Introducing the innovative QJP series fountain pump, a product of superior efficiency meticulously developed and researched by our factory. With a meticulously designed pump motor core crafted from premium cold rolled silicon steel, this fountain pump boasts exceptional magnetic conductivity, enabling seamless and heat-free starts. Unlike traditional fountain pumps, the 0JP series features motor rotor ends that utilize a unique water-lubricated alloy copper sleeve, replacing standard ball bearings. This innovative design not only mitigates issues of rust and wear caused by lack of oil but also ensures longevity and durability for the motor. Upgrade your fountain experience with the cutting-edge technology and superior performance of the QJP series fountain pump.
The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply, and has strict requirements for clean water: water temperature shall not exceed 20 °C; solid impurities content (mass ratio) shall not exceed 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content shall not exceed 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product adopts a closed or water immersion structure motor, the submersible motor must be filled with clean water before use to prevent empty. In addition, the water can be used after filling and tightening the air release bolt. The submersible pump must be completely immersed in water to work, the diving depth shall not exceed 70m, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3m. The well water flow should meet the water output and continuous operation requirements of the submersible pump, and the water output shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally, and it must be installed vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Modelo | Daloy (m3/h) | Ulo (m) |
Bilis ng pag-ikot (baguhin/punto) |
Bomba ng tubig(%) | Outlet diameter (mm) |
Applicable na rin diameter(mm) |
Na-rate kapangyarihan(KW) |
Na-rate boltahe(V) |
Na-rate kasalukuyang(A) |
Motorefficiency (%) | power factorcosφ | Yunit Radial Maximu size(mm) |
Puna | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135sa itaas | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135sa itaas | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135sa itaas | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135sa itaas | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135sa itaas | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135sa itaas | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135sa itaas | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
Well submersible pump is a clean water pump, it is strictly prohibited to dig a new well to extract mud and silt. The voltage grade of the well pump is 380/50HZ, and the submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof and must be equipped with starting equipment, such as distribution box, etc. Starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be timely tripping. When installing and using the pump, the pump must be reliably grounded, and it is prohibited to push and pull the switch when the hands and feet are wet. Before installing and maintaining the pump, the power must be cut off, and the place where the pump is used must be clearly marked "anti-electric shock". Before going down the well or installing the pump, the motor must be filled with distilled water or clean cold water without corrosion, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be poured into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. When using the pump, the lift and flow range specified by the pump must be strictly followed to prevent the pump from having a large flow at low lift or a large pull at high lift, which will lead to serious wear and tear of the thrust bearing and other parts and components, and cause the motor to overload and burn out. After the pump is put into the well, the insulation resistance between the motor and the ground should be measured, which should not be less than 100MΩ. After the start, the voltage and current should be observed regularly, and the motor winding insulation should be checked to see if it meets the requirements; if the temperature of the pump storage location is below the freezing point, the water in the motor cavity should be drained to prevent the water in the motor cavity from freezing and damaging the motor due to low temperature.
Maikling panimula ng istraktura: ang bahagi ng bomba ay pangunahing binubuo ng pump shaft, impeller, diversion shell, rubber bearing, check valve body (opsyonal na mga bahagi) at iba pang mga bahagi. Ang bahagi ng motor ay pangunahing binubuo ng base, pressure regulating film, thrust bearing, thrust plate , lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable at iba pang bahagi.
Ang mga pangunahing tampok ng produkto ay kinabibilangan ng:
1, Ang motor ay isang wet submersible three-phase asynchronous na motor na puno ng tubig, ang lukab ng motor ay puno ng malinis na tubig, ginagamit upang palamig ang motor at mag-lubricate ang tindig, ang pressure regulating film sa ilalim ng motor ay ginagamit upang ayusin ang pagkakaiba ng pagpapalawak at pag-urong ng presyon ng tubig sa loob ng katawan sanhi ng pagbabago ng pagtaas ng temperatura ng motor.
2, Upang maiwasan ang pagpasok ng buhangin sa tubig ng balon sa motor, ang itaas na dulo ng baras ng motor ay nilagyan ng dalawang mga seal ng langis, at isang singsing ng buhangin ay naka-install upang bumuo ng isang istraktura ng pag-iwas sa buhangin.
3, Upang maiwasan ang pagtakbo ng pump shaft kapag nagsisimula, ang pump shaft at ang motor shaft ay konektado sa pamamagitan ng isang coupling, at isang upper thrust bearing ay naka-install sa ibabang bahagi ng motor.
4, Ang pagpapadulas ng motor at ang pump bearing ay water lubrication.
5, Ang motor stator winding ay gawa sa mataas na kalidad na submersible motor winding wire, na may mataas na pagganap ng pagkakabukod.
6, Ang bomba ay dinisenyo ng computer CAD, na may simpleng istraktura at mahusay na teknikal na pagganap.

(1) Paghahanda bago i-install:
1. Suriin kung ang submersible pump ay nakakatugon sa mga kondisyon ng paggamit at saklaw na tinukoy sa manual.
2. Gamit ang isang mabigat na obiect na may diameter na katumbas ng maximum na panlabas na diameter ng submersible pump, sukatin kung ang inneldiameter ng wellbore ay maaaring magkasya sa submersible pump, at sukatin kung ang lalim ng balon ay nakakatugon sa mga kinakailangan sa pag-install.
3. Suriin kung malinis ang wellbore at kung ang tubig ng balon ay maputik. Huwag gumamit ng submersible electric pump upang hugasan ang welor pump na putik at tubig ng buhangin upang maiwasan ang maagang pagkasira ng submersible electric pump.
4. Suriin kung ang posisyon ng welhead installation clamp ay angkop at kung ito ay makatiis sa kalidad ng buong unit
5. Suriin kung ang mga bahagi ng submersible pump ay kumpleto at maayos na naka-install ayon sa assembly diagram sa manualAlisin ang filter screen at paikutin ang coupling upang makita kung ito ay umiikot nang flexible
6. Alisin ang turnilyo ng tubig at punan ang lukab ng motor ng malinis, hindi kinakaing unti-unti na tubig (tandaan. siguraduhing salaan ito), pagkatapos ay higpitan ang waterscrew. Pagkatapos ng 12 oras na pag-iniksyon ng tubig, ang insulation resistance ng motor ay hindi dapat mas mababa sa 150M Q kapag sinusukat sa isang 500V shaking table.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Ang naka-attach na cable wiring process diagram ay ang mga sumusunod:
8. Gumamit ng multimeter upang suriin kung ang mga three-phase na wire ay konektado at kung ang DC resistance ay tinatayang balanse.
9. Suriin kung ang kapasidad ng circuit at transpormer ay na-overload, at pagkatapos ay ikonekta ang overload na proteksyon switch o panimulang kagamitan. Tingnan ang Talahanayan 2 para sa mga partikular na modelo, at pagkatapos ay ibuhos ang isang balde ng tubig sa water pump mula sa outlet ng water pump upang lubricate ang rubber bearings sa pump, at pagkatapos ay ilagay ang submersible electric pump nang patayo at matatag. Magsimula (hindi hihigit sa isang segundo) at suriin kung ang direksyon ng pagpipiloto ay pare-pareho sa sign ng pagpipiloto. Kung hindi, palitan ang alinmang dalawang connector ng three-phase cable. Pagkatapos ay i-install ang filter at maghanda na bumaba sa balon. Kung ginagamit sa mga espesyal na okasyon (tulad ng mga kanal, kanal, ilog, pond, pond, atbp.), ang electric pump ay dapat na mapagkakatiwalaang naka-ground.
(2) Kagamitan at kasangkapan sa pag-install:
1. Isang pares ng lifting chain para sa higit sa dalawang tonelada.
2. Isang tripod na may patayong taas na hindi bababa sa apat na metro.
3. Dalawang nakabitin na lubid (wire ropes) na kayang magdala ng bigat na higit sa isang tonelada (maaaring pasanin ang bigat ng isang kumpletong hanay ng mga water pump).
4. Mag-install ng dalawang pares ng clamps (splints).
5. Wrenches, martilyo, distornilyador, mga kasangkapang elektrikal at instrumento, atbp.
(3)Pag-install ng electric pump:
1. Ang diagram ng pag-install ng submersible electric pump ay ipinapakita sa Figure 2. Ang mga partikular na sukat ng pag-install ay ipinapakita sa Talahanayan 3 "Listahan ng Mga Dimensyon ng Pag-install ng Submersible Electric Pump".
2. Ang mga submersible electric pump na may ulo na wala pang 30 metro ay maaaring iangat nang direkta sa balon gamit ang mga hose at wire rope o iba pang mga lubid ng abaka na kayang pasanin ang buong bigat ng buong makina, mga tubo ng tubig, at tubig sa mga tubo.
3. Ang mga pump na may ulo na higit sa 30 metro ay gumagamit ng mga bakal na tubo, at ang pagkakasunud-sunod ng pag-install ay ang mga sumusunod:
①Gumamit ng clamp upang i-clamp ang itaas na dulo ng bahagi ng water pump (ang motor at water pump ay konektado sa oras na ito), iangat ito gamit ang isang nakabitin na kadena, at dahan-dahang itali ito sa balon hanggang sa Ilagay ang clamp sa wellhead at alisin ang nakasabit na kadena.
② Gumamit ng isa pang pares ng clamp para i-clamp ang isang tubo, iangat ito gamit ang nakabitin na kadena 15 cm ang layo mula sa flange, at ibaba ito ng dahan-dahan. Sa pagitan ng pipe flange at pump flangeIlagay ang rubber pad sa lugar at higpitan ang pipe at pump nang pantay-pantay gamit ang bolts, nuts at spring washers.
③ Bahagyang iangat ang submersible pump, tanggalin ang clamp sa itaas na dulo ng water pump, itali ang cable sa pipe ng tubig gamit ang plastic tape, at dahan-dahang itali ito hanggang sa mailagay ang clamp sa wellhead.
④Gamitin ang parehong paraan upang itali ang lahat ng tubo ng tubig sa balon.
⑤Pagkatapos maikonekta ang lead-out cable sa control switch, ito ay konektado sa three-phase power supply.
(4) Mga bagay na dapat tandaan sa panahon ng pag-install:
1. Kung may nakitang jamming phenomenon sa panahon ng proseso ng pumping, paikutin o hilahin ang tubo ng tubig upang malampasan ang jamming point. Kung ang iba't ibang mga hakbang ay hindi pa rin gumagana, mangyaring Huwag pilitin ang pump upang maiwasan ang pinsala sa submersible electric pump at sa balon.
2. Sa panahon ng pag-install, ang isang rubber pad ay dapat ilagay sa flange ng bawat pipe at higpitan nang pantay-pantay.
3. Kapag ang bomba ng tubig ay ibinaba sa balon, dapat itong ilagay sa gitna ng tubo ng balon upang maiwasan ang pagtakbo ng bomba sa dingding ng balon nang mahabang panahon, na nagiging sanhi ng pag-vibrate ng bomba at pagwalis at pagkasunog ng motor. .
4. Tukuyin ang lalim ng water pump sa ilalim ng balon ayon sa dumadaloy na buhangin at silt na kondisyon ng balon. Huwag ibaon ang bomba sa putik. Ang distansya mula sa water pump hanggang sa ilalim ng balon ay karaniwang hindi bababa sa 3 metro (tingnan ang Larawan 2).
5. Ang lalim ng pagpasok ng tubig ng water pump ay dapat na hindi bababa sa 1-1.5 metro mula sa dynamic na lebel ng tubig hanggang sa water inlet node (tingnan ang Larawan 2). Kung hindi, ang water pump bearings ay maaaring madaling masira.
6. Ang pagtaas ng water pump ay hindi maaaring masyadong mababa. Kung hindi, kailangang mag-install ng gate valve sa wellhead water pipeline para makontrol ang pump flow sa rated flow point para maiwasang ma-overload at masunog ang motor dahil sa malalaking flow rate.
7. Kapag ang water pump ay tumatakbo, ang tubig na output ay dapat na tuluy-tuloy at kahit na, ang kasalukuyang ay dapat na stable (sa ilalim ng rated working conditions, sa pangkalahatan ay hindi hihigit sa 10% ng rated current), at dapat walang vibration o ingay. Kung mayroong anumang abnormalidad, dapat na ihinto ang makina upang malaman ang sanhi at maalis ito.
8. Kapag nag-i-install, bigyang-pansin ang setting ng grounding wire ng motor (tingnan ang Figure 2). Kapag ang tubo ng tubig ay isang bakal na tubo, akayin ito mula sa wellhead clamp; kapag ang tubo ng tubig ay isang plastik na tubo, akayin ito mula sa marka ng saligan ng electric pump.
- 1. Kumpleto na ang pag-install ng submersible pump, muling suriin ang insulation resistance at three-phase conduction mula sa switch, suriin ang instrumento at simulan ang error sa koneksyon ng kagamitan, kung walang problema, maaaring simulan ang pagsubok, pagkatapos ng pagsisimula ng instrumento na nagpapahiwatig ng pagbabasa kung higit pa kaysa sa nameplate itinakda rate boltahe at kasalukuyang, obserbahan ang pump ingay at panginginig ng boses phenomenon, ang lahat ay normal ay maaaring ilagay sa operasyon.
- 2. Ang unang operasyon ng bomba para sa apat na oras, ay dapat na shut down mabilis na subukan ang thermal pagkakabukod pagtutol ng motor, ang halaga ay hindi dapat mas mababa sa 0.5 megaohm.
- 3.After ang pump shutdown, ay dapat na nagsimula pagkatapos ng isang pagitan ng limang minuto, upang maiwasan ang tubig haligi sa pipe ay hindi ganap na kati sanhi ng labis na motor kasalukuyang at burnout.
- 4.After ang bomba sa normal na operasyon, upang pahabain ang buhay ng serbisyo nito, upang suriin ang supply boltahe, nagtatrabaho kasalukuyang at pagkakabukod paglaban ay normal, kung natagpuan ang mga sumusunod na sitwasyon, dapat agad na isara ang pag-troubleshoot.
- - sa rate na kondisyon, ang kasalukuyang ay higit sa 20%.
- - dynamic na antas ng tubig sa seksyon ng pumapasok ng tubig, na nagiging sanhi ng pasulput-sulpot na tubig.
- - submersible pump matinding vibration o ingay.
- - ang boltahe ng supply ay mas mababa sa 340 volts.
- - nasunog ng fuse ang isang bahagi.
- - pagkasira ng tubo ng tubig.
- - Ang motor sa thermal insulation resistance ay mas mababa sa 0.5 megaohm.
- 5.Pag-disassembly ng unit:
- (1)untie cable tether, remove the pipeline part, remove the wire plate.
- (2)screw down the water bolt, put out the motor cavity water.
- (3)remove the filter, loosening the coupling fixed motor shaft fixed screw.
- (4)screw down the inlet joint and motor bolt, the pump and motor separate (separation attention will unit mat flat, prevent the pump shaft bending)
- (5)pump disassembly sequence is: (see figure 1) inlet joint, impeller, diversion shell, impeller...... check valve body, dismantle the impeller with special tools will first fix the conical sleeve loosening, the disassembly process to avoid the pump shaft bending and each bump.
- (6)motor disassembly process is: (see figure 1) the motor placed on the platform, from the bottom of the motor in turn removed double head bolt (pull rod bolt) on the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt, and then take out the rotor (pay attention not to damage the wire package) finally removed the connecting section and upper guide bearing seat.
- (7)unit assembly: before assembly should be the parts of the rust, dirt clean, each mating surface and fastener coated with sealant, and then in turn according to the reverse sequence of disassembly assembly (after assembly motor shaft up and down momentum is about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine.
- 6.submersible pump every operation for a year, or less than a year of operation but the submersible time has reached two years, should be proposed in accordance with the fifth paragraph of the well to be dismantled and repaired, replace the worn parts.
This product is a brand new submersible pump, suitable for a variety of occasions for pump work needs. In order to ensure the long-term use and stable performance of the product, the user needs to clean the water in the motor cavity of the pump after use (especially in winter to prevent the motor from freezing), coil up and tie the cable, and then store the product in an environment free of corrosive substances and gases, with the temperature kept below 40 °C in the room. In addition, if the submersible pump is not used for a long time, special attention should be paid to prevent rust to protect the service life of the product. This submersible pump will provide users with convenient and efficient pump solutions to ensure the safe and stable operation of the pump equipment.
- Impeller
- manggas ng baras
- manggas ng goma shaft
-
Singsing sa pagbubuklod
01 Deep well water intake
02 Mataas na suplay ng tubig
03 suplay ng tubig sa bundok
04 tubig sa tore
05 Pang-agrikultura na patubig
06 patubig sa hardin
07 pag-inom ng tubig sa ilog
08 tubig sa bahay