Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.
1, magetsi: matatu-chikamu AC 380V (kushivirira + / - 5%), 50HZ (kushivirira + / - 1%).
2, kunaka kwemvura:
(1) tembiricha yemvura haina kupfuura 20 °C;
(2) kusvibiswa kwakasimba kwemukati (huwandu hwehuwandu) haisi yakakura kudarika 0.01%;
(3) PH kukosha (pH) 6.5-8.5;
(4) hydrogen sulfide content haisi yakakura kudarika 1.5mg/L;
(5) chloride ion yemukati haina kupfuura 400mg/L.
3, mota yakavharwa kana yakazadzwa nemvura yakanyorova chimiro, usati washandisa iyo submersible mota mhango inofanira kunge izere nemvura yakachena, kudzivirira manyepo akazara, uye ipapo simbisa jekiseni remvura, mabhaudhi ekuburitsa mhepo, neimwe nzira isingabvumirwe kushandisa.
4, pombi inodzika inofanira kunge yakanyura mumvura, kudzika kwakadzika hakuna kudarika 70m, pasi pepombi inoputika kubva pasi petsime haisi pasi pe3m.
5, iyo tsime kuyerera kwemvura kunofanira kukwanisa kusangana neiyo submersible pombi mvura inobuda uye inoramba ichishanda, iyo submersible pombi mvura inobuda inofanira kudzorwa pa 0.7 - 1.2 nguva yekuyerwa kuyerera.
6, tsime rinofanira kunge rakatwasuka, pombi inonyudza haigone kushandiswa kana kuraswa, inongomira yakamira chete.
7, pombi inodzika inofanira kufananidzwa netambo zvinoenderana nezvinodiwa, uye mudziyo wekunze wekudzivirira wakawandisa. 8, pombi inorambidzwa zvachose pasina mvura isina-mutoro bvunzo muchina
Model | Kuyerera (m3/h) | Head (m) |
Rotating speed(change/point) | Pombi yemvura(%) | Outlet dhayamita (mm) |
Inoshanda zvakanaka dhayamita(mm) |
Rated simba (KW) |
Rated voltage(V) | Ratedcurrent(A) | Motorefficiency (%) | simba factorcos | Unit Radial Maximu size(mm) |
Remark | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125kumusoro | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125kumusoro | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125kumusoro | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125kumusoro | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125kumusoro | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125kumusoro | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125kumusoro | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125kumusoro | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125kumusoro | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125kumusoro | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125kumusoro | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125kumusoro | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125kumusoro | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125kumusoro | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.
Izvo zvakakosha zvechigadzirwa zvinosanganisira:
1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

(1) Gadziriro isati yaiswa:
1. Tarisa kana pombi inodzika inosangana nemamiriro ekushandiswa uye chiyero chakatsanangurwa mubhuku rekushandisa.
2. Uchishandisa inorema obiect ine dhayamita yakaenzana nehupamhi hwekunze dhayamita yepombi inonyura, yera kana innediameter yemugodhi inogona kukwana pombi yepasi, uye kuyera kana kudzika kwetsime kunosangana nezvinodiwa zvekuisa.
3. Tarisa kuti chibhorani chakachena here uye kuti mvura yemutsime ine tsvina here. Usambofa washandisa pombi yemagetsi inonyura kugeza madhaka epombi yewelor nemvura yejecha kudzivirira kukuvara kusati kwasvika kwepombi yemagetsi inonyura.
4. Tarisa kana chinzvimbo cheiyo welhead yekumisikidza chisimbi chakakodzera uye kana ichikwanisa kumira nemhando yechikamu chose.
5. Tarisa kana zvikamu zvepombi zvinopinda mumvura zvakakwana uye zvakaiswa zvakanaka maererano nedhiyagiramu yegungano iri mubhukuBvisa sikirini yekusefa uye tenderedza coupling kuti uone kana ichitenderera zviri nyore.
6. Sunungura siruu yemvura wozadza monitivha nemvura yakachena, isingaore (noti. iva nechokwadi chekuinyora), wobva wasunga simbi yemvura. Mushure memaawa gumi nemaviri ejekiseni remvura, kudzivirira kwekudzivirira kwemota hakufanirwe kunge kuri pasi pe150M Q kana kuyerwa ne500V tafura yekuzunza.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.
After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Iyo yakasungirirwa cable wiring process diagraph yakaita seiyi:
8. Shandisa multimeter kuti utarise kana mawaya matatu-chikamu akabatana uye kana iyo DC inopikisa inenge yakaenzana.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.
(2) Midziyo yekuisa uye zvishandiso:
1. Imwe peya yekusimudza maketani anopfuura matani maviri.
2. Chitatu chine hurefu hwakamira husingasviki mamita mana.
3. Tambo mbiri dzakarembera (tambo dzetambo) dzinogona kutakura huremu hunodarika tani imwe (dzinogona kutakura huremu hweseti yakakwana yemapombi emvura).
4. Isai mapeya maviri emagetsi (splints).
5. Wrenches, sando, screwdrivers, midziyo yemagetsi uye zviridzwa, nezvimwewo.
(3) Kuiswa kwepombi yemagetsi:
1. Dhidhiyo yekuisa yepombi yemagetsi inoputika inoratidzwa muMufananidzo 2. Izvo zviyero zvekuisa zvakananga zvinoratidzwa muTebhu 3 "Rondedzero yeKuisa Dimensions ye Submersible Electric Pump".
2. Pombi dzemagetsi dzinonyura dzine musoro usingasviki mamita makumi matatu dzinogona kusimudzwa zvakananga mugomba uchishandisa hose netambo dzewaya kana dzimwe tambo dzehemp dzinogona kutakura huremu hwakazara hwemuchina wese, pombi dzemvura, uye mvura mumapombi.
3. Mapombi ane musoro weanopfuura mamita makumi matatu anoshandisa pombi dzesimbi, uye kutevedzana kwekugadzika kunotevera:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Simudza pombi inonyura zvishoma, bvisa chinosungirira chiri kumucheto kwepombi yemvura, sunga tambo zvakasimba papombi yemvura netepi yepurasitiki, woisunga zvishoma nezvishoma kusvikira Chisungiso chaiswa patsime.
④Shandisa nzira imwechete kusungira pombi dzose dzemvura mutsime.
⑤Mushure metambo yekutungamirira-kunze yakabatanidzwa kune chinja chekutonga, chakabatanidzwa kune matatu-phase simba rekupa.
(4) Zvinhu zvekucherechedza panguva yekuisa:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Panguva yekuisa, rubber pad inofanira kuiswa paflange yepombi imwe neimwe uye yakasimbiswa zvakafanana.
3. Kana pombi yemvura yadzikiswa mugomba, inofanira kuiswa pakati pepombi yetsime kudzivirira kuti pombi isamhanye nemudhuri wetsime kwenguva yakareba, zvichiita kuti pombi izununguke uye injini kutsvaira nekutsva. .
4. Sarudza kudzika kwepombi yemvura kusvika pasi petsime maererano nejecha rinoyerera uye silt mamiriro emutsime. Usavige pombi mumatope. Nhambwe kubva papombi yemvura kusvika pasi petsime kazhinji haisviki mamita matatu (ona Mufananidzo 2).
5. Kudzika kwemvura yepombi yemvura hakufanirwe kunge kuri pasi pe1-1.5 metres kubva padanho remvura rine simba kusvika painopinza mvura (ona Mufananidzo 2). Zvikasadaro, pombi yemvura inotakura inogona kukuvara nyore.
6. Kusimudzwa kwepombi yemvura hakugoni kuderera zvakanyanya. Zvikasadaro, vharuvhu yegedhi inoda kuiswa papombi yemvura yemugodhi kudzora kuyerera kwepombi panzvimbo yakayerwa yekuyerera kudzivirira mota kuti isaremerwe nekupiswa nekuda kwekuyerera kukuru.
7. Apo pombi yemvura iri kushanda, kubuda kwemvura kunofanira kuenderera mberi uye kunyange, ikozvino inofanira kunge yakagadzikana (pasi pemamiriro ekushanda akarongwa, kazhinji haapfuuri 10% yehuwandu hwemazuva ano), uye hapafaniri kuva nekudengenyeka kana ruzha. Kana paine abnormality, muchina uyu unofanirwa kumiswa kuti uzive chikonzero uye kubvisa.
8. Paunenge uchiisa, teerera kugadzika kwemoto wepasi waya (ona Mufananidzo 2). Kana pombi yemvura iri pombi yesimbi, itungamire kubva patsime remusoro; apo pombi yemvura iri pombi yepurasitiki, itungamirire kubva painogadzika chiratidzo chepombi yemagetsi.
- 1. Mushure mokunge pombi inoputika yakaiswa, chengetedza kupikisa kwekudzivirira uye katatu-phase conduction kubva pakushandura zvakare, chengetedza kana chiridzwa uye kubatanidzwa kwemichina yekutanga kusina kunaka, kana pasina dambudziko, muchina wekuedza unogona kutangwa, uye tarisa kana chiratidzo chekuverenga chiridzwa chichipfuura iyo yakayerwa voltage uye ikozvino inotsanangurwa pane nameplate mushure mekutanga, uye tarisa kana pombi ine ruzha uye vibration chiitiko, uye kuiswa mukushanda kana zvese zvakajairika.
- 2.Mushure mekushanda kwekutanga kwepombi kwemaawa mana, motokari inofanira kuvharwa kuti iedze kupisa kwekudzivirira kupisa nokukurumidza, uye kukosha kwayo hakufaniri kuva pasi pe0.5 megaohm.
- 3.Pashure pokunge pombi yakavharwa, inofanira kutangwa mushure memaminitsi mashanu kudzivirira mbiru yemvura mupombi kuti irege kudzorerwa zvachose uye inokonzera kuwandisa kwemotokari ikozvino uye kupisa.
- 4.After pombi yakaiswa mukushanda kwakajairika, kuitira kuti uwedzere hupenyu hwayo hwebasa, zvakakosha kutarisa kana magetsi ekupa, kushanda ikozvino uye kupikisa kwekudzivirira zvinowanzoitika nguva dzose. Kana mamiriro anotevera awanikwa, pombi inofanira kuvharwa pakarepo kugadzirisa dambudziko.
- 1 In the rated condition, the current exceeds 20%.
- 2 Chiyero chemvura chine simba chinodonha kusvika pachikamu chekupinda kwemvura, zvichikonzera mvura inopindirana.
- 3 Iyo pombi inonyura ine kuzunguzika kwakanyanya kana ruzha.
- 4 Iyo yekugovera voltage yakaderera pane 340 volts.
- 5 Fuse inopiswa.
- 6 Pombi yekupa mvura yakakuvadzwa.
- 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- Unit disassembly:
- 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.
-
- Impeller
- Shaft sleeve
- Rubber shaft sleeve
-
Chisimbiso mhete
01 Kunwa mvura mutsime rakadzika
02 Mvura yakakwirira-inokwira
03 mvura yemugomo
04 shongwe yemvura
05 Kudiridzira kwekurima
06 kudiridza mubindu
07 kunwa mvura yerwizi
08 mvura yemumba