Semi-Stainless Steel Split Series Deep Well Pump

Isagawa ang pagproseso ng OEM! Ayon sa mga kinakailangan ng gumagamit, disenyo at paggawa ng iba't ibang uri ng mga espesyal na pangangailangan ng non-standard na submersible motor at pump. Ang mga pamantayan sa pagpapatupad ng produkto: GB/T2816-2014 "well submersible pump", GB/T2818-2014 "well submersible asynchronous motor". WhatsApp:17855846335
PDF DOWNLOAD
Mga Detalye
Mga tag
 
Pangkalahatang-ideya ng Produkto

Ang paggamit ng tubig sa ilalim ng tubig submersible motor, rotor wear-lumalaban haluang metal manggas at haluang metal thrust disc disenyo. well water, mas ligtas na paggamit.Ang grupo ng impeller na gumagamit ng mataas na lakas na anti-sand wear-resistant PC composite polymer materials, bagong three-dimensional na haydroliko na disenyo, lumulutang na impeller, ceramic na anti-sand structure wear resistance, full lift, large flow.Water-filled ang motor ay maaaring sumisid sa lalim ng 300 metro.

 

 
Kondisyon sa Paggamit

This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply system, designed for strict water quality requirements. The product is suitable for water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) between 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L environment. This product is equipped with a closed or water-filled wet structure motor, before use must be submersible motor inner cavity filled with clean water to prevent false full, and then tighten the water and air bolts, otherwise not to use. The submersible pump must be completely immersed in water to work, penetration depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. In addition, the well water flow should meet the continuous operation requirements of the submersible pump, the water output of the submersible pump should be controlled at 0.7-1.2 times the rated flow. When used, the well must be vertical, and the submersible pump can not be used horizontally or dumped, only vertical installation. To ensure safety, the submersible pump must match the cable according to the requirements and be equipped with external overload protection device, and it is strictly prohibited to conduct no-load test on the pump without water. This product is an ideal choice for providing high quality water source, and can be widely used in various industrial and civil water processing fields.

 

 
Kahulugan ng Modelo

Semi-Stainless Steel Split Series Deep Well Pump

 
Bahagyang Sanggunian ng Modelo

105QJ series water-filled stainless steel deep well pump

Modelo

Daloy

m³/h

Ulo

(m)

Motor

kapangyarihan

(KW)

Yunit

diameter

(mm)

diameter (mm)

105QJ2-230/36

2

230

4kw

103

105

105QJ2-300/50

300

5.5kw

105QJ2-390/65

390

7.5kw

105QJ4-50/10

4

50

1.1kw

103

105

105QJ4-60/12

60

1.5kw

105QJ4-80/16

80

2.2kw

105QJ4-100/20

100

3kw

105QJ4-140/28

140

4kw

105QJ4-200/40

200

5.5kw

105QJ4-275/55

275

7.5kw

105QJ6-35/10

6

35

1.1kw

103

105

105QJ6-40/12

40

1.5kw

105QJ6-60/16

60

2.2kw

105QJ6-75/20

75

3kw

105QJ6-105/28

105

4kw

105QJ6-140/40

140

5.5kw

105QJ6-192/55

192

7.5kw

105QJ8-25/5

8

25

1.1kw

103

105

105QJ8-40/8

40

1.5kw

105QJ8-55/11

55

2.2kw

105QJ8-75/15

75

3kw

105QJ8-95/19

95

4kw

105QJ8-125/25

125

5.5kw

105QJ8-160/32

160

7.5kw

105QJ10-20/5

10

20

1.1kw

103

105

105QJ10-30/8

30

1.5kw

105QJ10-40/11

40

2.2kw

105QJ10-55/15

55

3kw

105QJ10-75/19

75

4kw

105QJ10-90/25

90

5.5kw

105QJ10-120/32

120

7.5kw

105QJ16-22/9

16

22

2.2kw

103

105

105QJ16-28/12

28

3kw

105QJ16-35/15

35

4kw

105QJ16-50/20

50

5.5kw

105QJ16-68/27

68

7.5kw

 

130QJ series water-filled stainless steel deep well pump

Modelo

Daloy

m³/h

Ulo

(m)

Motor

kapangyarihan

(KW)

Yunit

diameter

(mm)

diameter (mm)

130QJ10-60/7

10

60

1.5kw

130

135

130QJ10-80/12

80

2.2kw

130QJ10-100/15

100

3kw

130QJ10-130/20

130

4kw

130QJ10-160/25

160

5.5kw

130QJ10-220/32

220

7.5kw

130QJ10-250/38

250

9.2kw

130QJ10-300/42

300

11kw

130QJ10-350/50

350

13kw

130QJ10-400/57

400

15kw

130QJ10-450/64

450

18.5kw

130QJ10-500/70

500

22kw

130QJ15-40/5

15

40

1.5kw

130

135

130QJ15-50/7

50

2.2kw

130QJ15-60/10

60

3kw

130QJ15-80/12

80

4kw

130QJ15-105/15

105

5.5kw

130QJ15-150/22

150

7.5kw

130QJ15-170/25

170

9.2kw

130QJ15-200/28

200

11kw

130QJ15-240/34

240

13kw

130QJ15-280/40

280

15kw

130QJ15-300/42

300

18.5kw

130QJ15-336/48

336

18.5kw

130QJ15-350/50

350

22kw

130QJ15-400/56

400

22kw

 

130QJ series water-filled stainless steel deep well pump

 

Modelo

Daloy

m³/h

Ulo

(m)

Motor

kapangyarihan

(KW)

Yunit

diameter

(mm)

diameter (mm)

130QJ20-22/3

20

30

2.2kw

130

135

130QJ20-30/5

42

3kw

130QJ20-42/6

54

4kw

130QJ20-52/8

65

5.5kw

130QJ20-72/11

85

7.5kw

130QJ20-90/14

110

9.2kw

130QJ20-105/16

128

11kw

130QJ20-130/19

145

13kw

130QJ20-150/22

164

15kw

130QJ20-182/27

182

18.5kw

130QJ20-208/31

208

22kw

130QJ20-240/35

240

25kw

130QJ20-286/42

286

30kw

130QJ25-35/6

25

35

3kw

130

135

130QJ25-40/7

40

4kw

130QJ25-52/9

52

5.5kw

130QJ25-70/12

70

7.5kw

130QJ25-85/15

85

9.2kw

130QJ25-105/18

105

11kw

130QJ25-120/21

120

13kw

130QJ25-140/24

140

15kw

 

150QJ series water-filled stainless steel deep well pump

Modelo

Daloy

m³/h

Ulo

(m)

Motor

kapangyarihan

(KW)

Yunit

diameter

(mm)

diameter (mm)

150QJ12-40/3

12

40

2.2kw

143

150

150QJ12-55/5

55

3kw

150QJ12-80/7

80

4kw

150QJ12-107/9

107

5.5kw

150QJ12-142/11

142

7.5kw

150QJ12-175/14

175

9.2kw

150QJ12-200/16

200

11kw

150QJ12-242/19

242

13kw

150QJ12-268/21

268

15kw

150QJ12-293/23

293

18.5kw

150QJ20-28/3

20

28

3kw

143

150

150QJ20-48/5

48

4kw

150QJ20-70/7

70

5.5kw

150QJ20-90/9

90

7.5kw

150QJ20-107/11

107

9.2kw

150QJ20-135/14

135

11kw

150QJ20-155/16

155

13kw

150QJ20-175/18

175

15kw

150QJ20-195/20

195

18.5kw

150QJ20-220/22

220

18.5kw

150QJ20-235/25

235

22kw

150QJ20-255/28

255

25kw

 

150QJ series water-filled stainless steel deep well pump

Modelo

Daloy

m³/h

Ulo

(m)

Motor

kapangyarihan

(KW)

Yunit

diameter

(mm)

diameter (mm)

150QJ45-18/2

45

18

4KW

143

150

150QJ45-28/3

28

5.5KW

150QJ45-46/5

46

7.5KW

150QJ45-57/6

57

9.2KW

150QJ45-65/7

65

11KW

150QJ45-75/8

75

13KW

150QJ45-90/10

90

15KW

150QJ45-108/12

108

18.5KW

150QJ45-125/14

125

22KW

150QJ45-145/16

145

25KW

150QJ45-168/18

168

30KW

150QJ32-20/2

32

20

3kw

143

150

150QJ32-30/3

30

4kw

150QJ32-43/4

43

5.5kw

150QJ32-60/5

60

7.5kw

150QJ32-65/6

65

7.5kw

150QJ32-75/7

75

9.2kw

150QJ32-85/8

85

11kw

150QJ32-100/9

100

13kw

150QJ32-110/10

110

15kw

150QJ32-118/11

118

18.5kw

150QJ32-140/13

140

18.5kw

150QJ32-155/15

155

22kw

150QJ32-185/18

185

25kw

150QJ32-215/21

215

30kw

 

 

 
Mga Pag-iingat sa Kaligtasan

 This kind of well submersible pump is a clean water pump. It is strictly prohibited to dig new wells and extract sediments and turbid water. The voltage grade of the well pump is 380/50HZ. The submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common comprehensive motor protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc., to prevent timely tripping when abnormal conditions occur. The pump must be reliably grounded during installation and use, and it is strictly prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water in the internal chamber, and the drain bolt must be fastened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instantaneous start time shall not exceed one second to check whether the direction is correct, and the direction is the same as the direction indicator. When the pump is erected, pay attention to safety to prevent injury from tilting. Strictly in accordance with the provisions of the pump lift and flow range of use, to avoid the pump in the low flow when the large flow or in the high lift appears in the large pull, resulting in extreme wear of thrust bearings and other components, the motor overload and burn. After the pump into the well, the insulation resistance between the motor and the ground should be measured, not less than 100MΩ. After the start, regular observation of voltage and current, and check whether the motor winding insulation meets the requirements of the provisions. If the location temperature of the pump storage is below the freezing point, the water in the motor cavity should be drained, so as not to damage the motor in winter low temperature freezing.

 

 
Pagpapanatili at Pagpapanatili
  1. 1. Kumpleto na ang pag-install ng submersible pump, muling suriin ang insulation resistance at three-phase conduction mula sa switch, suriin ang instrumento at simulan ang error sa koneksyon ng kagamitan, kung walang problema, maaaring simulan ang pagsubok, pagkatapos ng pagsisimula ng instrumento na nagpapahiwatig ng pagbabasa kung higit pa kaysa sa nameplate itinakda rate boltahe at kasalukuyang, obserbahan ang pump ingay at panginginig ng boses phenomenon, ang lahat ay normal ay maaaring ilagay sa operasyon.
  2. 2. Ang unang operasyon ng bomba para sa apat na oras, ay dapat na shut down mabilis na subukan ang thermal pagkakabukod pagtutol ng motor, ang halaga ay hindi dapat mas mababa sa 0.5 megaohm.
  3. 3.After ang pump shutdown, ay dapat na nagsimula pagkatapos ng isang pagitan ng limang minuto, upang maiwasan ang tubig haligi sa pipe ay hindi ganap na kati sanhi ng labis na motor kasalukuyang at burnout.
  4. 4.After ang bomba sa normal na operasyon, upang pahabain ang buhay ng serbisyo nito, upang suriin ang supply boltahe, nagtatrabaho kasalukuyang at pagkakabukod paglaban ay normal, kung natagpuan ang mga sumusunod na sitwasyon, dapat agad na isara ang pag-troubleshoot.
  5.  

 1 sa rate na kondisyon, ang kasalukuyang ay higit sa 20%.

 2 dynamic na antas ng tubig sa seksyon ng pumapasok ng tubig, na nagiging sanhi ng pasulput-sulpot na tubig.

 3 submersible pump matinding vibration o ingay.

 Ang 4 supply boltahe ay mas mababa sa 340 volts.

 Nasunog ng 5 fuse ang isang phase.

 6 pinsala sa tubo ng tubig.

 7 motor sa thermal pagkakabukod pagtutol ay mas mababa sa 0.5 megaohm.

 

  1. 5.Pag-disassembly ng unit:

 1 kalasin ang cable tether, tanggalin ang bahagi ng pipeline, tanggalin ang wire plate.

 2 i-screw down ang water bolt, ilagay ang tubig sa motor chamber.

 3 tanggalin ang filter, maluwag ang nakapirming tornilyo sa pagkabit upang ayusin ang baras ng motor.

 4 i-screw down ang bolt na kumukonekta sa water inlet section sa motor, at paghiwalayin ang pump mula sa motor (pansinin ang unit cushion kapag naghihiwalay, para maiwasan ang baluktot ng pump shaft)

 5 ang disassembly sequence ng pump ay: (tingnan ang figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, kapag inaalis ang impeller, gumamit ng mga espesyal na tool para paluwagin ang conical sleeve ng fixed impeller muna, at iwasan ang baluktot at pasa ang pump shaft sa proseso ng disassembly.

 6 ang proseso ng disassembly ng motor ay: (tingnan ang figure 1) ilagay ang motor sa platform, at alisin ang mga nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat at double head bolt mula sa ibaba ng ang motor naman, at pagkatapos ay kunin ang rotor (pansinin na huwag masira ang wire package) at sa wakas ay tanggalin ang connecting section at upper guide bearing seat.

 7 yunit ng pagpupulong: bago ang pagpupulong, ang kalawang at dumi ng mga bahagi ay dapat linisin, at ang ibabaw ng isinangkot at mga fastener ay pinahiran ng sealant, at pagkatapos ay tipunin sa kabaligtaran na pagkakasunud-sunod ng disassembly (ang motor shaft ay gumagalaw pataas at pababa pagkatapos ng pagpupulong para sa halos isa millimeter), pagkatapos ng pagpupulong, ang pagkabit ay dapat na nababaluktot, at pagkatapos ay ang filter screen test machine. Ang mga submersible pump ay dapat ilabas mula sa balon para sa pagtatanggal-tanggal at pagpapanatili ayon sa Artikulo 5 pagkatapos ng isang taon ng operasyon, o mas mababa sa isang taon ng operasyon ngunit dalawang taon ng diving time, at ang mga pagod na bahagi ay dapat palitan.

 

 
Imbakan at Kustodiya

Ang produktong ito ay isang submersible electric pump na may mahusay na pagganap. Ang kakaibang disenyo nito ay angkop para gamitin sa iba't ibang okasyon. Kung ito man ay upang maiwasan ang pagyeyelo ng motor sa taglamig o upang maiwasan ang kalawang kapag hindi ito ginagamit sa mahabang panahon, maaaring matugunan ng submersible electric pump na ito ang iyong mga pangangailangan para sa pagpapanatili ng kagamitan. Ito ay simple upang patakbuhin at maginhawa upang mapanatili. Sundin lamang ang mga hakbang sa manual para sa tamang pagpapanatili at pag-iimbak, na maaaring epektibong pahabain ang buhay ng serbisyo ng produkto. Kunin ang submersible electric pump na ito ngayon at gawing mas makinis at mas mahusay ang iyong trabaho!

 

 
Mga Sitwasyon ng Application

01 Deep well water intake

02 Mataas na suplay ng tubig

03 suplay ng tubig sa bundok 

04 tubig sa tore

05 Pang-agrikultura na patubig

06 patubig sa hardin

07 pag-inom ng tubig sa ilog

08 tubig sa bahay

 

Kung interesado ka sa aming mga produkto, maaari mong piliing iwanan ang iyong impormasyon dito, at makikipag-ugnayan kami sa iyo sa ilang sandali.


Isulat ang iyong mensahe dito at ipadala ito sa amin

Kung interesado ka sa aming mga produkto, maaari mong piliing iwanan ang iyong impormasyon dito, at makikipag-ugnayan kami sa iyo sa ilang sandali.


tlTagalog