پمپ شناور 135QJP Peep Well

پردازش OEM را انجام دهید! با توجه به نیاز کاربر، طراحی و ساخت انواع نیازهای ویژه موتور و پمپ شناور غیر استاندارد. استانداردهای اجرای محصول: GB/T2816-2014 "پمپ شناور چاه"، GB/T2818-2014 "موتور ناهمزمان غوطه ور چاه". واتس اپ: 17855846335
PDF DOWNLOAD
جزئیات
برچسب ها
 
بررسی اجمالی محصولات

Introducing the innovative QJP series fountain pump, a product of superior efficiency meticulously developed and researched by our factory. With a meticulously designed pump motor core crafted from premium cold rolled silicon steel, this fountain pump boasts exceptional magnetic conductivity, enabling seamless and heat-free starts. Unlike traditional fountain pumps, the 0JP series features motor rotor ends that utilize a unique water-lubricated alloy copper sleeve, replacing standard ball bearings. This innovative design not only mitigates issues of rust and wear caused by lack of oil but also ensures longevity and durability for the motor. Upgrade your fountain experience with the cutting-edge technology and superior performance of the QJP series fountain pump.

 

 
شرایط استفاده

The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply, and has strict requirements for clean water: water temperature shall not exceed 20 °C; solid impurities content (mass ratio) shall not exceed 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content shall not exceed 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product adopts a closed or water immersion structure motor, the submersible motor must be filled with clean water before use to prevent empty. In addition, the water can be used after filling and tightening the air release bolt. The submersible pump must be completely immersed in water to work, the diving depth shall not exceed 70m, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3m. The well water flow should meet the water output and continuous operation requirements of the submersible pump, and the water output shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally, and it must be installed vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to do no-load test without water.

 

 
معنی مدل

 

135QJP Peep Well Submersible Pump

 
مرجع مدل جزئی
مدل جریان (m3/h) سر
(متر)

سرعت چرخش

(تغییر/نقطه)

 پمپ آب(٪) پریز
قطر
(میلی متر)
به خوبی قابل اجرا است
قطر (میلی متر) 
دارای رتبه
توان (KW)
دارای رتبه
ولتاژ (V)
 دارای رتبه
جریان (A)
راندمان حرکتی (%)  power factorcosφ   واحد
اندازه حداکثر شعاعی (میلی متر)
تذکر دهید
135QJ5-34 5 34 2850   40  135در بالا 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135در بالا 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135در بالا 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135در بالا 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135در بالا 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135در بالا 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135در بالا 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
ملاحضات امنیتی

Well submersible pump is a clean water pump, it is strictly prohibited to dig a new well to extract mud and silt. The voltage grade of the well pump is 380/50HZ, and the submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof and must be equipped with starting equipment, such as distribution box, etc. Starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be timely tripping. When installing and using the pump, the pump must be reliably grounded, and it is prohibited to push and pull the switch when the hands and feet are wet. Before installing and maintaining the pump, the power must be cut off, and the place where the pump is used must be clearly marked "anti-electric shock". Before going down the well or installing the pump, the motor must be filled with distilled water or clean cold water without corrosion, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be poured into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. When using the pump, the lift and flow range specified by the pump must be strictly followed to prevent the pump from having a large flow at low lift or a large pull at high lift, which will lead to serious wear and tear of the thrust bearing and other parts and components, and cause the motor to overload and burn out. After the pump is put into the well, the insulation resistance between the motor and the ground should be measured, which should not be less than 100MΩ. After the start, the voltage and current should be observed regularly, and the motor winding insulation should be checked to see if it meets the requirements; if the temperature of the pump storage location is below the freezing point, the water in the motor cavity should be drained to prevent the water in the motor cavity from freezing and damaging the motor due to low temperature.

 

 
مقدمه ای بر ساختار

معرفی مختصر ساختار: قسمت پمپ عمدتاً از شفت پمپ، پروانه، پوسته انحراف، یاتاقان لاستیکی، بدنه شیر چک (قطعات اختیاری) و سایر اجزا تشکیل شده است. قسمت موتور عمدتا از پایه، فیلم تنظیم فشار، یاتاقان رانش، صفحه رانش تشکیل شده است. ، صندلی بلبرینگ راهنمای پایین، استاتور، روتور، صندلی بلبرینگ راهنمای بالایی، حلقه شنی، بخش ورودی آب، کابل و سایر اجزاء.


ویژگی های اصلی محصول عبارتند از:

1، موتور یک موتور سه فاز ناهمزمان غوطه ور مرطوب پر از آب است، حفره موتور پر از آب تمیز است، برای خنک کردن موتور و روغن کاری بلبرینگ استفاده می شود، فیلم تنظیم کننده فشار در پایین موتور برای تنظیم استفاده می شود. اختلاف فشار انبساط و انقباض آب داخل بدنه ناشی از تغییر افزایش دمای موتور.

 2، به منظور جلوگیری از ورود شن و ماسه در آب چاه به موتور، انتهای بالایی شفت موتور مجهز به دو مهر و موم روغن است و یک حلقه شنی برای تشکیل یک ساختار جلوگیری از شن نصب شده است.

 3، به منظور جلوگیری از بالا آمدن شفت پمپ هنگام راه اندازی، شفت پمپ و محور موتور توسط یک کوپلینگ به هم متصل می شوند و یک یاتاقان رانش بالایی در قسمت پایین موتور نصب می شود.

 4، روغن کاری موتور و یاتاقان پمپ روانکاری آب است.

 5، سیم پیچ استاتور موتور از سیم پیچ موتور شناور با کیفیت بالا با عملکرد عایق بالا ساخته شده است.

 6، پمپ توسط کامپیوتر CAD، با ساختار ساده و عملکرد فنی خوب طراحی شده است.

135QJP Peep Well Submersible Pump
 
نصب

(1) آماده سازی قبل از نصب:
1. بررسی کنید که آیا پمپ شناور با شرایط استفاده و محدوده مشخص شده در دفترچه راهنما مطابقت دارد یا خیر.
2. با استفاده از یک شیء سنگین با قطری برابر با حداکثر قطر بیرونی پمپ شناور، اندازه گیری کنید که آیا قطر داخلی چاه می تواند با پمپ شناور مطابقت داشته باشد یا خیر، و اندازه گیری کنید که آیا عمق چاه با الزامات نصب مطابقت دارد یا خیر.
3. تمیز بودن چاه و کدر بودن آب چاه را بررسی کنید. هرگز از الکتروپمپ شناور برای شستشوی گل و لای پمپ ولوور و آب شن و ماسه استفاده نکنید تا از آسیب زودهنگام به الکتروپمپ شناور جلوگیری کنید.
4. بررسی کنید که آیا موقعیت گیره نصب جوشکار مناسب است و آیا می تواند کیفیت کل واحد را تحمل کند یا خیر.
5. بررسی کنید که آیا اجزای پمپ شناور به درستی مطابق با نمودار مونتاژ در دفترچه راهنما نصب شده اند، صفحه فیلتر را بردارید و کوپلینگ را بچرخانید تا ببینید آیا به طور انعطاف پذیر می چرخد ​​یا خیر.
6. پیچ آب را باز کنید و حفره موتور را با آب تمیز و غیر خورنده پر کنید (توجه داشته باشید که آن را پر کنید)، سپس پیچ آب را ببندید. پس از 12 ساعت تزریق آب، مقاومت عایق موتور در هنگام اندازه گیری با میز لرزان 500 ولت نباید کمتر از 150M Q باشد.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

نمودار فرآیند سیم کشی کابل پیوست شده به شرح زیر است:
135QJP Peep Well Submersible Pump

 

8. از یک مولتی متر برای بررسی اینکه آیا سیم های سه فاز متصل هستند و آیا مقاومت DC تقریبا متعادل است یا خیر استفاده کنید.
9. بررسی کنید که آیا مدار و ظرفیت ترانسفورماتور اضافه بار شده است یا خیر، و سپس کلید حفاظت اضافه بار یا تجهیزات راه اندازی را وصل کنید. برای مدل‌های خاص به جدول 2 مراجعه کنید، سپس یک سطل آب را از خروجی پمپ آب در پمپ آب بریزید تا یاتاقان‌های لاستیکی پمپ روغن کاری شوند و سپس الکتروپمپ شناور را در حالت عمودی و ثابت قرار دهید. شروع کنید (بیش از یک ثانیه) و بررسی کنید که آیا جهت فرمان با علامت فرمان مطابقت دارد یا خیر. اگر نه، هر دو کانکتور کابل سه فاز را عوض کنید. سپس فیلتر را نصب کنید و برای پایین رفتن از چاه آماده شوید. در صورت استفاده در مواقع خاص (مانند گودال ها، خندق ها، رودخانه ها، حوضچه ها، حوضچه ها و غیره)، الکتروپمپ باید به طور مطمئن به زمین متصل شود.

 

(2) تجهیزات و ابزار نصب:
1. یک جفت زنجیر بالابر برای بیش از دو تن.
2. سه پایه با ارتفاع عمودی که کمتر از چهار متر نباشد.
3. دو طناب آویزان (طناب سیم) که تحمل وزن بیش از یک تن را دارند (می تواند وزن مجموعه کاملی از پمپ های آب را تحمل کند).
4. دو جفت گیره (آتل) نصب کنید.
5. آچار، چکش، پیچ گوشتی، ابزار و ابزار الکتریکی و غیره.

 

(3) نصب پمپ برقی:
1. نمودار نصب الکتروپمپ شناور در شکل 2 نشان داده شده است. ابعاد نصب خاص در جدول 3 "لیست ابعاد نصب پمپ الکتریکی شناور" نشان داده شده است.

 

2. الکتروپمپ های شناور با هد کمتر از 30 متر را می توان با استفاده از شیلنگ ها و سیم بکسل ها یا سایر طناب های کنفی که می تواند وزن کل دستگاه، لوله های آب و آب موجود در لوله ها را تحمل کند، مستقیماً به داخل چاه بالا برد.

 

3. پمپ های با هد بیش از 30 متر از لوله های فولادی استفاده می کنند و ترتیب نصب به شرح زیر است:
① با استفاده از گیره انتهای بالایی قسمت پمپ آب را ببندید (در حال حاضر موتور و پمپ آب وصل شده اند) آن را با زنجیر آویزان بلند کرده و به آرامی داخل چاه ببندید تا گیره را روی سر چاه قرار دهید و زنجیر آویزان
② از یک جفت گیره دیگر برای بستن لوله استفاده کنید، آن را با یک زنجیر آویزان در فاصله 15 سانتی متری از فلنج بلند کنید و به آرامی پایین بیاورید. بین فلنج لوله و فلنج پمپ پد لاستیکی را در جای خود قرار دهید و لوله را محکم کنید و با پیچ و مهره و واشر فنری به طور یکنواخت پمپ کنید.
③ پمپ شناور را کمی بلند کنید، گیره انتهای بالایی پمپ آب را بردارید، کابل را با یک نوار پلاستیکی محکم به لوله آب ببندید و به آرامی آن را ببندید تا گیره در دهانه چاه قرار گیرد.
④از همین روش برای بستن تمام لوله های آب به چاه استفاده کنید.
⑤پس از اتصال کابل خروجی به کلید کنترل، به برق سه فاز متصل می شود.


(4) مواردی که باید در هنگام نصب توجه داشته باشید:
1. اگر در طی فرآیند پمپاژ پدیده گیر یافت شد، لوله آب را بچرخانید یا بکشید تا بر نقطه گیر کردن غلبه کنید. اگر اقدامات مختلف هنوز جواب نداد، لطفاً پمپ را مجبور نکنید تا به پمپ الکتریکی شناور و چاه آسیب نرسد.
2. در هنگام نصب، یک پد لاستیکی باید در فلنج هر لوله قرار داده شود و به طور یکنواخت سفت شود.
3. هنگامی که پمپ آب به داخل چاه پایین می آید، باید آن را در وسط لوله چاه قرار داد تا از کارکرد طولانی پمپ به دیواره چاه جلوگیری شود و باعث لرزش پمپ و جارو و سوختن موتور شود. .
4. عمق پمپ آب تا کف چاه را با توجه به شرایط جاری شن و سیلت چاه تعیین کنید. پمپ را در گل دفن نکنید. فاصله پمپ آب تا کف چاه معمولاً کمتر از 3 متر نیست (شکل 2 را ببینید).
5. عمق ورودی آب پمپ آب نباید کمتر از 1-1.5 متر از سطح آب دینامیکی تا گره ورودی آب باشد (شکل 2 را ببینید). در غیر این صورت، بلبرینگ پمپ آب ممکن است به راحتی آسیب ببیند.
6. بالابر پمپ آب نمی تواند خیلی کم باشد. در غیر این صورت، باید یک شیر دروازه روی خط لوله آب سر چاه نصب شود تا جریان پمپ را در نقطه جریان نامی کنترل کند تا از بارگیری و سوختن موتور به دلیل دبی زیاد جلوگیری کند.
7. هنگامی که پمپ آب در حال کار است، خروجی آب باید پیوسته و یکنواخت باشد، جریان باید پایدار باشد (در شرایط کاری نامی، معمولا بیش از 10٪ جریان نامی)، و نباید لرزش یا نویز وجود داشته باشد. در صورت وجود هرگونه ناهنجاری، دستگاه باید متوقف شود تا علت آن مشخص شود و آن را از بین ببرید.
8. هنگام نصب، به تنظیم سیم اتصال زمین موتور توجه کنید (شکل 2 را ببینید). هنگامی که لوله آب یک لوله فولادی است، آن را از گیره سر چاه هدایت کنید. هنگامی که لوله آب یک لوله پلاستیکی است، آن را از علامت زمین پمپ الکتریکی هدایت کنید.

 

 
نگهداری و تعمیرات
  • 1. نصب پمپ شناور کامل است، مجدداً مقاومت عایق و هدایت سه فاز را از سوییچ بررسی کنید، دستگاه را بررسی کنید و خطای اتصال تجهیزات را شروع کنید، اگر مشکلی وجود نداشت، می توانید آزمایش را شروع کنید، پس از شروع دستگاه با نشان دادن خوانش هایی که آیا بیش از ولتاژ و جریان نامی که در پلاک ذکر شده است، نویز پمپ و پدیده ارتعاش را مشاهده کنید، همه چیز عادی است را می توان به بهره برداری رساند.
  • 2. اولین عملیات پمپ به مدت چهار ساعت، باید به سرعت خاموش شود مقاومت عایق حرارتی موتور را آزمایش کنید، مقدار آن نباید کمتر از 0.5 مگا اهم باشد.
  • 3. پس از خاموش شدن پمپ، باید پس از یک فاصله زمانی پنج دقیقه شروع شود، برای جلوگیری از رفلاکس ستون آب در لوله به طور کامل ناشی از جریان بیش از حد موتور و فرسودگی.
  • 4. پس از پمپ به عملکرد عادی، به منظور طولانی کردن عمر مفید آن، برای بررسی ولتاژ منبع تغذیه، جریان کار و مقاومت عایق طبیعی است، در صورت یافتن وضعیت زیر، باید بلافاصله عیب یابی را خاموش کنید.
  • - در شرایط نامی، جریان بیش از 20٪ است.
  • - سطح آب دینامیک به قسمت ورودی آب، باعث آب متناوب می شود.
  • - پمپ شناور لرزش یا سر و صدای شدید.
  • - ولتاژ تغذیه کمتر از 340 ولت است.
  • - فیوز یک فاز سوخت.
  • - آسیب لوله آب
  • - مقاومت موتور در برابر عایق حرارتی کمتر از 0.5 مگا اهم است.
  •  
  • 5. جداسازی واحد:
  • (1)untie cable tether, remove the pipeline part, remove the wire plate.
  • (2)screw down the water bolt, put out the motor cavity water.
  • (3)remove the filter, loosening the coupling fixed motor shaft fixed screw.
  • (4)screw down the inlet joint and motor bolt, the pump and motor separate (separation attention will unit mat flat, prevent the pump shaft bending)
  • (5)pump disassembly sequence is: (see figure 1) inlet joint, impeller, diversion shell, impeller...... check valve body, dismantle the impeller with special tools will first fix the conical sleeve loosening, the disassembly process to avoid the pump shaft bending and each bump.
  • (6)motor disassembly process is: (see figure 1) the motor placed on the platform, from the bottom of the motor in turn removed double head bolt (pull rod bolt) on the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt, and then take out the rotor (pay attention not to damage the wire package) finally removed the connecting section and upper guide bearing seat.
  • (7)unit assembly: before assembly should be the parts of the rust, dirt clean, each mating surface and fastener coated with sealant, and then in turn according to the reverse sequence of disassembly assembly (after assembly motor shaft up and down momentum is about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • 6.submersible pump every operation for a year, or less than a year of operation but the submersible time has reached two years, should be proposed in accordance with the fifth paragraph of the well to be dismantled and repaired, replace the worn parts.

 

 
ذخیره سازی و نگهداری

This product is a brand new submersible pump, suitable for a variety of occasions for pump work needs. In order to ensure the long-term use and stable performance of the product, the user needs to clean the water in the motor cavity of the pump after use (especially in winter to prevent the motor from freezing), coil up and tie the cable, and then store the product in an environment free of corrosive substances and gases, with the temperature kept below 40 °C in the room. In addition, if the submersible pump is not used for a long time, special attention should be paid to prevent rust to protect the service life of the product. This submersible pump will provide users with convenient and efficient pump solutions to ensure the safe and stable operation of the pump equipment.

 

 
پوشیدن قطعات
  • پروانه
  • آستین شفت
  • آستین شفت لاستیکی
  • حلقه آب بندی

 
سناریوهای کاربردی

01 آب ورودی چاه عمیق

02 تامین آب مرتفع

03 آبرسانی کوهستان 

آب برج 04

05 آبیاری کشاورزی

06 آبیاری باغ

07 آبگیری رودخانه

08 آب خانگی

 

اگر به محصولات ما علاقه مند هستید، می توانید اطلاعات خود را در اینجا بگذارید و ما به زودی با شما تماس خواهیم گرفت.


پیام خود را اینجا بنویسید و برای ما ارسال کنید

اگر به محصولات ما علاقه مند هستید، می توانید اطلاعات خود را در اینجا بگذارید و ما به زودی با شما تماس خواهیم گرفت.


fa_IRPersian