Suitable for underground hot water mining with water temperature below 100°C, with heat resistance, corrosion resistance, aging resistance and other characteristics
This product is a powerful three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) electric pump, suitable for all kinds of occasions need high-power pump. Its design considers a variety of water quality factors, including water temperature not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L, etc. The product adopts a closed or water immersion wet structure of the motor, before use in the submersible motor chamber filled with clean water to prevent empty fill. Requirements in strict accordance with the requirements of the matching cable and equipped with external overload protection device. To ensure stable operation, the submersible pump must be completely immersed in water operation, the insertion depth shall not exceed 70 meters, and the distance from the bottom of the well shall not be less than 3 meters. In addition, the pump shall not be a no-load test before start. In general, this product has the characteristics of high efficiency and stability, suitable for a variety of pump tasks in harsh environment.
Модел | Проток (м3/х) | Глава (м) |
Ротатингспеед (промена/тачка) |
Пумпа за воду(%) | Оутлет пречника (мм) |
Добро применљиво пречник (мм) |
Оцењено снага (КВ) |
Оцењено напон (В) |
Оцењено струја (А) |
Моторна ефикасност (%) | power factorcosφ | Јединица Радијална максимална величина (мм) |
Напомена | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125изнад | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125изнад | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125изнад | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125изнад | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125изнад | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125изнад | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125изнад | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125изнад | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125изнад | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125изнад | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125изнад | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125изнад | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125изнад | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125изнад | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, strictly according to the provisions of the pump lift, flow range of use, to prevent low flow or high lift pumping force, the thrust bearing and other parts of the wear, the motor overload burned 6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the water in the motor cavity, prevent the motor cavity water ice damage caused by low temperature.
The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other components. The motor is a water-filled submersible three-phase asynchronous motor, which is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom is used to adjust the difference in internal water expansion and contraction pressure caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor. The lubrication of the motor and the pump bearing is water lubrication. The stator winding of the motor adopts high quality submersible motor winding wire, with high insulation performance. The pump adopts computer CAD design, with simple structure and excellent technical performance.

(1) Припрема пре инсталације:
1. Проверите да ли потопљена пумпа испуњава услове коришћења и обим који је наведен у приручнику.
2. Користећи тежак предмет пречника који је једнак максималном спољашњем пречнику потопљене пумпе, измерите да ли унутрашњи пречник бушотине може да стане на потапајућу пумпу и измерите да ли дубина бунара испуњава захтеве за инсталацију.
3. Проверите да ли је бушотина чиста и да ли је вода замућена. Никада не користите потапајућу електричну пумпу за прање блата и песка из велор пумпе како бисте избегли прерано оштећење потопљене електричне пумпе.
4. Проверите да ли је положај стезаљке за уградњу на завару погодан и да ли може да издржи квалитет целе јединице
5. Проверите да ли су компоненте потопљене пумпе комплетне и правилно инсталиране према дијаграму монтаже у упутству. Уклоните филтерски екран и окрените спојницу да бисте видели да ли се флексибилно окреће
6. Одврните завртањ за воду и напуните шупљину мотора чистом водом која није корозивна (напомена. обавезно је напуните), а затим затегните водени завртањ. Након 12 сати убризгавања воде, отпор изолације мотора не би требало да буде мањи од 150М К када се мери помоћу стола за тресење од 500В.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Приложени дијаграм процеса ожичења каблова је следећи:
8. Користите мултиметар да проверите да ли су трофазне жице повезане и да ли је ДЦ отпор приближно избалансиран.
9. Проверите да ли су струјни круг и капацитет трансформатора преоптерећени, а затим повежите прекидач за заштиту од преоптерећења или опрему за покретање. Погледајте Табелу 2 за одређене моделе, а затим сипајте канту воде у пумпу за воду из излаза пумпе за воду да бисте подмазали гумене лежајеве у пумпи, а затим поставите потапајућу електричну пумпу усправно и мирно. Почните (не више од једне секунде) и проверите да ли је смер управљања у складу са знаком за управљање. Ако не, замените било која два конектора трофазног кабла. Затим инсталирајте филтер и припремите се за спуштање у бунар. Ако се користи у посебним приликама (као што су ровови, ровови, реке, баре, баре, итд.), електрична пумпа мора бити поуздано уземљена.
(2) Опрема и алати за инсталацију:
1. Један пар ланаца за подизање за више од две тоне.
2. Статив са вертикалном висином не мањом од четири метра.
3. Два висећа ужад (жичана ужад) која могу да поднесу тежину већу од једне тоне (могу да издрже тежину комплетног комплета пумпи за воду).
4. Уградите два пара стезаљки (удлаге).
5. Кључеви, чекићи, шрафцигери, електрични алати и инструменти итд.
(3) Инсталација електричне пумпе:
1. Инсталациони дијаграм потопљене електричне пумпе је приказан на слици 2. Специфичне инсталационе димензије су приказане у табели 3 „Листа инсталационих димензија потопљене електричне пумпе“.
2. Потопне електричне пумпе са напоном мањим од 30 метара могу се дизати директно у бунар помоћу црева и жичаних ужади или других ужади од конопље која могу да поднесу пуну тежину целе машине, водоводних цеви и воде у цевима.
3. Пумпе са напоном већим од 30 метара користе челичне цеви, а редослед уградње је следећи:
①Употребите стезаљку да причврстите горњи крај дела пумпе за воду (мотор и пумпа за воду су у овом тренутку повезани), подигните га ланцем за вешање и полако га вежите за бунар док не поставите стезаљку на врх бунара и уклоните висећи ланац.
② Употријебите још један пар обујмица за стезање цијеви, подигните је ланцем за вјешање 15 цм даље од прирубнице и полако је спустите. Између прирубнице цеви и прирубнице пумпе Поставите гумену подлогу на место и затегните цев и пумпу равномерно помоћу вијака, навртки и опружних подложака.
③ Лагано подигните потапајућу пумпу, уклоните стезаљку на горњем крају пумпе за воду, завежите кабл чврсто за цев за воду пластичном траком и полако га завежите док се стезаљка не постави на врх бунара.
④Употребите исти метод да вежете све водоводне цеви у бунар.
⑤Након што је излазни кабл прикључен на контролни прекидач, он се повезује на трофазно напајање.
(4) Ствари на које треба обратити пажњу током инсталације:
1. Ако се током процеса пумпања пронађе појава заглављивања, окрените или повуците цев за воду да бисте превазишли тачку заглављивања. Ако разне мере и даље не функционишу, молимо вас да не притискате пумпу да бисте избегли оштећење потапајуће електричне пумпе и бунара.
2. Током уградње, гумену подлогу треба поставити на прирубницу сваке цеви и равномерно затегнути.
3. Када се пумпа за воду спусти у бунар, треба је поставити у средину цеви бунара како би се спречило да пумпа дуго ради о зид бунара, узрокујући да пумпа вибрира и мотор да брише и гори .
4. Одредите дубину пумпе за воду до дна бунара у складу са условима протока песка и муља у бунару. Немојте закопавати пумпу у блато. Растојање од пумпе за воду до дна бунара углавном није мање од 3 метра (види слику 2).
5. Дубина улаза воде у пумпу за воду не би требало да буде мања од 1-1,5 метара од динамичког нивоа воде до улазног чвора воде (погледајте слику 2). У супротном, лежајеви пумпе за воду могу се лако оштетити.
6. Подизање водене пумпе не може бити прениско. У супротном, на цевоводу за воду на ушћу бунара треба да се инсталира засун за контролу протока пумпе на номиналној тачки протока како би се спречило преоптерећење и изгоревање мотора услед великих брзина протока.
7. Када пумпа за воду ради, излаз воде треба да буде континуиран и равномеран, струја треба да буде стабилна (под номиналним радним условима, углавном не више од 10% називне струје), и не би требало да буде вибрација или буке. Ако постоји било каква абнормалност, машину треба зауставити да би се открио узрок и отклонио га.
8. Приликом уградње обратите пажњу на подешавање жице за уземљење мотора (погледајте слику 2). Када је водоводна цев челична цев, водите је од стезаљке на глави бунара; када је водоводна цев пластична цев, водите је од ознаке уземљења електричне пумпе.
- (1)With the continuous development of modern technology, submersible pumps play a crucial role in the field of pumps. After installing the submersible pump, check the insulation resistance and three-phase continuity repeatedly to ensure that there are no errors in the connection between the instrument and the starting equipment. If everything is normal, the test equipment can be started. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, pay attention to observe whether the pump has any noise or vibration. If everything is normal, it can be put into operation. After the pump runs for four hours for the first time, it should be closed and the thermal insulation resistance of the motor should be tested quickly, and its value should not be less than 0.5 megaohms. After stopping the pump, restart it after five minutes to prevent the water column in the pipeline from completely reversing, resulting in the motor burning due to overcurrent. After the pump is running normally, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the equipment should be shut down immediately to troubleshoot. The current exceeds 20% under the rated working conditions; the dynamic water level drops to the inlet section, resulting in intermittent drainage; the submersible pump vibrates violently or makes noisy sounds; the supply voltage is lower than 340 volts; any fuse is broken; the water pipe is damaged; The thermal insulation resistance between the motor and the ground is less than 0.5 megaohm.These recommended operating procedures and safety measures ensure the safe operation of the submersible pump, prolong the service life of the equipment, and provide users with a reliable pump choice.
- (2)Unit disassembly:
- 1 untie the cable tie, remove the pipeline part, remove the wire plate.
- 2 unscrew the water release bolt, put the water in the motor chamber.
- 3 remove the filter, loose the fixing screw of the motor shaft on the coupling.
- 4 unscrew the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5 the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending the pump shaft and various bumps in the disassembly process.
- 6 the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
- (3)The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.
1, избаците воду из шупљине мотора (посебно зими да бисте спречили смрзавање мотора) и добро завежите кабл.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, дуготрајна употреба треба обратити пажњу на превенцију рђе потопљених пумпи.
- Импеллер
- Навлака осовине
- Гумени рукавац вратила
-
Заптивни прстен
01 Дубоки захват воде из бунара
02 Високо водоснабдевање
03 планински водовод
04 торањ вода
05 Пољопривредно наводњавање
06 наводњавање баште
07 речни водозахват
08 домаћа вода