The variable frequency winding design ensures the motor's long-term smooth conversion operation between 1HZ-50HZ, energy saving and longer service life. This product stands out for its advanced technology and efficient performance, which can achieve energy-saving and environmentally friendly operation, while ensuring the stability and reliability of the motor for long-term use. Not only that, its design makes the product with a longer life, bringing more value to users. Whether in home applications or industrial fields, this motor can provide you with excellent performance to meet a variety of needs.
1,Power supply: three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%).
2, kalidad ng tubig:
(1) water temperature is not higher than 20 °C;
(2) solid impurities content (mass ratio) ay hindi hihigit sa 0.01%;
(3) PH value (pH) 6.5-8.5;
(4) ang nilalaman ng hydrogen sulfide ay hindi hihigit sa 1.5mg/L;
(5) ang nilalaman ng chloride ion ay hindi hihigit sa 400mg/L.
3, the motor is a closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use
4, the submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m.
5, ang mahusay na daloy ng tubig ay dapat na matugunan ang submersible pump tubig output at tuluy-tuloy na operasyon, ang submersible pump tubig output ay dapat na kontrolado sa 0.7 - 1.2 beses ang rate ng daloy.
6, ang balon ay dapat na tuwid, ang submersible pump ay hindi maaaring gamitin o dumped, tanging vertical na paggamit.
7, ang submersible pump ay dapat na tumugma sa cable ayon sa mga kinakailangan, at ang panlabas na overload na proteksyon na aparato.
8, the pump is strictly prohibited without water no-load test machine.
Modelo | Daloy (m3/h) | Ulo (m) |
Bilis ng pag-ikot (baguhin/punto) |
Bomba ng tubig(%) | Outlet diameter (mm) |
Applicable na rin diameter(mm) |
Na-rate kapangyarihan(KW) |
Na-rate boltahe(V) |
Na-rate kasalukuyang(A) |
Motorefficiency (%) | power factorcosφ | Yunit Radial Maximu size(mm) |
Puna | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135sa itaas | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135sa itaas | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135sa itaas | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135sa itaas | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135sa itaas | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135sa itaas | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135sa itaas | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, mahigpit na ayon sa mga probisyon ng pump lift, daloy ng hanay ng paggamit, upang maiwasan ang mababang daloy o mataas na lift pumping puwersa, ang thrust tindig at iba pang mga bahagi ng wear, ang motor overload burn 6, pagkatapos ng pump pababa sa balon, ang pagsukat ng motor sa ground insulation resistance ay hindi dapat mas mababa sa 100M, pagkatapos ng simula upang obserbahan ang boltahe at kasalukuyang, suriin ang motor winding insulation, kung naaayon sa mga kinakailangan; magpahitit imbakan temperatura ng lokasyon kung mas mababa sa pagyeyelo point, ay dapat na tuyo ang motor lukab tubig, maiwasan ang motor lukab tubig yelo pinsala na dulot ng mababang temperatura.
The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor parts are mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, and lead cable.
Ang mga pangunahing tampok ng produkto ay kinabibilangan ng:
The main characteristic of the product is that the pump is a water-immersed three-phase asynchronous motor, and the motor cavity is full of water for cooling the motor and lubricating the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference of the water inside the body caused by the change of temperature. At the same time, in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the end of the motor shaft, and the sand discharging ring is installed to form a sand control structure. In order to prevent the pump shaft from beating when starting up, the pump shaft and the motor shaft are connected by a coupling, and the thrust bearing is installed at the bottom of the motor. In addition, the motor and the pump bearing are water-lubricated, and the stator winding of the motor uses high-quality submersible motor winding to ensure high insulation performance. The overall design is made of computer CAD, with simple structure and superior technical performance.

(1) Paghahanda bago i-install:
1. Suriin kung ang submersible pump ay nakakatugon sa mga kondisyon ng paggamit at saklaw na tinukoy sa manual.
2. Gamit ang isang mabigat na obiect na may diameter na katumbas ng maximum na panlabas na diameter ng submersible pump, sukatin kung ang inneldiameter ng wellbore ay maaaring magkasya sa submersible pump, at sukatin kung ang lalim ng balon ay nakakatugon sa mga kinakailangan sa pag-install.
3. Suriin kung malinis ang wellbore at kung ang tubig ng balon ay maputik. Huwag gumamit ng submersible electric pump upang hugasan ang welor pump na putik at tubig ng buhangin upang maiwasan ang maagang pagkasira ng submersible electric pump.
4. Suriin kung ang posisyon ng welhead installation clamp ay angkop at kung ito ay makatiis sa kalidad ng buong unit
5. Suriin kung ang mga bahagi ng submersible pump ay kumpleto at maayos na naka-install ayon sa assembly diagram sa manualAlisin ang filter screen at paikutin ang coupling upang makita kung ito ay umiikot nang flexible
6. Alisin ang turnilyo ng tubig at punan ang lukab ng motor ng malinis, hindi kinakaing unti-unti na tubig (tandaan. siguraduhing salaan ito), pagkatapos ay higpitan ang waterscrew. Pagkatapos ng 12 oras na pag-iniksyon ng tubig, ang insulation resistance ng motor ay hindi dapat mas mababa sa 150M Q kapag sinusukat sa isang 500V shaking table.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Ang naka-attach na cable wiring process diagram ay ang mga sumusunod:
8. Gumamit ng multimeter upang suriin kung ang mga three-phase na wire ay konektado at kung ang DC resistance ay tinatayang balanse.
9. Suriin kung ang kapasidad ng circuit at transpormer ay na-overload, at pagkatapos ay ikonekta ang overload na proteksyon switch o panimulang kagamitan. Tingnan ang Talahanayan 2 para sa mga partikular na modelo, at pagkatapos ay ibuhos ang isang balde ng tubig sa water pump mula sa outlet ng water pump upang lubricate ang rubber bearings sa pump, at pagkatapos ay ilagay ang submersible electric pump nang patayo at matatag. Magsimula (hindi hihigit sa isang segundo) at suriin kung ang direksyon ng pagpipiloto ay pare-pareho sa sign ng pagpipiloto. Kung hindi, palitan ang alinmang dalawang connector ng three-phase cable. Pagkatapos ay i-install ang filter at maghanda na bumaba sa balon. Kung ginagamit sa mga espesyal na okasyon (tulad ng mga kanal, kanal, ilog, pond, pond, atbp.), ang electric pump ay dapat na mapagkakatiwalaang naka-ground.
(2) Kagamitan at kasangkapan sa pag-install:
1. Isang pares ng lifting chain para sa higit sa dalawang tonelada.
2. Isang tripod na may patayong taas na hindi bababa sa apat na metro.
3. Dalawang nakabitin na lubid (wire ropes) na kayang magdala ng bigat na higit sa isang tonelada (maaaring pasanin ang bigat ng isang kumpletong hanay ng mga water pump).
4. Mag-install ng dalawang pares ng clamps (splints).
5. Wrenches, martilyo, distornilyador, mga kasangkapang elektrikal at instrumento, atbp.
(3)Pag-install ng electric pump:
1. Ang diagram ng pag-install ng submersible electric pump ay ipinapakita sa Figure 2. Ang mga partikular na sukat ng pag-install ay ipinapakita sa Talahanayan 3 "Listahan ng Mga Dimensyon ng Pag-install ng Submersible Electric Pump".
2. Ang mga submersible electric pump na may ulo na wala pang 30 metro ay maaaring iangat nang direkta sa balon gamit ang mga hose at wire rope o iba pang mga lubid ng abaka na kayang pasanin ang buong bigat ng buong makina, mga tubo ng tubig, at tubig sa mga tubo.
3. Ang mga pump na may ulo na higit sa 30 metro ay gumagamit ng mga bakal na tubo, at ang pagkakasunud-sunod ng pag-install ay ang mga sumusunod:
①Gumamit ng clamp upang i-clamp ang itaas na dulo ng bahagi ng water pump (ang motor at water pump ay konektado sa oras na ito), iangat ito gamit ang isang nakabitin na kadena, at dahan-dahang itali ito sa balon hanggang sa Ilagay ang clamp sa wellhead at alisin ang nakasabit na kadena.
② Gumamit ng isa pang pares ng clamp para i-clamp ang isang tubo, iangat ito gamit ang nakabitin na kadena 15 cm ang layo mula sa flange, at ibaba ito ng dahan-dahan. Sa pagitan ng pipe flange at pump flangeIlagay ang rubber pad sa lugar at higpitan ang pipe at pump nang pantay-pantay gamit ang bolts, nuts at spring washers.
③ Bahagyang iangat ang submersible pump, tanggalin ang clamp sa itaas na dulo ng water pump, itali ang cable sa pipe ng tubig gamit ang plastic tape, at dahan-dahang itali ito hanggang sa mailagay ang clamp sa wellhead.
④Gamitin ang parehong paraan upang itali ang lahat ng tubo ng tubig sa balon.
⑤Pagkatapos maikonekta ang lead-out cable sa control switch, ito ay konektado sa three-phase power supply.
(4) Mga bagay na dapat tandaan sa panahon ng pag-install:
1. Kung may nakitang jamming phenomenon sa panahon ng proseso ng pumping, paikutin o hilahin ang tubo ng tubig upang malampasan ang jamming point. Kung ang iba't ibang mga hakbang ay hindi pa rin gumagana, mangyaring Huwag pilitin ang pump upang maiwasan ang pinsala sa submersible electric pump at sa balon.
2. Sa panahon ng pag-install, ang isang rubber pad ay dapat ilagay sa flange ng bawat pipe at higpitan nang pantay-pantay.
3. Kapag ang bomba ng tubig ay ibinaba sa balon, dapat itong ilagay sa gitna ng tubo ng balon upang maiwasan ang pagtakbo ng bomba sa dingding ng balon nang mahabang panahon, na nagiging sanhi ng pag-vibrate ng bomba at pagwalis at pagkasunog ng motor. .
4. Tukuyin ang lalim ng water pump sa ilalim ng balon ayon sa dumadaloy na buhangin at silt na kondisyon ng balon. Huwag ibaon ang bomba sa putik. Ang distansya mula sa water pump hanggang sa ilalim ng balon ay karaniwang hindi bababa sa 3 metro (tingnan ang Larawan 2).
5. Ang lalim ng pagpasok ng tubig ng water pump ay dapat na hindi bababa sa 1-1.5 metro mula sa dynamic na lebel ng tubig hanggang sa water inlet node (tingnan ang Larawan 2). Kung hindi, ang water pump bearings ay maaaring madaling masira.
6. Ang pagtaas ng water pump ay hindi maaaring masyadong mababa. Kung hindi, kailangang mag-install ng gate valve sa wellhead water pipeline para makontrol ang pump flow sa rated flow point para maiwasang ma-overload at masunog ang motor dahil sa malalaking flow rate.
7. Kapag ang water pump ay tumatakbo, ang tubig na output ay dapat na tuluy-tuloy at kahit na, ang kasalukuyang ay dapat na stable (sa ilalim ng rated working conditions, sa pangkalahatan ay hindi hihigit sa 10% ng rated current), at dapat walang vibration o ingay. Kung mayroong anumang abnormalidad, dapat na ihinto ang makina upang malaman ang sanhi at maalis ito.
8. Kapag nag-i-install, bigyang-pansin ang setting ng grounding wire ng motor (tingnan ang Figure 2). Kapag ang tubo ng tubig ay isang bakal na tubo, akayin ito mula sa wellhead clamp; kapag ang tubo ng tubig ay isang plastik na tubo, akayin ito mula sa marka ng saligan ng electric pump.
- 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and after the start, observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate, observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- 2. After the first operation of the pump for four hours, the motor should be stopped to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- 3. After the pump is stopped, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
- 4. Our pump is designed to provide efficient, reliable and lasting pumping solutions.After normal operation, in order to prolong the service life of the pump, it is necessary to check the power supply voltage, running current and insulation resistance regularly to ensure that they are normal.
- If the following conditions are found, the machine should be shut down immediately to eliminate the fault:
- - the current exceeds 20% under the rated working conditions;
- - the dynamic water level drops to the inlet section, resulting in intermittent drainage;
- - the submersible pump vibrates violently or emits noisy sounds;
- - the power supply voltage is lower than 340 volts;
- - one phase of a fuse is blown out;
- - the water pipe is damaged;
- - the thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
- The steps of disassembling the unit include unlocking the cable holder, taking off the pipe part, removing the line protection plate, rotating the drain screw and emptying all the water in the motor chamber, taking out the filter and loosening the screw of the coupling fixed to the motor shaft.Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (note that the unit should be placed horizontally when separating to prevent the bending of the pump shaft).
- 5. The disassembly sequence of the pump includes: water inlet part, impeller, shunt shell, impeller, check valve body.When removing the impeller, use a special tool to loosen the cone sleeve fixing the impeller.During the disassembly process, avoid bending the pump shaft and damaging various parts.The disassembly process of the motor includes: placing the motor on the platform, and then removing the nuts on the studs, base, shaft head lock nut, thrust plate, key, lower guide rail, bearing seat and bolt from the bottom of the motor, then removing the rotor (be careful not to damage the winding), and finally removing the connecting parts and upper guide bearing seat. Before assembling the unit, it is necessary to clean the rust and dirt of each part, and apply sealant on each mating surface and fastener, and then assemble it in the opposite order of disassembly.After assembly, the coupling should be flexibly rotated, and then the filter should be put on to test the machine. Our pump products are designed to provide superior performance and reliability to meet your pumping needs.
- 6. Submersible pumps operating every year, or less than a year of operation but the submersible time has reached two years, should be taken out of the well according to the 5th dismantled maintenance, replacement of worn parts.
1, ilabas ang tubig sa cavity ng motor (lalo na sa taglamig upang maiwasan ang pagyeyelo ng motor), at itali ng mabuti ang cable.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, ang pang-matagalang paggamit ay dapat magbayad ng pansin sa pag-iwas sa kalawang ng mga submersible pump.
- Impeller
- manggas ng baras
- manggas ng goma shaft
- Singsing sa pagbubuklod
01 Deep well water intake
02 Mataas na suplay ng tubig
03 suplay ng tubig sa bundok
04 tubig sa tore
05 Pang-agrikultura na patubig
06 patubig sa hardin
07 pag-inom ng tubig sa ilog
08 tubig sa bahay