Suitable for underground hot water mining with water temperature below 100°C, with heat resistance, corrosion resistance, aging resistance and other characteristics
This product is a powerful three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) electric pump, suitable for all kinds of occasions need high-power pump. Its design considers a variety of water quality factors, including water temperature not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L, etc. The product adopts a closed or water immersion wet structure of the motor, before use in the submersible motor chamber filled with clean water to prevent empty fill. Requirements in strict accordance with the requirements of the matching cable and equipped with external overload protection device. To ensure stable operation, the submersible pump must be completely immersed in water operation, the insertion depth shall not exceed 70 meters, and the distance from the bottom of the well shall not be less than 3 meters. In addition, the pump shall not be a no-load test before start. In general, this product has the characteristics of high efficiency and stability, suitable for a variety of pump tasks in harsh environment.
Model | Flow (m3/h) | Holle (m) |
Rotatingspeed (feroarje/punt) |
Wetterpomp(%) | Outlet diameter (mm) |
Goed tapast diameter (mm) |
Rated macht (KW) |
Rated spanning (V) |
Rated aktuele (A) |
Motor effisjinsje (%) | macht factorcosφ | Ienheid Radiale Maksimum grutte (mm) |
Opmerking | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125boppe | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125boppe | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125boppe | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125boppe | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125boppe | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125boppe | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125boppe | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125boppe | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125boppe | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125boppe | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125boppe | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125boppe | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125boppe | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125boppe | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, strictly according to the provisions of the pump lift, flow range of use, to prevent low flow or high lift pumping force, the thrust bearing and other parts of the wear, the motor overload burned 6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the water in the motor cavity, prevent the motor cavity water ice damage caused by low temperature.
The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other components. The motor is a water-filled submersible three-phase asynchronous motor, which is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom is used to adjust the difference in internal water expansion and contraction pressure caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor. The lubrication of the motor and the pump bearing is water lubrication. The stator winding of the motor adopts high quality submersible motor winding wire, with high insulation performance. The pump adopts computer CAD design, with simple structure and excellent technical performance.

(1) Tarieding foar ynstallaasje:
1. Kontrolearje oft de dompelpomp foldocht oan de gebrûksbetingsten en omfang spesifisearre yn 'e hantlieding.
2. Mei in swiere objekt mei in diameter lyk oan de maksimale bûtendiameter fan 'e dompelpomp, mjitte oft de binnendiameter fan' e putboring de dompelpomp passe kin, en mjit oft de putdjipte foldocht oan de ynstallaasjeeasken.
3. Kontrolearje oft de putboring skjin is en oft it putwetter troebel is. Nea brûke in dompelpomp elektryske pomp te waskjen de welor pomp modder en sân wetter te kommen foar betiid skea oan de dompelpomp elektryske pomp.
4. Kontrolearje oft de posysje fan de welhead ynstallaasje clamp is geskikt en oft it kin wjerstean de kwaliteit fan de hiele ienheid
5. Kontrolearje oft de submersible pomp ûnderdielen binne kompleet en ynstallearre goed neffens de gearstalling diagram yn de hânlieding Ferwiderje it filter skerm en draaie de koppeling om te sjen oft it draait fleksibel
6. Skroef de wetterskroef los en folje de motorholte mei skjin, net-korrosyf wetter (notysje. Wês wis dat it opfolje), dan draait de wetterskroef oan. Nei 12 oeren fan wetterynjeksje moat de isolaasjeferset fan 'e motor net minder wêze dan 150M Q as mjitten mei in 500V skoddetafel.
7. Kabel joint, snij in 120mm rubberen sleeve fan ien ein fan 'e útgeande kabel en de oerienkommende kabel mei in elektricien syn mes dan stagger de lingte fan' e trije kearn triedden yn in stepped foarm, skilje ôf in 20mm koperen kearn, scrape fan it okside laach op theoutside fan de koperen tried mei in mes of sân doek, en ynfoegje de twa ferbûn tried einen yn palirs.After tying de laach strak mei fyn koperen tried, solder it yngeand en stevich, en sân fan eltse. burrs op it oerflak. Brûk dan, foar de trije gewrichten, polyvester-isolaasjetape om se op in semi-steapele manier te wikkeljen foar trije lavers. Wikkel de twa einen fan 'e wikkellaach strak mei nyiondraad, en brûk dan in semi-steapele metoade om de tape foar trije lagen te wikkeljen. Wrap de outellayer mei hege druk isolaasje tape foar trije lagen. As lêste, fold de trije stringen byinoar en wrap se ferskate kearen foar fiif lagen mei hege druk tape. Elke laach moat strak bûn wurde, en de tuskenlizzende gewrichten moatte strak en fiif wêze om foar te kommen dat wetter de isolaasje penetrearret en beskeadiget. , dy't net minder wêze moatte as 100M Ω
It taheakke prosesdiagram foar kabelbedrading is as folget:
8. Brûk in multimeter om te kontrolearjen oft de trije-fase triedden binne ferbûn en oft de DC ferset is likernôch lykwichtich.
9. Kontrolearje oft it circuit en transformator kapasiteit binne oerladen, en dan ferbinen de oerlêst beskerming switch of begjinnende apparatuer. Sjoch Tabel 2 foar spesifike modellen, en dan Giet in amer mei wetter yn 'e wetterpomp út' e wetterpompútlaat om de rubberlagers yn 'e pomp te smeerjen, en set dan de ûnderdompelbere elektryske pomp rjochtop en steady.Start (net mear as ien sekonde) en kontrolearje oft de stjoerrjochting oerienkomt mei it stjoerteken. As net, ruilje alle twa Anschlüsse fan 'e trije-faze kabel. Ynstallearje dan it filter en meitsje jo klear om de put del te gean. As brûkt by spesjale gelegenheden (lykas sleatten, sleatten, rivieren, fivers, fivers, ensfh.), De elektryske pomp moat betrouber wurde grûn.
(2) Ynstallaasje apparatuer en ark:
1. Ien pear liftkeatlingen foar mear as twa ton.
2. In tripod mei in fertikale hichte fan net minder as fjouwer meter.
3. Twa hingjende touwen (wire touwen) dy't in gewicht fan mear as ien ton drage kinne (kinne it gewicht fan in folsleine set wetterpompen drage).
4. Ynstallearje twa pearen fan clamps (spalken).
5. Wrenches, hammers, schroevendraaiers, elektryske ark en ynstruminten, ensfh.
(3) Elektryske pomp ynstallaasje:
1. It ynstallaasjediagram fan 'e ûnderdompele elektryske pomp wurdt werjûn yn figuer 2. De spesifike ynstallaasjedimensjes wurde werjûn yn Tabel 3 "List fan ynstallaasje-ôfmjittings fan 'e ûnderdompele elektryske pomp".
2. Submersible elektryske pompen mei in kop minder as 30 meter kinne direkt yn 'e boarne ophelle wurde mei slangen en draadseilen of oare himp-touwen dy't it folsleine gewicht fan' e hiele masine, wetterpipes, en wetter yn 'e pipes drage kinne.
3. Pompen mei in kop fan mear as 30 meter brûke stielen pipen, en de ynstallaasje folchoarder is as folget:
①Gebrûk in klem om it boppeste ein fan it wetterpompdiel te klemmen (de motor en de wetterpomp binne op dit stuit ferbûn), til it mei in hingjende keatling op en bine it stadichoan yn 'e put oant Set de klem op' e putkop en fuortsmite hingjende ketting.
② Brûk in oar pear klemmen om in piip te klemmen, til it mei in hingjende ketting 15 sm fuort fan 'e flange, en ferleegje it stadich. Tusken pipe flange en pomp flangePut de rubberen pad yn plak en strak de piip en pomp gelyk mei bouten, moeren en spring washers.
③ Til de dompelpomp in bytsje op, ferwiderje de klem op 'e boppeste ein fan' e wetterpomp, bine de kabel stevich oan 'e wetterpipe mei in plestik tape, en bûgje it stadichoan oant De klem wurdt pleatst by de putkop.
④Brûk deselde metoade om alle wetterpipes yn 'e put te binen.
⑤ Neidat de lead-out kabel is ferbûn mei de kontrôle switch, it is ferbûn oan de trije-fase Netzteil.
(4) Dingen om op te merken by ynstallaasje:
1. As in jamming ferskynsel wurdt fûn tidens it pompen proses, draaie of lûke de wetter piip te oerwinnen it jamming punt. As ferskate maatregels noch net wurkje, twinge asjebleaft de pomp net omleech om skea oan 'e dompelpomp en de put te foarkommen.
2. By ynstallaasje moat in rubberen pad op 'e flange fan elke piip pleatst wurde en gelijkmatig oanskerpe.
3. As de wetterpomp yn 'e boarne ferlege wurdt, moat it yn' e midden fan 'e putpipe pleatst wurde om te foarkommen dat de pomp lang tsjin' e wellmuorre rint, wêrtroch't de pomp trillet en de motor sweep en brânt .
4. Bepale de djipte fan 'e wetterpomp nei de boaiem fan' e boarne neffens de streamende sân- en siltbetingsten fan 'e boarne. Begrave de pomp net yn 'e modder. De ôfstân fan 'e wetterpomp nei de boaiem fan' e put is oer it generaal net minder as 3 meter (sjoch figuer 2).
5. De wetteryngongsdjipte fan 'e wetterpomp moat net minder wêze as 1-1,5 meter fan it dynamyske wetterpeil nei it wetteryntreeknooppunt (sjoch figuer 2). Oars kinne de wetterpomplagers maklik skea wurde.
6. De lift fan 'e wetterpomp kin net te leech wêze. Oars, in poarte fentyl moat wurde ynstallearre op de wellhead wetter pipeline te kontrolearjen de pomp trochstreaming op de rated flow punt om foar te kommen dat de motor wurdt oerladen en útbaarnd fanwege grutte stream tariven.
7. As de wetterpomp rint, moat de wetterútfier kontinuële en sels wêze, de aktuele moat stabyl wêze (ûnder beoardielde wurkomstannichheden, oer it generaal net mear as 10% fan 'e nominearre aktuele), en der moat gjin trilling of lûd wêze. As der in abnormaliteit is, moat de masine wurde stoppe om de oarsaak te finen en it te eliminearjen.
8. By it ynstallearjen, betelje omtinken oan de ynstelling fan 'e motor grûndraad (sjoch figuer 2). As it wetter piip is in stielen piip, liedt it út de puthead clamp; as it wetter piip is in plestik piip, liedt it út 'e grûn mark fan' e elektryske pomp.
- (1)With the continuous development of modern technology, submersible pumps play a crucial role in the field of pumps. After installing the submersible pump, check the insulation resistance and three-phase continuity repeatedly to ensure that there are no errors in the connection between the instrument and the starting equipment. If everything is normal, the test equipment can be started. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, pay attention to observe whether the pump has any noise or vibration. If everything is normal, it can be put into operation. After the pump runs for four hours for the first time, it should be closed and the thermal insulation resistance of the motor should be tested quickly, and its value should not be less than 0.5 megaohms. After stopping the pump, restart it after five minutes to prevent the water column in the pipeline from completely reversing, resulting in the motor burning due to overcurrent. After the pump is running normally, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the equipment should be shut down immediately to troubleshoot. The current exceeds 20% under the rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the submersible pump vibrates violently or makes noisy sounds; the supply voltage is lower than 340 volts; any fuse is broken; the water pipe is damaged; The thermal insulation resistance between the motor and the ground is less than 0.5 megaohm.These recommended operating procedures and safety measures ensure the safe operation of the submersible pump, prolong the service life of the equipment, and provide users with a reliable pump choice.
- (2)Unit disassembly:
- 1 untie the cable tie, remove the pipeline part, remove the wire plate.
- 2 unscrew the water release bolt, put the water in the motor chamber.
- 3 remove the filter, loose the fixing screw of the motor shaft on the coupling.
- 4 unscrew the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5 the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending the pump shaft and various bumps in the disassembly process.
- 6 the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
- (3)The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.
1, set it wetter yn 'e motorholte (benammen yn' e winter om foar te kommen dat de motor befriest), en bine de kabel goed.
2, bewarje yn in binnenkeamer sûnder korrosive stoffen en gassen, mei in temperatuer ûnder 40 °C.
3, lange-termyn gebrûk moatte betelje omtinken foar de roest previnsje fan dompelpompen.
- Impeller
- Shaft mouwe
- Rubber shaft sleeve
-
Segelring
01 Djippe boarne wetter yntak
02 Hege wetterfoarsjenning
03 berch wetterfoarsjenning
04 toer wetter
05 Agraryske yrrigaasje
06 tún yrrigaasje
07 rivier wetter yntak
08 húshâldlik wetter