125QJB Deep Well Submersible Pump

Isagawa ang pagproseso ng OEM! Ayon sa mga kinakailangan ng gumagamit, disenyo at paggawa ng iba't ibang uri ng mga espesyal na pangangailangan ng non-standard na submersible motor at pump. Ang mga pamantayan sa pagpapatupad ng produkto: GB/T2816-2014 "well submersible pump", GB/T2818-2014 "well submersible asynchronous motor". WhatsApp:17855846335
PDF DOWNLOAD
Mga Detalye
Mga tag
 
Pangkalahatang-ideya ng Produkto

Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.

 

 
Kondisyon sa Paggamit

1, power supply: tatlong-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%).

2, kalidad ng tubig:

(1) water temperature is not higher than 20 °C;

(2) solid impurities content (mass ratio) ay hindi hihigit sa 0.01%;

(3) PH value (pH) 6.5-8.5;

(4) ang nilalaman ng hydrogen sulfide ay hindi hihigit sa 1.5mg/L;

(5) ang nilalaman ng chloride ion ay hindi hihigit sa 400mg/L.

3, ang motor ay sarado o puno ng tubig na basa na istraktura, bago gamitin ang submersible motor cavity ay dapat na puno ng malinis na tubig, upang maiwasan ang maling puno, at pagkatapos ay higpitan ang iniksyon ng tubig, air release bolts, kung hindi man ay hindi pinapayagang gamitin

4, ang submersible pump ay dapat na lubusang lumubog sa tubig, ang diving depth ay hindi hihigit sa 70m, ang ilalim ng submersible pump mula sa ilalim ng balon ay hindi mas mababa sa 3m.

5, ang mahusay na daloy ng tubig ay dapat na matugunan ang submersible pump tubig output at tuluy-tuloy na operasyon, ang submersible pump tubig output ay dapat na kontrolado sa 0.7 - 1.2 beses ang rate ng daloy.

6, ang balon ay dapat na tuwid, ang submersible pump ay hindi maaaring gamitin o dumped, tanging vertical na paggamit.

7, ang submersible pump ay dapat na tumugma sa cable ayon sa mga kinakailangan, at ang panlabas na overload na proteksyon na aparato. 8, ang bomba ay mahigpit na ipinagbabawal nang walang tubig na walang-load na pagsubok na makina

 

 
Kahulugan ng Modelo

125QJB Deep Well Submersible Pump

 
Bahagyang Sanggunian ng Modelo
Modelo Daloy (m3/h)  Ulo
(m)
 Rotating speed(change/point)  Bomba ng tubig(%)  Outlet
diameter
(mm)
Applicable na rin
diameter(mm) 
Na-rate
kapangyarihan(KW)
Rated voltage(V) Ratedcurrent(A)  Motorefficiency (%)  power factorcosφ  Yunit
Radial Maximu size(mm)
Puna
125QJ5-34 5 34 2850 53 40  125sa itaas 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125sa itaas 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125sa itaas 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125sa itaas 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125sa itaas 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125sa itaas 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125sa itaas 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125sa itaas 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125sa itaas 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125sa itaas 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125sa itaas 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125sa itaas 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125sa itaas 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125sa itaas 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      
 
Mga Pag-iingat sa Kaligtasan

 The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.

 

 
Panimula sa Istruktura
The pump part is mainly composed of pump shaft,impeller,diversion shell,rubber bearing,check valve body(optional)and other components.The motor part is mainly composed of base,pressure regulating diaphragm,thrust bearing,thrust plate,lower guide bearing seat,stator,rotor,upper guide bearing seat,sand ring,water inlet section,lead cable and other components.

Ang mga pangunahing tampok ng produkto ay kinabibilangan ng:

1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

125QJB Deep Well Submersible Pump

 

 
I-install

(1) Paghahanda bago i-install:
1. Suriin kung ang submersible pump ay nakakatugon sa mga kondisyon ng paggamit at saklaw na tinukoy sa manual.
2. Gamit ang isang mabigat na obiect na may diameter na katumbas ng maximum na panlabas na diameter ng submersible pump, sukatin kung ang inneldiameter ng wellbore ay maaaring magkasya sa submersible pump, at sukatin kung ang lalim ng balon ay nakakatugon sa mga kinakailangan sa pag-install.

3. Suriin kung malinis ang wellbore at kung ang tubig ng balon ay maputik. Huwag gumamit ng submersible electric pump upang hugasan ang welor pump na putik at tubig ng buhangin upang maiwasan ang maagang pagkasira ng submersible electric pump.

4. Suriin kung ang posisyon ng welhead installation clamp ay angkop at kung ito ay makatiis sa kalidad ng buong unit

5. Suriin kung ang mga bahagi ng submersible pump ay kumpleto at maayos na naka-install ayon sa assembly diagram sa manualAlisin ang filter screen at paikutin ang coupling upang makita kung ito ay umiikot nang flexible

6. Alisin ang turnilyo ng tubig at punan ang lukab ng motor ng malinis, hindi kinakaing unti-unti na tubig (tandaan. siguraduhing salaan ito), pagkatapos ay higpitan ang waterscrew. Pagkatapos ng 12 oras na pag-iniksyon ng tubig, ang insulation resistance ng motor ay hindi dapat mas mababa sa 150M Q kapag sinusukat sa isang 500V shaking table.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.

After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Ang naka-attach na cable wiring process diagram ay ang mga sumusunod:

125QJB Deep Well Submersible Pump

8. Gumamit ng multimeter upang suriin kung ang mga three-phase na wire ay konektado at kung ang DC resistance ay tinatayang balanse.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2) Kagamitan at kasangkapan sa pag-install:
1. Isang pares ng lifting chain para sa higit sa dalawang tonelada.
2. Isang tripod na may patayong taas na hindi bababa sa apat na metro.
3. Dalawang nakabitin na lubid (wire ropes) na kayang magdala ng bigat na higit sa isang tonelada (maaaring pasanin ang bigat ng isang kumpletong hanay ng mga water pump).
4. Mag-install ng dalawang pares ng clamps (splints).
5. Wrenches, martilyo, distornilyador, mga kasangkapang elektrikal at instrumento, atbp.

 

(3)Pag-install ng electric pump:
1. Ang diagram ng pag-install ng submersible electric pump ay ipinapakita sa Figure 2. Ang mga partikular na sukat ng pag-install ay ipinapakita sa Talahanayan 3 "Listahan ng Mga Dimensyon ng Pag-install ng Submersible Electric Pump".


2. Ang mga submersible electric pump na may ulo na wala pang 30 metro ay maaaring iangat nang direkta sa balon gamit ang mga hose at wire rope o iba pang mga lubid ng abaka na kayang pasanin ang buong bigat ng buong makina, mga tubo ng tubig, at tubig sa mga tubo.

3. Ang mga pump na may ulo na higit sa 30 metro ay gumagamit ng mga bakal na tubo, at ang pagkakasunud-sunod ng pag-install ay ang mga sumusunod:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Bahagyang iangat ang submersible pump, tanggalin ang clamp sa itaas na dulo ng water pump, itali ang cable sa pipe ng tubig gamit ang plastic tape, at dahan-dahang itali ito hanggang sa mailagay ang clamp sa wellhead.
④Gamitin ang parehong paraan upang itali ang lahat ng tubo ng tubig sa balon.
⑤Pagkatapos maikonekta ang lead-out cable sa control switch, ito ay konektado sa three-phase power supply.

 

(4) Mga bagay na dapat tandaan sa panahon ng pag-install:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Sa panahon ng pag-install, ang isang rubber pad ay dapat ilagay sa flange ng bawat pipe at higpitan nang pantay-pantay.
3. Kapag ang bomba ng tubig ay ibinaba sa balon, dapat itong ilagay sa gitna ng tubo ng balon upang maiwasan ang pagtakbo ng bomba sa dingding ng balon nang mahabang panahon, na nagiging sanhi ng pag-vibrate ng bomba at pagwalis at pagkasunog ng motor. .
4. Tukuyin ang lalim ng water pump sa ilalim ng balon ayon sa dumadaloy na buhangin at silt na kondisyon ng balon. Huwag ibaon ang bomba sa putik. Ang distansya mula sa water pump hanggang sa ilalim ng balon ay karaniwang hindi bababa sa 3 metro (tingnan ang Larawan 2).
5. Ang lalim ng pagpasok ng tubig ng water pump ay dapat na hindi bababa sa 1-1.5 metro mula sa dynamic na lebel ng tubig hanggang sa water inlet node (tingnan ang Larawan 2). Kung hindi, ang water pump bearings ay maaaring madaling masira.
6. Ang pagtaas ng water pump ay hindi maaaring masyadong mababa. Kung hindi, kailangang mag-install ng gate valve sa wellhead water pipeline para makontrol ang pump flow sa rated flow point para maiwasang ma-overload at masunog ang motor dahil sa malalaking flow rate.
7. Kapag ang water pump ay tumatakbo, ang tubig na output ay dapat na tuluy-tuloy at kahit na, ang kasalukuyang ay dapat na stable (sa ilalim ng rated working conditions, sa pangkalahatan ay hindi hihigit sa 10% ng rated current), at dapat walang vibration o ingay. Kung mayroong anumang abnormalidad, dapat na ihinto ang makina upang malaman ang sanhi at maalis ito.
8. Kapag nag-i-install, bigyang-pansin ang setting ng grounding wire ng motor (tingnan ang Figure 2). Kapag ang tubo ng tubig ay isang bakal na tubo, akayin ito mula sa wellhead clamp; kapag ang tubo ng tubig ay isang plastik na tubo, akayin ito mula sa marka ng saligan ng electric pump.

 

 
Pagpapanatili at Pagpapanatili
  • 1.Pagkatapos na mai-install ang submersible pump, suriin muli ang insulation resistance at three-phase conduction mula sa switch, suriin kung mali ang instrumento at ang koneksyon ng start equipment, kung walang problema, maaaring simulan ang trial machine, at obserbahan kung ang mga pagbabasa ng indicator ng instrumento ay lumampas sa rate na boltahe at kasalukuyang tinukoy sa nameplate pagkatapos ng pagsisimula, at obserbahan kung ang bomba ay may ingay at panginginig ng boses phenomenon, at ilagay sa operasyon kung ang lahat ay normal.
  • 2.Pagkatapos ng unang operasyon ng pump sa loob ng apat na oras, dapat na isara ang motor upang mabilis na masubukan ang thermal insulation resistance, at ang halaga nito ay hindi dapat mas mababa sa 0.5 megaohm.
  • 3.Pagkatapos na isara ang bomba, dapat itong simulan pagkatapos ng limang minuto upang maiwasan ang muling pagdaloy ng haligi ng tubig sa tubo at magdulot ng labis na agos ng motor at pagkasunog.
  • 4.Pagkatapos mailagay ang bomba sa normal na operasyon, upang mapahaba ang buhay ng serbisyo nito, kinakailangang suriin kung ang boltahe ng supply, kasalukuyang gumagana at resistensya ng pagkakabukod ay normal nang regular. Kung ang mga sumusunod na kondisyon ay natagpuan, ang pump ay dapat na isara kaagad upang i-troubleshoot.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Ang pabagu-bagong lebel ng tubig ay bumababa sa bahaging pumapasok ng tubig, na nagiging sanhi ng pasulput-sulpot na tubig.
  • 3 Ang submersible pump ay may matinding vibration o ingay.
  • 4 Ang supply boltahe ay mas mababa sa 340 volts.
  • 5 Ang isang piyus ay nasunog.
  • 6 Nasira ang tubo ng suplay ng tubig.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Imbakan at Kustodiya

This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.

 

 
Nagsusuot ng mga Bahagi
    • Impeller
    • manggas ng baras
    • manggas ng goma shaft
    •  Singsing sa pagbubuklod

 
Mga Sitwasyon ng Application

01 Deep well water intake

02 Mataas na suplay ng tubig

03 suplay ng tubig sa bundok 

04 tubig sa tore

05 Pang-agrikultura na patubig

06 patubig sa hardin

07 pag-inom ng tubig sa ilog

08 tubig sa bahay

 

Kung interesado ka sa aming mga produkto, maaari mong piliing iwanan ang iyong impormasyon dito, at makikipag-ugnayan kami sa iyo sa ilang sandali.


Isulat ang iyong mensahe dito at ipadala ito sa amin

Kung interesado ka sa aming mga produkto, maaari mong piliing iwanan ang iyong impormasyon dito, at makikipag-ugnayan kami sa iyo sa ilang sandali.


tlTagalog