaŭzita de troa motoro fluo kaj elĉerpiĝo.
  • 4.Post la pumpilo en normala funkciado, por plilongigi sian servodaŭron, kontroli la provizon de tensio, funkcianta kurento kaj izolaj rezisto estas normala, se trovite la sekva situacio, devus tuj fermi problemojn.
  • - en la taksita kondiĉo, la fluo estas pli ol 20%.
  • - dinamika akvonivelo al la akva enirsekcio, kaŭzante intermitan akvon.
  • - subakvigebla pumpilo severa vibro aŭ bruo.
  • - la tensio de provizado estas pli malalta ol 340 voltoj.
  • - fuze forbrulis fazon.
  • - difekto de akvotubo.
  • - motoro al la termika izolado rezisto estas malpli ol 0,5 megaohm.
  •  
  • 5.Unuomalmuntado:
  • (1)untie cable tether, remove the pipeline part, remove the wire plate.
  • (2)screw down the water bolt, put out the motor cavity water.
  • (3)remove the filter, loosening the coupling fixed motor shaft fixed screw.
  • (4)screw down the inlet joint and motor bolt, the pump and motor separate (separation attention will unit mat flat, prevent the pump shaft bending)
  • (5)pump disassembly sequence is: (see figure 1) inlet joint, impeller, diversion shell, impeller...... check valve body, dismantle the impeller with special tools will first fix the conical sleeve loosening, the disassembly process to avoid the pump shaft bending and each bump.
  • (6)motor disassembly process is: (see figure 1) the motor placed on the platform, from the bottom of the motor in turn removed double head bolt (pull rod bolt) on the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt, and then take out the rotor (pay attention not to damage the wire package) finally removed the connecting section and upper guide bearing seat.
  • (7)unit assembly: before assembly should be the parts of the rust, dirt clean, each mating surface and fastener coated with sealant, and then in turn according to the reverse sequence of disassembly assembly (after assembly motor shaft up and down momentum is about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • 6.submersible pump every operation for a year, or less than a year of operation but the submersible time has reached two years, should be proposed in accordance with the fifth paragraph of the well to be dismantled and repaired, replace the worn parts.

 

 
Stokado kaj Gardo

This product is a brand new submersible pump, suitable for a variety of occasions for pump work needs. In order to ensure the long-term use and stable performance of the product, the user needs to clean the water in the motor cavity of the pump after use (especially in winter to prevent the motor from freezing), coil up and tie the cable, and then store the product in an environment free of corrosive substances and gases, with the temperature kept below 40 °C in the room. In addition, if the submersible pump is not used for a long time, special attention should be paid to prevent rust to protect the service life of the product. This submersible pump will provide users with convenient and efficient pump solutions to ensure the safe and stable operation of the pump equipment.

 

 
Portantaj Partoj
  • Impulsilo
  • Ŝafta maniko
  • Kaŭĉuka ŝafta maniko
  • Sigela ringo

 
Aplikaj Scenaroj

01 Profunda puta akvokonsumado

02 Alta akvoprovizado

03 montara akvoprovizado 

04 turo akvo

05 Agrikultura irigacio

06 ĝardeno irigacio

07 rivera akvopreno

08 hejma akvo

 

Se vi interesiĝas pri niaj produktoj, vi povas elekti lasi viajn informojn ĉi tie, kaj ni baldaŭ kontaktos vin.


Skribu vian mesaĝon ĉi tie kaj sendu ĝin al ni

Se vi interesiĝas pri niaj produktoj, vi povas elekti lasi viajn informojn ĉi tie, kaj ni baldaŭ kontaktos vin.


eoEsperanto