125QJR Yakadzika Pakadzika Submersible Pombi

Ita OEM kugadzirisa! Zvinoenderana nezvinodiwa nemushandisi, dhizaini uye kugadzirwa kwemhando dzakasiyana dzezvakakosha zvinodiwa zveasina-standard submersible mota uye pombi. Izvo zvigadzirwa zvekushandisa zviyero: GB/T2816-2014 "tsime submersible pombi", GB/T2818-2014 "zvakanaka submersible asynchronous mota". WhatsApp: 17855846335
PDF DOWNLOAD
Details
Tags
 
Product Overview

Suitable for underground hot water mining with water temperature below 100°C, with heat resistance, corrosion resistance, aging resistance and other characteristics

 

 
Mamiriro Ekushandisa

This product is a powerful three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) electric pump, suitable for all kinds of occasions need high-power pump. Its design considers a variety of water quality factors, including water temperature not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L, etc. The product adopts a closed or water immersion wet structure of the motor, before use in the submersible motor chamber filled with clean water to prevent empty fill. Requirements in strict accordance with the requirements of the matching cable and equipped with external overload protection device. To ensure stable operation, the submersible pump must be completely immersed in water operation, the insertion depth shall not exceed 70 meters, and the distance from the bottom of the well shall not be less than 3 meters. In addition, the pump shall not be a no-load test before start. In general, this product has the characteristics of high efficiency and stability, suitable for a variety of pump tasks in harsh environment.

 

 
Muenzaniso Zvinoreva

125QJR Deep Well Submersible Pump

 
Partial Model Reference
Model Kuyerera (m3/h)  Head
(m)

 Rotatingspeed

(chinja/point)

 Pombi yemvura(%)  Outlet
dhayamita
(mm)
Inoshanda zvakanaka
dhayamita(mm) 
Rated
simba (KW)
Rated
voltage (V)
Rated
ikozvino (A)
 Motorefficiency (%)  power factorcosφ  Unit
Radial Maximu size(mm)
Remark
125QJ5-34 5 34 2850 53 40  125kumusoro 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125kumusoro 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125kumusoro 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125kumusoro 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125kumusoro 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125kumusoro 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125kumusoro 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125kumusoro 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125kumusoro 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125kumusoro 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125kumusoro 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125kumusoro 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125kumusoro 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125kumusoro 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      

 

 
Chengetedzo Yekuchengetedza

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, strictly according to the provisions of the pump lift, flow range of use, to prevent low flow or high lift pumping force, the thrust bearing and other parts of the wear, the motor overload burned 6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the water in the motor cavity, prevent the motor cavity water ice damage caused by low temperature.

 

 
Nhanganyaya yeChimiro

The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other components. The motor is a water-filled submersible three-phase asynchronous motor, which is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom is used to adjust the difference in internal water expansion and contraction pressure caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor. The lubrication of the motor and the pump bearing is water lubrication. The stator winding of the motor adopts high quality submersible motor winding wire, with high insulation performance. The pump adopts computer CAD design, with simple structure and excellent technical performance.

125QJR Deep Well Submersible Pump

 

 
Install

(1) Gadziriro isati yaiswa:
1. Tarisa kana pombi inodzika inosangana nemamiriro ekushandiswa uye chiyero chakatsanangurwa mubhuku rekushandisa.
2. Uchishandisa inorema obiect ine dhayamita yakaenzana nehupamhi hwekunze dhayamita yepombi inonyura, yera kana innediameter yemugodhi inogona kukwana pombi yepasi, uye kuyera kana kudzika kwetsime kunosangana nezvinodiwa zvekuisa.
3. Tarisa kuti chibhorani chakachena here uye kuti mvura yemutsime ine tsvina here. Usambofa washandisa pombi yemagetsi inonyura kugeza madhaka epombi yewelor nemvura yejecha kudzivirira kukuvara kusati kwasvika kwepombi yemagetsi inonyura.
4. Tarisa kana chinzvimbo cheiyo welhead yekumisikidza chisimbi chakakodzera uye kana ichikwanisa kumira nemhando yechikamu chose.
5. Tarisa kana zvikamu zvepombi zvinopinda mumvura zvakakwana uye zvakaiswa zvakanaka maererano nedhiyagiramu yegungano iri mubhukuBvisa sikirini yekusefa uye tenderedza coupling kuti uone kana ichitenderera zviri nyore.
6. Sunungura siruu yemvura wozadza monitivha nemvura yakachena, isingaore (noti. iva nechokwadi chekuinyora), wobva wasunga simbi yemvura. Mushure memaawa gumi nemaviri ejekiseni remvura, kudzivirira kwekudzivirira kwemota hakufanirwe kunge kuri pasi pe150M Q kana kuyerwa ne500V tafura yekuzunza.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Iyo yakasungirirwa cable wiring process diagraph yakaita seiyi:
125QJR Deep Well Submersible Pump

 

8. Shandisa multimeter kuti utarise kana mawaya matatu-chikamu akabatana uye kana iyo DC inopikisa inenge yakaenzana.
9. Tarisa kana dunhu neshanduko simba rakawandisa, uye wozobatanidza iyo overload kudzivirira switch kana kutanga michina. Ona Tafura 2 yemhando dzakanangana, wozoDurura mugomo wemvura mupombi yemvura kubva papombi yemvura kuti uise mabearings erabha mupombi, wobva waisa pombi yemagetsi inonyura yakamira uye yakatsiga. Tanga (pasingapfuuri sekondi imwe) uye tarisa kana gwara rekutungamirira richienderana nechiratidzo chekutungamirira. Kana zvisina kudaro, chinjanisa chero zvibatanidza zviviri zvetatu-phase cable. Wobva waisa sefa uye gadzirira kudzika pasi mutsime. Kana yakashandiswa muzviitiko zvakakosha (zvakadai semigero, migero, nzizi, madziva, madziva, nezvimwewo), pombi yemagetsi inofanira kunge yakavimbika pasi.

 

(2) Midziyo yekuisa uye zvishandiso:
1. Imwe peya yekusimudza maketani anopfuura matani maviri.
2. Chitatu chine hurefu hwakamira husingasviki mamita mana.
3. Tambo mbiri dzakarembera (tambo dzetambo) dzinogona kutakura huremu hunodarika tani imwe (dzinogona kutakura huremu hweseti yakakwana yemapombi emvura).
4. Isai mapeya maviri emagetsi (splints).
5. Wrenches, sando, screwdrivers, midziyo yemagetsi uye zviridzwa, nezvimwewo.

 

(3) Kuiswa kwepombi yemagetsi:
1. Dhidhiyo yekuisa yepombi yemagetsi inoputika inoratidzwa muMufananidzo 2. Izvo zviyero zvekuisa zvakananga zvinoratidzwa muTebhu 3 "Rondedzero yeKuisa Dimensions ye Submersible Electric Pump".

2. Pombi dzemagetsi dzinonyura dzine musoro usingasviki mamita makumi matatu dzinogona kusimudzwa zvakananga mugomba uchishandisa hose netambo dzewaya kana dzimwe tambo dzehemp dzinogona kutakura huremu hwakazara hwemuchina wese, pombi dzemvura, uye mvura mumapombi.

3. Mapombi ane musoro weanopfuura mamita makumi matatu anoshandisa pombi dzesimbi, uye kutevedzana kwekugadzika kunotevera:
①Shandisa chibatiso kusungirira kumucheto kwekumusoro kwepombi yemvura (motor nepombi yemvura zvabatanidzwa panguva ino), isimudze neketani inorembera, woisungirira zvishoma nezvishoma mugomba kusvikira Isa chirambi patsime wobvisa. hanging chain.
② Shandisa imwe peya yezvisungo kusungirira pombi, woisimudza necheni yakaturika masendimita gumi nemashanu kubva paflange, woidzikisa zvishoma nezvishoma. Pakati pepombi flange nepombi flangeIsa pedhi rerabha panzvimbo uye simbisa pombi uye pomba zvakaenzana nemabhaudhi, nzungu uye mawachi echirimo.
③ Simudza pombi inonyura zvishoma, bvisa chinosungirira chiri kumucheto kwepombi yemvura, sunga tambo zvakasimba papombi yemvura netepi yepurasitiki, woisunga zvishoma nezvishoma kusvikira Chisungiso chaiswa patsime.
④Shandisa nzira imwechete kusungira pombi dzose dzemvura mutsime.
⑤Mushure metambo yekutungamirira-kunze yakabatanidzwa kune chinja chekutonga, chakabatanidzwa kune matatu-phase simba rekupa.


(4) Zvinhu zvekucherechedza panguva yekuisa:
1. Kana chiitiko chejamming chinowanikwa panguva yekupomba, shandura kana kudhonza pombi yemvura kuti ukunde nzvimbo yekumisa. Kana matanho akasiyana-siyana achiri kusashanda, ndapota Usamanikidza pombi pasi kuti udzivise kukuvadzwa kwepombi yemagetsi inonyudza uye tsime.
2. Panguva yekuisa, rubber pad inofanira kuiswa paflange yepombi imwe neimwe uye yakasimbiswa zvakafanana.
3. Kana pombi yemvura yadzikiswa mugomba, inofanira kuiswa pakati pepombi yetsime kudzivirira kuti pombi isamhanye nemudhuri wetsime kwenguva yakareba, zvichiita kuti pombi izununguke uye injini kutsvaira nekutsva. .
4. Sarudza kudzika kwepombi yemvura kusvika pasi petsime maererano nejecha rinoyerera uye silt mamiriro emutsime. Usavige pombi mumatope. Nhambwe kubva papombi yemvura kusvika pasi petsime kazhinji haisviki mamita matatu (ona Mufananidzo 2).
5. Kudzika kwemvura yepombi yemvura hakufanirwe kunge kuri pasi pe1-1.5 metres kubva padanho remvura rine simba kusvika painopinza mvura (ona Mufananidzo 2). Zvikasadaro, pombi yemvura inotakura inogona kukuvara nyore.
6. Kusimudzwa kwepombi yemvura hakugoni kuderera zvakanyanya. Zvikasadaro, vharuvhu yegedhi inoda kuiswa papombi yemvura yemugodhi kudzora kuyerera kwepombi panzvimbo yakayerwa yekuyerera kudzivirira mota kuti isaremerwe nekupiswa nekuda kwekuyerera kukuru.
7. Apo pombi yemvura iri kushanda, kubuda kwemvura kunofanira kuenderera mberi uye kunyange, ikozvino inofanira kunge yakagadzikana (pasi pemamiriro ekushanda akarongwa, kazhinji haapfuuri 10% yehuwandu hwemazuva ano), uye hapafaniri kuva nekudengenyeka kana ruzha. Kana paine abnormality, muchina uyu unofanirwa kumiswa kuti uzive chikonzero uye kubvisa.
8. Paunenge uchiisa, teerera kugadzika kwemoto wepasi waya (ona Mufananidzo 2). Kana pombi yemvura iri pombi yesimbi, itungamire kubva patsime remusoro; apo pombi yemvura iri pombi yepurasitiki, itungamirire kubva painogadzika chiratidzo chepombi yemagetsi.

 

 
Maintenance and Maintenance
  • (1)With the continuous development of modern technology, submersible pumps play a crucial role in the field of pumps. After installing the submersible pump, check the insulation resistance and three-phase continuity repeatedly to ensure that there are no errors in the connection between the instrument and the starting equipment. If everything is normal, the test equipment can be started. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, pay attention to observe whether the pump has any noise or vibration. If everything is normal, it can be put into operation. After the pump runs for four hours for the first time, it should be closed and the thermal insulation resistance of the motor should be tested quickly, and its value should not be less than 0.5 megaohms. After stopping the pump, restart it after five minutes to prevent the water column in the pipeline from completely reversing, resulting in the motor burning due to overcurrent. After the pump is running normally, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the equipment should be shut down immediately to troubleshoot. The current exceeds 20% under the rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the submersible pump vibrates violently or makes noisy sounds; the supply voltage is lower than 340 volts; any fuse is broken; the water pipe is damaged; The thermal insulation resistance between the motor and the ground is less than 0.5 megaohm.These recommended operating procedures and safety measures ensure the safe operation of the submersible pump, prolong the service life of the equipment, and provide users with a reliable pump choice.
  •  
  • (2)Unit disassembly:
  • 1 untie the cable tie, remove the pipeline part, remove the wire plate.
  • 2 unscrew the water release bolt, put the water in the motor chamber.
  • 3 remove the filter, loose the fixing screw of the motor shaft on the coupling.
  • 4 unscrew the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5 the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending the pump shaft and various bumps in the disassembly process.
  • 6 the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • (3)The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Kuchengeta uye Kuchengeta

 1, bvisa mvura mumugodhi wemota (kunyanya munguva yechando kudzivirira mota kubva kuchando), uye sunga tambo zvakanaka.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, kushandiswa kwenguva refu kunofanira kutarisisa kudzivirira ngura kwemapombi anodzika.

 

 
Kupfeka Zvikamu
  • Impeller
  • Shaft sleeve
  • Rubber shaft sleeve
  • Chisimbiso mhete

 
Application Scenarios

01 Kunwa mvura mutsime rakadzika

02 Mvura yakakwirira-inokwira

03 mvura yemugomo 

04 shongwe yemvura

05 Kudiridzira kwekurima

06 kudiridza mubindu

07 kunwa mvura yerwizi

08 mvura yemumba

 

Kana iwe uchifarira zvigadzirwa zvedu, unogona kusarudza kusiya ruzivo rwako pano, uye isu tichabatana newe munguva pfupi.


Nyora meseji yako pano ugotitumira

Kana iwe uchifarira zvigadzirwa zvedu, unogona kusarudza kusiya ruzivo rwako pano, uye isu tichabatana newe munguva pfupi.


snShona